Loading...
HomeMy WebLinkAboutSUB201600129 Review Comments Final Plat 2016-06-28Christopher Perez From: Christopher Perez Sent: Tuesday, June 28, 2016 8:10 AM To: Scott Collins Cc: Clint Harmon Subject: RE: SUB2016-129 Sunset Overlook — final plat Scott, See my responses below in red. Christopher P. Perez I Senior Planner Department of Community Development ICounty of Albemarle, Virginia 401 McIntire Road I Charlottesville, VA 22902 434.296.5832 ext. 3443 From: Scott Collins [mailto:scott@collins-engineering.com] Sent: Tuesday, June 28, 2016 7:50 AM To: Clint Harmon <CHarmon@roudabush.com>; Andrew Baldwin <Andrew@corecville.com>; Christopher Perez <cperez@albemarle.org> Cc: Bill Ledbetter <BLedbetter@roudabush.com> Subject: RE: SUB2016-129 Sunset Overlook — final plat Chris - Clint forwarded me this email. Keep in mind, we processed both an initial site plan (yes, an initial site plan was submitted, reviewed, and approved w/ conditions see SDP2015-55) and a preliminary plat for this project (I believe that is an incorrect statement, a preliminary plat was never submitted nor reviewed with this proposal, thus the reason for my correspondence to Clint), both of which have been reviewed and approved by Albemarle County (if a prelim plat was submitted/ reviewed/approved for this proposal what is the SUB# and I'll look it up?, or provide me the approval letter). hi addition, we have both a road plan and a site plan for this project (yes, road plans and a final site plan are in our office and actively under review). It is my understanding that the subdivision plat does not need to go back through a SRC review process, unless something in the ordinance or processing has changed that I am not aware of. (The only reason I mentioned SRC is be a preliminary sub plat was never submitted/reviewed/approved for the single family detached lots) Thx. Scott From: Christopher Perez [mailto:cperez@albemarle.org] Sent: Monday, June 27, 2016 12:47 PM To: Clint Harmon <CHarmon@roudabush.com> Subject: SUB2016-129 Sunset Overlook — final plat Clint, SUB2016-129 Sunset Overlook — final plat I have been assigned the above referenced plat. Before I distributed it for review I wanted to contact you and determine what type of review you are requesting. I noticed this plat was submitted as a final subdivision plat under 14-206, which means it needs to go to Site Review Committee (SRC) be the single family detached lots do not have a preliminary subdivision plat associated with them. SRC is a 60 day review period. Or did you mean to submit this plat under 14-207 as a subdivision following a final site plan approval? The fee for this review is $742. If you choose this route, the review of the plat cannot commence until the final site plan is approved. If you choose this route please request a deferral of this plat till the site plan is approved. It seems as through it'd be best to do the review under 14-207 being the single family lots cannot be approved till the water & sewer serving the lots is built or bonded. Let me know how you wish to proceed. Thanks Christopher P. Perez I Senior Planner Department of Community Development ICounty of Albemarle, Virginia 401 McIntire Road I Charlottesville, VA 22902 434.296.5832 ext. 3443