Loading...
HomeMy WebLinkAboutWPO200600087 Calculations Final Site Plan and Comps. 2007-03-08 UVA Research Park Town Centers III and IV ENGINEERING CALCULATIONS County of Albemarle, Virginia / .0/40,77 D. C.J;(s, ..„, A OP 9 ,..451111 Prepared for : University of Virginia Real Estate Foundation 465 Crestwood Drive Charlottesville , Virginia 22903 Prepared by: The Cox Company 220 East High Street Charlottesville, Virginia 22902 November 30, 2006 Revised March 8, 2007 r.r' TABLE OF CONTENTS DIVISION 1 — Stormwater Management ✓ DIVISION 2 — Storm Pipe Calculations — ,,i,S- D DIVISION 3 — Storm Inlet Calculations DIVISION 4 — Erosion Control: Sediment Basin Calculations The Cox Company UVA Research Park 06-50 Town Centers III and IV DIVISION 1 — Stormwater Management The Cox Company UVA Research Park 06-50 Town Centers III and IV Storm Water Management Summary The Town Centers Three and Four sites will primarily drain surface storm water off into two watersheds. Each sub area lies within a larger existing watershed. Both sites were included within the previously approved stormwater master plan for the UVA Research Park. Master planning for the Research Park assumes a full build-out to the region and the Town Center sub areas were designed to be captured and treated in two existing storm water management basins located downstream from the site and close to U.S. 29. The basins were constructed and designed to "bank" allowable impervious areas as they each phase of the Park developed. Excerpts from the approved storm water management study were copied and are included within this section of the calculations. No other treatment is proposed with this development. Specific details and calculations related to stormwater piping, inlet sizing and storm water conveyance were not addressed in the master plan. Calculations and summary tables for those sections are included within this booklet. Within the storm piping calculations, the sub areas are described as the western reach and the eastern reach. UVA RESEARCH PARK AT NORTH FORK Albemarle County, Virginia do FORK JL APPROX. AREA OF SITE ( 4)i1,4 ANALYZED IN THIS REPORT /VA/4 6 \Z\\J\\\'±;5�Q� / ,s4g 5- 649 606 VICINITY MAP Dewberry & Davis Architects Engineers 10525 Battleview Parkway Manassas, Va. 20109 Planners Surveyors (703) 369-4933 FAX(703) 631-2834 Sof 14.00 STORMWATER MANAGEMENT/BMP ANALYSIS AND FLOODPLAIN STUDY FOR THE UVA RESEARCH PARK AT NORTH FORK ALBEMARLE COUNTY, VIRGINIA PREPARED FOR: UNIVERSITY OF VIRGINIA REAL ESTATE FOUNDATION P.O. Box 9023 2333 Old Ivy Road Charlottesville, Virginia 22903 PREPARED BY: DEWBERRY & DAVIS Battlefield Business Park 10525 Battleview Parkway Manassas, Virginia 20175-3907 OCTOBER 1997 a -it -. .1 ,.,... ' t .+, -' Ir i ,,.� , 1,a tY r$ • Le r k - 'N'•••-- '-,,:•44:,k;2.,,..,-, ''''',4'..,,,,'''''''',. • z , ei w • f N f. rozoa ; --..\....N,- ' n I , 1/4' 1 , / : ��. 1 i r r . �1p1 / i P Y , ''`'..i--,4 r I + '�i - O 1\1 / �. } -` / - w 5�2 Sz a. �° %, - _,:..,—..1.:„... e ,� ka �' . / �` / r = � ' ' ......,< _ 1. �- � _ m / 54± 1 4163-V3'"'' ), r, g 2 s �u1 ' r : t i 1 / ''' 7--1. ' , , II § l cgi - r .' .e r/ j m i--:-..----,t. A'-':;,0,6-, v yo / c L _� (4' Mobs.. l _ . S t, � • I/ 4 F age 1 �. ' / �� ` V oU ,. Q —' 0 1 /; s NSE,, 4D, ccW Z ro a� N: o Z fr ti gym`-� —, o. E,t —'� e U C g ,'. - X01 / ! �. / \ z p 8 d '� . ' \ W u ,5N r F pa w ,, L- -- o ;, �_ -_,_ �.�.�. -- ,..--` -- �., SII �� 0 t 4 n ,� ` I 1 ,\ g_ 1 i '1 O4,.___ _ _ 4,.___ �_ _ „w_.,- A'N, \, -\ \: 1 _ 1 \f a 1, /Y� 1 �i I ,: vrod -...../ ii 1 Y\ G I L— __ ' QP.j-- ��•,,:,', to \ 01\ ' i 1 / .rte ,' 1 w ro� ____....y s ��� ro1 Iva6 F \\ . 4 4. A — J ___, -- ro) -$3''',2,“ 1 ��... .55 Vo) / �� ,... i �� —"� W -- 1 4G / J ��\--- r , - 3i cu ._ o 0 1.1O p w o Lu 1 ' � �V Z 3Lu I a r p<cn SS i--- 8 i y &e 11o ' �\ moa 0 Li- a a MoD rre.v ;ai N,�SLi- -----7 , F- Ao.....4, a 0 a OS.,,F m L • ♦ a m o • .x Ili co rAig .. - gym ��i �n.d� 4`f' �� � � ��'•.,'� 1�,' 0_ � ,,,,,,,,,„,„„_ 44114;iit,....t:.„: „... ,, LT' CC I f o ® re er a VIII �I • 1 - `���'"Q I / ill li,Iii 1 A ON 0 /' / ��„ .,r, i/� I / , �; bbly � i�il "' � /4-----,, ' / \ � 6 i t, r —/ I cif �\$ Nd Wir ii 1/„/ , // r [if/ \ ' O ' ,, iffili4N /i 4' , / / .\ / / i' ' /p\\ E 1 \ it1' ' ill/ ®I9bY l i !di* 111 �11/1011k gr / � 1 � 1 / ffr071110\111 I a,-. / F \ \,,I,,,g‘k,s,, e, ._..,-. ,\ lAti \\ h ' / / /t1 vA ., tea°�v ,t v,v • • AN .� ,v v�v - my 4�`ys � l \ a� / i;; \\\11, i \ „� ye4 t \ I.' t pr�,V � / t1,,\\, • *„.\ \ � �, :-- ,/. ''-‘,s 'save- i, \`'-'• N A � ,1 L ,,I! o '/ ii \\\:...,. .,1 1rk l 11 � IL � Cu a� ' w , ,„i , !i [i"*..' - ' - .', , \‘',.— \ a m�, hr ,, , `r; r 7 a �6 � . C �l ®/ / \ _ '—/, / / .s 1\ .�. J. "- ' .:;....-; "1/ ,/:/// , ,, ' -,,- , �� : \‘‘ � i/ - � tali- � ' isoir�. \ r \ /ivll , E Y4' 4 \ \vc� ` 9 ,, , w s;„, P t. �,J I ' ' e \ ;III �k A, �/ ' � ” Ili I/ ; :� zz I $? `Tit'^ ` t2' 6 t', I i , I 1 f �1 r \ /,---- -i'. 411"joilf riftiamdeoliv -7.0.11,4t .,- ,,, ',..., / - /' ✓ ' / Vi5.#,41-.',.,-41‘ . _ _ ,..__.... _ 4411 roe,‘ ,. y e - ,t,ilto, -,„,,, -// , 0 // / ill [.1 l'....„,. - \ � \, 1 ,��` l�� �'� // ok0 7#gr� k \ ' z_ - ,,, , \-• \.' \ w' '''7 #,fir , ..„_,, A ir' , ' N1I ; • 71 / ' \ ' ', b' \ . 9 -, ,f7 /0 oo,, \ �.. / ��Mtq I a V /.---- ,,- asa ' 1,4" —4,:///4 1 -.'..-7---,,,,,-,._ \ .4 -_----- --.--- - . F I.' ` ' I P• P . I m.Qy .:y POND 1 .i i ' ,, zil " 1 ` a,„,2.- ''. ' i _______ v !r \ \ +.'' a A....„. /.._____________j ././ lit(' i' / cd o \ 1 i/ ��. // 0 CC ' !.' / ''.. / / .-":117 W •�� :[ 1-• w VG -;-,3. jr. z a Z c; 5`�- // of om 8 a m n J' 41-3' oa ~ 0 j2 a w L.,.. /i 9 / 5 x / 2O ][ N o .1 m 1��.' c. W 2 v /2 el kg/ '4 / >1- - 0 �' �LA'U0 w d_s LLI ,\_ dzz CE QOM /I • 0 z (f) ,:. OA J a � W a W = zz 3 Y o O ,-, / O // / OZ `O Q N O N 4 i B1\IP CALCULATIONS FOR UVA RESEARCH PARK AT NORTH FORK *ow N40 Introduction I31\1P facilities are desiiuned to remove pollutants from storm\vater runoff before the runoff is conveyed to a receiving waterway. There are various types of B1\1P facilities that can be used to treat surface runoff. and the ability of each type of facility to remove pollutants varies. BMP facilities for the UVA Research Park at North Fork will consist of two ponds. the larger pond (pond 1 ) being a wet pond for greater pollutant removal efficiency, and the smaller pond being an extended detention dry pond. The attached Table 2 (Exhibit I ) from the Chesapeake Bay Local Assistance Department's (CBLAD's) "Local Assistance Manual" shows the removal efficiencies for several types of BMP facilities, including extended detention dry ponds and wet ponds. which have removal efficiencies of 20-50%. The ensuing calculations show the amount of relative pollutant load reduction that is achieved by the two ponds. Pond 2 will provide BMP storage for subbasin B2. while Pond 1 will provide BMP storage for subbasins Cl. C2, Dl. D2. El. E2. Fl. and F2 plus the offsite area within its drainage basin. Calculation of Pollutant Load Reduction Requirement ,S'te'p 1: Determine the percentage of the site that u/Il he impervious following development Proposed Land Use Cover - Phase 1, UVA Research Park at North Fork Subbasin Impervious Area (Ac.) Open Space (Ac.) Total Area (Ac.) Al 18.93 34.97 53.90 A2 0.65 9.51 10.16 B1 13.69 3124 44.93 B2 28.39 20.17 48.56 Cl 11.16 11.12 22.28 C2 40.19 30.75 70.94 D1 6.66 5.67 12.33 D2 7.72 13.76 21.48 E1 7.43 9.56 16.99 E2 4.00 4.95 8.95 Fl 5.12 2.11 7.23 F2 3.14 1.29 4.43 *Other 4.50 9.19 13.69 Total 151.58 184.29 335.87 `,fir 1 :ncontrolled area at southern end of site near .1irport Road uimpervious = 151.58'335.87( 100) = 45.1P0 Step Determine the relative pollutant local;Le'ne'r'utecl hi t/rc: .trite hers'e'c/utt urcrc1.2e land COVer COnclit1on S. For new development. the pre-development pollutant load can be calculated by first determining the weighted pollutant load for the watershed in lbs/acre/year. The weighted pollutant load is calculated by determining all of the existing land uses for the watershed. and the acreage covered by each of these uses. For each type of land use. a pollutant loading in lbs/acre/year can be determined from the CBLAD's "Local Assistance Manual," Appendix C. Table 1. page C-10. The total acreage for each type of land use is multiplied by the pollutant loading, and the results are summed and divided by the total acreage to arrive at the weighted pollutant load. The weighted pollutant load is then compared to the values in Table 1 to find the "equivalent impervious cover." These procedures are outlined in Appendix C of the "Local Assistance Manual." Weighted Pollutant Load for Flat Branch Watershed Upstream of U.S. Route 29 Land Use Acres *Loading (lbs/ac/yr) Total Load (lbs/yr) Woods 411.66 0.12 49.40 Business/Industrial 127.01 8.37 1063.07 Residential (1/8 ac) 1.82 3.38 6.15 Residential (1A ac) 6.92 2.13 14.74 Residential (1 ac) 1.79 0.41 0.73 Residential (2 ac) 1.94 0.31 0.60 Total 551.14 1134.69 Weighted Load = 1134.69/551.14 = 2.06 lbs/ac/yr From Table 1. Equivalent Impervious Cover = 20%; Assume l\a terst, d = 19 The pre-development pollutant load is then calculated using the Simple Method formula: Lpre = P x P, x [0.05 + 0.009(I„atershed)] XC x A x 2.72/12 where: Lyre = relative pre-development phosphorus load (lbs/yr) *NW •Nvoil P = average annual rainfall depth (42 inches for Albermarle County) P. __ unitless correction tactor for storm with no runoff= 0.9 equivalent impervious cover for watershed (°ol C = flow-weighted mean pollutant concentration (mal) = (1.26 when I„a,„hed 20 = 1.06 when I"Aater,hed 20 A = applicable area of site (ac.) L .r. = 42 x 0.9 x [0.05 — 0.009( 10)] x 0.26 x 335.87 x 2.72/12 Lrr = 165.4 lb/yr Step 3. Determine the relative post-development pollutant loud The Simple Method is also used for this calculation. Lrosr = PxPix [0.05 + 0.009(I epost)] xCxAx2.72/12 where: Lrs, = relative post-development phosphorus load (lbs/yr) 1s,te(post) = equivalent post-development impervious cover for watershed (%) Lrost = 42x0.9x [0.05 + 0.009(45.1)] x0.26x335.87x2.72/12 Cron = 341.1 lb/yr Step 4: Determine the relative Removal Requirement (RR)for the site. RR = Leos, - lire RR = 341.1 - 165.4 = 175.7 lb/yr Step 5' Determine the overall B.1IP removal efficiency required t%RR) fbr the site. %RR = RR/Lrost x 100 %RR = 175.7/341.1 x 100 °oRR = 51.5 Calculation of Relative Pollutant Reduction for Pond 1 Pond 1 will be a wet pond (retention pond) sized to accommodate a volume 4 times greater than the runoff volume generated by the mean storm. Wet ponds are very effective at removing soluble pollutants. including soluble phosphorus and nitrogen. as well as sediment and other nutrients from the surface runoff. Sources. including the aforementioned Table 2 (exhibit 1 ) from CBLAD's "Local Assistance Manual. credit wet retention ponds (design 4.9 x \.',) with a pollutant removal efficiency of Step I. t alcidate percent (?I 1111percuu/s cover fol' Pond J LIIL'1'.ched. *Land Use Cover - Area Draining to Pond I Existing Conditions for Offsite Areas/Post-developed Conditions for Onsite Areas Subbasin Impervious Area (Ac.) Open Space (Ac.) Total Area (Ac.) Cl 12.13 15.25 27.38 C2 43.02 42.82 85.84 Dl 6.66 5.67 12.33 D2 19.60 64.43 84.03 E 1 9.48 18.32 27.80 E2 5.58 11.70 17.28 Fl 16.37 50.07 66.44 F2 8.31 23.33 31.64 01 9.29 39.61 48.90 G2 9.32 39.73 49.05 Total 139.76 310.93 450.69 * Includes offsite areas: all offsite areas assumed to have an average impervious cover of 190/0 (pre-developed conditions) %Impervious = 139.76/450.69 x 100 = 31.0 Step Calculate relative pollutant load conveyed to Pond 1. The Simple Method is also used to calculate the pollutant load conveyed to Pond 1. This calculation is for post-developed conditions onsite: however. existing conditions ( 19% average impervious cover) has been assumed for offsite areas. P x P x [0.05 + 0.009(Isttopost))] x C 1 ,A x 2.72112 L = 42 N 0.9 s [0.05 + 0.009(31.01] x 0.26 x 450.70 x 2.72/12 ,,fir = 330.3 11- \,. Stcp ; ( '/r/culatc the rciativc pnst dol cloprnrrrt > u1lutarzt lucid 1C(.111c1i()11tor/,011d I. As noted previously. wet ponds I desi`in 7) have a pollutant removal efficiency of 50% (see Exhibit I ). Therefore, the pollutant load removed from the surface runoff by Pond I is calculated as follows: Lem = Lp,„,(°(iefflclency/l 00) where: Lr,,,, = relative post-development phosphorus load removed (lbsiyr) Lfen = 330.3(50/100) = 165.2 lbs/yr Calculation of Relative Pollutant Reduction for Pond 2 Pond 2 will be an extended detention dry pond. Extended detention dry ponds with detention times of 24 hours or more remove about 90% of particulate pollutants through the settling process. However, this type of pond is not as effective at removing soluble pollutants when it does not have a shallow marsh bottom. Available sources credit extended detention ponds that do not have a shallow marsh bottom with a pollutant removal efficiency between 30-40%, provided that runoff is detained for 24 hours. The ensuing calculations assume a removal efficiency of 30% which is consistent with the efficiency ratings in Table 2. Step 1: Calculate percent of.impervious cover for Pond 2 watershed. *Land Use Cover - Area Draining to Pond 2 Existing Conditions for Offsite Areas/Post-developed Conditions for Onsite Areas Subbasin Impervious Area (Ac.) Open Space (Ac.) Total Area (Ac.) B2 28.39 20.17 48.56 Total 28.39 20.17 48.56 * There are no offsite areas draining to Pond 2 °/olmpervious = (28.39/48.56) x 100 = 58.5% Step 2: Calculate the relative pollutant load conveyed to pond 2. LT,„„ = P x P1 x [0.05 + 0.009) itc,p„,,l)1 x C x A x ,2.72/12 • = 42 x (I.�) S 10.05 — I).009(58.5)1 x 48.56 \ ".72/12 11-vvr .Step 3 Calculate the relative post-cievelopmcut pollutant load reduction for porlcl 2. Lr_m = L;nst(n,betficiencv/1 00) Lren. 62.4(30/100) = 18.7 lbs/yr Total Relative Phosphorus Load Removed by Ponds 1 and 2 165.2 (pond 1) + 18.7 (pond 2) = 183.9 lbs/yr 183.9 lbs/yr removed > 175.7 lbs/yr required The proposed BMP measures (ponds 1 and 2) will reduce the relative post-development phosphorus load from the site to less than the relative pre-developed load; therefore, the proposed measures are adequate for the UVA Research Park at North Fork site. BMP STORAGE REQUIREMENTS FOR POND 1 AND POND 2 The preceding calculations demonstrate that the proposed BMP measures for the UVA Research Park at North Fork site are adequate for reducing post-development pollutants from surface water runoff. The proposed BMP measures include two ponds. The following calculations will determine the amount of BMP storage required for ponds 1 and 2. Pond 1 will be sized to have a permanent pool volume of 4 times greater than the runoff volume generated by the mean storm for the watershed. As noted earlier in this calculation set, a significant amount of offsite area will drain to pond 1. As with earlier calculations. this offsite area is assumed to have an average impervious cover of 1 9% based on existing watershed conditions. Pond 2 will be sized to accommodate the "first flush" runoff volume of 0.5 inch per impervious acre as required by Albermarle County. Required BMP Storage for Pond 1 Step 1: Calculate the rainfall/runoff coefficient (R,.)_for the pond l watershed. R„ = rainfall/runoff coefficient = 0.05 + 0.009(I) where: 1 = percent of site imperviousness fir✓ 44100 • R. = 0.05 --- 0.009(31 0.=29 Step 2 Determine the mean runotf volume to pond 1. , = [(R,,, x R,)/12]A where: V, = mean runoff volume (acre-ft) Rm = depth of mean storm (inches) = rainfall/runoff coefficient = 0.05 = 0.009(1) I = percent of site imperviousness A = area of contributing watershed (acres) V1 = [(0.5 x 0.329)/12]450.69 V, = 6.18 acre-ft Vr = 6.18 acre-ft(43,560 ft'/acre) = 269.123 ft' V,= 242.194 ft3/(3 5.31 ft3/m) = 7,621 in' Step 3: Determine the BIIIP (normal pool) volume to pond I. Vb„p = 4.0xV, where: V,rnp = BMP (normal pool) volume (m') Vmp = 4.0 x 7,621 m3 = 30,487 m3 Required BMP Storage for Pond 2 Step I: Determine the amount of proposed impervious area that drains to pond 2. Impervious Area= (58.5/100) x 48.56 acres Impervious Area = 28.41 acres Step Determine the storage volume required for pond 2. Required storage Volume = 28.41 ac(43,560 ft''ac n0.5 in H1 ft/12 in) Nisi" squire Required Storage Volume = 51.560 tt= Required Storage Volume = 51.53id IV( I m-.35.31 5 It 1 = 1 .430.111 mr X'X HI :T 1 slue • GUIDANCE CALCULATON PROCEDURE '"" STRUCTURAL BMPs FOR CHESAPEAKE BAY PRESERVATION AREAS TABLE 2 Average Total P Removal Acceptable BMP Efficiency A. Extended Detention (1) Design 2 (6-12): 20% (2) Design 3 (24 hours): 30% (3) Design 4 (shallow marsh): 50% B. Wet Pond (1) Design 5 (0.5 in/imp.ac): 35% (2) Design 6 (2.5 V): 40-45% (3) Design 7 (4.0 V): 50% C. Infiltration (1) Design 8 (0.5 in/imp. ac): 50% (2) Design 9 (1.0 in/imp. ac): 65% (3) Design 10 (2-year storm): 70% D. Grassed Swale (1) Design 15 (check dams): 10-20% These designs are taken from Metropolitan Washington Council of Governments, Controlling Urban Runoff: A Practical Manual for Planning and Designing Urban BMPS, ,1987 Effeciency ratings are taken from John P. Hartigan, P.E., Three Step Process for Evaluating Compliance with BMP Requirements for Chesapeake Bay Preservation Areas, 1990 C-11 Now • UVA Research Park at North Fork Impervious Surface Totals PRA Total Impervious Acreage: 4.2 Acres Micro-aire Total Impervious Acreage: 2.4 Acres Motion Control Total Impervious Acreage: 1.5 Acres Area in Right-of Way Total Impervious Acreage: 3.0 Acres Biotage Total Impervious Acreage: 1.9 Acres Discovery Drive Total Impervious: Area = 39802.4 sq.ft. or 0.91 Acres ETC #1 Total Impervious: Area = 74693.4 sq.ft. or 1.71 Acres ETC #2 Total Impervious: Area = 71306.2 sq.ft. or 1.64 Acres NOW k " • •4 '4'jr4tVafl?1i'1] 4.41114W Town Center #1 Total Impervious: Area = 186480.3 sq.ft. or 4.28 Acres Town Center #2 Total Impervious: Area = 151239.1 sq.ft. or 3.47 Acres Grand Total: 25.0 Acres Arc:::,; 45C Ac:e!.: inToLinomert Capz3,ciiy; , 60C; DIVISION 2 — Storm Pipe Calculations The Cox Company UT/A Research Park 06-50 Town Centers III and IV .o✓ Nue Y CO _ CC O A- N N A ` Q c0 N CO 't Ln CO N. CO O) .- r- c- c- C a) 2 Na.) C) W CU a) Na.) 0 C) ca d w a a a a a a a a a a a a a ix N a a a a a a a a a �, co a) LL () O Q 0 > W � ~ Ct O Z • I- To c3 - 2 x o ,C) N Z Ua (7) N- Ln t- 0) co O O O •,- co 5- co Cl) - ,- co O O O CO C' N O CO CO p W O) CO M O O) CO CO N- CO O) M >, C C L I- Q } U CO O M 2 ' ti `, I� CO CO O CO (6 0 W 0_ _H W M CA M t` N CO o0 -C E Li] V U U NO - O oi M CO N r r r O N Q z �^ M .00 �- N N N N CO CO CO In 10 10 H S 0 - IL 03 U W - N CO N- U) O O M O CO .f- .- CO C Q' W 1_ r- CO O CO In to 4 to It) O) N N C) 0 I— LL M N N N H .- N- r V- c-- 4 N M R cr ( J l~i.. - O 0 3 Q' I O O C) (N ' d' O c- co ct CO N- O) E h In N O O ct to CO Ln Ln O CO In CO 0 0 F' 4 N M 4 4 CO h Ln CO N O O Ln (.) W LL_ CO O N N CO CO CO CO CO .- N- CA N C J H N N c- O) rz O O O O O O O O O O O O O _> 0) W 0 O O to 7 O O Ln Ln Ln I- O O O 0 ` z z 7- O c-- CO .- N CO CA tf) CA 4 M Ln 6 0 H. O O W - Ln N- N- I,- N- N- N- CO CO N- I,- CA O) Q O Z > W Q O O O O O O O O O O O O O CO O Ln In O Ln Ln In CA O O O J 0_ z 8,2 r- CO I� ,- M N- O CO O d O I` O V. E .4.W ? W S- in N- N- N- N- N- CO CO O CA N- O O p C ca (= Sr St Sr St Sr V V Sr Sr Sr d- Ln (n N E Li_ Ln N CO N- CO N c- N- to O CO CO r a) Z LL O W m CO O O N CO C) O) CO C0) N CA O Ln Cr) J Q O U Ln Ln N CA c- CO N c-- CO CO CO M .- ZN c- r .- .- p 0 z J c N- ti ti N- ti N- I,- N- ti N- N- N- 1,- .-1 I- -z lc S CO CO CO CO CO CO CO CO CO CO CO CO CO N >- d x LL_ Z m di I- E C) I- Z 0 W W u) Ln Ln Ln Ln Ln Ln Ln Ln Ln Ln Ln Ln Ln C O Z I • LnQN CO n d CO CO T- T- Ln O) Ln W - N Ln 00 rN d- Cr) CO CO CO 4' tia N- COV _ ONdQ < 0) CO HV' N O CO -at sr NOVM O O M N N N ,- c- .- O OZ Q Q D •0 0 co co to CO N Ln Ln CO CO N In •t Ln F ( Z CO N- In CO N- CO to Ln CA O CO t I� W U W v d O c- N N M r CO in Ln N �t CO N u) Z O O O O O O O O O O O O LU er 0Ln .- LO N CO In Ln CO .- CO in c-- Ln Z LL tL W N ti CO CO co CO CO CO CO co ti ti CO ce O 0 - co O O O O O O O O O O O O 2 D CO N- V O H O CO CO O CO d- InQ Wrt CO N N N CO .1- H I,- N- CO COa ¢ O o O o 0 0 o O o 0 0 0 002 � � UV H 0 < 0 < H Oz a V N CO 'zt Ln I,- CO O) O- Ln r r W 0 0 0 0 0 0 0 0 0 0 0 0 O CD 0) o g N (N 0 _z CO cL N >+ 0 0 = N CO CO N 0 7 CC 0_ Ln I` CO O) O- c- r O r r J 0 0 0 0 0 0 0 0 0 0 0 0 0 NNW ``r.✓ User Name: Eric Woolley Date: 03-08-07 Project: UVAF: TC 3 Site Time: 17:33:34 Network: 01 — Eastern Reach Page: 1 of 26 Storm Sewers Detail Report PIPE DESCRIPTION: Pipe 1 - ---RAINFALL INFORMATION- - - - Return Period = 10 Year Rainfall File = Albemarle 05 - - - -PIPE INFORMATION- - - - Current Pipe = Pipe 1 Downstream Pipe = Outfall Pipe Material = RCP Pipe Length = 134.59 ft Plan Length = 136.59 ft Pipe Type = Circular Pipe Dimensions = 36.00 in Pipe Manning 's "n" = 0.013 Pipe Capacity at Invert Slope = 70.38 cfs Invert Elevation Downstream = 450.00 ft Invert Elevation Upstream = 451 .50 ft Invert Slope = 1 . 11% Invert Slope (Plan Length) = 1 .10% Rim Elevation Downstream = 453.00 ft Rim Elevation Upstream = 477.00 ft Natural Ground Slope = 17.83% Crown Elevation Downstream = 453.00 ft Crown Elevation Upstream = 454.50 ft -- - -FLOW INFORMATION- - -- Catchment Area = 0.44 ac Runoff Coefficient = 0.750 Inlet Time = 5.00 min Inlet Intensity = 6.70 in/hr Inlet Rational Flow = 2.25 cfs Inlet Input Flow = 0.00 cfs Inlet Hydrograph Flow = 0.00 cfs Total Area = 5.57 ac Weighted Coefficient = 0.758 Total Time of Concentration = 7.06 min Total Intensity = 6.07 in/hr Total Rational Flow = 25.85 cfs Total Flow = 25.85 cfs Uniform Capacity = 70.38 cfs Skipped flow = 0.00 cfs Infiltration = 0.00 gpd Nome -,11010 - - - -HYDRAULIC INFORMATION- - - - HGL Elevation Downstream = 451 .26 ft HGL Elevation Upstream = 452.76 ft HGL Slope = 1 . 11 EGL Elevation Downstream = 452.57 ft EGL Elevation Upstream = 454.07 ft EGL Slope = 1 . 11 % Critical Depth = 19.70 in Depth Downstream = 15. 10 in Depth Upstream = 15. 10 in Velocity Downstream = 9. 19 ft/s Velocity Upstream = 9. 19 ft/s Uniform Velocity Downstream = 0.00 ft/s Uniform Velocity Upstream = 9.20 ft/s Area Downstream = 2.81 ft"2 Area Upstream = 2.81 ft"2 Kj (JLC) = 0.50 Calculated Junction Loss = 19.443 ft - - - -INLET INFORMATION- - - - Downstream Inlet = EW 1 N.✓ PIPE DESCRIPTION: Pipe 2 - - --RAINFALL INFORMATION- - - - Return Period = 10 Year Rainfall File = Albemarle 05 - - --PIPE INFORMATION- - - - Current Pipe = Pipe 2 Downstream Pipe = Pipe 1 Pipe Material = RCP Pipe Length = 202.20 ft Plan Length = 206. 13 ft Pipe Type = Circular Pipe Dimensions = 18.00 in Pipe Manning ' s "n" = 0.013 Pipe Capacity at Invert Slope = 17.00 cfs Invert Elevation Downstream = 471 .00 ft Invert Elevation Upstream = 476.30 ft Invert Slope = 2.62% Invert Slope (Plan Length) = 2.57% Rim Elevation Downstream = 477.00 ft Rim Elevation Upstream = 483.30 ft Natural Ground Slope = 3. 12% Crown Elevation Downstream = 472.50 ft Crown Elevation Upstream = 477.80 ft - - --FLOW INFORMATION- - - - Catchment Area = 0.63 ac Runoff Coefficient = 0.710 Inlet Time = 5.00 min Inlet Intensity = 6.70 in/hr Inlet Rational Flow = 3.00 cfs Inlet Input Flow = 0.00 cfs Inlet Hydrograph Flow = 0.00 cfs Total Area = 1 .09 ac Weighted Coefficient = 0.684 Total Time of Concentration = 5. 17 min Total Intensity = 6.64 in/hr Total Rational Flow = 5.02 cfs Total Flow = 5.02 cfs Uniform Capacity = 17.00 cfs Skipped flow = 0.00 cfs Infiltration = 0.00 gpd .410 - - - -HYDRAULIC INFORMATION- - - - HGL Elevation Downstream = 471 .56 ft HGL Elevation Upstream = 476.86 ft HGL Slope = 2.62 % EGL Elevation Downstream = 472.65 ft EGL Elevation Upstream = 477.95 ft EGL Slope = 2.62 % Critical Depth = 10.34 in Depth Downstream = 6.70 in Depth Upstream = 6.70 in Velocity Downstream = 8.37 ft/s Velocity Upstream = 8.37 ft/s Uniform Velocity Downstream = 11 .78 ft/s Uniform Velocity Upstream = 8.37 ft/s Area Downstream = 0.60 ft"2 Area Upstream = 0.60 ft"2 Kj (JLC) = 0.50 Calculated Junction Loss = 0.801 ft - -- -INLET INFORMATION- - - - Downstream Inlet = DI 2 PIPE DESCRIPTION: Pipe 3 - - - -RAINFALL INFORMATION- - - - Return Period = 10 Year Rainfall File = Albemarle 05 - - --PIPE INFORMATION- - - - Current Pipe = Pipe 3 Downstream Pipe = Pipe 2 Pipe Material = RCP Pipe Length = 23.99 ft Plan Length = 27.99 ft Pipe Type = Circular Pipe Dimensions = 15.00 in Pipe Manning 's "n" = 0.013 Pipe Capacity at Invert Slope = 9.32 cfs Invert Elevation Downstream = 476.50 ft Invert Elevation Upstream = 477.00 ft Invert Slope = 2.08% Invert Slope (Plan Length) = 1 .79% Rim Elevation Downstream = 483.30 ft Rim Elevation Upstream = 483.80 ft Natural Ground Slope = 2.08% Crown Elevation Downstream = 477.75 ft Crown Elevation Upstream = 478.25 ft - - --FLOW INFORMATION- - - - Catchment Area = 0.47 ac Runoff Coefficient = 0.650 Inlet Time = 5.00 min Inlet Intensity = 6.70 in/hr Inlet Rational Flow = 2.06 cfs Inlet Input Flow = 0.00 cfs Inlet Hydrograph Flow = 0.00 cfs Total Area = 0.47 ac Weighted Coefficient = 0.650 Total Time of Concentration = 5.00 min Total Intensity = 6.70 in/hr Total Rational Flow = 2.06 cfs Total Flow = 2.06 cfs Uniform Capacity = 9.32 cfs Skipped flow = 0.00 cfs Infiltration = 0.00 gpd `41010 - - - -HYDRAULIC INFORMATION- - - - HGL Elevation Downstream = 477.66 ft HGL Elevation Upstream = 477.69 ft HGL Slope = 0. 12 % EGL Elevation Downstream = 477.71 ft EGL Elevation Upstream = 477.90 ft EGL Slope = 0.79 % Critical Depth = 6.86 in Depth Downstream = 13.91 in Depth Upstream = 7.01 in Velocity Downstream = 1 .73 ft/s Velocity Upstream = 3.65 ft/s Uniform Velocity Downstream = 6. 10 ft/s Uniform Velocity Upstream = 0.00 ft/s Area Downstream = 1 . 19 ft"2 Area Upstream = 0.56 ft"2 Kj (JLC) = 0.50 Calculated Junction Loss = NA - - - -INLET INFORMATION- - - - Downstream Inlet = DI 3 NEW PIPE DESCRIPTION: Pipe 4 - - - -RAINFALL INFORMATION- - - - Return Period = 10 Year Rainfall File = Albemarle 05 - - - -PIPE INFORMATION- - - - Current Pipe = Pipe 4 Downstream Pipe = Pipe 1 Pipe Material = RCP Pipe Length = 24.02 ft Plan Length = 28.01 ft Pipe Type = Circular Pipe Dimensions = 27.00 in Pipe Manning ' s "n" = 0.013 Pipe Capacity at Invert Slope = 39.95 cfs Invert Elevation Downstream = 471 . 10 ft Invert Elevation Upstream = 471 .50 ft Invert Slope = 1 .67% Invert Slope (Plan Length) = 1 .43% Rim Elevation Downstream = 477.00 ft Rim Elevation Upstream = 477.00 ft Natural Ground Slope = 0.00% Crown Elevation Downstream = 473.35 ft Crown Elevation Upstream = 473.75 ft - - - -FLOW INFORMATION- - - - Catchment Area = 0.24 ac Runoff Coefficient = 0.620 Inlet Time = 5.00 min Inlet Intensity = 6.70 in/hr Inlet Rational Flow = 1 .00 cfs Inlet Input Flow = 0.00 cfs Inlet Hydrograph Flow = 0.00 cfs Total Area = 4.03 ac Weighted Coefficient = 0.779 Total Time of Concentration = 7.02 min Total Intensity = 6.08 in/hr Total Rational Flow = 19.27 cfs Total Flow = 19.27 cfs Uniform Capacity = 39.95 cfs Skipped flow = 0.00 cfs Infiltration = 0.00 gpd - - - -HYDRAULIC INFORMATION-- - - HGL Elevation Downstream = 472.20 ft HGL Elevation Upstream = 472.60 ft HGL Slope = 1 .67 % EGL Elevation Downstream = 473.75 ft EGL Elevation Upstream = 474. 15 ft EGL Slope = 1 .67 % Critical Depth = 18.43 in Depth Downstream = 13.21 in Depth Upstream = 13.21 in Velocity Downstream = 9.97 ft/s Velocity Upstream = 9.97 ft/s Uniform Velocity Downstream = 9.96 ft/s Uniform Velocity Upstream = 9.96 ft/s Area Downstream = 1 .93 ft"2 Area Upstream = 1 .93 ft"2 Kj (JLC) = 0.50 Calculated Junction Loss = 0.932 ft - - - -INLET INFORMATION- - - - Downstream Inlet = DI 2 Imre —w PIPE DESCRIPTION: Pipe 5 - - - -RAINFALL INFORMATION-- - - Return Period = 10 Year Rainfall File = Albemarle 05 - - - -PIPE INFORMATION- - - - Current Pipe = Pipe 5 Downstream Pipe = Pipe 4 Pipe Material = RCP Pipe Length = 64.41 ft Plan Length = 68.41 ft Pipe Type = Circular Pipe Dimensions = 24.00 in Pipe Manning 's "n" = 0.013 Pipe Capacity at Invert Slope = 28. 17 cfs Invert Elevation Downstream = 472.50 ft Invert Elevation Upstream = 473.50 ft Invert Slope = 1 .55% Invert Slope (Plan Length) = 1 .46% Rim Elevation Downstream = 477.00 ft Rim Elevation Upstream = 480.50 ft Natural Ground Slope = 5.43% Crown Elevation Downstream = 474.50 ft Crown Elevation Upstream = 475.50 ft - - - -FLOW INFORMATION- - - - Catchment Area = 0.20 ac Runoff Coefficient = 0.860 Inlet Time = 5.00 min Inlet Intensity = 6.70 in/hr Inlet Rational Flow = 1 . 15 cfs Inlet Input Flow = 0.00 cfs Inlet Hydrograph Flow = 0.00 cfs Total Area = 3.02 ac Weighted Coefficient = 0.799 Total Time of Concentration = 6.89 min Total Intensity = 6. 12 in/hr Total Rational Flow = 14.88 cfs Total Flow = 14.88 cfs Uniform Capacity = 28. 17 cfs Skipped flow = 0.00 cfs Infiltration = 0.00 gpd - - - -HYDRAULIC INFORMATION-- - - HGL Elevation Downstream = 473.53 ft HGL Elevation Upstream = 474.53 ft HGL Slope = 1 .55 % EGL Elevation Downstream = 474.82 ft EGL Elevation Upstream = 475.82 ft EGL Slope = 1 .55 % Critical Depth = 16.69 in Depth Downstream = 12.40 in Depth Upstream = 12.40 in Velocity Downstream = 9.09 ft/s Velocity Upstream = 9.09 ft/s Uniform Velocity Downstream = 9.09 ft/s Uniform Velocity Upstream = 9.09 ft/s Area Downstream = 1 .64 ft"2 Area Upstream = 1 .64 ft"2 Kj (JLC) = 0.50 Calculated Junction Loss = 2.469 ft - - - -INLET INFORMATION- - - - Downstream Inlet = DI 5 PIPE DESCRIPTION: Pipe 6 - - - -RAINFALL INFORMATION-- - - Return Period = 10 Year Rainfall File = Albemarle 05 - - - -PIPE INFORMATION- - - - Current Pipe = Pipe 6 Downstream Pipe = Pipe 5 Pipe Material = RCP Pipe Length = 66.54 ft Plan Length = 70.53 ft Pipe Type = Circular Pipe Dimensions = 24.00 in Pipe Manning ' s "n" = 0.013 Pipe Capacity at Invert Slope = 27.72 cfs Invert Elevation Downstream = 476.00 ft Invert Elevation Upstream = 477.00 ft Invert Slope = 1 .50% Invert Slope (Plan Length) = 1 .42% Rim Elevation Downstream = 480.50 ft Rim Elevation Upstream = 483.50 ft Natural Ground Slope = 4.51% Crown Elevation Downstream = 478.00 ft Crown Elevation Upstream = 479.00 ft - -- -FLOW INFORMATION- - - - Catchment Area = 0.21 ac Runoff Coefficient = 0.850 Inlet Time = 5.00 min Inlet Intensity = 6.70 in/hr Inlet Rational Flow = 1 . 18 cfs Inlet Input Flow = 0.00 cfs Inlet Hydrograph Flow = 0.00 cfs Total Area = 2.82 ac Weighted Coefficient = 0.795 Total Time of Concentration = 6.76 min Total Intensity = 6. 15 in/hr Total Rational Flow = 13.92 cfs Total Flow = 13.92 cfs Uniform Capacity = 27.72 cfs Skipped flow = 0.00 cfs Infiltration = 0.00 gpd - - - -HYDRAULIC INFORMATION- - - - HGL Elevation Downstream = 477.00 ft HGL Elevation Upstream = 478.00 ft HGL Slope = 1 .50 % EGL Elevation Downstream = 478.22 ft EGL Elevation Upstream = 479.22 ft EGL Slope = 1 .50 % Critical Depth = 16. 13 in Depth Downstream = 12.03 in Depth Upstream = 12.03 in Velocity Downstream = 8.83 ft/s Velocity Upstream = 8.83 ft/s Uniform Velocity Downstream = 8.84 ft/s Uniform Velocity Upstream = 8.84 ft/s Area Downstream = 1 .58 ft"2 Area Upstream = 1 .58 ft"2 Kj (JLC) = 0.50 Calculated Junction Loss = 2.545 ft - - - -INLET INFORMATION- - -- Downstream Inlet = DI 7 ,.we Now PIPE DESCRIPTION: Pipe 7 - - - -RAINFALL INFORMATION- - - - Return Period = 10 Year Rainfall File = Albemarle 05 - - - -PIPE INFORMATION- - - - Current Pipe = Pipe 7 Downstream Pipe = Pipe 6 Pipe Material = RCP Pipe Length = 67.30 ft Plan Length = 71 .29 ft Pipe Type = Circular Pipe Dimensions = 21 .00 in Pipe Manning ' s "n" = 0.013 Pipe Capacity at Invert Slope = 19.31 cfs Invert Elevation Downstream = 479.50 ft Invert Elevation Upstream = 480.50 ft Invert Slope = 1 .49% Invert Slope (Plan Length) = 1 .40% Rim Elevation Downstream = 483.50 ft Rim Elevation Upstream = 489.50 ft Natural Ground Slope = 8.92% Crown Elevation Downstream = 481 .25 ft Crown Elevation Upstream = 482.25 ft - ---FLOW INFORMATION- - - - Catchment Area = 0.30 ac Runoff Coefficient = 0.850 Inlet Time = 5.00 min Inlet Intensity = 6.70 in/hr Inlet Rational Flow = 1 .75 cfs Inlet Input Flow = 0.00 cfs Inlet Hydrograph Flow = 0.00 cfs Total Area = 2.62 ac Weighted Coefficient = 0.791 Total Time of Concentration = 6.62 min Total Intensity = 6. 19 in/hr Total Rational Flow = 12.91 cfs Total Flow = 12.91 cfs Uniform Capacity = 19.31 cfs Skipped flow = 0.00 cfs Infiltration = 0.00 gpd - - - -HYDRAULIC INFORMATION- - - - HGL Elevation Downstream = 480.55 ft HGL Elevation Upstream = 481 .55 ft HGL Slope = 1 .49 % EGL Elevation Downstream = 481 .70 ft EGL Elevation Upstream = 482.70 ft EGL Slope = 1 .49 % Critical Depth = 16.06 in Depth Downstream = 12.56 in Depth Upstream = 12.56 in Velocity Downstream = 8.60 ft/s Velocity Upstream = 8.60 ft/s Uniform Velocity Downstream = 8.60 ft/s Uniform Velocity Upstream = 8.60 ft/s Area Downstream = 1 .50 ft"2 Area Upstream = 1 .50 ft"2 Kj (JLC) = 0.50 Calculated Junction Loss = 5.040 ft - - - -INLET INFORMATION- - - - Downstream Inlet = DI 8 r..wr Now PIPE DESCRIPTION: Pipe 8 - - - -RAINFALL INFORMATION-- - - Return Period = 10 Year Rainfall File = Albemarle 05 - - - -PIPE INFORMATION- - - - Current Pipe = Pipe 8 Downstream Pipe = Pipe 7 Pipe Material = RCP Pipe Length = 65.51 ft Plan Length = 69.50 ft Pipe Type = Circular Pipe Dimensions = 18.00 in Pipe Manning ' s "n" = 0.013 Pipe Capacity at Invert Slope = 12.97 cfs Invert Elevation Downstream = 485.50 ft Invert Elevation Upstream = 486.50 ft Invert Slope = 1 .53% Invert Slope (Plan Length) = 1 .44% Rim Elevation Downstream = 489.50 ft Rim Elevation Upstream = 493.50 ft Natural Ground Slope = 6. 11% Crown Elevation Downstream = 487.00 ft Crown Elevation Upstream = 488.00 ft - - - -FLOW INFORMATION- - - - Catchment Area = 0.46 ac Runoff Coefficient = 0.860 Inlet Time = 5.00 min Inlet Intensity = 6.70 in/hr Inlet Rational Flow = 2.67 cfs Inlet Input Flow = 0.00 cfs Inlet Hydrograph Flow = 0.00 cfs Total Area = 2.31 ac Weighted Coefficient = 0.783 Total Time of Concentration = 6.48 min Total Intensity = 6.23 in/hr Total Rational Flow = 11 .37 cfs Total Flow = 11 .37 cfs Uniform Capacity = 12.97 cfs Skipped flow = 0.00 cfs Infiltration = 0.00 gpd tome 'wry' - - - -HYDRAULIC INFORMATION- - - - HGL Elevation Downstream = 486.59 ft HGL Elevation Upstream = 487.59 ft HGL Slope = 1 .53 % EGL Elevation Downstream = 487.65 ft EGL Elevation Upstream = 488.65 ft EGL Slope = 1 .53 % Critical Depth = 15.45 in Depth Downstream = 13.05 in Depth Upstream = 13.05 in Velocity Downstream = 8.29 ft/s Velocity Upstream = 8.29 ft/s Uniform Velocity Downstream = 8.28 ft/s Uniform Velocity Upstream = 8.28 ft/s Area Downstream = 1 .37 fit"2 Area Upstream = 1 .37 ft"2 Kj (JLC) = 0.50 Calculated Junction Loss = 2.834 ft - -- -INLET INFORMATION- - - - Downstream Inlet = DI 9 Now PIPE DESCRIPTION: Pipe 9 - - - -RAINFALL INFORMATION-- - - Return Period = 10 Year Rainfall File = Albemarle 05 - - - -PIPE INFORMATION- - - - Current Pipe = Pipe 9 Downstream Pipe = Pipe 8 Pipe Material = RCP Pipe Length = 66.58 ft Plan Length = 70.58 ft Pipe Type = Circular Pipe Dimensions = 18.00 in Pipe Manning ' s "n" = 0.013 Pipe Capacity at Invert Slope = 12.87 cfs Invert Elevation Downstream = 489.50 ft Invert Elevation Upstream = 490.50 ft Invert Slope = 1 .50% Invert Slope (Plan Length) = 1 .42% Rim Elevation Downstream = 493.50 ft Rim Elevation Upstream = 499.70 ft Natural Ground Slope = 9.31% Crown Elevation Downstream = 491 .00 ft Crown Elevation Upstream = 492.00 ft - - - -FLOW INFORMATION-- - - Catchment Area = 0. 16 ac Runoff Coefficient = 0.810 Inlet Time = 5.00 min Inlet Intensity = 6.70 in/hr Inlet Rational Flow = 0.88 cfs Inlet Input Flow = 0.00 cfs Inlet Hydrograph Flow = 0.00 cfs Total Area = 1 .85 ac Weighted Coefficient = 0.764 Total Time of Concentration = 6.34 min Total Intensity = 6.28 in/hr Total Rational Flow = 8.95 cfs Total Flow = 8.95 cfs Uniform Capacity = 12.87 cfs Skipped flow = 0.00 cfs Infiltration = 0.00 gpd *41110, - - - -HYDRAULIC INFORMATION- - - - HGL Elevation Downstream = 490.42 ft HGL Elevation Upstream = 491 .42 ft HGL Slope = 1 .50 % EGL Elevation Downstream = 491 .38 ft EGL Elevation Upstream = 492.38 ft EGL Slope = 1 .50 % Critical Depth = 13.89 in Depth Downstream = 11 .05 in Depth Upstream = 11 .05 in Velocity Downstream = 7.86 ft/s Velocity Upstream = 7.86 ft/s Uniform Velocity Downstream = 7.87 ft/s Uniform Velocity Upstream = 7.87 ft/s Area Downstream = 1 . 14 ft"2 Area Upstream = 1 . 14 ft"2 Kj (JLC) = 0.50 Calculated Junction Loss = 0.082 ft - - - -INLET INFORMATION- - - - Downstream Inlet = DI 10 PIPE DESCRIPTION: Pipe 10 -- - -RAINFALL INFORMATION-- - - Return Period = 10 Year Rainfall File = Albemarle 05 - - - -PIPE INFORMATION- - - - Current Pipe = Pipe 10 Downstream Pipe = Pipe 9 Pipe Material = RCP Pipe Length = 212.04 ft Plan Length = 216.00 ft Pipe Type = Circular Pipe Dimensions = 18.00 in Pipe Manning ' s "n" = 0.013 Pipe Capacity at Invert Slope = 14.78 cfs Invert Elevation Downstream = 490.70 ft Invert Elevation Upstream = 494.90 ft Invert Slope = 1 .98% Invert Slope (Plan Length) = 1 .94% Rim Elevation Downstream = 499.70 ft Rim Elevation Upstream = 502.00 ft Natural Ground Slope = 1 .08% Crown Elevation Downstream = 492.20 ft Crown Elevation Upstream = 496.40 ft - - - -FLOW INFORMATION- - - - Catchment Area = 0.70 ac Runoff Coefficient = 0.860 Inlet Time = 5.00 min Inlet Intensity = 6.70 in/hr Inlet Rational Flow = 4.06 cfs Inlet Input Flow = 0.00 cfs Inlet Hydrograph Flow = 0.00 cfs Total Area = 1 .69 ac Weighted Coefficient = 0.759 Total Time of Concentration = 5.92 min Total Intensity = 6.40 in/hr Total Rational Flow = 8.29 cfs Total Flow = 8.29 cfs Uniform Capacity = 14.78 cfs Skipped flow = 0.00 cfs Infiltration = 0.00 gpd SIM' 'rs0 - - - -HYDRAULIC INFORMATION-- - - HGL Elevation Downstream = 491 .50 ft HGL Elevation Upstream = 495.70 ft HGL Slope = 1 .98 % EGL Elevation Downstream = 492.65 ft EGL Elevation Upstream = 496.85 ft EGL Slope = 1 .98 % Critical Depth = 13.39 in Depth Downstream = 9.64 in Depth Upstream = 9.64 in Velocity Downstream = 8.61 ft/s Velocity Upstream = 8.61 ft/s Uniform Velocity Downstream = 8.61 ft/s Uniform Velocity Upstream = 8.61 ft/s Area Downstream = 0.96 ft"2 Area Upstream = 0.96 ft"2 Kj (JLC) = 0.50 Calculated Junction Loss = 0.774 ft - - - -INLET INFORMATION- - - - Downstream Inlet = DI 11 Now PIPE DESCRIPTION: Pipe 11 - - - -RAINFALL INFORMATION- - - - Return Period = 10 Year Rainfall File = Albemarle 05 - - - -PIPE INFORMATION- - - - Current Pipe = Pipe 11 Downstream Pipe = Pipe 4 Pipe Material = RCP Pipe Length = 70.88 ft Plan Length = 74.82 ft Pipe Type = Circular Pipe Dimensions = 15.00 in Pipe Manning ' s "n" = 0.013 Pipe Capacity at Invert Slope = 13.28 cfs Invert Elevation Downstream = 473.00 ft Invert Elevation Upstream = 476.00 ft Invert Slope = 4.24% Invert Slope (Plan Length) = 4.01% Rim Elevation Downstream = 477.00 ft Rim Elevation Upstream = 483.00 ft Natural Ground Slope = 8.46% Crown Elevation Downstream = 474.25 ft Crown Elevation Upstream = 477.25 ft - - - -FLOW INFORMATION- - - - Catchment Area = 0.78 ac Runoff Coefficient = 0.750 Inlet Time = 5.00 min Inlet Intensity = 6.70 in/hr Inlet Rational Flow = 3.93 cfs Inlet Input Flow = 0.00 cfs Inlet Hydrograph Flow = 0.00 cfs Total Area = 0.78 ac Weighted Coefficient = 0.750 Total Time of Concentration = 5.00 min Total Intensity = 6.70 in/hr Total Rational Flow = 3.93 cfs Total Flow = 3.93 cfs Uniform Capacity = 13.28 cfs Skipped flow = 0.00 cfs Infiltration = 0.00 gpd 4401, - - - -HYDRAULIC INFORMATION- - - - HGL Elevation Downstream = 473.47 ft HGL Elevation Upstream = 477. 16 ft HGL Slope = 5.21 % EGL Elevation Downstream = 474.85 ft EGL Elevation Upstream = 478.54 ft EGL Slope = 5.21 % Critical Depth = 9.63 in Depth Downstream = 5.59 in Depth Upstream = 5.59 in Velocity Downstream = 9.43 ft/s Velocity Upstream = 9.43 ft/s Uniform Velocity Downstream = 13. 18 ft/s Uniform Velocity Upstream = 0.00 ft/s Area Downstream = 0.42 ft"2 Area Upstream = 0.42 ft"2 Kj (JLC) = 0.50 Calculated Junction Loss = NA - - - -INLET INFORMATION- - - - Downstream Inlet = DI 5 ,.✓ New PIPE DESCRIPTION: Pipe 12 - - - -RAINFALL INFORMATION-- - - Return Period = 10 Year Rainfall File = Albemarle 05 - - - -PIPE INFORMATION- - - - Current Pipe = Pipe 12 Downstream Pipe = Pipe 10 Pipe Material = RCP Pipe Length = 90.57 ft Plan Length = 94.55 ft Pipe Type = Circular Pipe Dimensions = 15.00 in Pipe Manning' s "n" = 0.013 Pipe Capacity at Invert Slope = 9.60 cfs Invert Elevation Downstream = 495.00 ft Invert Elevation Upstream = 497.00 ft Invert Slope = 2.21% Invert Slope (Plan Length) = 2. 12% Rim Elevation Downstream = 502.00 ft Rim Elevation Upstream = 501 .00 ft Natural Ground Slope = -1 . 10% Crown Elevation Downstream = 496.25 ft Crown Elevation Upstream = 498.25 ft - - - -FLOW INFORMATION- - - - Catchment Area = 0.64 ac Runoff Coefficient = 0.710 Inlet Time = 5.00 min Inlet Intensity = 6.70 in/hr Inlet Rational Flow = 3.08 cfs Inlet Input Flow = 0.00 cfs Inlet Hydrograph Flow = 0.00 cfs Total Area = 0.64 ac Weighted Coefficient = 0.710 Total Time of Concentration = 5.00 min Total Intensity = 6.70 in/hr Total Rational Flow = 3.08 cfs Total Flow = 3.08 cfs Uniform Capacity = 9.60 cfs Skipped flow = 0.00 cfs Infiltration = 0.00 gpd - - - -HYDRAULIC INFORMATION- - -- HGL Elevation Downstream = 496.48 ft HGL Elevation Upstream = 497.85 ft HGL Slope = 1 .52 % EGL Elevation Downstream = 496.58 ft EGL Elevation Upstream = 498. 14 ft EGL Slope = 1 .73 % Critical Depth = 8.48 in Depth Downstream = 15.00 in Depth Upstream = 8.48 in Velocity Downstream = 2.51 ft/s Velocity Upstream = 4.31 ft/s Uniform Velocity Downstream = 6.96 ft/s Uniform Velocity Upstream = 0.00 ft/s Area Downstream = 1 .23 ft"2 Area Upstream = 0.72 ft"2 Kj (JLC) = 0.50 Calculated Junction Loss = NA - - - -INLET INFORMATION- - - - Downstream Inlet = DI 12 PIPE DESCRIPTION: Pipe 12B - - - -RAINFALL INFORMATION- - - - Return Period = 10 Year Rainfall File = Albemarle 05 - - - -PIPE INFORMATION- - - - Current Pipe = Pipe 12B Downstream Pipe = Pipe 10 Pipe Material = RCP Pipe Length = 125.69 ft Plan Length = 129.59 ft Pipe Type = Circular Pipe Dimensions = 15.00 in Pipe Manning ' s "n" = 0.013 Pipe Capacity at Invert Slope = 12.88 cfs Invert Elevation Downstream = 495.00 ft Invert Elevation Upstream = 500.00 ft Invert Slope = 3.98% Invert Slope (Plan Length) = 3.86% Rim Elevation Downstream = 502.00 ft Rim Elevation Upstream = 507.00 ft Natural Ground Slope = 3.98% Crown Elevation Downstream = 496.25 ft Crown Elevation Upstream = 501 .25 ft - - - -FLOW INFORMATION- - - - Catchment Area = 0.35 ac Runoff Coefficient = 0.650 Inlet Time = 5.00 min Inlet Intensity = 6.70 in/hr Inlet Rational Flow = 1 .54 cfs Inlet Input Flow = 0.00 cfs Inlet Hydrograph Flow = 0.00 cfs Total Area = 0.35 ac Weighted Coefficient = 0.650 Total Time of Concentration = 5.00 min Total Intensity = 6.70 in/hr Total Rational Flow = 1 .54 cfs Total Flow = 1 .54 cfs Uniform Capacity = 12.88 cfs Skipped flow = 0.00 cfs Infiltration = 0.00 gpd slime - - - -HYDRAULIC INFORMATION- - - - HGL Elevation Downstream = 496.28 ft HGL Elevation Upstream = 500.58 ft HGL Slope = 3.43 % EGL Elevation Downstream = 496.30 ft EGL Elevation Upstream = 500.77 ft EGL Slope = 3.56 % Critical Depth = 5.91 in Depth Downstream = 15.00 in Depth Upstream = 5.91 in Velocity Downstream = 1 .26 ft/s Velocity Upstream = 3.44 ft/s Uniform Velocity Downstream = 8.62 ft/s Uniform Velocity Upstream = 0.00 ft/s Area Downstream = 1 .23 ft"2 Area Upstream = 0.45 ft"2 Kj (JLC) = 0.50 Calculated Junction Loss = NA - - - -INLET INFORMATION- - - - Downstream Inlet = DI 12 err �..r er Y _ ct Ln CO co 0) O r N CO d' Ln CO ti f0 Y < CO `- r r r r r N N N N N N N N c CO 2 a) a) a) a) a) a) a) a) a) a) a) a) (1) a) ca a, WCC a a a a a a a a a a a Cl a a U N d d d a. d. d d E_ n. E. 11 a)0) Lcz �, o a) O W 11Lu .) a) 02D zg o C ; User Name: Eric Woolley Date: 03-08-07 Project: UVAF: TC 3 Site Time: 16: 18:57 Network: 02 - Western Reach Page: 1 of 28 Storm Sewers Detail Report PIPE DESCRIPTION: Pipe 14 - - - -RAINFALL INFORMATION- - - - Return Period = 10 Year Rainfall File = Albemarle 05 - - - -PIPE INFORMATION- - - - Current Pipe = Pipe 14 Downstream Pipe = Outfall Pipe Material = RCP Pipe Length = 63.56 ft Plan Length = 66.56 ft Pipe Type = Circular Pipe Dimensions = 36.00 in Pipe Manning ' s "n" = 0.013 Pipe Capacity at Invert Slope = 83.62 cfs Invert Elevation Downstream = 482.00 ft Invert Elevation Upstream = 483.00 ft Invert Slope = 1 .57% Invert Slope (Plan Length) = 1 .50% Rim Elevation Downstream = 485.00 ft Rim Elevation Upstream = 514.00 ft Natural Ground Slope = 45.62% Crown Elevation Downstream = 485.00 ft Crown Elevation Upstream = 486.00 ft - - - -FLOW INFORMATION- - - - Catchment Area = 0.42 ac Runoff Coefficient = 0.830 Inlet Time = 5.00 min Inlet Intensity = 6.70 in/hr Inlet Rational Flow = 2.33 cfs Inlet Input Flow = 0.00 cfs Inlet Hydrograph Flow = 0.00 cfs Total Area = 3.88 ac Weighted Coefficient = 0.787 Total Time of Concentration = 6.86 min Total Intensity = 6. 13 in/hr Total Rational Flow = 18.83 cfs Total Flow = 18.83 cfs Uniform Capacity = 83.62 cfs Skipped flow = 0.00 cfs Infiltration = 0.00 gpd N►" `4000 - - - -HYDRAULIC INFORMATION- - - - HGL Elevation Downstream = 482.97 ft HGL Elevation Upstream = 483.97 ft HGL Slope = 1 .57 % EGL Elevation Downstream = 484.39 ft EGL Elevation Upstream = 485.39 ft EGL Slope = 1 .57 % Critical Depth = 16.69 in Depth Downstream = 11 .61 in Depth Upstream = 11 .61 in Velocity Downstream = 9.55 ft/s Velocity Upstream = 9.55 ft/s Uniform Velocity Downstream = 0.00 ft/s Uniform Velocity Upstream = 9.55 ft/s Area Downstream = 1 .97 ft"2 Area Upstream = 1 .97 ft"2 Kj (JLC) = 0.50 Calculated Junction Loss = 20.535 ft - - --INLET INFORMATION- - -- Downstream Inlet = Outfall 14 PIPE DESCRIPTION: Pipe 15 - - - -RAINFALL INFORMATION- - - - Return Period = 10 Year Rainfall File = Albemarle 05 - - - -PIPE INFORMATION- - - - Current Pipe = Pipe 15 Downstream Pipe = Pipe 14 Pipe Material = RCP Pipe Length = 129.25 ft Plan Length = 134.22 ft Pipe Type = Circular Pipe Dimensions = 18.00 in Pipe Manning' s "n" = 0.013 Pipe Capacity at Invert Slope = 15.45 cfs Invert Elevation Downstream = 510.00 ft Invert Elevation Upstream = 512.80 ft Invert Slope = 2. 17% Invert Slope (Plan Length) = 2.09% Rim Elevation Downstream = 514.00 ft Rim Elevation Upstream = 520.40 ft Natural Ground Slope = 4.95% Crown Elevation Downstream = 511 .50 ft Crown Elevation Upstream = 514.30 ft - - --FLOW INFORMATION- - - - Catchment Area = 0.08 ac Runoff Coefficient = 0.880 Inlet Time = 5.00 min Inlet Intensity = 6.70 in/hr Inlet Rational Flow = 0.46 cfs Inlet Input Flow = 0.00 cfs Inlet Hydrograph Flow = 0.00 cfs Total Area = 0.43 ac Weighted Coefficient = 0.794 Total Time of Concentration = 5.72 min Total Intensity = 6.47 in/hr Total Rational Flow = 2.21 cfs Total Flow = 2.21 cfs Uniform Capacity = 15.45 cfs Skipped flow = 0.00 cfs Infiltration = 0.00 gpd "w✓` - - - -HYDRAULIC INFORMATION-- - - HGL Elevation Downstream = 510.38 ft HGL Elevation Upstream = 513. 18 ft HGL Slope = 2. 17 % EGL Elevation Downstream = 510.98 ft EGL Elevation Upstream = 513.78 ft EGL Slope = 2. 17 % Critical Depth = 6.75 in Depth Downstream = 4.60 in Depth Upstream = 4.60 in Velocity Downstream = 6.21 ft/s Velocity Upstream = 6.21 ft/s Uniform Velocity Downstream = 9.89 ft/s Uniform Velocity Upstream = 6.21 ft/s Area Downstream = 0.36 ft"2 Area Upstream = 0.36 ft"2 Kj (JLC) = 0.50 Calculated Junction Loss = 3. 167 ft - - - -INLET INFORMATION- - - - Downstream Inlet = DI 15 s w.r PIPE DESCRIPTION: Pipe 16 - - - -RAINFALL INFORMATION- - - - Return Period = 10 Year Rainfall File = Albemarle 05 - - - -PIPE INFORMATION- - - - Current Pipe = Pipe 16 Downstream Pipe = Pipe 15 Pipe Material = RCP Pipe Length = 212.91 ft Plan Length = 216.86 ft Pipe Type = Circular Pipe Dimensions = 18.00 in Pipe Manning ' s "n" = 0.013 Pipe Capacity at Invert Slope = 15.26 cfs Invert Elevation Downstream = 516.00 ft Invert Elevation Upstream = 520.50 ft Invert Slope = 2. 11% Invert Slope (Plan Length) = 2.08% Rim Elevation Downstream = 520.40 ft Rim Elevation Upstream = 529.00 ft Natural Ground Slope = 4.04% Crown Elevation Downstream = 517.50 ft Crown Elevation Upstream = 522.00 ft - - --FLOW INFORMATION- -- - Catchment Area = 0. 18 ac Runoff Coefficient = 0.780 Inlet Time = 5.00 min Inlet Intensity = 6.70 in/hr Inlet Rational Flow = 0.96 cfs Inlet Input Flow = 0.00 cfs Inlet Hydrograph Flow = 0.00 cfs Total Area = 0.35 ac Weighted Coefficient = 0.775 Total Time of Concentration = 5. 10 min Total Intensity = 6.67 in/hr Total Rational Flow = 1 .82 cfs Total Flow = 1 .82 cfs Uniform Capacity = 15.26 cfs Skipped flow = 0.00 cfs Infiltration = 0.00 gpd - - - -HYDRAULIC INFORMATION- - - - HGL Elevation Downstream = 516.35 ft HGL Elevation Upstream = 520.85 ft HGL Slope = 2. 11 % EGL Elevation Downstream = 516.88 ft EGL Elevation Upstream = 521 .38 ft EGL Slope = 2. 11 % Critical Depth = 6. 10 in Depth Downstream = 4.20 in Depth Upstream = 4.20 in Velocity Downstream = 5.82 ft/s Velocity Upstream = 5.82 ft/s Uniform Velocity Downstream = 5.82 ft/s Uniform Velocity Upstream = 5.82 ft/s Area Downstream = 0.31 ft"2 Area Upstream = 0.31 ft"2 Kj (JLC) = 0.50 Calculated Junction Loss = 3.908 ft - -- -INLET INFORMATION- - - - Downstream Inlet = DI 16 Niue w.rr PIPE DESCRIPTION: Pipe 17 - - - -RAINFALL INFORMATION- - - - Return Period = 10 Year Rainfall File = Albemarle 05 - - - -PIPE INFORMATION- - - - Current Pipe = Pipe 17 Downstream Pipe = Pipe 16 Pipe Material = RCP Pipe Length = 24.01 ft Plan Length = 28.00 ft Pipe Type = Circular Pipe Dimensions = 15.00 in Pipe Manning ' s "n" = 0.013 Pipe Capacity at Invert Slope = 9.32 cfs Invert Elevation Downstream = 524.50 ft Invert Elevation Upstream = 525.00 ft Invert Slope = 2.08% Invert Slope (Plan Length) = 1 .79% Rim Elevation Downstream = 529.00 ft Rim Elevation Upstream = 529.05 ft Natural Ground Slope = 0.00% Crown Elevation Downstream = 525.75 ft Crown Elevation Upstream = 526.25 ft -- - -FLOW INFORMATION- - - - Catchment Area = 0. 17 ac Runoff Coefficient = 0.770 Inlet Time = 5.00 min Inlet Intensity = 6.70 in/hr Inlet Rational Flow = 0.87 cfs Inlet Input Flow = 0.00 cfs Inlet Hydrograph Flow = 0.00 cfs Total Area = 0. 17 ac Weighted Coefficient = 0.770 Total Time of Concentration = 5.00 min Total Intensity = 6.70 in/hr Total Rational Flow = 0.87 cfs Total Flow = 0.87 cfs Uniform Capacity = 9.32 cfs Skipped flow = 0.00 cfs Infiltration = 0.00 gpd - - - -HYDRAULIC INFORMATION-- - - HGL Elevation Downstream = 524.76 ft HGL Elevation Upstream = 525.44 ft HGL Slope = 2.82 % EGL Elevation Downstream = 525. 11 ft EGL Elevation Upstream = 525.79 ft EGL Slope = 2.82 % Critical Depth = 4.40 in Depth Downstream = 3. 10 in Depth Upstream = 3. 10 in Velocity Downstream = 4.77 ft/s Velocity Upstream = 4.77 ft/s Uniform Velocity Downstream = 4.77 ft/s Uniform Velocity Upstream = 0.00 ft/s Area Downstream = 0. 18 fit"2 Area Upstream = 0. 18 ft"2 Kj (JLC) = 0.50 Calculated Junction Loss = NA - - - -INLET INFORMATION- - - - Downstream Inlet = DI 17 ti.rr PIPE DESCRIPTION: Pipe 18 - - --RAINFALL INFORMATION- - - - Return Period = 10 Year Rainfall File = Albemarle 05 - - --PIPE INFORMATION- - - - Current Pipe = Pipe 18 Downstream Pipe = Pipe 14 Pipe Material = RCP Pipe Length = 43.01 ft Plan Length = 47.98 ft Pipe Type = Circular Pipe Dimensions = 15.00 in Pipe Manning ' s "n" = 0.013 Pipe Capacity at Invert Slope = 12.06 cfs Invert Elevation Downstream = 510.00 ft Invert Elevation Upstream = 511 .50 ft Invert Slope = 3.49% Invert Slope (Plan Length) = 3. 13% Rim Elevation Downstream = 514.00 ft Rim Elevation Upstream = 516.50 ft Natural Ground Slope = 5.81% Crown Elevation Downstream = 511 .25 ft Crown Elevation Upstream = 512.75 ft - - --FLOW INFORMATION- - - - Catchment Area = 0.42 ac Runoff Coefficient = 0.800 Inlet Time = 5.00 min Inlet Intensity = 6.70 in/hr Inlet Rational Flow = 2.28 cfs Inlet Input Flow = 0.00 cfs Inlet Hydrograph Flow = 0.00 cfs Total Area = 0.42 ac Weighted Coefficient = 0.800 Total Time of Concentration = 5.00 min Total Intensity = 6.70 in/hr Total Rational Flow = 2.28 cfs Total Flow = 2.28 cfs Uniform Capacity = 12.06 cfs Skipped flow = 0.00 cfs Infiltration = 0.00 gpd - - - -HYDRAULIC INFORMATION-- - - HGL Elevation Downstream = 510.37 ft HGL Elevation Upstream = 512.31 ft HGL Slope = 4.52 % EGL Elevation Downstream = 511 .25 ft EGL Elevation Upstream = 513.20 ft EGL Slope = 4.52 % Critical Depth = 7.24 in Depth Downstream = 4.41 in Depth Upstream = 4.41 in Velocity Downstream = 7.55 ft/s Velocity Upstream = 7.55 ft/s Uniform Velocity Downstream = 11 .77 ft/s Uniform Velocity Upstream = 0.00 ft/s Area Downstream = 0.30 ft"2 Area Upstream = 0.30 ft"2 Kj (JLC) = 0.50 Calculated Junction Loss = NA - - - -INLET INFORMATION- - - - Downstream Inlet = DI 15 PIPE DESCRIPTION: Pipe 19 - - - -RAINFALL INFORMATION- - - - Return Period = 10 Year Rainfall File = Albemarle 05 - - - -PIPE INFORMATION- - - - Current Pipe = Pipe 19 Downstream Pipe = Pipe 14 Pipe Material = RCP Pipe Length = 175.70 ft Plan Length = 180.69 ft Pipe Type = Circular Pipe Dimensions = 24.00 in Pipe Manning ' s "n" = 0.013 Pipe Capacity at Invert Slope = 25.30 cfs Invert Elevation Downstream = 503.50 ft Invert Elevation Upstream = 505.70 ft Invert Slope = 1 .25% Invert Slope (Plan Length) = 1 .22% Rim Elevation Downstream = 514.00 ft Rim Elevation Upstream = 516.50 ft Natural Ground Slope = 1 .42% Crown Elevation Downstream = 505.50 ft Crown Elevation Upstream = 507.70 ft - - - -FLOW INFORMATION- - - - Catchment Area = 0.32 ac Runoff Coefficient = 0.720 Inlet Time = 5.00 min Inlet Intensity = 6.70 in/hr Inlet Rational Flow = 1 .56 cfs Inlet Input Flow = 0.00 cfs Inlet Hydrograph Flow = 0.00 cfs Total Area = 2.61 ac Weighted Coefficient = 0.776 Total Time of Concentration = 6.49 min Total Intensity = 6.23 in/hr Total Rational Flow = 12.73 cfs Total Flow = 12.73 cfs Uniform Capacity = 25.30 cfs Skipped flow = 0.00 cfs Infiltration = 0.00 gpd fir►' - - --HYDRAULIC INFORMATION-- - - HGL Elevation Downstream = 504.50 ft HGL Elevation Upstream = 506.70 ft HGL Slope = 1 .25 % EGL Elevation Downstream = 505.52 ft EGL Elevation Upstream = 507.72 ft EGL Slope = 1 .25 % Critical Depth = 15.40 in Depth Downstream = 12.04 in Depth Upstream = 12.04 in Velocity Downstream = 8.07 ft/s Velocity Upstream = 8.07 ft/s Uniform Velocity Downstream = 8.07 ft/s Uniform Velocity Upstream = 8.07 ft/s Area Downstream = 1 .58 ft"2 Area Upstream = 1 .58 ft"2 Kj (JLC) = 0.50 Calculated Junction Loss = 0.581 ft - - - -INLET INFORMATION- -- - Downstream Inlet = DI 15 Nome PIPE DESCRIPTION: Pipe 20 - - --RAINFALL INFORMATION- - - - Return Period = 10 Year Rainfall File = Albemarle 05 - - - -PIPE INFORMATION- - - - Current Pipe = Pipe 20 Downstream Pipe = Pipe 19 Pipe Material = RCP Pipe Length = 166. 12 ft Plan Length = 170. 12 ft Pipe Type = Circular Pipe Dimensions = 18.00 in Pipe Manning 's "n" = 0.013 Pipe Capacity at Invert Slope = 9.29 cfs Invert Elevation Downstream = 512.50 ft Invert Elevation Upstream = 513.80 ft Invert Slope = 0.78% Invert Slope (Plan Length) = 0.76% Rim Elevation Downstream = 516.50 ft Rim Elevation Upstream = 519.00 ft Natural Ground Slope = 1 .50% Crown Elevation Downstream = 514.00 ft Crown Elevation Upstream = 515.30 ft - - - -FLOW INFORMATION- - - - Catchment Area = 0.20 ac Runoff Coefficient = 0.810 Inlet Time = 5.00 min Inlet Intensity = 6.70 in/hr Inlet Rational Flow = 1 . 12 cfs Inlet Input Flow = 0.00 cfs Inlet Hydrograph Flow = 0.00 cfs Total Area = 0.79 ac Weighted Coefficient = 0.758 Total Time of Concentration = 5. 13 min Total Intensity = 6.66 in/hr Total Rational Flow = 4.04 cfs Total Flow = 4.04 cfs Uniform Capacity = 9.29 cfs Skipped flow = 0.00 cfs Infiltration = 0.00 gpd - - - -HYDRAULIC INFORMATION-- - - HGL Elevation Downstream = 513. 19 ft HGL Elevation Upstream = 514.49 ft HGL Slope = 0.78 % EGL Elevation Downstream = 513.59 ft EGL Elevation Upstream = 514.89 ft EGL Slope = 0.78 % Critical Depth = 9.24 in Depth Downstream = 8.30 in Depth Upstream = 8.30 in Velocity Downstream = 5.07 ft/s Velocity Upstream = 5.07 ft/s Uniform Velocity Downstream = 5.75 ft/s Uniform Velocity Upstream = 5.08 ft/s Area Downstream = 0.80 ft"2 Area Upstream = 0.80 ft"2 Kj (JLC) = 0.50 Calculated Junction Loss = 0.029 ft - - - -INLET INFORMATION- - - - Downstream Inlet = DI 20 some Noir PIPE DESCRIPTION: Pipe 21 - - --RAINFALL INFORMATION- - - - Return Period = 10 Year Rainfall File = Albemarle 05 - - --PIPE INFORMATION- - - - Current Pipe = Pipe 21 Downstream Pipe = Pipe 20 Pipe Material = RCP Pipe Length = 42.66 ft Plan Length = 46.65 ft Pipe Type = Circular Pipe Dimensions = 15.00 in Pipe Manning 's "n" = 0.013 Pipe Capacity at Invert Slope = 8.09 cfs Invert Elevation Downstream = 514.00 ft Invert Elevation Upstream = 514.67 ft Invert Slope = 1 .57% Invert Slope (Plan Length) = 1 .44% Rim Elevation Downstream = 519.00 ft Rim Elevation Upstream = 518.67 ft Natural Ground Slope = -0.77% Crown Elevation Downstream = 515.25 ft Crown Elevation Upstream = 515.92 ft - - - -FLOW INFORMATION- - - - Catchment Area = 0.59 ac Runoff Coefficient = 0.740 Inlet Time = 5.00 min Inlet Intensity = 6.70 in/hr Inlet Rational Flow = 2.95 cfs Inlet Input Flow = 0.00 cfs Inlet Hydrograph Flow = 0.00 cfs Total Area = 0.59 ac Weighted Coefficient = 0.740 Total Time of Concentration = 5.00 min Total Intensity = 6.70 in/hr Total Rational Flow = 2.95 cfs Total Flow = 2.95 cfs Uniform Capacity = 8.09 cfs Skipped flow = 0.00 cfs Infiltration = 0.00 gpd itse *too - - --HYDRAULIC INFORMATION-- - - HGL Elevation Downstream = 514.52 ft HGL Elevation Upstream = 515.48 ft HGL Slope = 2.24 % EGL Elevation Downstream = 515.10 ft EGL Elevation Upstream = 516.05 ft EGL Slope = 2.24 % Critical Depth = 8.28 in Depth Downstream = 6.26 in Depth Upstream = 6.26 in Velocity Downstream = 6.08 ft/s Velocity Upstream = 6.08 ft/s Uniform Velocity Downstream = 6.08 ft/s Uniform Velocity Upstream = 0.00 ft/s Area Downstream = 0.48 ft"2 Area Upstream = 0.48 ft"2 Kj (JLC) = 0.50 Calculated Junction Loss = NA - ---INLET INFORMATION- - - - Downstream Inlet = DI 21 4orar "trio PIPE DESCRIPTION: Pipe 22 - ---RAINFALL INFORMATION- - - - Return Period = 10 Year Rainfall File = Albemarle 05 - - - -PIPE INFORMATION- - - - Current Pipe = Pipe 22 Downstream Pipe = Pipe 19 Pipe Material = RCP Pipe Length = 52. 17 ft Plan Length = 56. 17 ft Pipe Type = Circular Pipe Dimensions = 18.00 in Pipe Manning ' s "n" = 0.013 Pipe Capacity at Invert Slope = 13.00 cfs Invert Elevation Downstream = 505.90 ft Invert Elevation Upstream = 506.70 ft Invert Slope = 1 .53% Invert Slope (Plan Length) = 1 .42% Rim Elevation Downstream = 516.50 ft Rim Elevation Upstream = 517.00 ft Natural Ground Slope = 0.96% Crown Elevation Downstream = 507.40 ft Crown Elevation Upstream = 508.20 ft - - - -FLOW INFORMATION- - - - Catchment Area = 0.50 ac Runoff Coefficient = 0.810 Inlet Time = 5.00 min Inlet Intensity = 6.70 in/hr Inlet Rational Flow = 2.73 cfs Inlet Input Flow = 0.00 cfs Inlet Hydrograph Flow = 0.00 cfs Total Area = 1 .33 ac Weighted Coefficient = 0.811 Total Time of Concentration = 6.29 min Total Intensity = 6.29 in/hr Total Rational Flow = 6.84 cfs Total Flow = 6.84 cfs Uniform Capacity = 13.00 cfs Skipped flow = 0.00 cfs Infiltration = 0.00 gpd - - - -HYDRAULIC INFORMATION-- - - HGL Elevation Downstream = 507.28 ft HGL Elevation Upstream = 507.71 ft HGL Slope = 0.82 % EGL Elevation Downstream = 507.53 ft EGL Elevation Upstream = 508. 16 ft EGL Slope = 1 .21 Critical Depth = 12. 15 in Depth Downstream = 16.60 in Depth Upstream = 12. 15 in Velocity Downstream = 4.02 ft/s Velocity Upstream = 5.39 ft/s Uniform Velocity Downstream = 7.45 ft/s Uniform Velocity Upstream = 7.45 ft/s Area Downstream = 1 .70 ft"2 Area Upstream = 1 .27 ft"2 Kj (JLC) = 0.50 Calculated Junction Loss = 0.509 ft - - --INLET INFORMATION- - - - Downstream Inlet = DI 20 NW, Norio° PIPE DESCRIPTION: Pipe 23 - - --RAINFALL INFORMATION- - - - Return Period = 10 Year Rainfall File = Albemarle 05 - - - -PIPE INFORMATION- - - - Current Pipe = Pipe 23 Downstream Pipe = Pipe 22 Pipe Material = RCP Pipe Length = 55.60 ft Plan Length = 59.59 ft Pipe Type = Circular Pipe Dimensions = 18.00 in Pipe Manning 's "n" = 0.013 Pipe Capacity at Invert Slope = 13.36 cfs Invert Elevation Downstream = 506.90 ft Invert Elevation Upstream = 507.80 ft Invert Slope = 1 .62% Invert Slope (Plan Length) = 1 .51% Rim Elevation Downstream = 517.00 ft Rim Elevation Upstream = 517.20 ft Natural Ground Slope = 0.36% Crown Elevation Downstream = 508.40 ft Crown Elevation Upstream = 509.30 ft - - --FLOW INFORMATION- - - - Catchment Area = 0. 16 ac Runoff Coefficient = 0.820 Inlet Time = 5.00 min Inlet Intensity = 6.70 in/hr Inlet Rational Flow = 0.91 cfs Inlet Input Flow = 0.00 cfs Inlet Hydrograph Flow = 0.00 cfs Total Area = 0.83 ac Weighted Coefficient = 0.812 Total Time of Concentration = 6.02 min Total Intensity = 6.37 in/hr Total Rational Flow = 4.34 cfs Total Flow = 4.34 cfs Uniform Capacity = 13.36 cfs Skipped flow = 0.00 cfs Infiltration = 0.00 gpd fir►` `400 - - - -HYDRAULIC INFORMATION-- - - HGL Elevation Downstream = 508.22 ft HGL Elevation Upstream = 508.60 ft HGL Slope = 0.68 EGL Elevation Downstream = 508.33 ft EGL Elevation Upstream = 508.92 ft EGL Slope = 1 .06 % Critical Depth = 9.59 in Depth Downstream = 15.86 in Depth Upstream = 9.59 in Velocity Downstream = 2.63 ft/s Velocity Upstream = 4.54 ft/s Uniform Velocity Downstream = 6.76 ft/s Uniform Velocity Upstream = 6.76 ft/s Area Downstream = 1 .65 ft"2 Area Upstream = 0.96 ft"2 Kj (JLC) = 0.50 Calculated Junction Loss = 0.398 ft - - - -INLET INFORMATION- - - - Downstream Inlet = DI 23 PIPE DESCRIPTION: Pipe 24 - - --RAINFALL INFORMATION- - - - Return Period = 10 Year Rainfall File = Albemarle 05 - - - -PIPE INFORMATION- - - - Current Pipe = Pipe 24 Downstream Pipe = Pipe 23 Pipe Material = RCP Pipe Length = 63. 19 ft Plan Length = 67. 18 ft Pipe Type = Circular Pipe Dimensions = 18.00 in Pipe Manning ' s "n" = 0.013 Pipe Capacity at Invert Slope = 13.21 cfs Invert Elevation Downstream = 508.00 ft Invert Elevation Upstream = 509.00 ft Invert Slope = 1 .58% Invert Slope (Plan Length) = 1 .49% Rim Elevation Downstream = 517.20 ft Rim Elevation Upstream = 517.50 ft Natural Ground Slope = 0.47% Crown Elevation Downstream = 509.50 ft Crown Elevation Upstream = 510.50 ft - - - -FLOW INFORMATION- - - - Catchment Area = 0.00 ac Runoff Coefficient = 0.500 Inlet Time = 5.00 min Inlet Intensity = 6.70 in/hr Inlet Rational Flow = 0.00 cfs Inlet Input Flow = 0.00 cfs Inlet Hydrograph Flow = 0.00 cfs Total Area = 0.67 ac Weighted Coefficient = 0.810 Total Time of Concentration = 5.70 min Total Intensity = 6.47 in/hr Total Rational Flow = 3.53 cfs Total Flow = 3.53 cfs Uniform Capacity = 13.21 cfs Skipped flow = 0.00 cfs Infiltration = 0.00 gpd fir+' '400 - - --HYDRAULIC INFORMATION- - - - HGL Elevation Downstream = 509.00 ft HGL Elevation Upstream = 509.72 ft HGL Slope = 1 . 14 % EGL Elevation Downstream = 509. 12 ft EGL Elevation Upstream = 510.00 ft EGL Slope = 1 .38 % Critical Depth = 8.61 in Depth Downstream = 11 .96 in Depth Upstream = 8.61 in Velocity Downstream = 2.83 ft/s Velocity Upstream = 4.23 ft/s Uniform Velocity Downstream = 6.33 ft/s Uniform Velocity Upstream = 6.33 ft/s Area Downstream = 1 .25 ft"2 Area Upstream = 0.83 ft"2 Kj (JLC) = 0.50 Calculated Junction Loss = 0.350 ft - - --INLET INFORMATION- - - - Downstream Inlet = DI 24 PIPE DESCRIPTION: Pipe 25 - - - -RAINFALL INFORMATION- - - - Return Period = 10 Year Rainfall File = Albemarle 05 - - - -PIPE INFORMATION- - - - Current Pipe = Pipe 25 Downstream Pipe = Pipe 24 Pipe Material = RCP Pipe Length = 61 .31 ft Plan Length = 65.30 ft Pipe Type = Circular Pipe Dimensions = 18.00 in Pipe Manning ' s "n" = 0.013 Pipe Capacity at Invert Slope = 11 .99 cfs Invert Elevation Downstream = 509.20 ft Invert Elevation Upstream = 510.00 ft Invert Slope = 1 .30% Invert Slope (Plan Length) = 1 .23% Rim Elevation Downstream = 517.50 ft Rim Elevation Upstream = 518.67 ft Natural Ground Slope = 1 .91% Crown Elevation Downstream = 510.70 ft Crown Elevation Upstream = 511 .50 ft - - - -FLOW INFORMATION- - - - Catchment Area = 0.34 ac Runoff Coefficient = 0.810 Inlet Time = 5.00 min Inlet Intensity = 6.70 in/hr Inlet Rational Flow = 1 .88 cfs Inlet Input Flow = 0.00 cfs Inlet Hydrograph Flow = 0.00 cfs Total Area = 0.67 ac Weighted Coefficient = 0.810 Total Time of Concentration = 5.41 min Total Intensity = 6.56 in/hr Total Rational Flow = 3.58 cfs Total Flow = 3.58 cfs Uniform Capacity = 11 .99 cfs Skipped flow = 0.00 cfs Infiltration = 0.00 gpd Ifte Now - - - -HYDRAULIC INFORMATION-- - - HGL Elevation Downstream = 510.07 ft HGL Elevation Upstream = 510.72 ft HGL Slope = 1 .07 % EGL Elevation Downstream = 510.25 ft EGL Elevation Upstream = 511 .00 ft EGL Slope = 1 .24 % Critical Depth = 8.67 in Depth Downstream = 10.41 in Depth Upstream = 8.67 in Velocity Downstream = 3.38 ft/s Velocity Upstream = 4.25 ft/s Uniform Velocity Downstream = 5.93 ft/s Uniform Velocity Upstream = 5.93 ft/s Area Downstream = 1 .06 ft^2 Area Upstream = 0.84 ft^2 Kj (JLC) = 0.50 Calculated Junction Loss = 0.357 ft -- - -INLET INFORMATION- - - - Downstream Inlet = MH 25 Now Now PIPE DESCRIPTION: Pipe 26 - - - -RAINFALL INFORMATION- - - - Return Period = 10 Year Rainfall File = Albemarle 05 - - --PIPE INFORMATION- - - - Current Pipe = Pipe 26 Downstream Pipe = Pipe 25 Pipe Material = RCP Pipe Length = 59.01 ft Plan Length = 63.00 ft Pipe Type = Circular Pipe Dimensions = 18.00 in Pipe Manning 's "n" = 0.013 Pipe Capacity at Invert Slope = 12.23 cfs Invert Elevation Downstream = 510.20 ft Invert Elevation Upstream = 511 .00 ft Invert Slope = 1 .36% Invert Slope (Plan Length) = 1 .27% Rim Elevation Downstream = 518.67 ft Rim Elevation Upstream = 518.67 ft Natural Ground Slope = 0.00% Crown Elevation Downstream = 511 .70 ft Crown Elevation Upstream = 512.50 ft - - --FLOW INFORMATION- - - - Catchment Area = 0.32 ac Runoff Coefficient = 0.810 Inlet Time = 5.00 min Inlet Intensity = 6.70 in/hr Inlet Rational Flow = 1 .77 cfs Inlet Input Flow = 0.00 cfs Inlet Hydrograph Flow = 0.00 cfs Total Area = 0.32 ac Weighted Coefficient = 0.810 Total Time of Concentration = 5.00 min Total Intensity = 6.70 in/hr Total Rational Flow = 1 .77 cfs Total Flow = 1 .77 cfs Uniform Capacity = 12.23 cfs Skipped flow = 0.00 cfs Infiltration = 0.00 gpd %we 441110 -- - -HYDRAULIC INFORMATION-- - - HGL Elevation Downstream = 511 .08 ft HGL Elevation Upstream = 511 .59 ft HGL Slope = 0.87 % EGL Elevation Downstream = 511 . 12 ft EGL Elevation Upstream = 511 .78 ft EGL Slope = 1 . 11 % Critical Depth = 6.01 in Depth Downstream = 10.56 in Depth Upstream = 6.01 in Velocity Downstream = 1 .65 ft/s Velocity Upstream = 3.43 ft/s Uniform Velocity Downstream = 4.93 ft/s Uniform Velocity Upstream = 0.00 ft/s Area Downstream = 1 .08 ft"2 Area Upstream = 0.52 ft"2 Kj (JLC) = 0.50 Calculated Junction Loss = NA - - - -INLET INFORMATION- - - - Downstream Inlet = DI 26 New Ngisior PIPE DESCRIPTION: Pipe 27 -- --RAINFALL INFORMATION- - - - Return Period = 10 Year Rainfall File = Albemarle 05 - - - -PIPE INFORMATION- - - - Current Pipe = Pipe 27 Downstream Pipe = Pipe 19 Pipe Material = RCP Pipe Length = 24.01 ft Plan Length = 28.00 ft Pipe Type = Circular Pipe Dimensions = 15.00 in Pipe Manning ' s "n" = 0.013 Pipe Capacity at Invert Slope = 9.32 cfs Invert Elevation Downstream = 512.00 ft Invert Elevation Upstream = 512.50 ft Invert Slope = 2.08% Invert Slope (Plan Length) = 1 .79% Rim Elevation Downstream = 516.50 ft Rim Elevation Upstream = 516.60 ft Natural Ground Slope = 0.00% Crown Elevation Downstream = 513.25 ft Crown Elevation Upstream = 513.75 ft - - --FLOW INFORMATION- - - - Catchment Area = 0. 17 ac Runoff Coefficient = 0.690 Inlet Time = 5.00 min Inlet Intensity = 6.70 in/hr Inlet Rational Flow = 0.77 cfs Inlet Input Flow = 0.00 cfs Inlet Hydrograph Flow = 0.00 cfs Total Area = 0. 17 ac Weighted Coefficient = 0.690 Total Time of Concentration = 5.00 min Total Intensity = 6.70 in/hr Total Rational Flow = 0.77 cfs Total Flow = 0.77 cfs Uniform Capacity = 9.32 cfs Skipped flow = 0.00 cfs Infiltration = 0.00 gpd - - - -HYDRAULIC INFORMATION-- - - HGL Elevation Downstream = 512.24 ft HGL Elevation Upstream = 512.91 ft HGL Slope = 2.77 EGL Elevation Downstream = 512.57 ft EGL Elevation Upstream = 513.24 ft EGL Slope = 2.77 % Critical Depth = 4. 13 in Depth Downstream = 2.92 in Depth Upstream = 2.92 in Velocity Downstream = 4.60 ft/s Velocity Upstream = 4.60 ft/s Uniform Velocity Downstream = 8.36 ft/s Uniform Velocity Upstream = 0.00 ft/s Area Downstream = 0. 17 ft"2 Area Upstream = 0. 17 ft"2 Kj (JLC) = 0.50 Calculated Junction Loss = NA - - - -INLET INFORMATION- - - - Downstream Inlet = DI 20 DIVISION 3 — Storm Inlet Calculations The Cox Company UVA Research Park 06-50 Town Centers III and IV INLET NUMBER 2 LENGTH 10.0 STATION 12+66 DRAINAGE AREA = 0.400 ACRES C VALUE = .750 CA = 0.300 DRAINAGE AREA = 0.040 ACRES C VALUE = .750 CA = 0.030 SUM CA= 0.330 INT= 4.00 CFS= 1.320 CO= 0.410 GUTTER FLOW= 1.730 GUTTER SLOPE = 0.0112 FT/FT PAVEMENT CROSS SLOPE = 0.0208 FT/FT SPREAD AT A SLOPE OF .011 (ft./ft.) IS 6.09 (ft.) XXXXXXXXXX CURB INLET IN A SUMP XXXXXXXXXX P EFFEC. LENGTH (ft) = 13.60 H (ft) = 0.500 DEPTH OF WATER (ft) = 0.12 SPREAD (ft) = 5.82 INLET NUMBER 2 LENGTH 10.0 STATION 12+66 DRAINAGE AREA = 0.400 ACRES C VALUE = .750 CA = 0.300 DRAINAGE AREA = 0.040 ACRES C VALUE= .750 CA = 0.030 SUM CA= 0.330 INT= 6.50 CFS= 3.185 CO= 0.000 GUTTER FLOW= 3.185 GUTTER SLOPE = 0.0112 FT/FT PAVEMENT CROSS SLOPE = 0.0208 FT/FT SPREAD AT A SLOPE OF .011 (ft./ft.) IS 8.44 (ft.) XXXXXXXXXX CURB INLET IN A SUMP XXXXXXXXXX P EFFEC. LENGTH (ft) = 13.60 H (ft) = 0.500 DEPTH OF WATER (ft) = 0.22 SPREAD (ft) = 10.48 *err Name • J1- < _ t/\) INLET NUMBER 3 LENGTH 8.0 STATION 14+75 v ;lot' DRAINAGE AREA= 0.630 ACRES C VALUE = .710 CA = 0.447 SUM CA= 0.447 INT= 4.00 CFS= 1.789 CO= 0.000 GUTTER FLOW= 1.789 GUTTER SLOPE = 0.0801 FT/FT PAVEMENT CROSS SLOPE = 0.0208 FT/FT SPREAD W W/T SW SW/SX Eo a S'W SE 3.17 2.0 0.63 0.0833 4.0 0.98 3.5 0.146 0.164 XXXXXXXXXX CURB INLET ON A CONTINUOUS GRADE XXXXXXXXXX REQUIRED LENGTH (ft) = 14.4 EFFICIENCY= 0.77 CFS INTERCEPTED= 1.38 CFS CARRYOVER= 0.41 INLET NUMBER 3 LENGTH 8.0 STATION 14+75 DRAINAGE AREA = 0.630 ACRES C VALUE = .710 CA = 0.447 SUM CA= 0.447 INT= 6.50 CFS= 2.907 CO= 0.000 GUTTER FLOW= 2.907 GUTTER SLOPE = 0.0801 FT/FT PAVEMENT CROSS SLOPE = 0.0208 FT/FT SPREAD W W/T SW SW/SX Eo a S'W SE 4.74 2.0 0.42 0.0833 4.0 0.90 3.5 0.146 0.152 XXXX CURB INLET ON A CONTINUOUS GRADE XXXXXXXXXX REQUIRED LENGTH (ft) = 18.4 EFFICIENCY= 0.64 CFS INTERCEPTED= 1.86 CFS CARRYOVER= 1.04 C), = sx Lit LI N... INLET NUMBER 4 LENGTH 8.0 STATION 15+75 DRAINAGE AREA = 0.470 ACRES C VALUE = .700 CA = 0.329 SUM CA= 0.329 INT= 4.00 CFS= 1.316 CO= 0.000 GUTTER FLOW= 1.316 GUTTER SLOPE = 0.0801 FT/FT PAVEMENT CROSS SLOPE = 0.0208 FT/FT SPREAD W W/T SW SW/SX Eo a S'W SE 2.21 2.0 0.90 0.0833 4.0 1.00 3.5 0.146 0.167 XXXXXXXXXX CURB INLET ON A CONTINUOUS GRADE XXXXXXXXXX REQUIRED LENGTH (ft) = 12.5 EFFICIENCY= 0.84 CFS INTERCEPTED= 1.11 CFS CARRYOVER= 0.21 INLET NUMBER 4 LENGTH 8.0 STATION 15+75 DRAINAGE AREA = 0.470 ACRES C VALUE = .700 CA = 0.329 SUM CA= 0.329 INT= 6.50 CFS= 2.139 CO= 0.000 GUTTER FLOW= 2.139 GUTTER SLOPE = 0.0801 FT/FT PAVEMENT CROSS SLOPE = 0.0208 FT/FT SPREAD W W/T SW SW/SX Eo a S'W SE 3.74 2.0 0.53 0.0833 4.0 0.96 3.5 0.146 0.161 XXXXXXXXXX CURB INLET ON A CONTINUOUS GRADE XXXXXXXXXX REQUIRED LENGTH (ft) = 15.7 EFFICIENCY= 0.72 CFS INTERCEPTED= 1.55 CFS CARRYOVER= 0.59 'Now *woe INLET NUMBER 5 LENGTH 8.0 STATION 12+66 DRAINAGE AREA = 0.220 ACRES C VALUE = .620 CA = 0.136 DRAINAGE AREA = 0.020 ACRES C VALUE = .620 CA = 0.012 SUM CA= 0.149 INT= 4.00 CFS= 0.595 CO= 0.210 GUTTER FLOW= 0.805 GUTTER SLOPE = 0.0143 FT/FT PAVEMENT CROSS SLOPE = 0.0208 FT/FT SPREAD AT A SLOPE OF .014 (ft./ft.) IS 3.17 (ft.) XXXXXXXXXX CURB INLET IN A SUMP XXXXXXXXXX P EFFEC. LENGTH (ft) = 11.60 H (ft) = 0.500 DEPTH OF WATER (ft) = 0.08 SPREAD (ft) = 3.81 INLET NUMBER 5 LENGTH 8.0 STATION 12+66 DRAINAGE AREA = 0.220 ACRES C VALUE = .620 CA = 0.136 DRAINAGE AREA = 0.020 ACRES C VALUE = .620 CA = 0.012 SUM CA= 0.149 INT= 6.50 CFS= 1.557 CO= 0.000 GUTTER FLOW= 1.557 GUTTER SLOPE = 0.0143 FT/FT PAVEMENT CROSS SLOPE = 0.0208 FT/FT SPREAD AT A SLOPE OF .014 (ft./ft.) IS 5.36 (ft.) XXXXXXXXXX CURB INLET IN A SUMP XXXXXXXXXX P EFFEC. LENGTH (ft) = 11.60 H (ft) = 0.500 DEPTH OF WATER (ft) = 0.15 SPREAD (ft) = 7.23 Nor INLET NUMBER 6 LENGTH 8.0 STATION 6 DRAINAGE AREA = 0.780 ACRES C VALUE = .750 CA = 0.585 SUM CA= 0.585 INT= 4.00 CFS= 2.340 CO= 0.000 GUTTER FLOW= 2.340 GUTTER SLOPE = 0.0493 FT/FT PAVEMENT CROSS SLOPE = 0.0200 FT/FT SPREAD W W/T SW SW/SX Eo a S'W SE 4.93 2.0 0.41 0.0833 4.2 0.89 3.5 0.147 0.151 XXXXXXXXXX CURB INLET ON A CONTINUOUS GRADE XXXXXXXXXX REQUIRED LENGTH (ft) = 14.7 EFFICIENCY= 0.76 CFS INTERCEPTED= 1.77 CFS CARRYOVER= 0.57 INLET NUMBER 6 LENGTH 8.0 STATION 6 DRAINAGE AREA = 0.780 ACRES C VALUE = .750 CA = 0.585 SUM CA= 0.585 INT= 6.50 CFS= 3.802 CO= 0.000 GUTTER FLOW= 3.802 GUTTER SLOPE = 0.0493 FT/FT PAVEMENT CROSS SLOPE = 0.0200 FT/FT SPREAD W W/T SW SW/SX Eo a S'W SE 6.66 2.0 0.30 0.0833 4.2 0.77 3.5 0.147 0.133 XXXXXXXXXX CURB INLET ON A CONTINUOUS GRADE XXXXXXXXXX REQUIRED LENGTH (ft) = 19.4 EFFICIENCY= 0.62 CFS INTERCEPTED= 2.34 CFS CARRYOVER= 1.46 New • INLET NUMBER 7 LENGTH 6.0 STATION 7 DRAINAGE AREA= 0.200 ACRES C VALUE = .860 CA = 0.172 SUM CA= 0.172 INT= 4.00 CFS= 0.688 CO= 0.000 GUTTER FLOW= 0.688 GUTTER SLOPE = 0.0242 FT/FT PAVEMENT CROSS SLOPE = 0.0200 FT/FT SPREAD W W/T SW SW/SX Eo a S'W SE 2.06 2.0 0.97 0.0833 4.2 1.00 3.5 0.147 0.167 XXXXXXXXXX CURB INLET ON A CONTINUOUS GRADE XXXXXXXXXX REQUIRED LENGTH (ft) = 6.7 EFFICIENCY= 0.98 CFS INTERCEPTED= 0.68 CFS CARRYOVER= 0.01 INLET NUMBER 7 LENGTH 6.0 STATION 7 DRAINAGE AREA = 0.200 ACRES C VALUE= .860 CA = 0.172 SUM CA= 0.172 INT= 6.50 CFS= 1.118 CO= 0.000 GUTTER FLOW= 1.118 GUTTER SLOPE = 0.0242 FT/FT PAVEMENT CROSS SLOPE = 0.0200 FT/FT SPREAD W W/T SW SW/SX Eo a SW SE 3.64 2.0 0.55 0.0833 4.2 0.97 3.5 0.147 0.162 XXL O LXXX CURB INLET ON A CONTINUOUS GRADE XXXXXXXXXX REQUIRED LENGTH (ft) = 8.3 EFFICIENCY= 0.90 CFS INTERCEPTED= 1.01 CFS CARRYOVER= 0.11 New INLET NUMBER 8 LENGTH 6.0 STATION 8 DRAINAGE AREA = 0.210 ACRES C VALUE = .850 CA= 0.178 SUM CA= 0.178 INT= 4.00 CFS= 0.714 CO= 0.000 GUTTER FLOW= 0.714 GUTTER SLOPE = 0.0500 FT/FT PAVEMENT CROSS SLOPE = 0.0200 FT/FT SPREAD W W/T SW SW/SX Eo a S'W SE 1.79 2.0 1.12 0.0833 4.2 1.00 3.5 0.147 0.167 XXXXXXXXXX CURB INLET ON A CONTINUOUS GRADE XXXXXXXXXX REQUIRED LENGTH (ft) = 8.4 EFFICIENCY= 0.89 CFS INTERCEPTED= 0.64 CFS CARRYOVER= 0.08 INLET NUMBER 8 LENGTH 6.0 STATION 8 DRAINAGE AREA = 0.210 ACRES C VALUE = .850 CA = 0.178 SUM CA= 0.178 INT= 6.50 CFS= 1.160 CO= 0.000 GUTTER FLOW= 1.160 GUTTER SLOPE = 0.0500 FT,/FT PAVEMENT CROSS SLOPE = 0.0200 FT/FT SPREAD W W/T SW SW/SX Eo a S'W SE 2.57 2.0 0.78 0.0833 4.2 1.00 3.5 0.147 0.166 XXXXXXXXXX CURB INLET ON A CONTINUOUS GRADE XXXXXXXXXX REQUIRED LENGTH (ft) = 10.3 EFFICIENCY= 0.79 CFS INTERCEPTED= 0.92 CFS CARRYOVER= 0.24 New INLET NUMBER 9 LENGTH 6.0 STATION 9 DRAINAGE AREA = 0.300 ACRES C VALUE = .850 CA = 0.255 SUM CA= 0.255 INT= 4.00 CFS= 1.020 CO= 0.000 GUTTER FLOW= 1.020 GUTTER SLOPE = 0.0082 FT/FT PAVEMENT CROSS SLOPE = 0.0200 FT/FT SPREAD W W/T SW SW/SX Eo a S'W SE 5.16 2.0 0.39 0.0833 4.2 0.87 3.5 0.147 0.148 XXXXXXXXXX CURB INLET ON A CONTINUOUS GRADE XXXXXXXXXX REQUIRED LENGTH (ft) = 6.1 EFFICIENCY= 1.00 CFS INTERCEPTED= 1.02 CFS CARRYOVER= 0.00 INLET NUMBER 9 LENGTH 6.0 STATION 9 DRAINAGE AREA = 0.300 ACRES C VALUE = .850 CA = 0.255 SUM CA= 0.255 INT= 6.50 CFS= 1.658 CO= 0.000 GUTTER FLOW= 1.658 GUTTER SLOPE = 0.0082 FT/FT PAVEMENT CROSS SLOPE = 0.0200 FT/FT SPREAD W W/T SW SW/SX Eo a SW SE 6.91 2.0 0.29 0.0833 4.2 0.75 3.5 0.147 0.130 XXXXXXXXXX CURB INLET ON A CONTINUOUS GRADE XXXXXXXXXX REQUIRED LENGTH (ft) = 8.1 EFFICIENCY= 0.91 CFS INTERCEPTED= 1.51 CFS CARRYOVER= 0.14 41111110 NO.* INLET NUMBER 10 LENGTH 8.0 STATION 10 DRAINAGE AREA = 0.460 ACRES C VALUE = .860 CA = 0.396 SUM CA= 0.396 INT= 4.00 CFS= 1.582 CO= 0.000 GUTTER FLOW= 1.582 GUTTER SLOPE = 0.0126 FT/FT PAVEMENT CROSS SLOPE = 0.0200 FT/FT SPREAD W W/T SW SW/SX Eo a S'W SE 5.95 2.0 0.34 0.0833 4.2 0.82 3.5 0.147 0.140 XXXXXXXXXX CURB INLET ON A CONTINUOUS GRADE XXXXXXXXXX REQUIRED LENGTH (ft) = 8.6 EFFICIENCY= 0.99 CFS INTERCEPTED= 1.57 CFS CARRYOVER= 0.01 INLET NUMBER 10 LENGTH 8.0 STATION 10 DRAINAGE AREA = 0.460 ACRES C VALUE = .860 CA = 0.396 SUM CA= 0.396 INT= 6.50 CFS= 2.571 CO= 0.000 GUTTER FLOW= 2.571 GUTTER SLOPE = 0.0126 FT/FT PAVEMENT CROSS SLOPE = 0.0200 FT/FT SPREAD W W/T SW SW/SX Eo a S'W SE 7.78 2.0 0.26 0.0833 4.2 0.70 3.5 0.147 0.122 X CURB INLET ON A CONTINUOUS GRADE XXXXXXXXXX REQUIRED LENGTH (ft) = 11.5 EFFICIENCY= 0.88 CFS INTERCEPTED= 2.27 CFS CARRYOVER= 0.30 Name INLET NUMBER 11 LENGTH 4.0 STATION 11 DRAINAGE AREA = 0.160 ACRES C VALUE = .810 CA = 0.130 SUM CA= 0.130 INT= 4.00 CFS= 0.518 CO= 0.000 GUTTER FLOW= 0.518 GUTTER SLOPE = 0.0058 FT/FT PAVEMENT CROSS SLOPE = 0.0200 FT/FT SPREAD W W/T SW SW/SX Eo a S'W SE 3.46 2.0 0.58 0.0833 4.2 0.97 3.5 0.147 0.163 XXXXXXXXXX CURB INLET ON A CONTINUOUS GRADE XXXXXXXXXX REQUIRED LENGTH (ft) = 3.9 EFFICIENCY= 1.00 CFS INTERCEPTED= 0.52 CFS CARRYOVER= 0.00 INLET NUMBER 11 LENGTH 4.0 STATION 11 DRAINAGE AREA = 0.160 ACRES C VALUE= .810 CA = 0.130 SUM CA= 0.130 INT= 6.50 CFS= 0.842 CO= 0.000 GUTTER FLOW= 0.842 GUTTER SLOPE = 0.0058 FT/FT PAVEMENT CROSS SLOPE = 0.0200 FT/FT SPREAD W W/T SW SW/SX Eo a S'W SE 5.10 2.0 0.39 0.0833 4.2 0.88 3.5 0.147 0.149 XXXXXXXXXX CURB INLET ON A CONTINUOUS GRADE XXXXXXXXXX REQUIRED LENGTH (ft) = 5.1 EFFICIENCY= 0.94 CFS INTERCEPTED= 0.79 CFS CARRYOVER= 0.05 INLET NUMBER 12 LENGTH 10.0 STATION 12 DRAINAGE AREA = 0.960 ACRES C VALUE = .860 CA = 0.826 SUM CA= 0.826 INT= 4.00 CFS= 3.302 CO= 0.000 GUTTER FLOW= 3.302 GUTTER SLOPE = 0.0145 FT/FT PAVEMENT CROSS SLOPE = 0.0200 FT/FT Sw 5x SPREAD W W/T SW SW/SX Eo a S'W SE 8.52 2.0 0.23 0.0833 4.2 0.65 3.5 0.147 0.115 XXXXXXXXXX CURB INLET ON A CONTINUOUS GRADE XXXXXXXXXX REQUIRED LENGTH (ft) = 13.8 EFFICIENCY= 0.90 CFS INTERCEPTED= 2.98 CFS CARRYOVER= 0.32 INLET NUMBER 12 LENGTH 10.0 STATION 12 DRAINAGE AREA = 0.960 ACRES C VALUE= .860 CA= 0.826 SUM CA= 0.826 INT= 6.50 CFS= 5.366 CO= 0.000 GUTTER FLOW= 5.366 GUTTER SLOPE = 0.0145 FT/FT PAVEMENT CROSS SLOPE = 0.0200 FT/FT SPREAD W W/T SW SW/SX Eo a SW SE 10.69 2.0 0.19 0.0833 4.2 0.54 3.5 0.147 0.099 XXXXXXXXXX CURB INLET ON A CONTINUOUS GRADE XXXXXXXXXX REQUIRED LENGTH (ft) = 18.5 EFFICIENCY= 0.75 CFS INTERCEPTED= 4.05 CFS CARRYOVER= 1.32 sir ti..r+ INLET NUMBER 13 LENGTH 8.0 STATION 13 DRAINAGE AREA = 0.640 ACRES C VALUE = .710 CA = 0.454 SUM CA= 0.454 INT= 4.00 CFS= 1.818 CO= 0.000 GUTTER FLOW= 1.818 GUTTER SLOPE = 0.0050 FT/FT PAVEMENT CROSS SLOPE = 0.0200 FT/FT SPREAD W W/T SW SW/SX Eo a S'W SE 8.25 2.0 0.24 0.0833 4.2 0.67 3.5 0.147 0.118 XXXXXXXXXX CURB INLET ON A CONTINUOUS GRADE XXXXXXXXXX REQUIRED LENGTH (ft) = 7.7 EFFICIENCY= 1.00 CFS INTERCEPTED= 1.82 CFS CARRYOVER= 0.00 INLET NUMBER 13 LENGTH 8.0 STATION 13 DRAINAGE AREA = 0.640 ACRES C VALUE = .710 CA = 0.454 SUM CA= 0.454 INT= 6.50 CFS= 2.954 CO= 0.000 GUTTER FLOW= 2.954 GUTTER SLOPE = 0.0050 FT/FT PAVEMENT CROSS SLOPE = 0.0200 FT/FT SPREAD W W/T SW SW/SX Eo a SW SE 10.38 2.0 0.19 0.0833 4.2 0.55 3.5 0.147 0.101 XXXXXXXXXX CURB INLET ON A CONTINUOUS GRADE XXXXXXXXXX REQUIRED LENGTH (ft) = 10.3 EFFICIENCY= 0.93 CFS INTERCEPTED= 2.75 CFS CARRYOVER= 0.20 NOW" NSW INLET NUMBER 15 LENGTH 12.0 STATION 37+40 DRAINAGE AREA = 0.420 ACRES C VALUE = .860 CA = 0.361 SUM CA= 0.361 INT= 4.00 CFS= 1.445 CO= 0.230 GUTTER FLOW= 1.675 GUTTER SLOPE = 0.0300 FT/FT PAVEMENT CROSS SLOPE = 0.0200 FT/FT SPREAD W W/T SW SW/SX Eo a S'W SE 4.63 2.0 0.43 0.0833 4.2 0.91 3.5 0.147 0.153 XXXXXXXXXX CURB INLET ON A CONTINUOUS GRADE XXXXXXXXXX REQUIRED LENGTH (ft) = 10.9 EFFICIENCY= 1.00 CFS INTERCEPTED= 1.67 CFS CARRYOVER= 0.00 INLET NUMBER 15 LENGTH 12.0 STATION 37+40 DRAINAGE AREA = 0.420 ACRES C VALUE _ .860 CA = 0.361 SUM CA= 0.361 INT= 6.50 CFS= 2.348 CO= 1.000 GUTTER FLOW= 3.348 GUTTER SLOPE = 0.0300 FT/FT PAVEMENT CROSS SLOPE = 0.0200 FT/FT SPREAD W W/T SW SW/SX Eo a S'W SE 7.12 2.0 0.28 0.0833 4.2 0.74 3.5 0.147 0.128 XXXXXXXXXX CURB INLET ON A CONTINUOUS GRADE XXXXXXXXXX REQUIRED LENGTH (ft) = 16.2 EFFICIENCY= 0.91 CFS INTERCEPTED= 3.06 CFS CARRYOVER= 0.29 Nese •ftrof INLET NUMBER 16 LENGTH 12.0 STATION 36+05 DRAINAGE AREA = 0.780 ACRES C VALUE = .880 CA = 0.686 SUM CA= 0.686 INT= 4.00 CFS= 2.746 CO= 0.000 GUTTER FLOW= 2.746 GUTTER SLOPE = 0.0491 FT/FT PAVEMENT CROSS SLOPE = 0.0200 FT/FT SPREAD W W/T SW SW/SX Eo a S'W SE 5.49 2.0 0.36 0.0833 4.2 0.85 3.5 0.147 0.145 XXXXXXXXXX CURB INLET ON A CONTINUOUS GRADE XXXXXXXXXX REQUIRED LENGTH (ft) = 16.0 EFFICIENCY= 0.92 CFS INTERCEPTED= 2.52 CFS CARRYOVER= 0.23 INLET NUMBER 16 LENGTH 12.0 STATION 36+05 DRAINAGE AREA = 0.780 ACRES C VALUE = .880 CA= 0.686 SUM CA= 0.686 INT= 6.50 CFS= 4.462 CO= 0.000 GUTTER FLOW= 4.462 GUTTER SLOPE = 0.0491 FT/FT PAVEMENT CROSS SLOPE = 0.0200 FT/FT SPREAD W W/T SW SW/SX Eo a S'W SE 7.28 2.0 0.27 0.0833 4.2 0.73 3.5 0.147 0.127 XXXXXXXXXX CURB INLET ON A CONTINUOUS GRADE XXXXXXXXXX REQUIRED LENGTH (ft) = 21.3 EFFICIENCY= 0.78 CFS INTERCEPTED= 3.46 CFS CARRYOVER= 1.00 Nome *Nor INLET NUMBER 17 LENGTH 8.0 STATION 31+00 DRAINAGE AREA = 0.180 ACRES C VALUE _ .780 CA = 0.140 SUM CA= 0.140 INT= 4.00 CFS= 0.562 CO= 0.000 GUTTER FLOW= 0.562 GUTTER SLOPE = 0.0408 FT/FT PAVEMENT CROSS SLOPE = 0.0200 FT/FT SPREAD W W/T SW SW/SX Eo a S'W SE 1.70 2.0 1.18 0.0833 4.2 1.00 3.5 0.147 0.167 XXXXXXXXXX CURB INLET ON A CONTINUOUS GRADE XXXXXXXXXX REQUIRED LENGTH (ft) = 7.2 EFFICIENCY= 1.00 CFS INTERCEPTED= 0.56 CFS CARRYOVER= 0.00 INLET NUMBER 17 LENGTH 8.0 STATION 31+00 DRAINAGE AREA = 0.180 ACRES C VALUE _ .780 CA = 0.140 SUM CA= 0.140 INT= 6.50 CFS= 0.913 CO= 0.000 GUTTER FLOW= 0.913 GUTTER SLOPE = 0.0408 FT/FT PAVEMENT CROSS SLOPE = 0.0200 FT/FT SPREAD W W/T SW SW/SX Eo a S'W SE 2.13 2.0 0.94 0.0833 4.2 1.00 3.5 0.147 0.167 XXXXXXXXXX CURB INLET ON A CONTINUOUS GRADE X )(XXX REQUIRED LENGTH (ft) = 8.8 EFFICIENCY= 0.99 CFS INTERCEPTED= 0.90 CFS CARRYOVER= 0.01 Now INLET NUMBER 18 LENGTH 8.0 STATION 31+00 DRAINAGE AREA = 0.170 ACRES C VALUE = .770 CA = 0.131 SUM CA= 0.131 INT= 4.00 CFS= 0.524 CO= 0.000 GUTTER FLOW= 0.524 GUTTER SLOPE = 0.0408 FT/FT PAVEMENT CROSS SLOPE = 0.0200 FT/FT SPREAD W W/T SW SW/SX Eo a S'W SE 1.65 2.0 1.21 0.0833 4.2 1.00 3.5 0.147 0.167 XXXXXXXXXX CURB INLET ON A CONTINUOUS GRADE XXXXXXXXXX REQUIRED LENGTH (ft) = 6.9 EFFICIENCY= 1.00 CFS INTERCEPTED= 0.52 CFS CARRYOVER= 0.00 INLET NUMBER 18 LENGTH 8.0 STATION 31+00 DRAINAGE AREA = 0.170 ACRES C VALUE = .770 CA = 0.131 SUM CA= 0.131 INT= 6.50 CFS= 0.851 CO= 0.000 GUTTER FLOW= 0.851 GUTTER SLOPE = 0.0408 FT/FT PAVEMENT CROSS SLOPE = 0.0200 FT/FT SPREAD W W/T SW SW/SX Eo a S'W SE 1.98 2.0 1.01 0.0833 4.2 1.00 3.5 0.147 0.167 XXXXXXXXXX CURB INLET ON A CONTINUOUS GRADE XXXXXXXXXX REQUIRED LENGTH (ft) = 8.5 EFFICIENCY= 0.99 CFS INTERCEPTED= 0.85 CFS CARRYOVER= 0.01 Nov' ti.. INLET NUMBER 19 LENGTH 8.0 STATION 19 DRAINAGE AREA = 0.420 ACRES C VALUE = .800 CA = 0.336 SUM CA= 0.336 INT= 4.00 CFS= 1.344 CO= 0.000 GUTTER FLOW= 1.344 GUTTER SLOPE = 0.0123 FT/FT PAVEMENT CROSS SLOPE = 0.0200 FT/FT SPREAD W W/T SW SW/SX Eo a S'W SE 5.41 2.0 0.37 0.0833 4.2 0.86 3.5 0.147 0.146 XXXXXXXXXX CURB INLET ON A CONTINUOUS GRADE XXXXXXXXXX REQUIRED LENGTH (ft) = 7.8 EFFICIENCY= 1.00 CFS INTERCEPTED= 1.34 CFS CARRYOVER= 0.00 INLET NUMBER 19 LENGTH 8.0 STATION 19 DRAINAGE AREA = 0.420 ACRES C VALUE = .800 CA = 0.336 SUM CA= 0.336 INT= 6.50 CFS= 2.184 CO= 0.000 GUTTER FLOW= 2.184 GUTTER SLOPE = 0.0123 FT/FT PAVEMENT CROSS SLOPE = 0.0200 FT/FT SPREAD W W/T SW SW/SX Eo a S'W SE 7.19 2.0 0.28 0.0833 4.2 0.73 3.5 0.147 0.128 XXXXXXXXXX CURB INLET ON A CONTINUOUS GRADE XXXXXXXXXX REQUIRED LENGTH (ft) = 10.4 EFFICIENCY= 0.93 CFS INTERCEPTED= 2.03 CFS CARRYOVER= 0.15 •wo, INLET NUMBER 20 LENGTH 6.0 STATION 20 DRAINAGE AREA = 0.320 ACRES C VALUE = .720 CA = 0.230 SUM CA= 0.230 INT= 4.00 CFS= 0.922 CO= 0.000 GUTTER FLOW= 0.922 GUTTER SLOPE = 0.0050 FT/FT PAVEMENT CROSS SLOPE = 0.0200 FT/FT SPREAD W W/T SW SW/SX Eo a SW SE 5.67 2.0 0.35 0.0833 4.2 0.84 3.5 0.147 0.143 XXXXXXXXXX CURB INLET ON A CONTINUOUS GRADE XXXXXXXXXX REQUIRED LENGTH (ft) = 5.1 EFFICIENCY= 1.00 CFS INTERCEPTED= 0.92 CFS CARRYOVER= 0.00 INLET NUMBER 20 LENGTH 6.0 STATION 20 DRAINAGE AREA = 0.320 ACRES C VALUE = .720 CA = 0.230 SUM CA= 0.230 INT= 6.50 CFS= 1.498 CO= 0.000 GUTTER FLOW= 1.498 GUTTER SLOPE = 0.0050 FT/FT PAVEMENT CROSS SLOPE = 0.0200 FT/FT SPREAD W W/T SW SW/SX Eo a SW SE 7.47 2.0 0.27 0.0833 4.2 0.72 3.5 0.147 0.125 XXXXXXXXXX CURB INLET ON A CONTINUOUS GRADE XXXXXXXXXX REQUIRED LENGTH (ft) = 6.8 EFFICIENCY= 0.98 CFS INTERCEPTED= 1.46 CFS CARRYOVER= 0.03 Nome INLET NUMBER 21 LENGTH 6.0 STATION 21 DRAINAGE AREA = 0.210 ACRES C VALUE = .810 CA = 0.170 SUM CA= 0.170 INT= 4.00 CFS= 0.680 CO= 0.000 GUTTER FLOW= 0.680 GUTTER SLOPE = 0.0159 FT/FT PAVEMENT CROSS SLOPE = 0.0200 FT/FT SPREAD W W/T SW SW/SX Eo a S'W SE 2.70 2.0 0.74 0.0833 4.2 1.00 3.5 0.147 0.166 XXXXXXXXXX CURB INLET ON A CONTINUOUS GRADE XXXXXXXXXX REQUIRED LENGTH (ft) = 5.9 EFFICIENCY= 1.00 CFS INTERCEPTED= 0.68 CFS CARRYOVER= 0.00 INLET NUMBER 21 LENGTH 6.0 STATION 21 DRAINAGE AREA = 0.210 ACRES C VALUE_ .810 CA = 0.170 SUM CA= 0.170 INT= 6.50 CFS= 1.106 CO= 0.000 GUTTER FLOW= 1.106 GUTTER SLOPE = 0.0159 FT/FT PAVEMENT CROSS SLOPE = 0.0200 FT/FT SPREAD W W/T SW SW/SX Eo a S'W SE 4.30 2.0 0.47 0.0833 4.2 0.93 3.5 0.147 0.156 XXXXXXXXXX CURB INLET ON A CONTINUOUS GRADE XXXXXXXXXX REQUIRED LENGTH (ft) = 7.4 EFFICIENCY= 0.95 CFS INTERCEPTED= 1.05 CFS CARRYOVER= 0.06 INLET NUMBER 22 LENGTH 10.0 STATION 22 DRAINAGE AREA = 0.590 ACRES C VALUE= .740 CA = 0.437 SUM CA= 0.437 INT= 4.00 CFS= 1.746 CO= 0.000 GUTTER FLOW= 1.746 GUTTER SLOPE = 0.0151 FT/FT PAVEMENT CROSS SLOPE = 0.0200 FT/FT SPREAD W W/T SW SW/SX Eo a S'W SE 5.98 2.0 0.33 0.0833 4.2 0.82 3.5 0.147 0.140 XXXXXXXXXX CURB INLET ON A CONTINUOUS GRADE XXXXXXXXXX REQUIRED LENGTH (ft) = 9.5 EFFICIENCY= 1.00 CFS INTERCEPTED= 1.75 CFS CARRYOVER= 0.00 INLET NUMBER 22 LENGTH 10.0 STATION 22 DRAINAGE AREA = 0.590 ACRES C VALUE = .740 CA = 0.437 SUM CA= 0.437 INT= 6.50 CFS= 2.838 CO= 0.000 GUTTER FLOW= 2.838 GUTTER SLOPE = 0.0151 FT/FT PAVEMENT CROSS SLOPE = 0.0200 FT/FT SPREAD W W/T SW SW/SX Eo a S'W SE 7.82 2.0 0.26 0.0833 4.2 0.69 3.5 0.147 0.122 XXXXXXXXXX CURB INLET ON A CONTINUOUS GRADE XXXXXXXXXX REQUIRED LENGTH (ft) = 12.7 EFFICIENCY= 0.94 CFS INTERCEPTED= 2.67 CFS CARRYOVER= 0.17 NSW NNW INLET NUMBER 23 LENGTH 8.0 STATION 23 DRAINAGE AREA = 0.500 ACRES C VALUE = .810 CA = 0.405 SUM CA= 0.405 INT= 4.00 CFS= 1.620 CO= 0.000 GUTTER FLOW= 1.620 GUTTER SLOPE = 0.0058 FT/FT PAVEMENT CROSS SLOPE = 0.0200 FT/FT SPREAD W W/T SW SW/SX Eo a S'W SE 7.49 2.0 0.27 0.0833 4.2 0.71 3.5 0.147 0.125 XXXXXXXXXX CURB INLET ON A CONTINUOUS GRADE XXXXXXXXXX REQUIRED LENGTH (ft) = 7.4 EFFICIENCY= 1.00 CFS INTERCEPTED= 1.62 CFS CARRYOVER= 0.00 INLET NUMBER 23 LENGTH 8.0 STATION 23 DRAINAGE AREA = 0.500 ACRES C VALUE = .810 CA = 0.405 SUM CA= 0.405 INT= 6.50 CFS= 2.632 CO= 0.000 GUTTER FLOW= 2.632 GUTTER SLOPE = 0.0058 FT/FT PAVEMENT CROSS SLOPE = 0.0200 FT/FT SPREAD W W/T SW SW/SX Eo a SW SE 9.52 2.0 0.21 0.0833 4.2 0.60 3.5 0.147 0.107 XXXXXXXXXXCURB INLET ON A CONTINUOUS GRADE XXXXXXXXXX REQUIRED LENGTH (ft) = 9.9 EFFICIENCY= 0.95 CFS INTERCEPTED= 2.49 CFS CARRYOVER= 0.14 r '`� •may" INLET NUMBER 24 LENGTH 8.0 STATION 24 DRAINAGE AREA = 0.160 ACRES C VALUE = .820 CA = 0.131 SUM CA= 0.131 INT= 4.00 CFS= 0.525 CO= 0.000 GUTTER FLOW= 0.525 GUTTER SLOPE = 0.0465 FT/FT PAVEMENT CROSS SLOPE = 0.0200 FT/FT SPREAD W W/T SW SW/SX Eo a S'W SE 1.61 2.0 1.24 0.0833 4.2 1.00 3.5 0.147 0.167 XXXXXXXXXX CURB INLET ON A CONTINUOUS GRADE XXXXXXXXXX REQUIRED LENGTH (ft) = 7.2 EFFICIENCY= 1.00 CFS INTERCEPTED= 0.52 CFS CARRYOVER= 0.00 INLET NUMBER 24 LENGTH 8.0 STATION 24 DRAINAGE AREA = 0.160 ACRES C VALUE= .820 CA= 0.131 SUM CA= 0.131 INT= 6.50 CFS= 0.853 CO= 0.000 GUTTER FLOW= 0.853 GUTTER SLOPE = 0.0465 FT/FT PAVEMENT CROSS SLOPE = 0.0200 FT/FT SPREAD W W/T SW SW/SX Eo a S'W SE 1.94 2.0 1.03 0.0833 4.2 1.00 3.5 0.147 0.167 XXXXXXXXXX CURB INLET ON A CONTINUOUS GRADE XXXXXXXXXX REQUIRED LENGTH (ft) = 8.9 EFFICIENCY= 0.98 CFS INTERCEPTED= 0.84 CFS CARRYOVER= 0.01 INLET NUMBER 26 LENGTH 8.0 STATION 26 DRAINAGE AREA = 0.340 ACRES C VALUE = .810 CA = 0.275 SUM CA= 0.275 INT= 4.00 CFS= 1.102 CO= 0.000 GUTTER FLOW= 1.102 GUTTER SLOPE = 0.0160 FT/FT PAVEMENT CROSS SLOPE = 0.0200 FT/FT SPREAD W W/T SW SW/SX Eo a S'W SE 4.28 2.0 0.47 0.0833 4.2 0.93 3.5 0.147 0.157 XXXXXXXXXX CURB INLET ON A CONTINUOUS GRADE XXXXXXXXXX REQUIRED LENGTH (ft) = 7.4 EFFICIENCY= 1.00 CFS INTERCEPTED= 1.10 CFS CARRYOVER= 0.00 INLET NUMBER 26 LENGTH 8.0 STATION 26 DRAINAGE AREA = 0.340 ACRES C VALUE = .810 CA = 0.275 SUM CA= 0.275 INT= 6.50 CFS= 1.790 CO= 0.000 GUTTER FLOW= 1.790 GUTTER SLOPE = 0.0160 FT/FT PAVEMENT CROSS SLOPE = 0.0200 FT/FT SPREAD W W/T SW SW/SX Eo a S'W SE 5.96 2.0 0.34 0.0833 4.2 0.82 3.5 0.147 0.140 XXXXXXXXXX CURB INLET ON A CONTINUOUS GRADE XXX X REQUIRED LENGTH (ft) = 9.8 EFFICIENCY= 0.95 CFS INTERCEPTED= 1.71 CFS CARRYOVER= 0.08 r Nue. 'fir INLET NUMBER 27 LENGTH 8.0 STATION 27 DRAINAGE AREA = 0.320 ACRES C VALUE = .810 CA = 0.259 SUM CA= 0.259 INT= 4.00 CFS= 1.037 CO= 0.000 GUTTER FLOW= 1.037 GUTTER SLOPE = 0.0160 FT/FT PAVEMENT CROSS SLOPE = 0.0200 FT/FT SPREAD W W/T SW SW/SX Eo a S'W SE 4.08 2.0 0.49 0.0833 4.2 0.94 3.5 0.147 0.158 XXXXXXXXXX CURB INLET ON A CONTINUOUS GRADE XXXXXXXXXX REQUIRED LENGTH (ft) = 7.2 EFFICIENCY= 1.00 CFS INTERCEPTED= 1.04 CFS CARRYOVER= 0.00 INLET NUMBER 27 LENGTH 8.0 STATION 27 DRAINAGE AREA = 0.320 ACRES C VALUE = .810 CA= 0.259 SUM CA= 0.259 INT= 6.50 CFS= 1.685 CO= 0.000 GUTTER FLOW= 1.685 GUTTER SLOPE = 0.0160 FT FT PAVEMENT CROSS SLOPE = 0.0200 FT/FT SPREAD W W/T SW SW/SX Eo a S'W SE 5.75 2.0 0.35 0.0833 4.2 0.83 3.5 0.147 0.142 XXXXXXXXXX CURB INLET ON A CONTINUOUS GRADE XXXXXXXXXX REQUIRED LENGTH (ft) = 9.4 EFFICIENCY= 0.97 CFS INTERCEPTED= 1.63 CFS CARRYOVER= 0.06 ver INLET NUMBER 28 LENGTH 4.0 STATION 28 DRAINAGE AREA = 0.170 ACRES C VALUE = .690 CA = 0.117 SUM CA= 0.117 INT= 4.00 CFS= 0.469 CO= 0.000 GUTTER FLOW= 0.469 GUTTER SLOPE = 0.0072 FT/FT PAVEMENT CROSS SLOPE = 0.0200 FT/FT SPREAD W W/T SW SW/SX Eo a S'W SE 2.78 2.0 0.72 0.0833 4.2 0.99 3.5 0.147 0.166 XXXXXXXXXX CURB INLET ON A CONTINUOUS GRADE XXXXXXXXXX REQUIRED LENGTH (ft) = 4.0 EFFICIENCY= 1.00 CFS INTERCEPTED= 0.47 CFS CARRYOVER= 0.00 INLET NUMBER 28 LENGTH 4.0 STATION 28 DRAINAGE AREA = 0.170 ACRES C VALUE = .690 CA = 0.117 SUM CA= 0.117 INT= 6.50 CFS= 0.762 CO= 0.000 GUTTER FLOW= 0.762 GUTTER SLOPE = 0.0072 FT/FT PAVEMENT CROSS SLOPE = 0.0200 FT/FT SPREAD W W/T SW SW/SX Eo a S'W SE 4.39 2.0 0.46 0.0833 4.2 0.92 3.5 0.147 0.156 XXXXXXXXXX CURB INLET ON A CONTINUOUS GRADE XXXXXXXXXX REQUIRED LENGTH (ft) = 5.0 EFFICIENCY= 0.94 CFS INTERCEPTED= 0.72 CFS CARRYOVER= 0.04 *aloe kyr DIVISION 4 — E&SC: Sediment Basin Calculations The Cox Company UVA Research Park 06-50 Town Centers III and IV UVA Research Park: Existing Basin 1 Engineering Calculations for the Erosion & Sediment Control Plan Temporary Sediment Basin Computations Disturbed Drainage Area: 7.06 Acre Reduced from original design * Wet Storage Required: 67 (cy/ac) x 7.06 Acre 473.02 cy Dry Storage Required: 67 (cy/ac) x 7.06 Acre 473.02 cy Bottom of Basin: 464.00 Existing Orifice Elevation: 468.50 Retrofit if necessary Pricipal Spillway: 471.00 Existing Emergency Spillway: none Top of Dam: 474.00 Existing Wet Storage Available: 606.13 cy Dry Storage Available: 579.04 cy Elevation Area (ft^2) Vol. (ft^3) Vol. (cy) Area (ac) 464.0 - t i s 2168 0.0498 466.0 3426 5594.0 207.19 0.0787 468.0 ;a 5 4826 8252,0 305.63 0.1108 _ 408_5 5252 2519.5 93.31 0.1206 470.0 �'ly1, 6446 87715 324.94 0.1480 471.0 7275 6860.5 254.09 0.1670 472.0 8104 7689.5 284.80 __ 0.1860 474.0 T- 1L 10250 18354.0 679.78 0.2353 Sub-Total: Wet @ Elev.: 464.0-468.5 16365.5 606.1 Sub-Total: Dry @ Elev.: 468.5-471.0 15634.0 579.0 Total: 31999.5 1185.2 *Original design calculations taken from SDP 02-110, Amended Dec-2005 `rrr ..,,r UVA Research Park: Basin 2 Engineering Calculations for the Erosion & Sediment Control Plan Temporary Sediment Basin Computations Disturbed Drainage Area: 5.83 Acre Wet Storage Required: 67 (cy/ac) x 5.83 Acre 390.6 cy Dry Storage Required: 67 (cy/ac) x 5.83 Acre 390.6 cy Bottom of Basin: 472.00 Orifice Elevation: 477.20 Pricipal Spillway: 480.00 Emergency Spillway: 481 .00 Top of Dam: 482.00 Wet Storage Available: 397.4 cy Dry Storage Available: 398.4 cy Elevation4___w Area (ft^2) Vol. (ft^3) Vol. (cy) Area (ac) 472.0 z° 1120 0.0257 474.0 Z 1792 2912.0 107.85 0.0411 476.0 3 I 2592 4384.0 162.37 0.0595 477.2 7 7 i 4 ! 3133 3435.0 127.22 0.0719 478.0 sO1-19 3520 2661.2 98.56 0.0808 480.0 q 9 I .52_ _ 4576 8096.0 299.85 0.1051 482.0 i 6 Z- 6400 10976.0 406.52 0.1469 Sub-Total Wet @ Elev.: 477.2 10731.0 397.4 Sub-Total Dry @ Elev.: 480.0 10757.2 398.4 Total: 21488.2 795.9 1992 3.14 TEMPORARY SEDIMENT BASIN DESIGN DATA SHEET (with or without an emergency spillway) Project U'!A � d 1�A+�� Td w� C 3 A-- Basin # 2. Location c;,(.)1-4 140,-.7-7 or -T:c. 4 Total area draining to basin: '. 83 acres. Basin Volume Design Wet Storage: 1. Minimum required volume = 67 cu. yds. x Total Drainage Area (acres). 67 cu. yds. x '. 3 acres = o. ' cu. yds. 2. Available basin volume = ,7.4 cu. yds. at elevation 4/7.2- . (From storage - elevation curve) 3. Excavate ?77 74 cu. yds. to obtain required volume*. * Elevation corresponding to required volume = invert of the dewatering orifice. 4. Available volume before cleanout required. 33 cu. yds. x 03 acres = 1924 cu. yds. 5. Elevation corresponding to cleanout level = 41 .s . (From Storage - Elevation Curve) 6. Distance from invert of the dewatering orifice to cleanout level = 1.7 ft. (Min. = 1.0 ft.) Dry Storage: 7. Minimum required volume = 67 cu. yds. x Total Drainage Area (acres). 67 cu. yds. x 5.83 acres = cu. yds. III - 112 Now 1992 3.14 8. Total available basin volume at crest of riser* = 795 . 5 cu. yds. at elevation Lao. o . (From Storage - Elevation Curve) * Minimum = 134 cu. yds./acre of total drainage area. 9. Diameter of dewatering orifice = in. 10. Diameter of flexible tubing = 7 in. (diameter of dewatering orifice plus 2 inches). Preliminary Design Elevations 11. Crest of Riser = 480. 0 Top of Dam = 452_ • O Design High Water = 4-5I Upstream Toe of Dam = 47z .0 Basin Shape 12. Length of Flow L = Z • 8 Effective Width We If > 2, baffles are not required If < 2, baffles are required Runoff 13. Q2 = 9.4-4 cfs (From Chapter 5) 14. Q25 = 27. 98 cfs (From Chapter 5) Principal Spillway Design 15. With emergency spillway, required spillway capacity Qp = Q, _ 19.44_ cfs. (riser and barrel) Without emergency spillway, required spillway capacity Qp = Q25 = 27.2e3 cfs. (riser and barrel) III - 113 r • 'rr �✓ r 1992 3.14 16. With emergency spillway: Assumed available head (h) = ( .0 ft. (Using Q2) h = Crest of Emergency Spillway Elevation - Crest of Riser Elevation Without emergency spillway: Assumed available head (h) = OA ft. (Using Q25) h = Design High Water Elevation - Crest of Riser Elevation 17. Riser diameter (Dr) = in. Actual head (h) = l ft. (From Plate 3.14-8.) Note: Avoid orifice flow conditions. 18. Barrel length (1) = 78 ft. Head (H) on barrel through embankment = 11 ft. (From Plate 3.14-7). 19. Barrel diameter = 21 in. (From Plate 3.14-B [concrete pipe] or Plate 3.14-A [corrugated pipe]). 20. Trash rack and anti-vortex device Diameter = 4 a inches. Height = l ( inches. (From Table 3.14-D). Emergency Spillway Design 21. Required spillway capacity Qe = Q25 - Qp = 8. 4 cfs. 22. Bottom width (b) = 8 ft.; the slope of the exit channel (s) = 3. I ft./foot; and the minimum length of the exit channel (x) = S 1 ft. (From Table 3.14-C). III - 114 • 1992 3.14 Anti-Seep Collar Design 23. Depth of water at principal spillway crest (Y) = 8 ft. Slope of upstream face of embankment (Z) = 2 :1. Slope of principal spillway barrel (Sb) = % Length of barrel in saturated zone (La) = S ft. i f 24. Number of collars required = 2 dimensions = 4•5 x 4•S (from Plate 3.14-12). Final Design Elevations 1J 25. Top of Dam = A:62 .0 Design High Water = 45 t . o Emergency Spillway Crest = 48 t - 0 Principal Spillway Crest = 450. o Dewatering Orifice Invert = 47 7 z Cleanout Elevation = 47-5 .0 Elevation of Upstream Toe of Dam or Excavated Bottom of "Wet Storage Area" (if excavation was performed) = 47z . o III - 115 ot • IrI diac Li j y " 11� v �tl:� C c.v �,� 1