Loading...
HomeMy WebLinkAboutWPO201500106 Bond Estimates 2016-09-14Dunlora Interconnect WPO file number: WP0201500106 Erosion and Sediment Control Bond Estimate Item Item Number stablization (PS, TS) silt fence (SF) safety fence (SAF) diversion (DD, FD, RWD) temporary slope drain (TSD) pipe length -ft pipe diameter 0 in earthwork for trap/basin height of dam at toe ft cut at high side 0 ft height of fill at face ft cut at face 0 ft length of dam ft length of cut 0 ft top width ft width of cut 0 ft (area above transition) 0 sf (area below transition: 0 sf (total width of dam) 0 ft (total width of cut) 0 ft (height below transition) 0 ft (depth below transitioi 0 ft (area below transition) 0 sf (area above transition 0 sf (total fill volume) 0.0 cy (total fill volume) 0.0 cy length of spillway _ft (TOAL CY estimate) 0 cy width of spillway ft (spillway stone tons) 0 tons structures for basin riser height ft riser diameter 0 in (riser unit price) $0.00 barrel length 0 ft base plate or fdn - barrel diameter 0 in (barrel unit price) $0.00 barrel collars Mft baffle length silt fence inlet protection (IP) stone inlet protection (IP) outlet protection length ft 00 width channel (SCC, matteatte d) length ft Lwidth ■ft ft check dam depth in channel 0 ft channel width it construction entrance (CE) wash rack paved construction entrance rip -rap, placed depth ft length it width (tons) 0 tons survey and layout (price per 0.1 mi.) acres traps and basins - mobilization stream crossing (computed independently) No. Unit Unit Cost Cost (installed) acres $5,000.00 $16,000.00 6240.0 ft $5.00 $31,200.00 0.0 ft $5.00 $0.00 0 ft $13.00 $0.00 $0.00 $0.00 $13.00 $0.00 $50.00 $0.00 $0.00 $200.00 $0 $0.00 $200.00 $0 $50.00 $0 ■ $100.00 $0.00 $200.00 $0.00 $0.00 $0.00 $0.00 $0.00 0.00 $2,000.00 $4,000.00 $2,000.00 $4,000.00 $3,500.00 $0.00 $60.00 $0.00 $500.00 $500.00 $0.00 cost sum $56,200.00 contingency $5,620.00 Total $61,820 9/14/2016