HomeMy WebLinkAboutWPO201500106 Bond Estimates 2016-09-14Dunlora Interconnect
WPO file number: WP0201500106
Erosion and Sediment Control Bond Estimate
Item Item
Number
stablization (PS, TS)
silt fence (SF)
safety fence (SAF)
diversion (DD, FD, RWD)
temporary slope drain (TSD) pipe length
-ft
pipe diameter
0 in
earthwork for trap/basin
height of dam at toe
ft
cut at high side
0 ft
height of fill at face
ft
cut at face
0 ft
length of dam
ft
length of cut
0 ft
top width
ft
width of cut
0 ft
(area above transition)
0 sf
(area below transition:
0 sf
(total width of dam)
0 ft
(total width of cut)
0 ft
(height below transition)
0 ft
(depth below transitioi 0 ft
(area below transition)
0 sf
(area above transition
0 sf
(total fill volume)
0.0 cy
(total fill volume)
0.0 cy
length of spillway
_ft
(TOAL CY estimate)
0 cy
width of spillway
ft
(spillway stone tons)
0 tons
structures for basin
riser height
ft
riser diameter
0 in
(riser unit price)
$0.00
barrel length
0 ft
base plate or fdn
-
barrel diameter
0 in
(barrel unit price)
$0.00
barrel collars
Mft
baffle length
silt fence inlet protection (IP)
stone inlet protection (IP)
outlet protection
length
ft
00
width
channel (SCC, matteatte d)
length
ft
Lwidth
■ft
ft
check dam
depth in channel
0 ft
channel width
it
construction entrance (CE)
wash rack
paved construction entrance
rip -rap, placed
depth
ft
length
it
width
(tons)
0 tons
survey and layout (price per 0.1 mi.)
acres
traps and basins
-
mobilization
stream crossing (computed independently)
No. Unit Unit Cost Cost
(installed)
acres $5,000.00 $16,000.00
6240.0 ft $5.00 $31,200.00
0.0 ft $5.00 $0.00
0 ft $13.00 $0.00
$0.00 $0.00
$13.00 $0.00
$50.00 $0.00
$0.00
$200.00 $0
$0.00
$200.00 $0
$50.00 $0
■ $100.00 $0.00
$200.00 $0.00
$0.00 $0.00
$0.00
$0.00 0.00
$2,000.00 $4,000.00
$2,000.00 $4,000.00
$3,500.00 $0.00
$60.00 $0.00
$500.00
$500.00
$0.00
cost sum $56,200.00
contingency $5,620.00
Total $61,820
9/14/2016