Loading...
HomeMy WebLinkAboutWPO201300032 Inspection 2016-08-08I' Iilll!II�� Department of Community Development 401 McIntire Road, North Wing Charlottesville, Virginia 22902-4596 Phone (434) 296-5832 Fax (434) 972-4126 VSMPIVESCP RE -INSPECTION INVOICE #6 DATE: August 8, 2016 INVOICE TO: Cascadia Development, LLC 170 S. Pantops Dr. Charlottesville, VA 22911 RE: Notice To Comply WP0201300032 - Cascadia DATE OF RE -INSPECTION: 4 14 2016 RE -INSPECTION FEE: $250.00 By September 8, 2016 Albemarle County must receive the re -inspection fee of $250.00 to continue your project. This fee is required per sections 17-207 and 17-208 of the County Code. To pay the re -inspection fee, please send a check payable to the County of Albemarle to my attention along with the enclosed copy of this invoice. If the re -inspection fee is not paid within 30 days, interest charges will be applied to the past due amount per the Albemarle County Water Protection Ordinance. (Sec. 17-210) If you should have any questions, please do not hesitate to contact me. Sincerely eG Todd Shifflett Engineering Division VTS/ Enclosure Revised — 7/13/2015 bra _ %1COUNTY OF ALBEMARLE Departmant of Community I)avelopment 401 McIntire Charlotftvffie, Virginia 22902 NOTICE TO COMPLY Hand delivered Project: Z Date; Under section 17-900 of the ADxmaarle County Code, this is you NOT ICE M COMPLY with, &e, requirements of the VSW Permit for the ref weed projed and to immediately take conwtive measures that address the deficie=ee m this property. 7be specific deficiencies are circled below: Mud on road Shovel and sweep all mud and dirt from the road Install adequate wash. rack and construction entrance for cleaning. easureg�norfteam-o�—ve�� not been installed per the approved plan, or have been Iaor obtain a pIgn am ,� � o off ; n s �'i"r� �i`��a�'-iEer► �'Ji i� ►) Se''7'� +Z �!-en..�/�t�i2.f�'►�•y s Measarm failing Measures have failed more than once. Build larger, more effective arias, or r WHP 444 amend the plan to better protect the site. PAWIt Site abandoned and repairs needed The site is not stabilized and erosion is occurring. Repair all measures and stabilize. No inlet protection Inlet protection has not been iiistalled Install inlet protection per the plans. Site does not match plans The site has deviated too much from the approved plan, or the plan was not buildable. A plan amendment is required. SWPPP documents deficient Correct document deficiencies. Pollution prevention practices not followed Install, maintain practices per SWPPP and CGP. washout facilities not provided or used Install and/or properly use washout facilities per SWPPP. Unless subsequently amended in writing by thip o % it is expected all of these corrective measures will be completed by: Date: 411111149 Re -inspection of this notice to verify correctivemeasures will incur a $250 fee (17-207/8, $150 for SF). Failure to take effective Stop Work Order upon re -inspection. County Inspector Signature: Receipt Signature: Jeremy Glode site visit 4,5.16 Cascadia We are issuine a Notice to Comply for measures not installed. Most notably that stabilization is required within 7 days when site at final wade. and stabilization required within 14 days when site not at final arade but remains dormant (MS11. Most of the site has been dormant for longer than 14 days. THE FOLLOWING ITEMS NEED TO BE ADDRESSED: Entrance area. Add silt fence and stabilize per plan. Right side of entrance area. Culvert inlet protection requires repair. Jeremy Glode site visit 4.5.16 0 Cascadia Right side of roadway. Outlet protection not installed properly. Stormwater conveyance channel not installed per plan (sheet SW6). install OP correctly. Reinstall the SCC-A after sidewalk installation. Blocks 1-3 area. Temporary conveyance channel not maintained property. Large swaths of Blocks 1-3 require stabilization — stabilization required within 7 days when site at final grade and stabilization required within 14 days when site not at final grade but remains dormant (M51). r +yam`' •' * * '+•'r��• ri� rw 1 ay.' +_ �� - •� Jeremy Glode site visit 4.5.16 A Cascadia Large swaths of Blocks 1-3 require stabilization — stabilization required within 7 days when site at final grade and stabilization required within 14 days when site not at final grade but remains dormant (msi). Large swaths of Blocks 1-3 require stabilization — stabilization required within 7 days when site at final grade and stabilization required within 14 days when site not at final grade but remains dormant Imsi). � A Jeremy Glode site visit 4.5.16 Cascadia Large swaths of Blocks 1-3 require stabilization — stabilization required within 7 days when site at final grade and stabilization required within 14 days when site not at final grade but remains dormant (msi). Soil stockpile and borrow area must be stabilized or protected if dormant longer than 14 days (MS 2). Jeremy Glode site visit 4.5.16 A Cascadia Slope drain area above SB2 needs immediate repair. Stabilize area after repair. t � JL Slope drain area above SB2 needs immediate repair. Stabilize area after repair. Jeremy Glode site visit 4.5.16 "�r Cascadia t7kI1� Slope drain area above SB2 needs immediate repair. Stabilize area after repair. Stabilize 5132. Temporary stabilization from last year died. Immediate stabilization required. Jeremy Glode site visit 4.5.16 r Cascadia Stabilize S02. Temporary stabilization from last year died. Immediate stabilization required. Large flat area above slope drains and SI34. Stabilization required within 7 days when site at final grade and stabilization required within 14 days when site not at final grade but remains dormant Imsi). Jeremy Glode site visit 4.5.15 N, Th Cascadia Area surrounding SB4. Stabilization required within 7 days when site at final grade and stabilization required within 14 days when site not at final grade but remains dormant (MS1). SB4. Weir not installed properly. Filter cloth exposed, install coarse aggregate (VDOT#3, #357, or #5), backed by class i riprap. Stabilization of basin required. � A B Jeremy Glode site visit 4.5.16 Cascadia �y K► Diversion above blocks 1-3 removed near SB4. Repair diversion so it leads into 5114. Stabilize. -rt Soil stockpile and borrow area must be stabilized or protected if dormant longer than 14 days (MS 2). Jeremy Glode site visit 4.5.16 Cascadia Large swaths of Blocks 4-7 require stabilization -- stabilization required within 7 days when site at final grade and stabilization required within 14 days when site not at final grade but remains dormant (msil. Blocks 4-7, east side of site. Diversion at top of slope needs maintenance and stabilization. Slope needs compaction and stabilization. . : . Jrmy§bde site visit w � C sad ia Blocks 4-7, eastside of site. Diversion at top of slope neesmaintenancean stabilization. mop needs compaction and stabilization. �- \ I ] \ _ I. _ . . _A ��, j.�� � !.z Blocks 47 east side of site. Diversion at top «slope needs maintenance and stabilization. Slope needs compaction an stabilization. . AV iM2�MITAWfin T Ve .. -,, '- LK4 1-.1 "- ; A Jeremy Glode site visit 4.5.16 Cascadia Sediment traps along north and east side of site. Weirs not installed properly. install coarse aggregate (VDOT #3, #357, or #5), backed by class I riprap. Temporary stabilization from last year died. Immediate stabilization required. sl 9.117 r ? '' «*}. +� � -t.X�*. mow. } • -._ .� '� .� r jig,• V F � T ..� . "�.. o�, , may_ - . ., Sediment Trap A (east side of site).Temporary stabilization from last year died. Immediate stabilization required. 1• OL-