HomeMy WebLinkAboutWPO201600049 Bond Estimates 2016-08-04Project Name: Old Trail Block 22 WPO file number: WP0201600049 Erosion and Sediment Control Bond Estimate Item Item Number stablization (PS, TS) silt fence (SF) safety fence (SAF) diversion (DD, FD, RWD) temporary slope drain (TSD) earthwork for trap/basin structures for basin silt fence inlet protection (I P) stone inlet protection (IP) outlet protection (OP) channel (SCC, matted) check dam construction entrance (CE) wash rack paved construction entrance pipe length height of dam at toe height of fill at face length of dam top width (area above transition) (total width of dam) (height below transition) (area below transition) (total fill volume) length of spillway width of spillway riser height riser diameter barrel length barrel diameter length length depth in channel rip -rap, placed depth width survey and layout (price per 0.1 mi.) acres mobilization stream crossing (computed independently) 0 it pipe diameter 0 in 10 it cut at high side 10 ft 6 ft cut at face 6 ft 50 ft length of cut 60 ft 2 ft width of cut 20 ft 84 sf (area below transition) 192 sf 20 ft (total width of cut) 52 ft 4 ft (depth below transitior 4 ft 24 sf (area above transition 88 sf 200.0 cy (total fill volume) 622.2 cy 18 ft (TOAL CY estimate) 689 cy 30 ft (spillway stone tons) 31.1 tons Oft 0 in (riser unit price) $0.00 0 ft base plate or fdn 0 0 in (barrel unit price) $0.00 barrel collars 0 baffle length 0 It 0 ft width 0 ft 0 ft width 0 ft 0 ft channel width 0 ft 0 It length 0.0 ft 0.0 (tons) 0 tons 3 traps and basins 1 No. Unit Unit Cost Cost installed 2.9 acres $5,000.00 $14,500.00 1425.0 ft $5.00 $7,125.00 0.0 ft $5.00 $0.00 850 ft $13.00 $11,050.00 $0.00 $0.00 $13.00 $8,957.00 $50.00 $1,555.00 $2,000.00 $500.00 $0.00 cost sum $47,687.00 contingency $4,768.70 Total $52,460 8/4/2016 $0.00 $200.00 $0 $0.00 $200.00 $0 $50.00 $0 0 $100.00 $0.00 0 $200.00 $0.00 0 $0.00 $0.00 0 $0.00 0 $0.00 $0.00 1 $2,000.00 $2,000.00 0 $2,000.00 $0.00 0 $3,500.00 $0.00 $60.00 $0.00 $2,000.00 $500.00 $0.00 cost sum $47,687.00 contingency $4,768.70 Total $52,460 8/4/2016 Approximate Earthwork computations for sed Assumes all out and fill slopes are 2:1 for simplicty Height of Fill at Face I h1 Cut at High Side h2 transitic w h1 Width of Cut Cut at Fa Fill area above transition = hl(2h1) + hl(w) Fill area below transition; total width of fill (dam) = 2h1 + w + 2h2 height below transition = h2 -h1, area = (width*height)/2 - height x height Length of Cut liment traps and basins Width m point \ Height of Dam at Toe h2 ice Volume= Length of Fill x Fill Area Cut Areas and Volume is the same as fill but using the cut dimensions Fill for Dam (imately)