HomeMy WebLinkAboutWPO201600038 Bond Estimates 2016-08-22Crozet Business Office
WPO file number: wpo201600038
Stormwater Management Plan Bond Estimate
ter tam
Number
permanent diversion or ditch
standard manhole frame top (not inlet)
drop inlet or grate
manhole structure (per ft. dse)
pipe, top, crap(15 to 48")
-n
d .ES-12
EC-1
aggregate base or drainage stone
in d
ftL
it W
earthwork for trap/basin
hei ht of dam at toe
9
ft
cut at high side
9
0 fl
height of fill at face
ft
cut
0it
EARTHWORK
length of dam
ft
length of cut
ft
IN
top width
ft
width of cut
ft
ESC BOND
(area above transition)
0at
(area below transition)
0sf
(total won of do,)
Oft
(total width of cut)
0 ft
(height below transition
0fl
(depth below transition
0ft
(area be low transition)
0sf
(area above transition)
Oat
(total fill volu me)
0.0 by
(total fill volume)
0.0 cy
length of spillway
ft
(TOAL Cy estimate)
0 cy
width of spillway
ft
(spillway stone tons)
0tons
structures for basin
riser height
ft
'ser diameter
in
(riser unit price)
$0.00
barrel length
ft
base plate or fdn
-
bar diameter
(barrel a nit price)
$0.00
barrel collars
Mh
baffle length
Vass
shrubs
seedlings
underdrain (LF)
biofilter Boll mix (CV)
trash rack/ anti vortex devices
maintenance access road (LF)
rip -rap placed
depth
ft
length
IWOft
width
(tons)
0
umey and layout (price per 0.1 mi.)
acres
basins
mobilization
as -built drawings(per facility)
materials testing (per facility)
compaction testing (per dam)
manufactured facilities (attach manufacturer§ or contractors price as a base)
No. Unit Unit Cost Cost
nstalled
0 ft $13.00 $0.00
0 an $500.00 $0.00
0 ea $3,500.00 $0.00
0 ft $450.00 $0.00
0.0 ft $0.00 $0.00
0.0 ton $3$5.00 $0.00
$0.00
$200.00 $0
$0.00
$200.00 $0
$50.00 $0
2 ea
$150.00
$300.00
3 ea
$50.00
$150.00
0 an
$5.00
$0.00
100 ft
$5.00
$500.00
123 cy
$38.00
$4,67 .00
0 ft
$1,500.00
$0.00
0 ft
$50.00
$0.00
$60.00
$0.00
$1,265.00
$500.00
$2,000.00
$2.000.00
$2,000.00
■ea
$2,000.00
$5,000.00
$5,000.00
$0.00
cast sum $16,389.00
contingency $1,638.90
Total $18,030
8/22/2016