HomeMy WebLinkAboutSUB201500119 Bond Estimates 2016-09-07Project Name: Rivanna Village Phase 1 and parts of Phase 3 & 4 Road and Infrastructure Construction Bond Estimate (roads, site work, storm sewer) Plan # SUB201500119 Item Road Name: Winding Road Begin station End station aggregate base blotted or prime&double seal asphalt base asphalt surface curb CG-2 curb CG-6 sidewalk, concrete (6) ramp CG-12 10+00.00 18+50.0W road length 850.0 ft 4.0 in d 850.0 ft L 25.0 ft W 850.0 ftL 0.0 ft W in d 850.0 ftL 25.0 ft W in d 850.0 ft L 25.0 ft W street name sign traffic control sign Street Landscape guardrail drop inlet or grate standard manhole frame top (not inlet) manhole structure (per ft. rise) pipe, rcp, cm (15 to 48") 15.0 in d pipe, rcp, cm (15 to 48") 18.0 in d pipe, rcp, cm (15 to 48") 24.0 in d pipe, rcp, cm (15 to 48") 36.0 in d pipe, rcp, cmp (60 to 108") 96.0 in d rip -rap, placed 2.0 ft d matting, EC-2 or 3 clear and grub (for wooded sites) cut grading fill grading as -built drawings (1k + price per 0.1 mi.) survey and layout (price per 0.1 mi.) mobilization materials testing compaction testing CBR tests (1 every 0.1 mi. per road) stone depth inspections pavement inspections pipe and drainage video inspections VDOT surety (1 lane) VDOT maintenance fee (1 In rd, 1 yr) VDOT admin. Cost recovery fee(1 lane) Each ES @L, 3000 1 ES-1,2 1W 1 EC-1 1 ES-1,2 1 EC-1 1 ES-1,2 1 EC-1 0 ES-1,2 EC-1 0 ES-1,2 EC-1 .ftL r0.ftW 0 0.00ft L 0.00ft W 0.0 ft L 0.0 ft W 850.0 ft L 0.16098 mi. 850.0 ft L 0.16098 mi. 850.0 ft L 1.7 inc of 500' 850.0 ft L 1.7 inc of 500' 850.0 ft L 1.7 inc of 500' 850.0 ft L 1.7 inc of 500' 850.0 ft L 1.7 inc of 500' 850.0 ft L 0.16098 mi. 850.0 ft L 0.16098 mi. 850.0 ft L 0.16098 mi. No. Unit 495.8 ton 0.0 sy 390.5 tons 260.3 tons 0.0 ft 1700.0 ft 1600.0 ft 6ft 2 each 2 each 27 each 0.0 ft 16 each 4 each 148 ft 1045.0 ft 252.0 ft 145.0 ft 0.0 ft 0.0 ft 0.0 ton 0.0 sy 0.0 acre cy cy 2 Isum 2 Isum - Isum 3 each 3 each 3 each 3 each 3 each 2342 ft Lanes Lanes Lanes cost sum Unit Cost Cost installed % compete cost remaining $35.00 $17,354.17 0% $17,354.17 $10.00 $0.00 0% $0.00 $100.00 $39,046.88 0% $39,046.88 $120.00 $31,237.50 0% $31,237.50 $13.00 $0.00 0% $0.00 $15.00 $25,500.00 0% $25,500.00 $17.00 $27,200.00 0% $27,200.00 $350.00 $2,100.00 0% $2,100.00 $200.00 $400.00 0% $400.00 $200.00 $400.00 0% $400.00 $150.00 $4,050.00 0% $4,050.00 $17.00 $0.00 0% $0.00 $3,500.00 $56,000.00 0% $56,000.00 $500.00 $2,000.00 0% $2,000.00 $450.00 $66,600.00 0% $66,600.00 $35.00 $37,575.00 0% $37,575.00 $40.00 $11,080.00 0% $11,080.00 $50.00 $8,250.00 0% $8,250.00 $70.00 $0.00 0% $0.00 $320.00 $0.00 0% $0.00 $60.00 $0.00 0% $0.00 $2.00 $0.00 0% $0.00 $24,000.00 $0.00 0% $0.00 $4.00 $0.00 0% $0.00 $9.00 $0.00 0% $0.00 $2,000.00 $5,000.00 0% $5,000.00 $2,000.00 $5,000.00 0% $5,000.00 $5,000.00 $5,000.00 0% $5,000.00 $200.00 $540.00 0% $540.00 $200.00 $540.00 0% $540.00 $200.00 $540.00 0% $540.00 $200.00 $540.00 0% $540.00 $200.00 $540.00 0% $540.00 $1.00 $2,342.00 0% $2,342.00 $2,000.00 $6,439.39 0% $6,439.39 $150.00 $482.95 0% $482.95 $100.00 $571.97 0% $571.97 $356,329.86 $356,329.86 C:\Users\mgreene\Documents\A-Review Comment letters\Rivanna Village Phase 1\RP_bond_est September2016.xls 9/7/2016 Project Name: Rivanna Village Phase 1 and parts of Phase 3 & 4 Road and Infrastructure Construction Bond Estimate (roads, site work, storm sewer) Plan # SUB201500119 Item Road Name: Winding Road No. Unit Unit Cost Cost installed % compete cost remaining contingency $35,632.99 $35,632.99 Total $391,970 $391,970 C:\Users\mgreene\Documents\A_Review Comment letters\Rivanna Village Phase 1\RP_bond_est_September20l6.xls 9/7/2016 Project Name: Rivanna Village Phase 1 and parts of Phase 3 & 4 Road and Infrastructure Construction Bond Estimate (roads, site work, storm sewer) Plan # SUB201500119 Item Road Name: Village Avenue Begin station End station aggregate base blotted or prime&double seal asphalt base asphalt surface curb CG-2 curb CG-6 sidewalk, concrete (6) ramp CG-12 10+00.00 22+53.OQM road length 1253.0 ft 8.0 d 1253.0 ftL 1253.0 ftLFolftw 0ftW ,in in d 123.0ftL0 ftW in d 1253.0 ftL0 ft W street name sign traffic control sign Street Landscape guardrail drop inlet or grate standard manhole frame top (not inlet) manhole structure (per ft. rise) pipe, rcp, cm (15 to 48") 15.0 in d pipe, rcp, cm (15 to 48") 18.0 in d pipe, rcp, cm (15 to 48") 24.0 in d pipe, rcp, cm (15 to 48") 36.0 in d pipe, rcp, cmp (60 to 108") 96.0 in d rip -rap, placed 2.0 ft d matting, EC-2 or 3 clear and grub (for wooded sites) cut grading fill grading as -built drawings (1k + price per 0.1 mi.) survey and layout (price per 0.1 mi.) mobilization materials testing compaction testing CBR tests (1 every 0.1 mi. per road) stone depth inspections pavement inspections pipe and drainage video inspections VDOT surety (1 lane) VDOT maintenance fee (1 In rd, 1 yr) VDOT admin. Cost recovery fee(1 lane) Each ES @L, 3000 2 ES-1,2 1W EC-1 1 ES-1,2 1 EC-1 0 ES-1,2 EC-1 1 ES-1,2 1 EC-1 0 ES-1,2 EC-1 .ftL r0.ftW 0.00ft L 0 0.00ft W 0.0 ft L 0.0 ftW 1253.0 ft L 0.23731 mi. 1253.0 ft L 0.23731 mi. 1253.0 ft L 2.506 inc of 500' 1253.0 ft L 2.506 inc of 500' 1253.0 ft L 2.506 inc of 500' 1253.0 ft L 2.506 inc of 500' 1253.0 ft L 2.506 inc of 500' 1253.0 ft L 0.23731 mi. 1253.0 ft L 0.23731 mi. 1253.0 ft L 0.23731 mi. No. Unit 1578.8 ton 0.0 sy 828.9 tons 414.4 tons 0.0 ft 2325.0 ft 2100.0 ft Oft 1 each 2 each 49 each 0.0 ft 17 each 5 each 181 ft 1374.0 ft 617.0 ft 338.0 ft 140.0 ft 0.0 ft 0.0 ton 0.0 sy 0.0 acre cy cy 3 Isum 3 Isum - Isum 4 each 4 each 4 each 4 each 4 each ft Lanes Lanes Lanes cost sum Unit Cost Cost installed % compete cost remaining $35.00 $55,257.30 0% $55,257.30 $10.00 $0.00 0% $0.00 $100.00 $82,885.95 0% $82,885.95 $120.00 $49,731.57 0% $49,731.57 $13.00 $0.00 0% $0.00 $15.00 $34,875.00 0% $34,875.00 $17.00 $35,700.00 0% $35,700.00 $350.00 $1,400.00 0% $1,400.00 $200.00 $200.00 0% $200.00 $200.00 $400.00 0% $400.00 $150.00 $7,350.00 0% $7,350.00 $17.00 $0.00 0% $0.00 $3,500.00 $59,500.00 0% $59,500.00 $500.00 $2,500.00 0% $2,500.00 $450.00 $81,450.00 0% $81,450.00 $35.00 $50,090.00 0% $50,090.00 $40.00 $25,680.00 0% $25,680.00 $50.00 $16,900.00 0% $16,900.00 $70.00 $10,800.00 0% $10,800.00 $320.00 $0.00 0% $0.00 $60.00 $0.00 0% $0.00 $2.00 $0.00 0% $0.00 $24,000.00 $0.00 0% $0.00 $4.00 $0.00 0% $0.00 $9.00 $0.00 0% $0.00 $2,000.00 $7,000.00 0% $7,000.00 $2,000.00 $7,000.00 0% $7,000.00 $5,000.00 $0.00 0% $0.00 $200.00 $720.00 0% $720.00 $200.00 $720.00 0% $720.00 $200.00 $720.00 0% $720.00 $200.00 $720.00 0% $720.00 $200.00 $720.00 0% $720.00 $1.00 $1,276.00 0% $1,276.00 $2,000.00 $9,492.42 0% $9,492.42 $150.00 $711.93 0% $711.93 $100.00 $724.62 0% $724.62 $544,524.80 $544,524.80 C:\Users\mgreene\Documents\A-Review Comment letters\Rivanna Village Phase 1\RP_bond_est September2016.xls 9/7/2016 Project Name: Rivanna Village Phase 1 and parts of Phase 3 & 4 Road and Infrastructure Construction Bond Estimate (roads, site work, storm sewer) Plan # SUB201500119 Item Road Name: Village Avenue No. Unit Unit Cost Cost installed % compete cost remaining contingency $54,452.48 $54,452.48 Total $598,980 $598,980 C:\Users\mgreene\Documents\A_Review Comment letters\Rivanna Village Phase 1\RP_bond_est_September20l6.xls 9/7/2016 Project Name: Rivanna Village Phase 1 and parts of Phase 3 & 4 Road and Infrastructure Construction Bond Estimate (roads, site work, storm sewer) Plan # SUB201500119 Item Road Name: Steamers Drive Begin station End station aggregate base blotted or prime&double seal asphalt base asphalt surface curb CG-2 curb CG-6 sidewalk, concrete (6) ramp CG-12 street name sign traffic control sign Street Landscape guardrail drop inlet or grate standard manhole frame top (not inlet) manhole structure (per ft. rise) pipe, rcp, cm (15 to 48") pipe, rcp, cm (15 to 48") pipe, rcp, cm (15 to 48") pipe, rcp, cm (15 to 48") pipe, rcp, cmp (60 to 108") rip -rap, placed matting, EC-2 or 3 clear and grub (for wooded sites) cut grading fill grading as -built drawings (1k + price per 0.1 mi.) survey and layout (price per 0.1 mi.) mobilization materials testing compaction testing CBR tests (1 every 0.1 mi. per road) stone depth inspections pavement inspections pipe and drainage video inspections VDOT surety (1 lane) VDOT maintenance fee (1 In rd, 1 yr) VDOT admin. Cost recovery fee(1 lane) No. Unit Unit Cost Cost installed % compete cost remaining 09+00.00 24+50." road length 1550.0 ft 8.0 in d 1550.0 ft L ft W 1808.3 ton $35.00 $63,291.67 0% $63,291.67 k5.0 1550.0 ft L0.0 ftW 0.0 sy $10.00 $0.00 0% $0.00 in d iin 1550.0 ftL5.0 ft W 949.4 tons $100.00 $94,937.50 0% $94,937.50 d 1550.0 ftL5.0 ft W 474.7 tons $120.00 $56,962.50 0% $56,962.50 0.0 ft $13.00 $0.00 0% $0.00 2750.0 ft $15.00 $41,250.00 0% $41,250.00 2200.0 ft $17.00 $37,400.00 0% $37,400.00 2 ft $350.00 $700.00 0% $700.00 2 each $200.00 $400.00 0% $400.00 2 each $200.00 $400.00 0% $400.00 Each 58 each $150.00 $8,700.00 0% $8,700.00 ES @LL 3000 0.0 ft $17.00 $0.00 0% $0.00 13 each $3,500.00 $45,500.00 0% $45,500.00 2 each $500.00 $1,000.00 0% $1,000.00 0 ft $450.00 $0.00 0% $0.00 15.0 in d 2 ES-1,2 EC-1 1727.0 ft $35.00 $62,445.00 0% $62,445.00 18.0 in d 1 ES-1,2 EC-1 119.0 ft $40.00 $5,760.00 0% $5,760.00 24.0 in d 0 ES-1,2 EC-1 0.0 ft $50.00 $0.00 0% $0.00 36.0 in d 0 ES-1,2 EC-1 0.0 ft $70.00 $0.00 0% $0.00 96.0 in d 0 ES-1,2 EC-1 0.0 ft $320.00 $0.00 0% $0.00 2.0 ft d 0.0 ft L ft W 0.0 ton $60.00 $0.00 0% $0.00 W0.0 0.0 ft L 0.0 ft W 0.0 sy $2.00 $0.00 0% $0.00 0.0 ft L 0.0 ft W 0.0 acre $24,000.00 $0.00 0% $0.00 cy $4.00 $0.00 0% $0.00 cy $9.00 $0.00 0% $0.00 1550.0 ft L 0.29356 mi. 3 Isum $2,000.00 $7,000.00 0% $7,000.00 1550.0 ft L 0.29356 mi. 3 Isum $2,000.00 $7,000.00 0% $7,000.00 -Isum $5,000.00 $0.00 0% $0.00 1550.0 ft L 3.1 inc of 500' 4 each $200.00 $820.00 0% $820.00 1550.0 ft L 3.1 inc of 500' 4 each $200.00 $820.00 0% $820.00 1550.0 ft L 3.1 inc of 500' 4 each $200.00 $820.00 0% $820.00 1550.0 ft L 3.1 inc of 500' 4 each $200.00 $820.00 0% $820.00 1550.0 ft L 3.1 inc of 500' 4 each $200.00 $820.00 0% $820.00 18460 ft $1.00 $18,460.00 0% $18,460.00 1550.0 ftL 0.29356 mi. Lanes $2,000.00 $11,742.42 0% $11,742.42 1550.0 ft L 0.29356 mi. Lanes $150.00 $880.68 0% $880.68 1550.0 ft L 0.29356 mi. Lanes $100.00 $837.12 0% $837.12 cost sum $468,766.89 $468,766.89 C:\Users\mgreene\Documents\A-Review Comment letters\Rivanna Village Phase 1\RP_bond_est September2016.xls 9/7/2016 Project Name: Rivanna Village Phase 1 and parts of Phase 3 & 4 Road and Infrastructure Construction Bond Estimate (roads, site work, storm sewer) Plan # SUB201500119 Item Road Name: Steamers Drive No. Unit Unit Cost Cost installed % compete cost remaining contingency $46,876.69 $46,876.69 Total $515,650 $515,650 C:\Users\mgreene\Documents\A_Review Comment letters\Rivanna Village Phase 1\RP_bond_est_September2016.xls 9/7/2016 Project Name: Rivanna Village Phase 1 and parts of Phase 3 & 4 Road and Infrastructure Construction Bond Estimate (roads, site work, storm sewer) Plan # SUB201500119 Item Road Name: Sweetgum Lane Begin station End station aggregate base blotted or prime&double seal asphalt base asphalt surface curb CG-2 curb CG-6 sidewalk, concrete (6) ramp CG-12 street name sign traffic control sign Street Landscape guardrail drop inlet or grate standard manhole frame top (not inlet) manhole structure (per ft. rise) pipe, rcp, cm (15 to 48") pipe, rcp, cm (15 to 48") pipe, rcp, cm (15 to 48") pipe, rcp, cm (15 to 48") pipe, rcp, cmp (60 to 108") rip -rap, placed matting, EC-2 or 3 clear and grub (for wooded sites) cut grading fill grading as -built drawings (1k + price per 0.1 mi.) survey and layout (price per 0.1 mi.) mobilization materials testing compaction testing CBR tests (1 every 0.1 mi. per road) stone depth inspections pavement inspections pipe and drainage video inspections VDOT surety (1 lane) VDOT maintenance fee (1 In rd, 1 yr) VDOT admin. Cost recovery fee(1 lane) No. Unit Unit Cost Cost installed % compete cost remaining 10+00.00 12+31.00 road length 231.0 ft 4.0 in d 231.0 ft L ft W 134.8 ton $35.00 $4,716.25 0% $4,716.25 a231.0 k5.0 ft L0.0 ftW 0.0 sy $10.00 $0.00 0% $0.00 3.0 in d 231.0 ftL5.0 ft W 106.1 tons $100.00 $10,611.56 0% $10,611.56 2.0 in d 231.0 ftL5.0 ft W 70.7 tons $120.00 $8,489.25 0% $8,489.25 0.0 ft $13.00 $0.00 0% $0.00 460.0 ft $15.00 $6,900.00 0% $6,900.00 230.0 ft $17.00 $3,910.00 0% $3,910.00 0 ft $350.00 $0.00 0% $0.00 2 each $200.00 $400.00 0% $400.00 2 each $200.00 $400.00 0% $400.00 Each 7 each $150.00 $1,050.00 0% $1,050.00 ES @L 3000 0.0 ft $17.00 $0.00 0% $0.00 0 each $3,500.00 $0.00 0% $0.00 0 each $500.00 $0.00 0% $0.00 0 ft $450.00 $0.00 0% $0.00 15.0 in d 0 ES-1,2 EC-1 0.0 ft $35.00 $0.00 0% $0.00 24.0 in d 0 ES-1,2 EC-1 0.0 ft $50.00 $0.00 0% $0.00 18.0 in d 0 ES-1,2 EC-1 0.0 ft $40.00 $0.00 0% $0.00 18.0 in d 0 ES-1,2 EC-1 0.0 ft $40.00 $0.00 0% $0.00 96.0 in d 0 ES-1,2 EC-1 0.0 ft $320.00 $0.00 0% $0.00 2.0 ft d 0.0 ft L 0.0 ft W 0.0 ton $60.00 $0.00 0% $0.00 0.0 ft L 0.0 ft W 0.0 sy $2.00 $0.00 0% $0.00 0.0 ft L 0.0 ft W 0.0 acre $24,000.00 $0.00 0% $0.00 cy $4.00 $0.00 0% $0.00 cy $9.00 $0.00 0% $0.00 231.0 ft L 0.04375 mi. 1 Isum $2,000.00 $3,000.00 0% $3,000.00 231.0 ft L 0.04375 mi. 1 Isum $2,000.00 $3,000.00 0% $3,000.00 -Isum $5,000.00 $0.00 0% $0.00 231.0 ft L 0.462 inc of 500' 2 each $200.00 $300.00 0% $300.00 231.0 ft L 0.462 inc of 500' 2 each $200.00 $300.00 0% $300.00 231.0 ft L 0.462 inc of 500' 2 each $200.00 $300.00 0% $300.00 231.0 ft L 0.462 inc of 500' 2 each $200.00 $300.00 0% $300.00 231.0 ft L 0.462 inc of 500' 2 each $200.00 $300.00 0% $300.00 ft $1.00 $0.00 0% $0.00 231.0 ft L 0.04375 mi. Lanes ELanes $2,000.00 $1,750.00 0% $1,750.00 231.0 ft L 0.04375 mi. Lanes $150.00 $131.25 0% $131.25 231.0 ft L 0.04375 mi. $100.00 $337.50 0% $337.50 $46,195.81 $46,195.81 cost sum C:\Users\mgreene\Documents\A-Review Comment letters\Rivanna Village Phase 1\RP_bond_est September2016.xls 9/7/2016 Project Name: Rivanna Village Phase 1 and parts of Phase 3 & 4 Road and Infrastructure Construction Bond Estimate (roads, site work, storm sewer) Plan # SUB201500119 Item Road Name: Sweetgum Lane No. Unit Unit Cost Cost installed % compete cost remaining contingency $4,619.58 $4,619.58 Total $50,820 $50,820 C:\Users\mgreene\Documents\A_Review Comment letters\Rivanna Village Phase 1\RP_bond_est_September20l6.xls 9/7/2016 Project Name: Rivanna Village Phase 1 and parts of Phase 3 & 4 Road and Infrastructure Construction Bond Estimate (roads, site work, storm sewer) Plan # SUB201500119 Item Road Name: Sycamore Lane Begin station End station aggregate base blotted or prime&double seal asphalt base asphalt surface curb CG-2 curb CG-6 sidewalk, concrete (6) ramp CG-12 street name sign traffic control sign Street Landscape guardrail drop inlet or grate standard manhole frame top (not inlet) manhole structure (per ft. rise) pipe, rcp, cm (15 to 48") pipe, rcp, cm (15 to 48") pipe, rcp, cm (15 to 48") pipe, rcp, cm (15 to 48") pipe, rcp, cmp (60 to 108") rip -rap, placed matting, EC-2 or 3 clear and grub (for wooded sites) cut grading fill grading as -built drawings (1k + price per 0.1 mi.) survey and layout (price per 0.1 mi.) mobilization materials testing compaction testing CBR tests (1 every 0.1 mi. per road) stone depth inspections pavement inspections pipe and drainage video inspections VDOT surety (1 lane) VDOT maintenance fee (1 In rd, 1 yr) VDOT admin. Cost recovery fee(1 lane) No. Unit Unit Cost Cost installed % compete cost remaining 10+14.00 12+62.00 road length 248.0 ft 4.0 in d 248.0 ft L 25.0 ft W 144.7 ton $35.00 $5,063.33 0% $5,063.33 248.0 ft L 0.0 ft W 0.0 sy $10.00 $0.00 0% $0.00 in d 248.0 ftL 25.0 ft W 113.9 tons $100.00 $11,392.50 0% $11,392.50 in d 248.0 ftL 25.0 ft W 76.0 tons $120.00 $9,114.00 0% $9,114.00 0.0 ft $13.00 $0.00 0% $0.00 450.0 ft $15.00 $6,750.00 0% $6,750.00 450.0 ft $17.00 $7,650.00 0% $7,650.00 4 ft $350.00 $1,400.00 0% $1,400.00 2 each $200.00 $400.00 0% $400.00 2 each $200.00 $400.00 0% $400.00 Each 9 each $150.00 $1,350.00 0% $1,350.00 ES @LL 3000 0.0 ft $17.00 $0.00 0% $0.00 2 each $3,500.00 $7,000.00 0% $7,000.00 0 each $500.00 $0.00 0% $0.00 2 ft $450.00 $1,080.00 0% $1,080.00 15.0 in d 0 ES-1,2 EC-1 118.0 ft $35.00 $4,130.00 0% $4,130.00 24.0 in d 0 ES-1,2 EC-1 0.0 ft $50.00 $0.00 0% $0.00 18.0 in d 0 ES-1,2 EC-1 0.0 ft $40.00 $0.00 0% $0.00 18.0 in d 0 ES-1,2 EC-1 0.0 ft $40.00 $0.00 0% $0.00 96.0 in d 0 ES-1,2 EC-1 0.0 ft $320.00 $0.00 0% $0.00 2.0 ft d 0.0 ft L ft W 0.0 ton $60.00 $0.00 0% $0.00 W0.0 0.0 ft L 0.0 ft W 0.0 sy $2.00 $0.00 0% $0.00 0.0 ft L 0.0 ft W 0.0 acre $24,000.00 $0.00 0% $0.00 cy $4.00 $0.00 0% $0.00 cy $9.00 $0.00 0% $0.00 248.0 ft L 0.04697 mi. 1 Isum $2,000.00 $3,000.00 0% $3,000.00 248.0 ft L 0.04697 mi. 1 Isum $2,000.00 $3,000.00 0% $3,000.00 -Isum $5,000.00 $0.00 0% $0.00 248.0 ft L 0.496 inc of 500' 2 each $200.00 $300.00 0% $300.00 248.0 ft L 0.496 inc of 500' 2 each $200.00 $300.00 0% $300.00 248.0 ft L 0.496 inc of 500' 2 each $200.00 $300.00 0% $300.00 248.0 ft L 0.496 inc of 500' 2 each $200.00 $300.00 0% $300.00 248.0 ft L 0.496 inc of 500' 2 each $200.00 $300.00 0% $300.00 118 ft $1.00 $118.00 0% $118.00 248.0 ftL 0.04697 mi. 2 Lanes $2,000.00 $1,878.79 0% $1,878.79 248.0 ft L 0.04697 mi. 2 Lanes $150.00 $140.91 0% $140.91 248.0 ft L 0.04697 mi. W2 Lanes $100.00 $343.94 0% $343.94 $65,711.47 $65,711.47 cost sum C:\Users\mgreene\Documents\A-Review Comment letters\Rivanna Village Phase 1\RP_bond_est September2016.xls 9/7/2016 Project Name: Rivanna Village Phase 1 and parts of Phase 3 & 4 Road and Infrastructure Construction Bond Estimate (roads, site work, storm sewer) Plan # SUB201500119 Item Road Name: Sycamore Lane No. Unit Unit Cost Cost installed % compete cost remaining contingency $6,571.15 $6,571.15 Total $72,290 $72,290 C:\Users\mgreene\Documents\A_Review Comment letters\Rivanna Village Phase 1\RP_bond_est_September2016.xls 9/7/2016 Project Name: Rivanna Village Phase 1 and parts of Phase 3 & 4 Road and Infrastructure Construction Bond Estimate (roads, site work, storm sewer) Plan # SUB201500119 Item Road Name: Private Alley " A' Begin station End station aggregate base blotted or prime&double seal asphalt base asphalt surface curb CG-2 curb CG-6 sidewalk, concrete (6) ramp CG-12 street name sign traffic control sign Street Landscape guardrail drop inlet or grate standard manhole frame top (not inlet) manhole structure (per ft. rise) pipe, rcp, cm (15 to 48") pipe, rcp, cm (15 to 48") pipe, rcp, cm (15 to 48") pipe, rcp, cm (15 to 48") pipe, rcp, cmp (60 to 108") rip -rap, placed matting, EC-2 or 3 clear and grub (for wooded sites) cut grading fill grading as -built drawings (1k + price per 0.1 mi.) survey and layout (price per 0.1 mi.) mobilization materials testing compaction testing CBR tests (1 every 0.1 mi. per road) stone depth inspections pavement inspections pipe and drainage video inspections VDOT surety (1 lane) VDOT maintenance fee (1 In rd, 1 yr) VDOT admin. Cost recovery fee(1 lane) No. Unit Unit Cost Cost installed % compete cost remaining 10+26.00 12+50.OIZ road length 224.0 ft 4.0 in d 224.0 ft L 24.0 ft W 125.4 ton $35.00 $4,390.40 0% $4,390.40 224.0 ft L 0.0 ft W 0.0 sy $10.00 $0.00 0% $0.00 3.0 in d 224.0 ft L 24.0 ft W 98.8 tons $100.00 $9,878.40 0% $9,878.40 2.0 in d 224.0 ft L 24.0 ft W 65.9 tons $120.00 $7,902.72 0% $7,902.72 448.0 ft $13.00 $5,824.00 0% $5,824.00 0.0 ft $15.00 $0.00 0% $0.00 0.0 ft $17.00 $0.00 0% $0.00 0 ft $350.00 $0.00 0% $0.00 2 each $200.00 $400.00 0% $400.00 2 each $200.00 $400.00 0% $400.00 Each 0 each $150.00 $0.00 0% $0.00 ES @ 3000 0.0 ft $17.00 $0.00 0% $0.00 1 each $3,500.00 $3,500.00 0% $3,500.00 0 each $500.00 $0.00 0% $0.00 7 ft $450.00 $3,330.00 0% $3,330.00 15.0 in d 0 ES-1,2 EC-1 129.0 ft $35.00 $4,515.00 0% $4,515.00 24.0 in d 0 ES-1,2 EC-1 0.0 ft $50.00 $0.00 0% $0.00 18.0 in d 0 ES-1,2 EC-1 0.0 ft $40.00 $0.00 0% $0.00 18.0 in d 0 ES-1,2 EC-1 0.0 ft $40.00 $0.00 0% $0.00 96.0 in d 0 ES-1,2 EC-1 0.0 ft $320.00 $0.00 0% $0.00 2.0 ft d 0.0 ft L ft W 0.0 ton $60.00 $0.00 0% $0.00 W0.0 0.0 ft L 0.0 ft W 0.0 sy $2.00 $0.00 0% $0.00 0.0 ft L 0.0 ft W 0.0 acre $24,000.00 $0.00 0% $0.00 cy $4.00 $0.00 0% $0.00 cy $9.00 $0.00 0% $0.00 224.0 ft L 0.04242 mi. 1 Isum $2,000.00 $3,000.00 0% $3,000.00 224.0 ft L 0.04242 mi. 1 Isum $2,000.00 $3,000.00 0% $3,000.00 -Isum $5,000.00 $0.00 0% $0.00 224.0 ft L 0.448 inc of 500' 2 each $200.00 $300.00 0% $300.00 224.0 ft L 0.448 inc of 500' 2 each $200.00 $300.00 0% $300.00 224.0 ft L 0.448 inc of 500' 2 each $200.00 $300.00 0% $300.00 224.0 ft L 0.448 inc of 500' 2 each $200.00 $300.00 0% $300.00 224.0 ft L 0.448 inc of 500' 2 each $200.00 $300.00 0% $300.00 ft $1.00 $129.00 0% $129.00 224.0 ft L 0.04242 mi. Lanes ELanes $2,000.00 $0.00 0% $0.00 224.0 ft L 0.04242 mi. Lanes $150.00 $0.00 0% $0.00 224.0 ft L 0.04242 mi. $100.00 $0.00 0% $0.00 $47,769.521 $47,769.52 cost sum C:\Users\mgreene\Documents\A-Review Comment letters\Rivanna Village Phase 1\RP_bond_est September2016.xls 9/7/2016 Project Name: Rivanna Village Phase 1 and parts of Phase 3 & 4 Road and Infrastructure Construction Bond Estimate (roads, site work, storm sewer) Plan # SUB201500119 Item Road Name: Private Alley "A" No. Unit Unit Cost Cost installed % compete cost remaining contingency $4,776.95 $4,776.95 Total $52,550 $52,550 C:\Users\mgreene\Documents\A_Review Comment letters\Rivanna Village Phase 1\RP_bond_est_September20l6.xls 9/7/2016 Project Name: Rivanna Village Phase 1 and parts of Phase 3 & 4 Road and Infrastructure Construction Bond Estimate (roads, site work, storm sewer) Plan # SUB201500119 Item Road Name: Private Alley "B" Begin station End station aggregate base blotted or prime&double seal asphalt base asphalt surface curb CG-2 curb CG-6 sidewalk, concrete (6) ramp CG-12 street name sign traffic control sign Street Landscape guardrail drop inlet or grate standard manhole frame top (not inlet) manhole structure (per ft. rise) pipe, rcp, cm (15 to 48") pipe, rcp, cm (15 to 48") pipe, rcp, cm (15 to 48") pipe, rcp, cm (15 to 48") pipe, rcp, cmp (60 to 108") rip -rap, placed matting, EC-2 or 3 clear and grub (for wooded sites) cut grading fill grading as -built drawings (1k + price per 0.1 mi.) survey and layout (price per 0.1 mi.) mobilization materials testing compaction testing CBR tests (1 every 0.1 mi. per road) stone depth inspections pavement inspections pipe and drainage video inspections VDOT surety (1 lane) VDOT maintenance fee (1 In rd, 1 yr) VDOT admin. Cost recovery fee(1 lane) No. Unit Unit Cost Cost installed % compete cost remaining 10+26.00 12+50.OIZ road length 224.0 ft 4.0 in d 224.0 ftL 0.0 ft W 0.0 ton $35.00 $0.00 0% $0.00 224.0 ft L 0.0 ft W 0.0 sy $10.00 $0.00 0% $0.00 3.0 in d 224.0 ftL 0.0 ft W 0.0 tons $100.00 $0.00 0% $0.00 2.0 in d 224.0 ft L 0.0 ft W 0.0 tons $120.00 $0.00 0% $0.00 224.0 ft $13.00 $2,912.00 0% $2,912.00 0.0 ft $15.00 $0.00 0% $0.00 0.0 ft $17.00 $0.00 0% $0.00 0 ft $350.00 $0.00 0% $0.00 2 each $200.00 $400.00 0% $400.00 2 each $200.00 $400.00 0% $400.00 Each 0 each $150.00 $0.00 0% $0.00 ES @ 3000 0.0 ft $17.00 $0.00 0% $0.00 2 each $3,500.00 $7,000.00 0% $7,000.00 0 each $500.00 $0.00 0% $0.00 12 ft $450.00 $5,580.00 0% $5,580.00 15.0 in d 0 ES-1,2 EC-1 109.0 ft $35.00 $3,815.00 0% $3,815.00 18.0 in d 0 ES-1,2 EC-1 39.0 ft $40.00 $1,560.00 0% $1,560.00 24.0 in d 0 ES-1,2 EC-1 0.0 ft $50.00 $0.00 0% $0.00 36.0 in d 0 ES-1,2 EC-1 0.0 ft $70.00 $0.00 0% $0.00 96.0 in d 0 ES-1,2 EC-1 0.0 ft $320.00 $0.00 0% $0.00 2.0 ft d 0.0 ft L 0.0 ft W 0.0 ton $60.00 $0.00 0% $0.00 0.0 ft L r0.0 ft W 0.0 sy $2.00 $0.00 0% $0.00 0.0 ft L 0.0 ft W 0.0 acre $24,000.00 $0.00 0% $0.00 cy $4.00 $0.00 0% $0.00 cy $9.00 $0.00 0% $0.00 224.0 ft L 0.04242 mi. 1 Isum $2,000.00 $3,000.00 0% $3,000.00 224.0 ft L 0.04242 mi. 1 Isum $2,000.00 $3,000.00 0% $3,000.00 -Isum $5,000.00 $0.00 0% $0.00 224.0 ft L 0.448 inc of 500' 2 each $200.00 $300.00 0% $300.00 224.0 ft L 0.448 inc of 500' 2 each $200.00 $300.00 0% $300.00 224.0 ft L 0.448 inc of 500' 2 each $200.00 $300.00 0% $300.00 224.0 ft L 0.448 inc of 500' 2 each $200.00 $300.00 0% $300.00 224.0 ft L 0.448 inc of 500' 2 each $200.00 $300.00 0% $300.00 148 ft $1.00 $148.00 0% $148.00 224.0 ft L 0.04242 mi. 0 Lanes $2,000.00 $0.00 0% $0.00 224.0 ft L 0.04242 mi. 0 Lanes $150.00 $0.00 0% $0.00 224.0 ft L 0.04242 mi. M0 Lanes $100.00 $0.00 0% $0.00 $29,315.00 $29,315.00 cost sum C:\Users\mgreene\Documents\A-Review Comment letters\Rivanna Village Phase 1\RP_bond_est September2016.xls 9/7/2016 Project Name: Rivanna Village Phase 1 and parts of Phase 3 & 4 Road and Infrastructure Construction Bond Estimate (roads, site work, storm sewer) Plan # SUB201500119 Item Road Name: Private Alley "B" No. Unit Unit Cost Cost installed % compete cost remaining contingency $2,931.50 $2,931.50 Total $32,250 $32,250 C:\Users\mgreene\Documents\A_Review Comment letters\Rivanna Village Phase 1\RP_bond_est_September20l6.xls 9/7/2016 Project Name: Rivanna Village Phase 1 and parts of Phase 3 & 4 Road and Infrastructure Construction Bond Estimate (roads, site work, storm sewer) Plan # SUB201500119 Item Road Name: Private Alley "C" Begin station End station aggregate base blotted or prime&double seal asphalt base asphalt surface curb CG-2 curb CG-6 sidewalk, concrete (6) ramp CG-12 street name sign traffic control sign Street Landscape guardrail drop inlet or grate standard manhole frame top (not inlet) manhole structure (per ft. rise) pipe, rcp, cm (15 to 48") pipe, rcp, cm (15 to 48") pipe, rcp, cm (15 to 48") pipe, rcp, cm (15 to 48") pipe, rcp, cmp (60 to 108") rip -rap, placed matting, EC-2 or 3 clear and grub (for wooded sites) cut grading fill grading as -built drawings (1k + price per 0.1 mi.) survey and layout (price per 0.1 mi.) mobilization materials testing compaction testing CBR tests (1 every 0.1 mi. per road) stone depth inspections pavement inspections pipe and drainage video inspections VDOT surety (1 lane) VDOT maintenance fee (1 In rd, 1 yr) VDOT admin. Cost recovery fee(1 lane) No. Unit Unit Cost Cost installed % compete cost remaining 10+10.00 14+32.00 road length 422.0 ft 4.0 in d 422.0 ft L 24.0 ft W 236.3 ton $35.00 $8,271.20 0% $8,271.20 in d Ain 422.0 ft L 0.0 ftW 422.0 ftL 24.0 ft W 0.0 sy 186.1 tons $10.00 $100.00 $0.00 $18,610.20 0% 0% $0.00 $18,610.20 d 422.0 ft L 24.0 ft W 124.1 tons $120.00 $14,888.16 0% $14,888.16 422.0 ft $13.00 $5,486.00 0% $5,486.00 0.0 ft $15.00 $0.00 0% $0.00 0.0 ft $17.00 $0.00 0% $0.00 0 ft $350.00 $0.00 0% $0.00 2 each $200.00 $400.00 0% $400.00 2 each $200.00 $400.00 0% $400.00 Each 0 each $150.00 $0.00 0% $0.00 ES @LL 3000 0.0 ft $17.00 $0.00 0% $0.00 3 each $3,500.00 $10,500.00 0% $10,500.00 0 each $500.00 $0.00 0% $0.00 22 ft $450.00 $9,990.00 0% $9,990.00 15.0 in d 0 ES-1,2 EC-1 283.0 ft $35.00 $9,905.00 0% $9,905.00 18.0 in d 0 ES-1,2 EC-1 0.0 ft $40.00 $0.00 0% $0.00 24.0 in d 0 ES-1,2 EC-1 0.0 ft $50.00 $0.00 0% $0.00 36.0 in d 0 ES-1,2 EC-1 0.0 ft $70.00 $0.00 0% $0.00 96.0 in d 0 ES-1,2 EC-1 0.0 ft $320.00 $0.00 0% $0.00 2.0 ft d 0.0 ft L ft W 0.0 ton $60.00 $0.00 0% $0.00 W0.0 0.0 ft L 0.0 ft W 0.0 sy $2.00 $0.00 0% $0.00 0.0 ft L 0.0 ftW 0.0 acre $24,000.00 $0.00 0% $0.00 cy $4.00 $0.00 0% $0.00 cy $9.00 $0.00 0% $0.00 422.0 ft L 0.07992 mi. 1 Isum $2,000.00 $3,000.00 0% $3,000.00 422.0 ft L 0.07992 mi. 1 Isum $2,000.00 $3,000.00 0% $3,000.00 -Isum $5,000.00 $0.00 0% $0.00 422.0 ft L 0.844 inc of 500' 2 each $200.00 $380.00 0% $380.00 422.0 ft L 0.844 inc of 500' 2 each $200.00 $380.00 0% $380.00 422.0 ft L 0.844 inc of 500' 2 each $200.00 $380.00 0% $380.00 422.0 ft L 0.844 inc of 500' 2 each $200.00 $380.00 0% $380.00 422.0 ft L 0.844 inc of 500' 2 each $200.00 $380.00 0% $380.00 283 ft $1.00 $283.00 0% $283.00 422.0 ft L 0.07992 mi. 0 Lanes $2,000.00 $0.00 0% $0.00 422.0 ft L 0.07992 mi. 0 Lanes $150.00 $0.00 0% $0.00 422.0 ft L 0.07992 mi. M0 Lanes $100.00 $0.00 0% $0.00 $86,633.56 $86,633.56 cost sum C:\Users\mgreene\Documents\A-Review Comment letters\Rivanna Village Phase 1\RP_bond_est September2016.xls 9/7/2016 Project Name: Rivanna Village Phase 1 and parts of Phase 3 & 4 Road and Infrastructure Construction Bond Estimate (roads, site work, storm sewer) Plan # SUB201500119 Item Road Name: Private Alley "C" No. Unit Unit Cost Cost installed % compete cost remaining contingency $8,663.36 $8,663.36 Total $95,300 $95,300 C:\Users\mgreene\Documents\A_Review Comment letters\Rivanna Village Phase 1\RP_bond_est_September20l6.xls 9/7/2016 Project Name: Rivanna Village Phase 1 and parts of Phase 3 & 4 Road and Infrastructure Construction Bond Estimate (roads, site work, storm sewer) Plan # SUB201500119 Item Road Name: Private Alley "D" Begin station End station aggregate base blotted or prime&double seal asphalt base asphalt surface curb CG-2 curb CG-6 sidewalk, concrete (6) ramp CG-12 street name sign traffic control sign Street Landscape guardrail drop inlet or grate standard manhole frame top (not inlet) manhole structure (per ft. rise) pipe, rcp, cm (15 to 48") pipe, rcp, cm (15 to 48") pipe, rcp, cm (15 to 48") pipe, rcp, cm (15 to 48") pipe, rcp, cmp (60 to 108") rip -rap, placed matting, EC-2 or 3 clear and grub (for wooded sites) cut grading fill grading as -built drawings (1k + price per 0.1 mi.) survey and layout (price per 0.1 mi.) mobilization materials testing compaction testing CBR tests (1 every 0.1 mi. per road) stone depth inspections pavement inspections pipe and drainage video inspections VDOT surety (1 lane) VDOT maintenance fee (1 In rd, 1 yr) VDOT admin. Cost recovery fee(1 lane) No. Unit Unit Cost Cost installed % compete cost remaining 10+00.00 18+34.0W road length 834.0 ft 4.0 in d 834.0 ft L I 14.0 ft W 272.4 ton $35.00 $9,535.40 0% $9,535.40 834.0 ft L 0.0 ft W 0.0 sy $10.00 $0.00 0% $0.00 in d 834.0 ft L 14.0 ft W 214.5 tons $100.00 $21,454.65 0% $21,454.65 NJ in d 834.0 ft L 14.0 ft W 143.0 tons $120.00 $17,163.72 0% $17,163.72 0.0 ft $13.00 $0.00 0% $0.00 0.0 ft $15.00 $0.00 0% $0.00 0.0 ft $17.00 $0.00 0% $0.00 0 ft $350.00 $0.00 0% $0.00 0 each $200.00 $0.00 0% $0.00 0 each $200.00 $0.00 0% $0.00 Each 0 each $150.00 $0.00 0% $0.00 ES @LL 3000 0.0 ft $17.00 $0.00 0% $0.00 0 each $3,500.00 $0.00 0% $0.00 0 each $500.00 $0.00 0% $0.00 0 ft $450.00 $0.00 0% $0.00 15.0 in d 0 ES-1,2 EC-1 0.0 ft $35.00 $0.00 0% $0.00 24.0 in d 0 ES-1,2 EC-1 0.0 ft $50.00 $0.00 0% $0.00 18.0 in d 0 ES-1,2 EC-1 0.0 ft $40.00 $0.00 0% $0.00 18.0 in d 0 ES-1,2 EC-1 0.0 ft $40.00 $0.00 0% $0.00 96.0 in d 0 ES-1,2 EC-1 0.0 ft $320.00 $0.00 0% $0.00 2.0 ft d 0.0 ft L 0.0 ft W 0.0 ton $60.00 $0.00 0% $0.00 0.0 ft L r0.0 ft W 0.0 sy $2.00 $0.00 0% $0.00 0.0 ft L 0.0 ft W 0.0 acre $24,000.00 $0.00 0% $0.00 cy $4.00 $0.00 0% $0.00 cy $9.00 $0.00 0% $0.00 834.0 ft L 0.15795 mi. 2 Isum $2,000.00 $5,000.00 0% $5,000.00 834.0 ft L 0.15795 mi. 2 Isum $2,000.00 $5,000.00 0% $5,000.00 -Isum $5,000.00 $0.00 0% $0.00 834.0 ft L 1.668 inc of 500' 3 each $200.00 $540.00 0% $540.00 834.0 ft L 1.668 inc of 500' 3 each $200.00 $540.00 0% $540.00 834.0 ft L 1.668 inc of 500' 3 each $200.00 $540.00 0% $540.00 834.0 ft L 1.668 inc of 500' 3 each $200.00 $540.00 0% $540.00 834.0 ft L 1.668 inc of 500' 3 each $200.00 $540.00 0% $540.00 ft $1.00 $0.00 0% $0.00 834.0 ft L 0.15795 mi. Lanes ELanes $2,000.00 $0.00 0% $0.00 834.0 ft L 0.15795 mi. Lanes $150.00 $0.00 0% $0.00 834.0 ft L 0.15795 mi. $100.00 $0.00 0% $0.00 $60,853.771 $60,853.77 cost sum C:\Users\mgreene\Documents\A-Review Comment letters\Rivanna Village Phase 1\RP_bond_est September2016.xls 9/7/2016 Project Name: Rivanna Village Phase 1 and parts of Phase 3 & 4 Road and Infrastructure Construction Bond Estimate (roads, site work, storm sewer) Plan # SUB201500119 Item Road Name: Private Alley "D" No. Unit Unit Cost Cost installed % compete cost remaining contingency $6,085.38 $6,085.38 Total $66,940 $66,940 C:\Users\mgreene\Documents\A_Review Comment letters\Rivanna Village Phase 1\RP_bond_est_September20l6.xls 9/7/2016