HomeMy WebLinkAboutWPO201200087 Stop Work Order 2014-07-31 o A tik1110; �'IRGII`itP COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road,Room 227 Charlottesville,Virginia 22902-4596 Phone(434)296-5832 Fax(434)972-4126 July 31,2014 Albemarle Health Care Center,LLC do Bruce H.Hedrick 2917 Penn Forest Blvd. Roanoke,VA 24018 RE: Tax Map 91,Parcel 12 WPO-2012-00087 Erosion Control Violation STOP WORK ORDER Mr.Hedrick: Under§17-213 of the Albemarle County Code,you are hereby notified to immediately cease all land disturbing activities on the above referenced property(STOP WORK)with the exception of work to address the installation of erosion control measures as approved by the County. A sworn complaint has been made by the Inspector,Kenny Thacker,who indicates that the approved erosion and sediment control plan is not being followed.This STOP WORK ORDER shall remain in place for seven(7)days from the date of receipt. If satisfactory repairs have not been made within seven(7)days,the County may elect to issue another Stop Work Order,and/or petition the Circuit Court for penalties and relief with regard to this violation. Required Correction(s): 1. Follow the sequence of construction as approved on the erosion and sediment control plan. 2. Install paved washrack construction entrance(70' long by 12' wide)with a water supply and a 1.5 inch hose. 3. Install stone construction road as shown on the plan sheet and cease uses of present roadway by blocking entrance and applying seed and straw mulch to disturbed roadway. 4. Install safety fence along the construction access road as shown on the plan. 5. Install diversion dike and inlet protection(on a wood frame)along the construction access road as shown on the plan. 6. Install sediment trap#2 correctly as shown on the plan,depth,width,length,and weir. 7. Install right-of-way diversion across construction access road to divert runoff into sediment trap. 8. Construction access road to be 14' wide. 9. Remove soil stockpile that appears to be outside the limits of construction shown on the plan and seed and straw mulch the disturbed area. 10. Sediment trap#1 was not installed.A diversion dike must be installed to direct runoff to the sediment basin. 11. Apply seed and straw mulch to all areas at fmal grade within 7 days.If hydroseeding is used straw mulch must still be applied. 12. Extend silt fence across private road on north side of project that is now blocked by fill material. 13. The perforated polyethylene drainage tube in the sediment basin needs to be 2"inches or larger than the 3"inch orifice,it is presently 1"inch larger.Also provide an adequate strap to hold the perforated drainage tube up (not a piece of wire)which is now being used. 14. Complete the installation of safety fence around the sediment basin and install signs reading"HAZARDOUS AREA—KEEP OUT". Once the above noted items have been completed,inspected,and approved by the County Inspector,the Stop Work Order will be lifted and work on the project may resume. Albemarle Health Care Center,LLC Stop Work Order July 31,2014 Page 2 If you have any questions or concerns with steps necessary to correct this violation,please contact Kenny Thacker at 434-296-5832,ext 3390. Sincerely, ���� ZA‘,4— nny T cker Glenn Brooks,P.E. Erosion Control Officer Erosion Control Program Administrator Inspection Division Copy: David Pruett, 10996 Richardson Road,Ashland,VA 23005 Mark Graham,Director of Community Development Fralin&Waldron,90 Town Center Street,Daleville,VA 23005 KT/ Certified No. 91 7199 9991 7030 7430 2987