Loading...
HomeMy WebLinkAboutWPO201600021 Bond Estimates 2016-08-05Woodlawn Subdivision WPO file number: WP0201600021 Stormwater Management Plan Bond Estimate Item Item No. Unit Unit Cost Cost Number installed permanent diversion or ditch 550 ft $13.00 $7,150.00 standard manhole frame top (not inlet) 0 ea $500.00 $0.00 drop inlet or grate 0 ea $3,500.00 $0.00 manhole structure (per ft. rise) 0 ft $450.00 $0.00 pipe, rcp, crop (15 to 48") in d ES -1,2 EC -1 0.0 ft $0.00 $0.00 aggregate base or drainage stone in d it L it W 0.0 ton $35.00 $0.00 earthwork for trap/basin height of dam at toeEft cut at hgh sideoft itheight of fill at faceff cut at faceit EARTHWORK IN ESC EST length of damff length of cutft top widthft width of cut (area above transition 0 sf (area below transitior 0 sf (total Width of dam) 0 ft (total Width of cut) 0 ft (height below transitic 0 ft (depth below transitic 0 ft (area below transition; 0 sf (area above transitioi 0 sf (total fill volume) 0.0 cy (total fill volume) 0.0 cy length of spillway =ft (TOAL CY estimate) 0 cy $13.00 $0.00 width of spillway ft (spillway stone tons) 0 tons $50.00 $0.00 structures for basin riser heightft STRUCTURE IN ESC EST riser diameterMin in (riser unit price) $0.00 $0.00 barrel lengthft base plate or fdn $200.00 $0 barrel diameter (barrel unit price) $0.00 $0.00 barrel collars Mft $200.00 $0 baffle length $50.00 $0 trees 0 ea $150.00 $0.00 shrubs 0 ea $50.00 $0.00 seedlings 0 ea $5.00 $0.00 underdrain (LF) 0 ft $5.00 $0.00 biofilter soil mix (CY) 0 cy $38.00 $0.00 trash rack/ anti vortex devices 0 ft $1,500.00 $0.00 maintenance access road (LF) 0 ft $50.00 $0.00 rip -rap, placed depth ft length _ft width (tons) 0 $60.00 $0.00 survey and layout (price per 0.1 mi.) acres basins $4,450.00 mobilization $500.00 as -built drawings (per facility) $2,000.00 $2,000.00 materials testing (per facility) Mae ea $2,000.00 $2,000.00 compaction testing (per dam) ea $5,000.00 $5,000.00 manufactured facilities (attach manufacturer's or contractor's price as a base) $0.00 cost sum $21,100.00 contingency $2,110.00 Total $23,210 8/5/2016