Loading...
HomeMy WebLinkAboutWPO201600038 Bond Estimates 2016-08-22 (3)Crozet Business Office WPO file number: WP0201600038 Erosion and Sediment Control Bond Estimate Item Item Number stablization (PS, TS) silt fence (SF) safety fence (SAF) diversion (DID, FD, RWD) temporary slope drain (TSD) earthwork for trap/basin structures for basin silt fence inlet protection (IP) stone inlet protection (IP) outlet protection (OP) channel (SCC, matted) check dam construction entrance (CE) wash rack paved construction entrance rip -rap, placed pipe length ■ 0 ft height of dam at toe 4.5 ft height of fill at face 2.5 ft length of dam 100 ft top width ft (area above transition) 17.5 sf (total width of dam) 9 ft (height below transition) 2 ft (area below transition) 5 sf (total fill volume) 83.3 cy length spillway _ft width off spillway ft riser height ft riser diameterMin in barrel lengthft barrel diameter length Witftlength ft depth in channel depth _ft width survey and layout (price per 0.1 mi.) acres - mobilization stream crossing (computed independently) pipe diameter -in cut at high side ft cut at face ft length of cutoft ft width of cut (area below transition) 0 sf (total width of cut) 27 ft (depth below transitior 2.5 ft (area above transition, 27.5 sf (total fill volume) 91.7 cy (TOAL CY estimate) 119 cy (spillway stone tons) 0.6 tons (riser unit price) $0.00 base plate orfdn - (barrel unit price) $0.00 barrel collars baffle length Mft width ft width ft channel width oft length -ft (tons) 0 tons traps and basins - No. Unit Unit Cost Cost (installed) Eacres $5,000.00 $7,500.00 ft $5.00 $3,560.00 ft $5.00 $0.00 ft $13.00 $5,850.00 $0.00 $0.00 $13.00 $1,547.00 $50.00 $30.00 $0.00 $200.00 $0 $0.00 $200.00 $0 $50.00 $0 ■ $100.00 $10.00 $ $200.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $2,000.00 $2,000.00 $2,000.00 $2,000.00 $3,500.00 $0.00 $60.00 $0.00 $1,250.00 $500.00 $0.00 cost sum $24,337.00 contingency $2,433.70 Total $26,780 8/22/2016