Loading...
HomeMy WebLinkAboutARB201600090 Application 2016-07-25 AlbemarleCommunityDevelopmentDepartrr 401 Mclntira Road Chrlottesville, VA 22902-4! '"" Noir+ Voice:(434)296-5832 Fax:(434)972-4Planning Application PARCEL/ OWNER INFORMATION IMP 04500-00-00-06801 Owner(s): B PROPERTIES LC Application # ARB2O1600090 PROPERTY INFORMATION Legal Description ACREAGE PARCEL"A" BEI tt R LIVING BUILDING SUPPLY Magisterial Dist. RioLand Use Primary Commercial Current AFD Not in A/F District " ' Current Zoning Primary : Highway Commercial [APPLICATION INFORMATION Street Address 2070 SEMINOLE TRL CHARLOTTESVILLE, 22901 Entered Judy Martin Application Type ' Architectural Review Board' s/25/2016 Project Malloy Ford Auto Dealership- Conceptual Received Date 07/25/16 Received Date Final Submittal Date 07/25/16 Total Fees Closing File Date Submittal Date Final Total Paid Revision Number Comments Legal Ad SUB APPLICATION(s) Type Sub Application Comment Conceptual Site Development Plan 07/25/16 APPLICANT / CONTACT INFORMATION ContactType j Name Address CityState Zip I Phone I PhoneCf Owner/Applicant B PROPERTIES LC P 0 BOX 7627 CHARLOTTESVILL 22906 Primary Contact VALERIE LONG AND ASHLEY DAVIES/WIL 321 EAST MAIN STREET CHARLOTTESVILL 22902 4349515709 Signature of Contractor or Authorized Agent Date *awe ,41110- Nee Nine Architectural Review Board Application Part A: Applicant, Contact and Parcel Information Project Name: Malloy Ford Auto Dealership Tax map and parcel(s): 45-6801 Physical Street Address: 2070 Seminole Trail Contact Person: Valerie Long and Ashley Davies Business Name: Williams Mullen Address 321 East Main Street City Charlottesville State VA Zip 22902 Daytime Phone( ) 951-5709 Fax#( �) E-mail vlong@williamsmullen.com Owner of Record: B Properties LC, John Nunley Address P.O. Box 7627 City Charlottesville State VA zip 22906 Daytime Phone( ) 962-0500 Fax#( ) E-mail )nunleym5@btrlvg.com Part B: Review Type and Fee Select review type Review by the Architectural Review Board X Conceptual Plan/Advisory Review(for a Special Use Permit or a No Fee Rezoning) Preliminary/Initial Review of a Site Development Plan No Fee Final Review of a Site Development Plan $1075.00 Amendment to an approved Certificate of Appropriateness $242.00 Building Permit Review $634.00 County-wide Certificate of Appropriateness Structures 750' or more from the EC,no taller than 5 stories No Fee Structures located behind a structure that fronts the EC No Fee Personal wireless service facilities No Fee Fencing or Equipment or Lighting No Fee Additions to ARB-approved buildings No Fee Minor amendments to site or architectural plans No Fee Building permits where the change is 50%or less of the altered elevation No Fee NOTE: For SIGNS, use the combined APPLICATION AND CHEKLIST FOR SIGNS. FOR OFFICE USE ONLY BP# ARB# Fee Amount$ Date Paid By who? Receipt# Check# By County of Albemarle Dept of Community Development,401 Mclntire Rd,Charlottesville,VA 22902 Voice:(434)296-5832 Fax:(434)972-4126 10/2015 Page I of 2 OVER Part C: Description of Proposal Describe your proposal.Attach a separate sheet if necessary. Review of Conceptual Building Design for proposed auto dealership to include outdoor storage and display of automobiles in the Entrance Corridor. See project narrative (attached)for more details. Part D: Applicant Agreement Applicant must read and sign • Each application package must contain(8) folded copies of all plans and documents being submitted. Only (1) set of building material samples is required. All submittal items, including building material samples, become the property of Albemarle County. Applicants are encouraged to maintain duplicate copies of all submittal items in their own files. • Only complete application packages will be scheduled for ARB review. The application package is not complete without the appropriate checklist, completed, signed, and included with the required submittal materials indicated on the checklist. I hereby certify that I own the subject property or have the legal power to act on behalf of the owner in filing this application. *See submittal requirements below. I also certify that the information provided on this application and accompanying information is accurate, true, and correct to the best of my knowledge, and that the attached planscontainall information required by the appropriate checklist. VA.U. t.U. l.() Signature of owner, owner's epresentative Date or contract purchaser Ua (��e l,-e c u- tA2/.) Pri ri.S — v`l 5E - Printed l -Printed name, Title Daytime phone number of Signatory *Ownership Information: • If ownership of the property is in the name of any type of Iegal entity or organization including, but not limited to, the name of a corporation, partnership or association, or in the name of a trust, or in a fictitious name, a document acceptable to the County must be submitted certifying that the person signing above has the authority to do so. • If the applicant is a contract purchaser, a document acceptable to the County must be submitted containing the owner's written consent to the application. • If the applicant is the agent of the owner, a document acceptable to the County must be submitted that is evidence of the existence and scope of the agency. Attach the owner's written consent. 11/2010 Page 2 of 2 OVER--> VW' '4ti410` i✓ 44. Architectural Review Board Concept Plan/Advisory Review Submittal Requirements Checklist Part A_Applicant.Contact and.Parcel Information Project name: 110,1 101 Foroi Auto Veale(.sn 1-„ Tax map and parcel#: 4S - 63G 1 Street address/location: -z - , ,eta,:no le Lura Location of property (landmarks, intersections, or other): C„frt.4 &he L:vt� PartB Advisory"Review Requirements Checklist Important Note: Submittal packages must contain (8)collated copies of all information unless otherwise indicated. A. Written description of the proposal Qj Provide a general description of all proposed work. Explain how the proposal is compatible with the surrounding area and the Entrance Corridor. B. Sketch plan showing the following (drawn to the scale of 1"=20', clearly legible and folded): [� Location(s) of proposed building(s) on the site. LiSchematic layout of parking, travelways, and other improvements. dLocation of existing and proposed tree lines. Individually identify trees of 6-inch caliper or greater. LTJ Existing and proposed topography and conceptual grading drawn with contour intervals of 5-feet or less, and with sufficient offsite topography to describe prominent and pertinent off-site features and physical characteristics, but in no case less than 50-feet outside of the site. It Sheet number, total number of sheets, date of the drawings, date and description of the latest revision, and contact information for the firm preparing the drawings in the title block on all drawings. C. Appearance of the proposed building(s) a Show a representation of the appearance of the proposed building(s). This may include architectural elevations, perspective sketches, or photos of the proposed building(s). These documents should provide a basic understanding of: ❑ The size, form and scale of the building. ❑ The architectural style of the building. ❑ The proposed building materials and color(s). D. Additional material 14 Provide labeled, color, 8-'/2” x 11" photographs of the site as seen from both directions on the Entrance Corridor. ❑ The applicant is welcome to submit any additional material that will make the conceptual review more productive. Drawings or other submittal items that clarify topography, visibility, utilities, landscaping, or other unique or unusual conditions are welcome. 1 Revised 7/28/10 v *II 4411° Part C: Applicant Agreement Applicant must read and sign • Each application package must contain (8) folded copies of all plans and documents being submitted. Only (1) set of building material samples is required. All submittal items, including building material samples, become the property of Albemarle County. Applicants are encouraged to maintain duplicate copies of all submittal items in their own files. • All information in this checklist is required, unless specifically waived by the ARB, prior to processing an advisory or concept plan review by the ARB. Additional submittal materials may be required, depending on the proposal. • Only complete application packages will be scheduled for ARB review. The application package is not complete without this checklist, completed, signed, and included with the required submittal materials indicated on the checklist. In representing the above referenced firm submitting this application for review, I hereby state that the information provided on this application, and all accompanying information, is accurate, true and correct to the best of my knowledge, and that the attached plans contain all information required by this checklist. g 7.25 .16 Sign. ure of person completing checklist Date �,,,�d I ;rel ecnan - l3RV✓ Arc�'/eJ 434 q'1 I - 711 0 Printed Name/Title Daytime phone number of Signatory County of Albemarle Department of Planning and Community Development 401 McIntire Road, Charlottesville, VA 22902-4596 (434) 296-5832 Tel, (434) 972-4126 Fax www.albemarle.orq RECEIVED 7 5 2'i15 COMMUNITY DEVELOPMENT 2 Revised 7/28/10 �M NINO G 0 t �'`R C H I T E C I S www.brucewardell.com Project Narrative— 1 1 2 fourth street ne ARB Conceptual Review . charlottesville virginia 22902 Malloy Ford [p] 434 . 971 . 7160 :f] 434971 . 7166 2070 Seminole Trail Charlottesville VA 22901 FROM: brwarchitects TO: Albemarle County DATE: 07.22.16 Project Proposal The proposed project for 2070 Seminole Trail includes the following: Project Description: Renovation of existing Building Supply store and warehouse into Ford Dealership. The majority of the project re-utilizes the existing space as Showroom and Sales, Parts and Service Office as well as Mechanical auto repair shop. All facades of the existing building are to be renovated with a combination of Metal paneling, new paint and storefront Windows. A new 2700 sq. ft. 'Service Drop-off' addition is proposed for the southern side of the building's front as well as the Entry Portal—typically a main feature of Ford's design standards. • Design Intent Update the building's façade with a design that is both in keeping with Ford standards as well as one following the county's entry corridor guidelines. Ways in which Ford has commented on how their design relates to the standard Guidelines: o Building Forms and Features—Current scale of the existing building has been maintained and further refined by the proposed design. The overall scale of the architectural elements and use of finishes and textures will be traditional in manner relating to historic buildings in the area. Similar to traditional architecture in the region, the following elements have been underscored by the exterior renovation: • Fascia and colonnade on either side of the entrance. • Use of differentiating materials to emphasize scale and building functions • Center entrance portal with vestibule to the showroom o Human Scale • Entry Portal scales down and defines showroom entrance • Layering of material finishes vertically and horizontally scales the front façade in a more traditional manner in that they establish a base, middle and cap. • Service entrance recessed from front façade further delineates building function and helps hide rear of existing building from Entry corridor. o Entrance Corridor: Building scale is maintained and storefront accentuated by glass and fascia wall; more in keeping with other buildings on route 29. NNW o Elimination of building blankness: • Addition of storefront will give building a more transparent appearance. • Existing colonnade has been maintained and improved in new design with new materials. o Accessory structure : will be re-clad and repainted to maintain consistency with new showroom. o Visibility issues from corridor : Loading, service, refuse, storage and utilities will be located behind the showroom and service entry of the building. Screening will be harmonious with building architecture. This project is compatible with the surrounding area in that it does not drastically alter the footprint of the existing condition. Also the proposed new addition will help hide the rambling rear portion of the structure—currently building storage which will be turned into auto service bays. We believe the development will improve the current condition of the site. The public will benefit from a new updated building design along the 29 corridor as well as the economic value in retaining a business already prospering in the county. Also, there is a component of sustainability in this project in the form of adaptive re-use and the plan's utilization of the entire portion of the existing structures. Thank you, BRW Bs�i31 R H I T E C T S www.brucewardell.com Project Narrative - 1 1 2 fourth street ne ARB Conceptual Review Charlottesville virginia 22902 Malloy Ford [p] 434 . 971 . 7160 f] 434 . 971 . 7166 2070 Seminole Trail Charlottesville VA 22901 FROM: brwarchitects TO: Albemarle County DATE: 07.22.16 Project Proposal The proposed project for 2070 Seminole Trail includes the following: Project Description: Renovation of existing Building Supply store and warehouse into Ford Dealership. The majority of the project re-utilizes the existing space as Showroom and Sales, Parts and Service Office as well as Mechanical auto repair shop. All facades of the existing building are to be renovated with a combination of Metal paneling, new paint and storefront Windows. A new 2700 sq. ft. 'Service Drop-off' addition is proposed for the southern side of the building's front as well as the Entry Portal—typically a main feature of Ford's design standards. • Design Intent Update the building's façade with a design that is both in keeping with Ford standards as well as one following the county's entry corridor guidelines. Ways in which Ford has commented on how their design relates to the standard Guidelines: o Building Forms and Features—Current scale of the existing building has been maintained and further refined by the proposed design. The overall scale of the architectural elements and use of finishes and textures will be traditional in manner relating to historic buildings in the area. Similar to traditional architecture in the region, the following elements have been underscored by the exterior renovation: • Fascia and colonnade on either side of the entrance. • Use of differentiating materials to emphasize scale and building functions • Center entrance portal with vestibule to the showroom o Human Scale • Entry Portal scales down and defines showroom entrance • Layering of material finishes vertically and horizontally scales the front façade in a more traditional manner in that they establish a base, middle and cap. • Service entrance recessed from front façade further delineates building function and helps hide rear of existing building from Entry corridor. o Entrance Corridor: Building scale is maintained and storefront accentuated by glass and fascia wall; more in keeping with other buildings on route 29. o Elimination of building blankness: • Addition of storefront will give building a more transparent appearance. • Existing colonnade has been maintained and improved in new design with new materials. o Accessory structure : will be re-clad and repainted to maintain consistency with new showroom. o Visibility issues from corridor : Loading, service, refuse, storage and utilities will be located behind the showroom and service entry of the building. Screening will be harmonious with building architecture. This project is compatible with the surrounding area in that it does not drastically alter the footprint of the existing condition. Also the proposed new addition will help hide the rambling rear portion of the structure—currently building storage which will be turned into auto service bays. We believe the development will improve the current condition of the site. The public will benefit from a new updated building design along the 29 corridor as well as the economic value in retaining a business already prospering in the county. Also, there is a component of sustainability in this project in the form of adaptive re-use and the plan's utilization of the entire portion of the existing structures. Thank you, BRW