HomeMy WebLinkAboutSDP201600003 Approval - Agencies 2016-07-15COMMONWEALTH of VIRGINIA
DEPARTMENT OF TRANSPORTATION
1661 Orange fioad
Culpeper Virginia 227x1
Charles A. Kilpatrick, P.E.
Commissioner
July 15, 2016
County of Albemarle
Department of Community Development
401 McIntire Road
Charlottesville, VA 22902
Attn: Christopher Perez
Re: Sunset Overlook — Final Site PIan
SDP -2016-00003
Review #4
Dear Mr. Perez:
The Department of Transportation, Charlottesville Residency Transportation and Land Use
Section, has reviewed the above referenced plan as submitted by Collins Engineering, last
revised 29 June 2016, and find it to be generally acceptable.
Upon submission of the appropriate signed and sealed approval copies this office will perform a
final review and, if acceptable, sign the plans. Please allow for this office to obtain two signature
copies.
A VDOT Land Use Permit will be required prior to any work within the right-of-way. The
owner/developer must contact the Charlottesville Residency Transportation and Land Use
Section at (434) 422-9399 for information pertaining to this process. If further information is
desired please contact Justin Deel at (434) 422-9894.
Sincerely,
0AW, , q6LA---
Adam
J. Moore, P.E.
Area Land Use Engineer
Charlottesville Residency
VirginiaDOT.org
WE KEEP VIRGINIA MOVING
Christopher Perez
From: Christopher Perez
Sent: Monday, September 26, 2016 11:10 AM
To: Patricia Saternye
Subject: RE:ARB201600022 Sunset Overlook Comments
Thanks for the heads up.
Christopher P.Perez I Senior Planner
Department of Community Development(County of Albemarle,Virginia
401 McIntire Road I Charlottesville,VA 22902
434.296.5832 ext.3443
From: Patricia Saternye
Sent: Monday,September 26, 2016 9:53 AM
To:Christopher Perez<cperez@albemarle.org>
Subject: RE:ARB201600022 Sunset Overlook Comments
Chris,
I am approving (for ARB) ARB201600022/SDP201600003 Sunset Overlook this morning O.
Thanks,
Paty Saternye
Senior Planner
Community Development
Albemarle County 5
401 McIntire Road
Charlottesville,VA 22902
434-296-5832 ext.3250
psaternye@albemarle.org
www.albemarle.org
From: Patricia Saternye
Sent:Wednesday,August 31, 2016 3:34 PM
To:Christopher Perez<cperez@albemarle.org>
Subject: RE:ARB201600022 Sunset Overlook Comments
Will Do 0
Paty Saternye
Senior Planner
Community Development
1
Albemarle County
Service Auth4rity
Serving ♦ Conserving
July 11, 2016
Forge Farm, LLC
195 Riverbend Drive
Charlottesville, VA 22911
Re: Sunset Overlook Final Site Plan
Dear Forge Farm, LLC:
Enclosed is a copy of the construction plan approval letter dated July 11, 2016. A
copy of the approved plan shall be on the job site throughout construction and shall be
modified by the contractor to show as -built conditions. It is the contractor's responsibility to
provide this information to you and your consultant for use in developing the final as -built
plan, which shall be submitted in the format of one paper copy and one mylar copy.
A preconstruction conference is required prior to the start of construction. I can be
reached at 977-4511 to schedule the meeting. The preconstruction conference will help to
ensure project coordination, clarify ACSA requirements pertaining to construction, and
answer any questions you may have. All offsite easements must be acquired before a
preconstruction conference will be scheduled. We have also enclosed copies of our
"Utility Inspection Policy," "Letter of Dedication," and "As -Built Guide" for your information.
These documents should be reviewed before the preconstruction conference.
A water and sewer construction inspection fee will be invoiced to you at the
completion of the project. The inspection fee for this project is $1,108.38 for the water
system and $1,184.04 for the sewer system, for a total of $2,292.42.
A plan review fee will be invoiced to you within the next few days. It will be
based upon the actual time of plan review billed at the current hourly rate established by
the Board of Directors of the ACSA. At the end of the project, you will also be invoiced
for an as -built plan review fee. It will be billed in the same manner as the plan review
fee.
The ACSA cannot set permanent water meters until construction has been
completed and approved for operation. The utility easements shall be reviewed and
approved prior to recordation. Copies of the deed of easement, plat, as -built plan and
Letter of Dedication shall be submitted as soon as possible following installation of the
utility systems. Timely submission of these documents will help you avoid delays in
receiving utility service.
Please be advised the Albemarle County Department of Community Development
is instructed to hold the water bond amount at a minimum value of 20% of the original
amount until the dedication of the utility systems is completed.
168 Spotnap Road • Charlottesville, VA 22911 * Tel (434) 977-4511 • Fax (434) 979-0698
www.serviceautkority.org
The ACSA has reviewed the proposed development and has determined that as of
this date there is an adequate supply of water and/or adequate sewer capacity to serve
the development. Water and/or sewer connections to the ACSA system are allotted on a
first-come, first-served basis at the time connection fees are paid. The ACSA does not
reserve capacity in its system for a specific project. Approval of water and/or sewer
utilities for this project does not constitute a guarantee of future service.
The plan approval is valid for a period of 18 months. If construction is not in
progress at the end of the approval period, the approval shall be void.
The contractor shall be responsible to comply with the no -lead regulation regarding
brass fittings that is effective on January 4, 2014 (Senate Bill 3874 which amends the Safe
Drinking Water Act). The contractor shall also be required to comply with the ACSA's
Approved Products List. The most current version of this list can be found on the ACSA's
website at www.serviceauthorit-Y.or-q/Specs/ApprovedProductsList.pdf.
If you have any questions, or if we may be of assistance, please give us a call at
977-4511.
Sincerely,
Alexander J. Morrison, PE
Civil Engineer
AJM:dmg
cc: ACSA Inspector
050601 ForgeFarmSunsetOve rlookLtr071116
Albemarle County
Service Authority
July 11, 2016
Collins Engineering
Attn: Scott Collins, PE
200 Garrett Street
Suite K
Charlottesville, VA 22902
Re: Sunset Overlook Final Site Plan
Dear Mr. Collins:
The plan, entitled "Sunset Overlook Final Site Plan" dated January 19, 2016, last
revised May 16, 2016, is hereby approved for construction. One set of the approved plan
is enclosed for your records. Any previously approved plans are voided with this approval.
This approval is for basic compliance with the General Water & Sewer Construction
Specifications of the Albemarle County Service Authority (ACSA) and does not relieve the
contractor from responsibility for his work as it relates to the plan and specifications.
The ACSA requires that a copy of the approved construction plan be on the job site.
The contractor is responsible for marking up a copy of the approved construction plan
showing as -built information and provide this data to your client at the completion of utility
installation. The final as -built plan shall be submitted in a format of one paper copy and
one mylar copy.
A preconstruction conference shall be scheduled with the project manager to
ensure coordination and answer any questions. This will be a short meeting to review the
project, materials, test methods and schedule, in order to expedite construction. Please
have the proper party call me at 977-4511 to schedule the meeting. All offsite easements
must be acquired before a preconstruction conference will be scheduled.
This approval is valid for a period of 18 months from this date. If construction is not
in progress at the end of this time period, the approval shall be void.
The contractor shall be responsible to comply with the no -lead regulation regarding
brass fittings that is effective on January 4, 2014 (Senate Bill 3874 which amends the Safe
Drinking Water Act). The contractor shall also be required to comply with the ACSA's
Approved Products List. The most current version of this list can be found on the ACSA's
website at www.serviceauthority.org/Specs/ApprovedProductsList.pdf.
168 Spotnap Road • Charlottesville, VA 22911 • Tel (434) 977-4511 • Fax (434) 979-0698
www.serviceauthority.org
ALBEMARLE COUNTY SERVICE AUTHORITY (ACSA)
UTILITY INSPECTION POLICY
The Utility Inspection Policy details the responsibilities of the contractor and the
Albemarle County Service Authority (ACSA) representative during construction of water
and wastewater infrastructure to be accepted by the ACSA. All water and wastewater
infrastructure shall be inspected by an ACSA representative. The intent of the following
items is to provide the Contractor with the appropriate level of ACSA inspection through
proper planning and scheduling. Failure of the Contractor to adhere to this policy shall
result in the ACSA denying acceptance of and/or providing connection to the
infrastructure.
The ACSA representative shall meet with the Contractor's representative prior
to construction. The responsible Field Superintendent shall attend the
Preconstruction Conference.
2. The Contractor shall maintain at the site for the duration of the project one set
of approved construction drawings and a second set on which to record as -built
information. The as -built record drawings shall be made available to the ACSA
representative on demand.
3. The Contractor shall notify the ACSA representative of the on-site receipt of
water and wastewater infrastructure materials to be used on the project.
4. The Contractor shall inform the ACSA representative of their schedule 48
hours prior to starting. If construction on water and wastewater infrastructure
remains inactive for a period of two weeks, the Contractor shall notify the
ACSA representative no less than 48 hours in advance of restarting.
5. The Contractor shall not backfill any fittings, thrust blocks, valves, hydrants,
blow -off assemblies or drop manhole connections without first being inspected
by an ACSA representative.
6. The Contractor shall contact the ACSA representative at least 24 hours in
advance of the need for an inspection and at least 48 hours prior to.the viewing
of a test to schedule the site visit.
7. In the event water or wastewater infrastructure testing is unsuccessful, the
developer shall be charged the hourly rate for each hour (minimum 1 hour) the
ACSA representative has been occupied, including travel time to and from the
site.
8. No changes from the ACSA approved construction drawings shall be made by
the contractor without prior approval of the ACSA.
010702Utilityinspection poli cyrevised041607
The undersigned,
LETTER OF DEDICATION
(Name of Owner(s))
doing business at ,
(Name of Organization & Address)
hereby dedicates unto the Albemarle County Service Authority (ACSA) certain
(water and/or sewer)
facilities in connection with the development of
identified on certain plans and specifications described as follows and
incorporated herein by reference:
(Title of Plans & Specifications, if applicable)
(Date & Revision Dates of Plans & Specifications, if applicable)
(Name of Consulting Engineering Firm)
The undersigned certifies:
(1) That all requirements of the Rules & Regulations and General Water &
Sewer Construction Specifications of the Albemarle County Service
Authority have been met.
(2) That the undersigned is the owner of the above-described facilities.
(3) That payment of all lawful claims of contractors, subcontractors,
materialmen and laborers for all labor performed and material
furnished in the completion of these facilities has been made.
(4) That payment has been made by the undersigned for all fees relative
to applications and inspections concerning the facilities.
(5) That the undersigned, his heirs, assigns, or successor in interest shall
be responsible for and obligated to correct any deficiencies in
construction for a period of one year from the date of acceptance of
these facilities by the Albemarle County Service Authority.
(6) That one copy of a recorded plat showing the dedicated easements, a
deed of easement and a copy of the Clerk's receipt for payment of the
recording fees have been submitted to the Albemarle County Service
Authority.
(7) That as -built plans have been submitted to the Albemarle County
Service Authority (two sets of blueline copies and one set of
reproducible mylars).
(8) That a cost estimate of the water and/or sewer facilities has been
submitted to the Albemarle County Service Authority.
Construction costs (labor and material only)
Water $
Sewer $
(9) These facilities include feet of water line and
feet of sanitary sewer line.
The undersigned hereby requests the Albemarle County Service Authority
to accept the facilities.
(Signature) (Date)
(Print or type name & title)
(Organization)
-------------------------------------------------------
(Signature) (Date)
(Print or type name & title)
ATTEST:
My commission expires:
ATTEST:
My commission expires:
(Organization)
ALBEMARLE COUNTY SERVICE AUTHORITY
ENGINEERING DEPARTMENT
AS -BUILT REQUIREMENTS
GENERAL
(1) Drawings shall not be larger than 30 inches by 42 inches. Drawings of
standard size 24 inches by 36 inches are preferred.
(2) Show the same information as the approved plans. Cross out any proposed
information and write the as -built correction boldly adjacent to the corrected
data.
(3) Accurately redraw plan and profiles where changes in alignment of over
three (3) feet horizontal or one (1) foot vertical occur between the proposed
design and the actual installation.
(4) Label the type, class, and size of pipe installed.
(5) Show all physical appurtenances, sidewalks, curb and gutters, buildings, lot
corners and property lines.
(6) Label street names, whether public or private. Label block and building
letters or numbers. Label unit letters or numbers.
(7) Show the proper title on each page along with phase or section as
applicable. Where only a portion of a phase or section is complete, label the
limits of construction to which the as -built applies.
(8) Show a vicinity map on the first sheet.
(9) Show the appropriate scale on all drawings.
(10) Number each page.
(11) Show a north arrow on each page.
(12) Provide a revision block on the drawings and show: (a) any revision made to
the drawings, (b) date plans were approved; and (c) as -built date.
(13) At stream crossings, state the type of pipe, the depth to top of pipe at the
centerline of the stream, casing size and limits of casing, include any valves
and sample taps installed, and show on both the plan and profile.