HomeMy WebLinkAboutWPO201600039 Bond Estimates 2016-07-11 (3)Project Name: Gazebo Plaza WPO file number: WP0201600039 Erosion and Sediment Control Bond Estimate Item Item Number No. Unit Unit Cost Cost installed stablization (PS, TS) 27.7 acres $5,000.00 $138,500.00 silt fence (SF) 4400.0 ft $5.00 $22,000.00 safety fence (SAF) 1800.0 ft $5.00 $9,000.00 diversion (DID, FD, RWD) 6850 ft $13.00 $89,050.00 temporary slope drain (TSD) pipe length 0 ft pipe diameter 0 in $0.00 $0.00 earthwork for basin height of dam at toe 8 ft cut at high side 8 ft height of fill at face 6 ft cut at face 10 ft length of dam 300 ft length of cut 400 ft top width 10 ft width of cut 10 ft (area above transition) 132 sf (area below transition) 300 sf (total width of dam) 16 ft (total width of cut) 46 ft (height below transition) 2 ft (depth below transitior -2 ft (area below transition) 12 sf (area above transition -50 sf (total fill volume) 1600.0 cy (total fill volume) 3703.7 cy length of spillway 40 ft (TOAL CY estimate) 4237 cy $13.00 $55,081.00 width of spillway 40 ft (spillway stone tons) 92 tons $50.00 $4,600.00 structures for basin riser height 6 ft riser diameter 72 in (riser unit price) $0.00 $0.00 barrel length 55 ft base plate or fdn 1 $200.00 $200 barrel diameter 36 in (barrel unit price) $70.00 $3,850.00 barrel collars 0 $200.00 $0 baffle length 0 ft $50.00 $0 earthwork for trap #1 height of dam at toe 6 ft cut at high side 2 ft height of fill at face 3 ft cut at face 0 ft length of dam 120 ft length of cut 110 ft top width 2 ft width of cut 20 ft (area above transition) 24 sf (area below transition) 0 sf (total width of dam) 12 ft (total width of cut) 24 ft (height below transition) 3 ft (depth below transitior 2 ft (area below transition) 9 sf (area above transition 20 sf (total fill volume) 146.7 cy (total fill volume) 81.5 cy length of spillway 17.5 ft (TOAL CY estimate) 174 cy $13.00 $2,262.00 width of spillway 10 ft (spillway stone tons) 10.1 tons $50.00 $505.00 earthwork for trap #2 height of dam at toe 0 ft cut at high side 14 ft height of fill at face 0 ft cut at face 12 ft length of dam 100 ft length of cut 100 ft top width 2 ft width of cut 8 ft (area above transition) 0 sf (area below transition) 384 sf (total width of dam) 0 ft (total width of cut) 60 ft (height below transition) 0 ft (depth below transitior 2 ft 7/11/2016 Project Name: Gazebo Plaza WPO file number: WP0201600039 Erosion and Sediment Control Bond Estimate Item Item Number (area below transition) 0 sf (area above transition 56 sf (total fill volume) 0.0 cy (total fill volume) 1629.6 cy length of spillway 6.5 ft JOAL CY estimate) 1630 cy width of spillway 10 ft (spillway stone tons) 3.7 tons silt fence inlet protection (IP) stone inlet protection (IP) outlet protection (OP) length 0 ft width 0 ft channel (SCC, matted) length 1380 ft width 8 ft check dam depth in channel 2 ft channel width 8 ft construction entrance (CE) wash rack paved construction entrance rip -rap, placed depth 0 ft length 0.0 ft width 0.0 (tons) 0 tons survey and layout (price per 0.1 mi.) acres 1 traps and basins 3 mobilization stream crossing (computed independently) No. Unit Unit Cost Cost installed $13.00 $21,190.00 $50.00 $185.00 0 $100.00 $0.00 25 $200.00 $5,000.00 2 $0.00 $0.00 $14,352.00 4 $360.00 $1,440.00 0 $2,000.00 $0.00 1 $2,000.00 $2,000.00 1 $3,500.00 $3,500.00 $60.00 $0.00 $2,000.00 $500.00 $0.00 cost sum $375,215.00 contingency $37,521.50 Total $412,740 7/11/2016 Approximate Earthwork computations for sed Assumes all out and fill slopes are 2:1 for simplicty Height of Fill at Face I h1 Cut at High Side h2 transitic w h1 Width of Cut Cut at Fa Fill area above transition = h1(2h 1) + h 1(w) Fill area below transition; total width of fill (dam) = 2h1 + w + 2h2 height below transition = h2-h1, area = (width*height)/2 - height x height Length of Cut liment traps and basins Width rn point \ Height of Dam at Toe h2 ice Volume = Length of Fill x Fill Area Cut Areas and Volume is the same as fill but using the cut dimensions Fill for Dam (imately)