Loading...
HomeMy WebLinkAboutWPO201600024 Bond Estimates 2016-08-26Texas Roadhouse WPO file number: WP0201600024 Erosion and Sediment Control Bond Estimate Item Item Number stablization (PS, TS) silt fence (SF) safety fence (SAF) diversion (DD, FD, RWD) temporary slope drain (TSD) earthwork for trap/basin structures for basin silt fence inlet protection (IP) stone inlet protection (IP) outlet protection (OP) channel (SCC, matted) check dam construction entrance (CE) wash rack paved construction entrance includes sock pipe length height of dam at toe height of fill at face length of dam top width (area above transition) (total width of dam) (height below transition) (area below transition) (total fill volume) length of spillway width of spillway riser height riser diameter barrel length barrel diameter length length depth in channel rip -rap, placed depth width survey and layout (price per 0.1 mi.) acres mobilization stream crossing (computed independently) it pipe diameter -in ft cut at high sideft ft cut at face ft ft length of cutoft ft ft width of cut 4 sf (area below transition) 108 sf 4 ft (total width of cut) 36 ft 1 ft (depth below transitior -3 ft 1 sf (area above transition, -63 sf 20.4 cy (total fill volume) 100.0 cy _ft(TOAL CY estimate) 107 cy ft (spillway stone tons) 0 tons (riser unit price) $0.00 base plate orfdn - (barrel unit price) $0.00 barrel collars baffle length Mft 110ft width Oft ft ft width ft ft channel width _ft length 0 tft (tons) 0 tons traps and basins - No. Unit Unit Cost Cost (installed) Macres $5,000.00 $4,500.00 ft $5.00 $2,850.00 ft $5.00 $3,350.00 ft $13.00 $845.00 $0.00 $0.00 $13.00 $1,391.00 $50.00 $0.00 $0.00 $200.00 $0 $0.00 $200.00 $0 $50.00 $0 TIM$100.00 $0.00 $200.00 $1,000.00 $0.00 $0.00 $0.00 $90.00 $90.00 $2,000.00 $0.00 $2,000.00 $2,000.00 $3,500.00 $3,500.00 $60.00 $0.00 $950.00 $500.00 $0.00 cost sum $20,976.00 contingency $2,097.60 Total $23,080 8/26/2016 Texas Roadhouse WPO file number: WP0201600024 Stormwater Management Plan Bond Estimate Item Item Number permanent diversion or ditch standard manhole frame top (not inlet) drop inlet or grate manhole structure (per ft. rise) pipe, rcp, cmp (15 to 48") pipe, rcp, cmp (15 to 48") aggregate base or drainage stone earthwork for trap/basin structures for basin trees shrubs seedlings underdrain (LF) biofilter soil mix (CY) trash rack/ anti vortex devices maintenance access road (LF) d Unit Cost -1:2 0 EC-1in =in d NES ES -2 0 EC -1 in d ea ft L I 0.0 ft W it height of dam a[ toeOft cu[ a[ high sideff9 9height $10,500.00 of fillatfacecut $450.00 at face 136. ft length of damft $4,760.00 length of cut ft top width 0.0 ton width of cut ft (area above transition; 0 sf (area below transition 0 sf (total width of dam) 0 ft (total width of cut) 0 ft (height below transitio 0 ft (depth below transitio 0 ft (area below transition) 0 sf (area above transitior 0 sf (total fill volume) 0.0 cy (total fill volume) 0.0 cy length of spillway _it (TOAL CY estimate) 0 cy width of spillway it (spillway stone tons) 0 tons riser height it riser diameter in (riser unit price) $0.00 barrel length ft base plate or Win _ barrel diameter in (barrel unit price) $0.00 barrel collars Mft baffle length rip -rap, placed depth M111 length width (tons) survey and layout (price per 0.1 mi.) acres basins mobilization as -built drawings (per facility) materials testing (per facility) compaction testing (per dam) manufactured facilities (attach manufacturer's or contractor's price as a base _ft 0 No. Unit Unit Cost Cost 0 ea (installed) $0.00 ft $13.00 $0.00 ea $500.00 $1,500.00 ea $3,500.00 $10,500.00 1 ft $450.00 $5,400.00 136. ft $35.00 $4,760.00 144. ft $40.00 $5,760.00 0.0 ton $35.00 $0.00 $13.00 $0.00 $50.00 $0.00 $0.00 $200.00 $0 $0.00 $200.00 $0 $50.00 $0 0 ea $150.00 $0.00 0 ea $50.00 $0.00 ea $5.00 $0.00 ft $5.00 $0.00 cy $38.00 $0.00 ft $1,500.00 $0.00 ft $50.00 $0.00 $60.00 $0.00 $450.00 $500.00 $2000.00 $200.0 ■ea ea $2,000.00 $0 $0.00 ea $5,000.00 $0.00 $24,000.00 cos[ sum $54,870.00 contingency $5,487.00 Total $60,360 6/26/2016