HomeMy WebLinkAboutWPO201600043 Review Comments WPO VSMP 2016-07-07COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902-4596 Phone (434) 296-5832 Fax (434) 972-4126 VSMP Permit plan review Project title: Mill Creek Industrial Park Lot 11 Project file number: WP0201600043 Plan preparer: Shimp Engineering Uustin@shimp-engineering.com] Owner or rep.: MILL CREEK INDUSTRIAL DEVELOPMENT LLC Plan received date: 14 June 2016 Date of comments: 7 July 2016 Reviewers: Max Greene County Code section 17-410 and Virginia Code §62.1-44.15:34 requires the VSMP authority to act on any VSMP permit by issuing a project approval or denial. This project is denied. The rationale is given in the comments below. The application may be resubmitted for approval if all of the items below are satisfactorily addressed. The VSMP application content requirements can be found in County Code section 17-401. A. Stormwater Pollution Prevention Plan (SWPPP) The SWPPP content requirements can be found in County Code section 17-405. A SWPPP must contain (1) a PPP, (2) an ESCP, (3) a SWMP, and (4) any TMDL measures necessary. 1. VRRM Spread sheet shows 0.28 acres of protected forest open space. Per DEQ, "All areas that will be considered forest/open space for stormwater purposes must have documentation that prescribes that the area will remain in a natural, vegetated state. Appropriate documentation includes: subdivision covenants and restrictions, deeded operation and maintenance agreements and plans, parcel of common ownership with maintenance plan, third -party protective easement, within public right-of-way or easement with maintenance plan, or other documentation approved by the local program authority" this office recommends a plat showing the area to be protected. (http://www.vwrrc.vt.edu/swc/documents/GM 16- 2001%20Virginia%20Runoff%20Reduction%20Method_V3.pdf) page 12 2. The nutrient credits will be purchased and approved by the County Attorney's Office prior to final plan approval. 3. A SWPPP document is required for this project. Please have the appropriate document signed by the owner. (#1 & #9 of the Albemarle County SWPPP Boiler plate.) hqp://www.albemarle.org/upload/images/forms_center/departments/Community Development/for ms/En ing eering and _WPO_Forms/Stormwater Pollution_ Prevention Plan SWPPP_template.pdf B. Pollution Prevention Plan (PPP) The PPP content requirements can be found in County Code section 17-404. 1. A PPP plan is required for this site and is a portion of the Albemarle County version of the SWPPP. hqp://www.albemarle.org/upload/images/forms_center/departments/Community Development/forms/ Engineering_and_WPO_Forms/Stormwater Pollution_ Prevention Plan_ SWPPPtemplate.pd Engineering Review Comments Page 2 of 3 C. Stormwater Management Plan (SWMP) VSMP Regulation 9VAC25-870-108 requires the VSMP authority to approve or disapprove a SWMP. This plan is disapproved, and the reasons are provided in the comments below. The stormwater management plan content requirements can be found in County Code section 17-403. 1. See comments above. D. Erosion and Sediment Control Plan (ESOP) Virginia Code §62.1-44.15:55 requires the VESCP authority to approve or disapprove an ESCP. This plan is disapproved, and the reasons are provided in the comments below. The erosion control plan content requirements can be found in County Code section 17-402. 1. Sediment trap should be moved from the foundation area of the building. Sediment trap will be required to remain in place until the VSMP Inspector has given approval for removal. This office recommends moving the sediment trap so the slope into the trap is a minimum 15' from the excavation so construction vehicles and scaffolding can access the site safely. 2. A right of way diversion may be required across the entrance to prevent sediment leaving site. Additional comments may be forthcoming due to requested changes. The VSMP permit application and all plans may be resubmitted for approval when all comments have been satisfactorily addressed. For re -submittals please provide 2 copies of the complete permit package with a completed application form. Engineering plan review staff are available from 2-4 PM on Thursdays, should you require a meeting to discuss this review. Process; After approval, plans will need to be bonded. The bonding process is begun by submitting a bond estimate request form and fee to the Department of Community Development. One of the plan reviewers will prepare estimates and check parcel and easement information based on the approved plans. The County's Management Analyst will prepare bond agreement forms, which will need to be completed by the owner and submitted along with cash, certificates or sureties for the amounts specified. The agreements will need to be approved and signed by the County Attorney and County Engineer. This may take 2-4 weeks to obtain all the correct signatures and forms. Stormwater Management Facilities Maintenance agreements will also need to be completed and recorded. The County's Management Analyst or other staff will prepare the forms and check for ownership and signature information. The completed forms will need to be submitted along with court recording fees. After bonding and agreements are complete, county staff will need to enter project information in a DEQ database for state application processing. DEQ will review the application information based on local VSMP authority approval. At this time, the DEQ portion of the application fees will need to be paid directly to the state. For fastest processing, this is done electronically with the emails provided on the application. DEQ should notify applicants with instructions on how to pay fees. When DEQ approves the application, they will issue a permit coverage letter. This should be copied to the county. After DEQ coverage is issued, via the coverage letter, the County can hold a pre -construction conference. Engineering Review Comments Page 3 of 3 Applicants will need to complete the request for a pre -construction conference form, and pay the remainder of the application fee. The form identifies the contractor and responsible land disturber, and the fee remaining to be paid. This will be checked by county staff, and upon approval, a pre -construction conference will be scheduled with the County inspector. At the pre -construction conference, should everything proceed satisfactorily, a joint VSMP and grading permit will be issued by the County so that work may begin. County forms can be found on the county website forms center under engineering; hiq2://www.albemarle.org/deptforyns.asl2?department=cdengWo o File: CDDE1_vsmp_review_Mill Creek Industrial Park Lot I I_wpo201600043.doc