Loading...
HomeMy WebLinkAboutWPO201600039 Bond Estimates 2016-07-11Project Name: Gazebo Plaza WPO file number: WPO201600039 Stormwater Management Plan Bond Estimate Item Item Number permanent diversion or ditch standard manhole frame top (not inlet) drop inlet or grate manhole structure (per ft. rise) pipe, rcp, cmp (15 to 48") pipe, rcp, cmp (15 to 48") pipe, rcp, cmp (15 to 48") pipe, rcp, cmp (15 to 48") pipe, rcp, cmp (15 to 48") aggregate base or drainage stone Underground Storm Filter System 15.0 in d 0 ES-1,2 0 EC-3 18.0 in d 0 ES-1,1 0 EC-2 24.0 in d 0 ES-1,0 0 EC-1 30.0 in d 0 ES-1,1 0 EC-0 36.0 in d 0 ES-1,2 0 EC-1 12.0 in d 700.0 ftL 1.0 ftw trees shrubs seedlings underdrain (LF) biofilter soil mix (CY) trash rack/ anti vortex devices maintenance access road (LF) rip -rap, placed depth 0 ft width 0.0 survey and layout (price per 0.1 mi.) acres 1 mobilization as -built drawings (per facility) materials testing (per facility) compaction testing (per dam) manufactured facilities (attach manufacturer's or contractor's price as a base) length 0.0 ft (tons) 0 basins 1 No. Unit Unit Cost installed Oft 11 ea 26 ea 550 ft 153.0 ft 824.0 ft 1150.0 ft 1562.0 ft 1288.0 ft 49.0 ton 56 ea 68 ea 0 ea 700 ft 1750 cy Oft Oft $13.00 $500.00 $3,500.00 $450.00 $35.00 $40.00 $50.00 $65.00 $70.00 $35.00 $150.00 $50.00 $5.00 $5.00 $38.00 $1,500.00 $50.00 $60.00 3 ea $2,000.00 3 ea $2,000.00 3 ea $5,000.00 Cost $0.00 $5,500.00 $91,000.00 $247,500.00 $5,355.00 $32,960.00 $57,500.00 $101,530.00 $90,160.00 $1,715.00 $0.00 $487,000.00 $0.00 $8,400.00 $3,400.00 $0.00 $3,500.00 $66,500.00 $0.00 $0.00 $0.00 $1,000.00 $500.00 $6,000.00 $6,000.00 $15,000.00 $0.00 cost sum $1,230,520.00 contingency $123,052.00 Total $1,353,580 7/11 /2016