HomeMy WebLinkAboutSUB200300212 Review Comments Stormwater Management Plan 2003-09-12COUNTY OF ALBEMARLEPlan Review Comments Department of Engineering & Public Works (434) 296-5861 Fax (434) 972-4035 k�Y www.albemarle.org/engineer `reciNtP Project: Connors Ridge Plan preparer: Mr. Brian Ray PLS, Roger W. Ray & Associates, Inc. (Fax: 434.293.4202) Plan preparer: Mr. Tom Muncaster PE, Muncaster Engineering, Inc.(Fax: 434.973.0249) Owner or rep.: Brian & Jennifer Gillespie Plan received date: 28 April 2003 (road plans), 25 August 2003 (E&SC and SWM plans) Date of comments: 12 September 2003 Lead Engineer: Allan Schuck, Engineer A. Final plat comments: (Allan Schuck) 1. A final plat has not been received. 2. All improvements must be built or bonded prior to approval of final plats. B. Road plan and drainage computation comments: (Allan Schuck) 3. All previous Engineering Department comments have been addressed. 4. All previous VDOT comments have been addressed. VDOT approves the road plans. C. Stormwater management plan comments: (Mark Chambers, Water Resources Reviewer) 5. The stormwater management plans received September 3, 2003 have been approved as submitted. Please take note of the following comments: 1. The stormwater management portion of the water protection bond is $10,000.00. Please contact Pam Shifflett for additional information concerning the bond (434) 296-5861. 2. A Stormwater Management Facilities Maintenance Agreement is required. Please submit the latest version, dated August 1999, typed and signed in black ink by the owner, along with the $16 recordation fee. Note: A grading permit WILL NOT be issued until the Maintenance Agreement has been received, approved and recorded. D. Erosion and sediment control plan comments: (Max Greene, Erosion Control Plan Reviewer) 6. Max Greene has reviewed the erosion and sediment control plans. The comments are as follows: #2379 Conner's Ridge Max Greene September 12, 2003 The E&SC portion of the above mentioned plan received September 3, 2003 is approved as submitted. The E&SC portion of the Water Protection Bond is $27,000.00 and shall become a part of the whole Water Protection bond amount. Please submit two (2) additional copies of the plan and narrative for the pre -construction meeting to be held in this office. Engineering Department approval of the construction plans will be given when "all comments have been addressed" for items A -D above. A grading permit will be issued when approvals have been granted from all applicable departments and agencies, an erosion control bond has been posted, and a pre -construction conference held with the contractor, certified responsible land disturber, owner and county staff. Attachments: (none) Copy: 2379 Francis MacCall File: SUB -2002-199 Connors Ridge fpt, ip, stm, esc(2) BOND ESTIMATE - EROSION CONTROL Spreadsheet last revised: 12-5-01 PROJECT NAME: Connor's Ridge PROJECT NUMBER: 2379 DATE OF ESTIMATE: 09/12/03 ESTIMATE BY: MRG BASED ON: 2nd Submittal WATER ITEM DESCRIPTION UNIT QUANTITY UNIT COST ITEM TOTAL SEED, FERTILIZE, MULCH ACRE 2 1500 3000 SILT FENCE LF 200 5 1000 SAFETY FENCE LF 0 3 0 TEMPORARY FILL DIVERSION LF 0 3 0 DIVERSION DIKE LF 0 3 0 TEMPORARY SLOPE DRAIN LF 0 20 0 SEDIMENT TRAP 1 ACRES 1 1000 1000 SEDIMENT TRAP 2 ACRES 1 1000 1000 SEDIMENT TRAP 3 ACRES 2 1000 2000 SEDIMENT TRAP 4 ACRES 1 1000 1000 SEDIMENT BASIN 1 ACRES 0 1000 0 CULVERT INLET PROTECTION EA 0 500 0 INLET PROTECTION EA 2 200 400 OUTLET PROTECTION EA 2 200 400 EC -2 & 3 DITCH PROTECTION LF 950 10 9500 RIP -RAP LF 0 55 0 CHECK DAMS SQ.YD. 0 30 0 PAVED CONSTRUCTION ENTRANCE EA 1 2000 2000 SUBTOTAL 21300.00 CONTINGENCY & ADMINISTRATION LS 25% 5325.00 TOTAL 26625.00 BOND AMOUNT REQUIRED 27000 PROJECT NAME: Connor's Ridge FILE M 2379 DATE APPROVED: pending BMP Type 4 bio -filters Item Unit Amount Unit Cost Subtotal site clearing acre 0 $7,100.00 $0.00 dam const.on site material cubic yard compacted 0 $4.00 $0.00 dam const.off site material cubic yard compacted 0 $15.00 $_0.00 Trees & Shrubs seedlings planted with tubes 0 $12.50 $0 bioretention construction wq treatment volume in cf 0 $6.40 $0 trees & shrubs planted 25 $100.00 $2,500 wetland plants planted 0 $2.00 $0 wetland seed mix acre 1.0 $1,500.00 $1,500 stream stabilization linear foot 0 $50.00 $0 underdrain stone cubic yard 59 $14.58 $864 stone delivery load 5 $37.50 $188 underdrain pipe, 4" PVC linear foot 120 $1.35 $162 filter fabric square yard 59 $10.00 $590 sand/soil mixture cubic yard 119 $20.00 $2,370 EC -1 outlet protection each 0 $4.00 $0 class 1 rip -rap square yard 0 $55.00 $0 class 2 rip -rap square yard 0 $110.00 $0 48" concrete riser structure each 0 $1,000.00 $0 Stream Buffer Sign Installed each 0 $50.00 $0 EC -2 EC -3 ditch stabilization linear foot 0.00 $10.00 $0 maintenance road linear foot 0.00 $8.00 $0 barrel pipe linear foot $25.00 $0 EC -3, EC -2 matting square yard 0.00 $10.00 $0 gabions, class 1 rip -rap square yard 0.00 $165.00 $0 concrete anti vortex each $1,500.00 $0.00 paved concrete ditch linear foot 0.00 $55.00 $0 pavement demolition square yard $5.00 $0 green roof square foot 0.00 $12.00 $0 turf stone(porous pavement) square foot 0.00 $5.00 $0 RCP underground detention linear foot 0.00 $100.00 $0 Conser Easement RR > 50% acre 0.00 $39,000.00 $0 Conser Easement RR < 50% acre 0.00 $25,000.00 $0 SUBTOTAL $8,173 25% Contingency $2,043 TOTAL $10,217 Rounded Total $10,000 pF AL COUNTY OF ALBEMARLE Plan Review Comments Department of Engineering & Public Works (434) 296-5861 Fax (434) 972-4035 `IRGIN�P www.albemarle.org/engineer Project: Connors Ridge Plan preparer: Mr. Brian Ray PLS, Roger W. Ray & Associates, Inc. (Fax: 434.293.4202) Plan preparer: Mr. Tom Muncaster PE, Muncaster Engineering, Inc.(Fax: 434.973.0249) Owner or rep.: Brian & Jennifer Gillespie Plan received date: 28 April 2003 (road plans), 28 June 2003 (E&SC and SWM plans) Date of comments: 18 August 2003 Lead Engineer: Allan Schuck, Engineer A. Final plat comments: (Allan Schuck) A final plat has not been received. All improvements must be built or bonded prior to approval of final plats. B. Road plan and drainage computation comments: (Allan Schuck) 3. All previous Engineering Department comments have been addressed. 4. All previous VDOT comments have been addressed. VDOT approves the road plans. C. Stormwater management plan comments: (Mark Chambers, Water Resources Reviewer) 5. Mark Chambers has reviewed the stormwater management plans. The comments are as follows: Stormwater Management Plan Comments: (Mark Chambers, Water Resources Reviewer/Inspector) 1. We agree that this rural subdivision will not substantially increase the peak flow rates and with the bio -filters capturing concentrated runoff from the road ditches detention will not be necessary. Under Section 17-314(F) of the County Water Protection Ordinance, a detention waiver is granted. 2. The County Water Protection Ordinance requires that BMPs be designed to capture as much of the impervious runoff as practicable. Please show sediment trap #1 to be converted into a bio -filter. 3. Please show the road ditches draining into the bio -filters with outlet protection at the ends of the ditches. 4. Please add another plant species to each bio -filter and increase the total number of plants in bio -filter #4 to 14. 5. The stormwater management portion of the water protection bond is $10,000.00. Please contact Pam Shifflett for additional information concerning the bond (434) 296-5861. 6. A Stormwater Management Facilities Maintenance Agreement is required. Please submit the latest version, dated August 1999, typed and signed in black ink by the owner, along with the $16 recordation fee. Note: The plan cannot be approved until the Maintenance Agreement has been received, approved and recorded. D. Erosion and sediment control plan comments: (Max Greene, Erosion Control Plan Reviewer) 6. Max Greene has reviewed the erosion and sediment control plans. The comments are as follows: #2379 Conner's Ridge Max Greene July 18, 2003 Narrative: 1. Soils appear to be mostly Hayesville Loams with a strip of Belvoir Loam in the middle. Please change the narrative section on soils to state: 5B -Belvoir Loam, 2 to 7 percent slopes; 36B- Hayesville Loam, 2 to 7 percent slopes; 36C- Haysville Loam 7 to 15 percent slopes; and 36D- Hayesville Loam 15 to 25 percent slopes. A copy of the soil map is available from this office. Plan sheet: 2. Please show the existing grade lines out to the drainage divides as a minimum. 3. Sediment trap #4 appears undersized for the initial disturbance until the roadside ditches are installed. Not clearly discernible due to lack of topography shown. 4. Roadside ditches shall drain into the sediment traps and Bio -filters, not bypassed as shown on the plan sheet. E&SC portion of the Water Protection Bond could not be determined at this time. Engineering Department approval of the construction plans will be given when "all comments have been addressed" for items A -D above. A grading permit will be issued when approvals have been granted from all applicable departments and agencies, an erosion control bond has been posted, and a pre -construction conference held with the contractor, certified responsible land disturber, owner and county staff. Attachments: (none) Copy: 2379 Francis MacCall File: SUB -2002-199, Connors Ridge fpt, rp, stm, esc(1) Conner's Ridge Stormwater Management Plan Comments: (Mark Chambers, Water Resources Reviewer/Inspector) 1. We agree that this rural subdivision will not substantially increase the peak flow rates and with the bio -filters capturing concentrated runoff from the road ditches detention will not be necessary. Under Section 17-314(F) of the County Water Protection Ordinance, a detention waiver is granted. 2. The County Water Protection Ordinance requires that BMPs be designed to capture as much of the impervious runoff as practicable. Please show sediment trap #1 to be converted into a bio -filter. 3. Please show the road ditches draining into the bio -filters with outlet protection at the ends of the ditches. 4. Please add another plant species to each bio -filter and increase the total number of plants in bio -filter #4 to 14. 5. The stormwater management portion of the water protection bond is $10,000.00. Please contact Pam Shifflett for additional information concerning the bond (434) 296-5861. 6. A Stormwater Management Facilities Maintenance Agreement is required. Please submit the latest version, dated August 1999, typed and signed in black ink by the owner, along with the $16 recordation fee. Note: The plan cannot be approved until the Maintenance Agreement has been received, approved and recorded. (.'0IJN"rY OF AI BEMARLE Department of Engineering &: Public ,"'orks 401 McIntire Road. Room 211 Charlottesville, Virginia, 22902-4596 (434) 296-5861 Fax (434) 972-4035 WATER PRO'.r.ECTION ORDINANCE GINERAL. APPLICATION FORM CIIE(:'K .rypI OIC' PLAN INCLi:DED WITH APPLI('A.TION: EROSION & SEDIMENT CONTROL PLAN ® S'rORMWA'I'ER MANAC.F Ml N'r/BMP PLAN E3 STREAM BUFFER MITIGAIJON PLAN „ ;Allp'lication: 7-"2-03 ,. 7 �,kICCf?11t1`er,' {tl)r11C'.Ill Ni1171C 1i:i,.:twt i.,)! Land Dkltlr11011hcr: 2,0 Acres ,.Icthr[x.rrla l _ ........... .. ...... !._ iaiori lel' Pro irrly: 1 T a( t 4 {,�' f� c l �` ?y ................. ()WNEIR PLAN PREPA.RER. ...............t_.'.%FL %z. V0 ? Phone: BY SIGNING "I'IIIS APPLICATION AS OWNER, l HEREBY C U R'rlFY 'THAT' ALL REQUIRE:kIEN'1.S OF' TlIF :1P1'R(jr 1v:1) EROSION C'ON'TROL PLAN. S"1' R IWAI'ER MANAGF;MENVBMP PLAN, ANI)/OR f1'IITIGA'FION P1.1N WIE 4 i(E ,+,,y iIA HE Atll'HORITY TO til'llnRl/..E THE LAND DIS'l'i. RBING AGUIVI III;s ANIP E71 i 1:.1.,[)1"141?1v'i TH SU .1` PROPERTY. I HEREBY GRAD C;OIEN`l:'Y' OF:AI.13EhLARl:ls 7'111, ltl(oll ? ? 1°:.N'I'h.It 1J1'[.1N "I' I% 1'I . PE S REQUIRED TO ENSURE C:OMPLIANCI? �ti'L'1'Fl '1'111. APPROVED PE.Ati,: PLEASE SEX REV1.+..RSF. � PPIACABLE FEE MIJISI'BE PAID ATTI ME OF APPLIGA010N, C'alc.ulate fee bulf)", and check jmlale to the "Counly of Albemarle", .0"PF'. C)1' PLAN F'ROSJON CONTROL PLAN: (SlAWIT2 C,01111U,S) Hm t01. il - irl"'110 IamilY Dwelling Ullil. ....... Plan fl. -,r Non T'Acmpt Agricidwral Land F)i'.,lllrNrw Acli" ity.. Othor Lawl Disturbing Activiiv: plus 10 25/acro of(ii-sitirbe(hirea or 1mr(joij thore.ot: Maj4 it, Amendrrictil. of 111"Ill ............... ... .......... ROSION CONTROL PLAN-- ....... S 111 ITOTA 1, 1-� um INOTTO I V. -F -F-1 150 STC)R.NlXVATVlZ NIANA(.;F:MlN'l./BMIIPl.,;kN. (SUBMIT201"IF",S) Stof TINIP Plall.................. IS 11 0 vlajoi, Amendinc.rit of Plan ................................................ .. Wi 1� I t4t V. el St BT0TAVSVVk,1/BMPPLAN ........ ...... — .. ... ...... $ —11 %_0 (Sl lBNM1T2COPluu;'S) % .............................. --- .......... Sl 143TOTAL MITIGATION PLAN........._... `11.)TA L A PPI, I ("'A TI ON ll,41+': FG" (Add lines 5, 8 and 10) THE OWNER SlIALL BL RESPONSIBLE FOR ALL REINSPECTION ANDIOR ANNI.!AYi IU]INEAVAL 1111,1.5 44HIC11 NIAY HE CHARGEDTOTIJIS PROJECT. FOR 01-TICE, USE ON V: D 1-,� I., � ily 00 -R G)Y� .It kl., ,-t: (."ollecled S 1.01 q May 29, 2003 11:44 AM Weir Length (ft) Weir Height (ft) Top of Berm Top of Weir Bottom of Weir Low Point Berm Width (ft) Silt Trap #4 Drainage Area (ac): Wet Storage Req: Dry Storage Req: Total Storage Req: Low Point: 1:1 Side Slope Botom of Weir: 2:1 Side Slope Top of Weir Weir Length (ft) Weir Height (ft) T oW ui Beira Top of Weir Bottom of Weir Low Point Berm Width (ft) Silt Trap #5 Drainage Area (ac) Wet Storage Req: Dry Storage Req: Total Storage Req: Low Point: 1:1 Side Slope Botom of Weir: 2:1 Side Slope Top of Weir Weir Length (ft) Weir Height (ft) Top of Berm Top of Weir Bottom of Weir Low Point Berm Width (ft) From:. caster Fax #: (434 973-0249 P. 1 of 2 11.8 2.4 616.40 615.40 613.0 34.0 34.0 609.0 26.0 26.0 2.5 0.15 10.05 10.05 20.1 Elev Side 1 Side 2 Area Vol (Cf) Vol (Cy) 608.0 6.0 6.0 36.0 wet wet 611.0 12.0 12.0 144.0 270.0 dry dry 612.3 17.2 17.2 295.8 285.9 0.9 1.3 613.30 612.30 611.0 12.0 12.0 608.0 6.0 6.0 2.0 0.66 44.22 44.22 88.44 Elev Side 1 Side 2 Area Vol (Cf) Vol (Gy) 622.0 13.0 13.0 169.0 wet wet 626.0 21.0 21.0 441.0 1220.0 dry dry 628.0 29.0 29.0 841.0 1282.0 4.0 2.0 629.00 628.00 626.0 21.0 21.0 622.0 13.0 13.0 2.5 Side Slope 1 10.0 Side Slope 2 10.6 Side Slope 1 45.2 Side Slope 2 47.5 5 May 29, 2003 11:44 AM From: A :aster Fax #: (434 973-0249 Pa 1 of 2 4 CALCULATIONS Silt Trap #1 Drainage Area (ac): 0.6 Wet Storage Req: 40.2 Dry Storage Req: 40.2 Total Storage Req: 80.4 Elev Side 1 Side 2 Area Vol (cf) Vol (cy) Low Point: 652.0 20.0 7.0 140.0 1:1 Side Slope wet wet Side Slope 1 Botom ofWeir: 656.0 28.0 15.0 420.0 1120.0 41.5 2:1 Side Slope dry dry Side Slope 2 Top of Weir 658.0 36.0 23.0 828.0 1248.0 46.2 Weir Length (ft) 3.6 Weir Height (ft) 2.0 Top of Berm 659.00 Top of Weir 658.00 Bottom of Weir 656.0 28.0 15.0 Low Point 652.0 20.0 7.0 q Width (1 Iltn'Trap # 2.5 Wet Storage Req: 18.09 Dry Storage Req: 18.09 Total Storage Req: 36.18 Elev Side 1 Side 2 Area Vol (cf) Vol (cy) Low Point: 607.0 7.0 7.0 49.0 1:1 Side Slope wet wet Side Slope 1 Botom of Weir: 611.0 15.0 15.0 225.0 548.0 20.3 2:1 Side Clnr+c dr dry Cirf= Cln- 2 Top of Weir 612.5 21.0 21.0 441.0 499.5 18.5 Weir Length (ft) 1.6 Weir Height (ft) 1.5 Top of Berm 613.50 Top of Weir 612.50 Bottom of Weir 611.0 15.0 15.0 Low Point 607.0 7.0 7.0 Berm Width (ft) 2.5 Silt Trap #3 Drainage Area (ac): 1.96 Wet Storage Req: 131.32 Dry Storage Req: 131.32 Total Storage Req: 262.64 Elev Side 1 Side 2 Area Vol (cf) Vol (cy) Lo.: Point: 609.0 26.0 C. 676.0 1:1 Side Slope wet wet Side Slope 1 Botom of Weir: 613.0 34.0 34.0 1156.0 3664.0 135.7 2:1 Side Slope dry dry Side Slope 2 Top of Weir 615.4 43.6 4'3.6 1901.0 3668.4 135.9