HomeMy WebLinkAboutWPO201400070 Inspection 2016-08-08i'dF .• it • _ � u=; Department of Community Development 401 McIntire Road, North Wing Charlottesville, Virginia 22902-4596 Phone (434) 296-5832 Fax (434) 972-4226 VSMP/VESCP RE -INSPECTION INVOICE #2 DATE: August 8, 2016 INVOICE TO: Faith Christian Center International, Inc. P.O. Box 2306 Charlottesville, VA 22902 RE: Notice To Comply WP0201400070; Faith Christian Center International DATE OF RE -INSPECTION: 5 20 2016 RE -INSPECTION FEE: $250.00 By September 8, 2016 Albemarle County must receive the re -inspection fee of $250.00 to continue your project. This fee is required per sections 17-207 and 17-208 of the County Code. To pay the re -inspection fee, please send a check payable to the County of Albemarle to my attention along with the enclosed copy of this invoice. If the re -inspection fee is not paid within 30 days, interest charges will be applied to the past due amount per the Albemarle County Water Protection Ordinance. (Sec. 17-210) If you should have any questions, please do not hesitate to contact me. Sincerely Todd Shifflett Engineering Division VTS/ Enclosure Revised -- 7/13/2015 #.z5z r{ - r<Spt-eTi' cs 1 C G a I COUNTY OF ALBEMARLE Department of Community Development ment � „7«„r 401 McIntire Road Charlottesville, Virginia 22902 NOTICE TO COMPLY Hand delivered Project: rA,144 (¢42 (S i C _i (�@I11C ,� � ` 100 ZO It{ 000 p Date: ! r /[(, Under section 17-900 of the Albemarle County Code, this is your NOTICE TO COMPLY with the requirements of the VSMP Permit for the referenced project and to immediately take corrective measures that address the deficiencies on this property. The specific deficiencies are circled below: Mud on road Shovel and sweep all mud and dirt from the road. Install adequate wash - rack and construction entrance for cleaning. • F,u'rk A"CQ_ 6 iV 9(Z.Sio 1Vf ,J Orr PO nQ 0_(& ram' AL_ , tJ c C b PLA tit 'r a i>> VEA1- 1 PT D 'i . o F- 5 IF nr D g A C-1G i70 r` ­� C-1 r 1V G r= re- eas es n tems not been installed per the approved plan, or have been u5E ��removed. Install Them, or obtain a Ian arnendrgent. d &T6-91 t_ 1 zF— OQcA D 5G09C- ? s' CKPiJ- si-ve_A tAjf4 icX J�vtTD�e65 Fo/L rRsS ajar pre/L1 A00 PR6ft2 &DA3i S. • � L rla AJ C- 0 U [_e! PlzcT-e:C'-ia N ir1 S�Fr �i9 �l� AL easures failing easures have failed more than once. Buil� larger, more effective ones, or amend the plan to better protect the site. • s£F•ric 421zA Co:.n,.;L,s tj 'p?A, p, r jaaLP�,NC� 'Y' ��NI TFZ� caNTRU�5 Ivy � rQ�P/`31R�—,Ftx Pivr�aIONS 5'f`f1R1L�Z . :S4C1�E J/1RfN Cdr�nrN�LS N �dD , PP�1it • tJCA'fH 5iPE (-oAIrIr L'c n�c�- a one an repair The site is not stabilized and erosion is occurring. Repair all measures and stabilize. .60-05'r0N ©CCV9-I1"J6) A?' NORTH S(PC 4F o inlet protection rlt protection has not been installed. Install inlet protection per the plans. Site does not match plans The site has deviated too much from the approved plan, or the plan was not buildable. A plan amendment is required. SWPPP documents deficient Correct document deficiencies. Pollution prevention practices not followed Install, maintain practices per SWPPP and CGP. Washout facilities not provided or used Install and/or properly use washout facilities per SWPPP. Unless subsequently amended in writing by this offic it is expected all of these corrective measures will be completed by: Date: r Z d Re -inspection of this notice tffem rrective measures will incur a $250 fee (17-207/8, $150 for SF). Failure to take effective correu77?rina Stop Work Order upon re -inspection. County Inspector Signature: Receipt Signature: Jeremy Glode site visit 5.11.16 Faith Christian Center International We are issuing a Notice to Complys grenerall for measures not installed and re airs needed to site. THE FOLLOWING ITEMS NEED TO BE ADDRESSED: Entrance diversions not functional. Need plan to fix issue or send back to engineer. Street paving soon? Septic area controls need repair. 0 Inlet protection along road. Stabilize road slope at stockpile area. Jeremy Glode site visit 5.11.16 Faith Christian Center International Jeremy Glode site visit 5.11.16 Faith Christian Center International Stabilize stockpile. Upper perimeter of building needs repair. Fix diversions and stabilize. Jeremy Glode site visit 5.11.16 A" Faith Christian Center International Upper perimeter of building needs repair. Fix diversions and stabilize. f wk-O: A Slope drain and channels leading to it need repair. _.- r 'lie4 Jeremy Glode site visit 5.11.16 x Faith Christian Center International Slope drain and channels leading to it need repair. 5tormwater structures not meant for E&S control. 74 ram' •�?tit �;� :1 2� r �� ' e Concrete dumped on site. Jeremy Glode site visit 5.11.16 Faith Christian Center International E Stormwater line. Use of stormwater structures for E&S control not permitted. Stop immediately. E line needs outlet protection, level spreader. Jeremy Glode site visit 5.11.16 Faith Christian Center International North end diversions, channels, culverts not functional for awhile. Erosion occurring at north side of retaining wall.