HomeMy WebLinkAboutWPO201500095 Bond Estimates 2016-08-26Fairhill Estates WPO file number: WP0201500095 Stormwater Management Plan Bond Estimate Item Item No. Unit Unit Cost Cost Number installed permanent diversion or ditch ft $13.00 $37,050.00 standard manhole frame top (not inlet) ea $500.00 $0.00 drop inlet or grate ea $3,500.00 $0.00 manhole structure (per ft. rise) ft $450.00 $0.00 pipe, rcp, cmp (15 to 48")in d ES -1,2 NES -1,2 EC -1 ft $0.00 $0.00 aggregate base or drainage stone in d L ft W 0.0 ton $35.00 $0.00 earthwork for trap/basin height of dam at toe 9 r 0 ft cut al high side 9 ft height of fill at face0 11 cut at face ft length of dam 0 11 length of cut ft width ft width of cut ft ap rea above transition; 0 sf (area below transition 0 sf (total width of dam) 0 it (total width of cut) 0 ft (height below transitioi Ott (depth below transitio Oft (area below transition) 0 sf (area above transition 0 sf (total fill volume) 0 ;y (total fill volume) 0.0 cy length of spillway = 0 it (TOAL CV estimate) 0 cy $13.00 $0.00 width of spillway 0 11 (spillway stone tons) 0 tons $50.00 $0.00 structures for basin riser height 0 11 riser diameter 0 in (riser unit price) $0.00 $0.00 barrel length 0 ft IF base plate or fdn $200.00 $0 barrel diameter 0 in (barrel unit price) $0.00 $0.00 barrel collars Mlt $200.00 $0 baffle length $50.00 $0 trees ea $150.00 $0.00 shrubs ea $50.00 $0.00 seedlings ea $5.00 $0.00 underdrain (LF) it $5.00 $0.00 biofilter soil mix (Cl) cy $38.00 $0.00 trash rack/ anti vortex devices ft $1,500.00 $0.00 maintenance access road (LF) ft $50.00 $0.00 rip -rap, placed depth 0 ft length ft width 0.0 (tons) 0 $60.00 $0.00 survey and layout (price per 0.1 mi.) acres 9 basins $4,500.00 mobilization $500.00 as -built drawings (per facility) $2,000.00 $0.00 materials testing (per facility) Mae ea $2,000.00 $0.00 compaction testing (per dam) as $5,000.00 $0.00 manufactured facilities (attach manufacturer's or contractor's price as a base) $0.00 cost sum $42,050.00 contingency $4,205.00 Total $46,260 8/25/2016 Fairhill Estates WPO file number: WP0201500095 Erosion and Sediment Control Bond Estimate Item Item Number stabilization (PS, TS) silt fence (SF) safety fence (SAF) diversion (DD, FD, RW D) temporary slope drain (TSD) earthwork for trap/basin #1 earthwork for trap/basin #2 earthwork for trap/basin #3 earthwork for trap/basin #4 earthwork for trap/basin #5 earthwork for trap/basin #6 earthwork for trap/basin #7 earthwork for trap/basin #6 pipe length -R height of dam at toe ft height of fill efface ft length of dam ft top width ft (area above transition) 6 at (total width of dam) 16 ft (height below transition) 7 ft (area below transition) 7 sf (total fill volume) 9.6 cy length spillway _fl width off spillway ft height of dam at toe ft height of fill at face ft length of dam ft top width ft (area above transition) 6 at (total wdid, of dam) 4 ft (height below transition) 1 ft (area below transition) 1 sf (total fill volume) 11.7 cy length spillway _fl width off Spillway tt height Of dam at toe ft height of fill at face ft length of dam ft top width ft (area above transition) 160 at (total width of dam) 20 ft (height below transition) 2 ft (area below transition) 16 sf (total fill volume) 228.1 cy length of spillway _fl width of spillway tt height of dam at toe ft height of fill at face ft length of dam ft top width ft (area above transition) 198 at (total width of dam) 20 ft (height below transition) 1 ft (area below transition) 9 sf (total fill volume) 920.0 cy length of spillway _flf[ width of spillway height of dam at toe ft height of fill at face ft length of dam ft top width ft (area above transition) 70 at (total width of dam) 2 ft (height below transition) -4 ft (area below transition) -20 sf (total fill volume) 129.6 cy length of spillway _fl width of Spillway tt height Of dam at toe ft height of fill at face ft length of dam ft top width ft (area above transition) 16 at (total width of dam) 12 ft (height below transition) 4 ft (area below transition) 8 sf (lotsl fill volume) 62.2 ay length of spillway _fl width of Spillway ft height of dam at toe ft height of fill at face ft length of dam ft top width ft (area above transition) 48 at (total width of dam) loft (height below transition) 1 ft (area below transition) 4 sf (lotsl fill volume) 192.6 cy length of spillway _fl width of Spillway tt height of dam at toe ft height of fill at face ft length of dam ft top width ft (area above transition) 48 at pipe diameter -in cut at high sideft cut at face ft length of cul ft width of cut ft (area below transition) 1008 sf (total width of cut) 96 ft (depth below transitior 2 ft (area above transition; 92 sf (total fill volume) 1222.2 cy (TOAL CV estimate) 1225 cy (spillway stone tons) 5.2 tons cut at high sideft cut at face ft length of cul ft width of cut ft (area below transition) 12 at (total width of cut) 16 ft (depth below transitior 1 ft (area above transition; 7 sf (total fill volume) 56.3 cy (TOAL CV estimate) 60 cy (spillway stone tons) 4.6 tons cut at high sideft cut at face ft length of cul ft width of cul ft (area below transition) 68 at (total width of cut) 34 ft (depth below transitior -2 ft (area above transition; -38 sf (total fill volume) 44.4 cy (TOAL CV estimate) 243 cy (spillway stone tons) 5.2 tons cut at high sideft cut at face ft length of cul ft width of cut ft (area below transition) 0 at (total width of cut) 10 ft (depth below transitior 0 ft (area above transition; 0 sf (total fill volume) 0.0 cy (TOAL CV estimate) 920 cy (spillway stone tons) 5.2 tons cut at high sideft cut at face ft length of cul ft width of cut ft (area below transition) 224 at (total width of cut) 40 ft (depth below transitior -2 ft (area above transition; -44 sf (total fill volume) 400.0 cy (TOAL CV estimate) 443 cy (spillway stone tons) 1.7 tons cut at high side10 ft cut at face 5 ft length of cul ft width of cut ft (area below transition) 100 at (total width of cut) 40 ft (depth below transitior 5 ft (area above transition; 75 sf (total fill volume) 259.3 cy (TOAL CV estimate) 280 cy (spillway stone tons) 2.3 tons cut at high sideft cut at face ft length of cul ft width of cul ft (area below transition) 132 at (total width of cut) 26 ft (depth below transitior -4 ft (area above transition; -fib sf (total fill volume) 94.8 cy (TOAL CV estimate) 224 cy (spillway stone tons) 10.4 tons cut at high sideft cut at face ft length of cul ft width of cut ft (area below transition) 100 at No. Unit Unit Cost Cost (installed) 9u acres $5,000.00 $45,000.00 440.0 ft $5.00 $2,200.00 0.0 ft $5.00 $0.00 2640 ft $13.00 $34,320.00 $0.00 $0.00 $13.00 $15,925.00 $50.00 $260.00 $13.00 $780.00 $50.00 $230.00 $13.00 $3,159.00 $50.00 $260.00 $13.00 $11,960.00 $50.00 $260.00 $13.00 $5,759.00 $50.00 $85.00 $13.00 $3,640.00 $50.00 $115.00 $13.00 $2,912.00 $50.00 $520.00 8/25/2016 Fail Estates WPO file number: WP0201500095 Erosion and Sediment Control Bond Estimate Item Item Number mobilization stream crossing (computed independently) No. Unit Unit Cost Cost (installed) (total width of dam) 10 k (total width of cut) 32 It $460.00 (height below transition) 1 k (depth below transitior 1 If $200.00 (area below transition) 4 at (area above transition; 15 at (total fill volume) 231.1 cy (total fill volume) 255.6 cy $0 length of spillwayk $100.00 (TOAL CV estimate) 333 cy $200.00 width of spillway k (spillway stone tons) 9.2 tons structures for basin $13.00 $270.00 $270.00 riser h= k $2,000.00 $2,000.00 riser diameterin rin (riser unit price) $0.00 barrel length k base plate or fdn - $4,500.00 barrel diameter (barrel unit price) $0.00 $0.00 cost sum barrel collars Mh contingency $14,643.20 baffle length silt fence inlet protection (IP) stone inlet protection (IP) outlet protection (OP) lengthk width 5 It channel (SCC, matted) length k width 10 If check dam depth in channel k channel width 6 It construction entrance (CE) wash rack paved construction entrance rip -rap, placed depth _k length -k width (tons) o tons survey and layout (price per 0.1 mi.) acres traps and basins mobilization stream crossing (computed independently) No. Unit Unit Cost Cost (installed) 8/25/2016 $13.00 $4,329.00 $50.00 $460.00 $0.00 $200.00 $o $0.00 $200.00 $o $50.00 $0 $100.00 $0.00 $200.00 $600.00 -A $225.00 $675.00 $13.00 $270.00 $270.00 $z,00,000.00 $2,000.00 $2,000.00 $2,000.00 $3,500.00 $3,500.00 $60.00 $0.00 $4,500.00 $500.00 $0.00 cost sum $146,432.00 contingency $14,643.20 Total $161,080 8/25/2016