HomeMy WebLinkAboutSDP201600018 Action Letter 2016-10-18Christopher Perez
From: Christopher Perez
Sent: Thursday, October 13, 2016 7:18 AM
To: 'Justin Shimp, P.E.'; Valerie Long
Cc: 'Ellie Ray'; Stephanie Mallory; David Benish
Subject: SDP2016-12 Nationwide - Special Exceptions & SDP201600018 - Better Living
Berkmar —Special Exceptions
Justin & Valarie,
SDP2016-12 Nationwide - Special Exceptions
SDP2016-18 - Better Living Berkmar — Special Exceptions
Each of the special exceptions (SE) for both of the above mentioned projects were approved last night by the
BOS (10-12-16) on consent agenda.
Please assure the site plans are provided with a note listing out the SEs that were approved and the date of the
BOS approval.
Thanks
Christopher P. Perez I Senior Planner
Department of Community Development ICounty of Albemarle, Virginia
401 McIntire Road I Charlottesville, VA 22902
434.296.5832 ext. 3443
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road, North Wing
Charlottesville, Virginia 22902-4596
Phone (434) 296-5832 Fax (434) 972-4126
September 28, 2016
Justin Shimp, Shimp Engineering
201 E. Main Street, Suite M
Charlottesville VA 22902
SDP201600018 Better Living Berkmar- Initial Site Plan
Mr. Shimp,
The Agent for the Board of Supervisors hereby grants administrative approval to the above referenced site plan.
This approval shall be valid for a period of five (5) years from the date of this letter, provided that the developer
submits a final site plan for all or a portion of the site within one (1) year after the date of this letter as provided in
section 32.4.3.1 of Chapter 18 of the Code of the County of Albemarle, and thereafter diligently pursues approval of
the final site plan.
In accordance with Chapter 18 Section 32.4.2.8 Early or Mass Grading may be permitted after the following
approvals are received:
1. ARB conditions to be satisfied prior to issuance of a grading permit: "If existing trees are to be utilized for
screening or any other EC requirements label them as preserved', provide tree protection fencing and
sped the individual tree locations, canopy limits, caliper and species. "
2. Submittal of a tree conservation checklist with areas for tree preservation identified.
3. Engineering approval of a VSMP plan meeting the requirements of Chapter 17 of the Code of the County
of Albemarle.
4. Approval of all easements for facilities for stormwater management and drainage control.
The final site plan will not be considered to have been officially submitted until the following items are received:
1. A final site plan that satisfies all of the requirements of section 32.6 of Chapter 18 of the Code.
2. A fee of $1,613.
Please submit 10 copies of the final plans to the Community Development Department. The assigned Lead
Reviewer will then distribute the plans to all reviewing agencies. Once you receive the first set of comments on the
final site plan, please work with each reviewer individually to satisfy their requirements.
The Department of Community Development shall not accept submittal of the final site plan for signature until
tentative approvals for the attached conditions from the following agencies/reviewers have been obtained:
SRC Members:
Albemarle County Planning Services (Planner) - 3 copies [Christopher Perez ext 34431
Albemarle County Planning Services (ARB) - 1 copy [Paty Saternye ext. 3250]
Albemarle County Engineering Services (Engineer) - 1 copy [Matthew Wentland ext 3458]
Albemarle County Information Services (E911) - 1 copy [Andrew Slack ext 3384]
Albemarle County Department of Fire Rescue - 1 copy [Robbie Gilmer 434-296-5833]
Virginia Department of Transportation - 1 copy [Adam Moore 434-422-9894]
Albemarle County Building inspections — 1 copy [Jay Schlothauer ext 3228]
Albemarle County Service Authority (ACSA) - 1 copy [Alex Morrison 434-977-4511 ext 116]
If you have any questions about these conditions or the submittal requirements please feel free to contact me at
Extension 3443, cperez@albemarle.org.
Sincerely�.-�
Senior Planner
A
U
vIRGt1�P
County of Albemarle
Department of Community Development
401 McIntire Road,
Charlottesville, VA, 22902
Phone 434-296-5832
Memorandum
To: Justin Shimp
From: Christopher P. Perez, Senior Planner
Division: Planning
Date: September 28, 2016
Subject: SDP201600018 Better Living Berkmar - Initial Site Plan
Fax 434-972-4126
The County of Albemarle Planning Division will recommend approval of the plan referenced above once the following
comments have been satisfactorily addressed (The following comments are those that have been identified at this time.
Additional comments or conditions may be added or eliminated based on further review.): [Each comment is preceded by
the applicable reference, which is to the Subdivision/Zoning Ordinances unless otherwise specified.]
1. A site plan meeting all the requirements of section 32.6 of Chapter 18 of the Code.
2. [32.7.2.1] Vehicular access to site. Each entrance onto any public street shall be designed and constructed as required
by the standards of the Virginia Department of Transportation (VDOT). VDOT approval of the entrance to the site
shall be required prior to final site plan approval (see attached Sept 13, 2016 VDOT comments).
3. [21.7, 4.20(a)21 Front -maximum setbacks. Building `A' does not meet the maximum 30 foot front setback from
Berkmar Drive. The applicant has requested a special exception (SE) to this requirement of the ordinance. Prior to final
site plan approval the applicant shall receive approval of the SE by the Board of Supervisors (BOS) or redesign the site
to meet the maximum front setback. This item is scheduled for the Oct 12, 2016 BOS meeting. If approved on sheet I
list all special exceptions that were approved along with the date of approval.
4. [21.7, 4.20(a)31 Side setback. Storage Shed D is located closer than 50 feet from the adjacent residentially zoned
properties of TMP 45-112 & 45-112E. Also, there are 18 proposed parking spaces located closer than 20 feet to these
residentially zoned parcels. The applicant has requested a SE to the side setback requirement of the ordinance. Prior to
final site plan approval the applicant shall receive approval of the SE by the BOS or redesign the site to meet the side
setbacks. This item is scheduled for the Oct 12, 2016 BOS meeting. If approved on sheet 1 list all special exceptions
that were approved along with the date of approval.
5. [21.7(c)] Buffer zone adjacent to residential districts. Improvements (18 parking spaces, grading, retaining walls, and
street tree plantings) are proposed within the 20 foot undisturbed buffer between the residentially zoned parcels of
TMP 45-112 & 45-112E and the site. The applicant has requested a SE to the buffer requirement of the ordinance.
Prior to final site plan approval the applicant shall receive approval of the SE by the BOS or redesign the site to meet
the buffer requirements. This item is scheduled for the Oct 12, 2016 BOS meeting. If approved on sheet I list all special
exceptions that were approved along with the date of approval.
6. [32.5.2(a), 4.2.1, 4.2.2(b)] General information. Portions of this development are proposed on TMP 45-68C 1 (0.16
acres) and TMP 45-112A (0.715 acres), which rely on a boundary line adjustment (BLA) with these properties. Prior to
final site plan approval the lot line adjustments shall take place on a subdivision plat to be reviewed by the County,
approved, and then recorded in the Clerk's Office. The DB page information of this action shall be provided on the
final site plan.
7. [32.5.2(k), 32.7.5.1, 4.11 Water and sewer facilities. As part of the BLA of TMP 45-112A the reduced parcel will be
reviewed to assure it contains adequate sewer and water services onsite. If the existing home is without either of these,
it shall be required to connect to public water and/or public sewer as it is located in the jurisdictional area of the
County. In order to not connect to both of these, the applicant shall provide a completed application for an exemption.
Prior to BLA approval, the exemption shall be reviewed and a finding shall be made to either approve or deny the
request. If the request is denied then public water and sewer shall be provided onsite and ACSA shall review/approve
this aspect of the proposal. If the exemption request is approved to not provide public sewer and/or public water, the
Health Department will be required to review/approve the BLA to assure adequate septic & water systems are provided
onsite.
8. [32.5.2(i)] Easements. Improvements are proposed within the existing publically dedicated access easement (DB 1429
PG 122). The applicant proposes to relocate the easement in a New 15' VDOT access easement as depicted on TMP
04500-00-00-068C1. The easement shall be platted prior to final site plan approval. The plat shall be reviewed by the
County & VDOT, approved, and then recorded in the Clerk's Office, the DB page information of this action shall be
provided on the final site plan.
9. [32.5.1(c)] As proposed offsite grading is taking place on TMP 45-68C1 and TMP 45-68A. All offsite grading
easements shall be applied for/reviewed/approved/recorded prior to final site plan approval.
10. [32.5.2(k)] Proposed sewer & water facilities. The proposed sanitary sewer line is located on TMP 45-68C1 and 45-
68.. The final site plan shall depict the entire extent of this easement on these properties from where the line originates
along Route 29 to where it connects to Building A. Also, the proposed water connection for this site is located on TMP
45-112E. All offsite water and sewer easements shall be reviewed by the County, approved, and then recorded in the
Clerk's Office prior to final site plan approval. The DB page information of this action shall be provided on the final
site plan.
11. [32.5.20)] Existing sewer and drainage facilities. Label, dimension, and depict the existing and proposed water and
sewer facilities and easements.
12. [32.7.2.3] Sidewalks and other pedestrian walkways. Are customers permitted within Building C? If so, it is suggested
the applicant provide pedestrians a safe and convenient walkway/marked path from the parking area to the building.
13. [32.5.2(b)] Proposed use. Some aspects of the proposal which are depicted on the initial site plan do not match what is
proposed/depicted on the ARB submission and vice-versa. For example: 1) the extent of the screening fence along the
northern property line 2) evergreen screening along the northern property line (25 plantings of eastern arborvitae & 4
plantings ofpin oaks). Prior to final site plan approval the differences between the two plans shall be rectified and
properly depicted on the final site plan.
14. [4.12.15(g)] Curb and Gutter. Provide curb and gutter in the parking area and along the travelways.
15. [32.5.2(a)] General Information. Throughout the plan depict the zoning and the current uses of all abutting parcels
(specifically the residentially zoned properties TMP 45-112 & 45-112E).
16. [32.5.2(n)] Existing and proposed improvements. If there is to be a sign for the proposed use, on the final site plan
depict and label the sign location. (Depicting the sign on the final site plan is not approval of the sign location or type).
17. [32.5.2(a)] Approval from the ARB is required prior to final site plan approval. See attached ARB review comments.
18. [Comment] The screening fence is blocking access to the stormwater treatment area. For maintenance purposes assure
there is a way to access this area of the site.
19. [32.5.2(n) & (p)] The following will be required for final site plan approval:
- Outdoor lighting information including a photometric plan and location, description, and photograph or diagram of
each type of outdoor luminaire [Sec. 32.7.8 & Sec. 4.17]
- A complete landscape plan in accordance with [Sec. 32.7.9]
Please contact Christopher P. Perez in the Planning Division by using cperez a,albemarle.oig or 434-296-5832 ext. 3443
for further information.
Charles A. Kilpatrick, P.E.
Commissioner
COMMONWEALTH of VIRGINIA
DEPARTMENT OF TRANSPORTATION
16o1 orange Road
Culpeper, Virginia 22701
September 13, 2016
County of Albemarle
Department of Community Development
401 McIntire Road
Charlottesville, VA 22902
Attn: Christopher Perez
Re: Better Living Berkmar Drive- Initial site plan
SDP -2016-00018
Review #2 REVISED
Dear Mr. Perez:
The Department of Transportation, Charlottesville Residency Transportation and Land Use
Section, has reviewed the above referenced plan as submitted by Shimp Engineering, dated
March 6, 2016, with a revision date of June 13, 2016 and offers the following comments:
Land Use
1. Please provide sight distance lines on the plans as well as the landscape plan sheet.
Additionally please provide a sight distance profile on the plans.
2. Please see Road Design Manual appendix F -Access Management design standards for
entrances and Intersections, figure 4-10 commercial entrance design. Provide a right turn
lane warrant analysis as shown in F-96. Please refer to F-109 to provide the appropriate
design vehicle and turning radius by land use.
3. Please conform to the pavement widening WP -2, 302_02 in the 2008 Road and Bridge
standards.
4. Please provide Route number, Street name, Speed limit, and Right of Way width on all
plan sheets.
5. Virginia Code 24VAC30-70-120 requires commercial entrances be shared with only
limited exceptions. The applicant shall arrange to share a commercial entrance with the
neighboring parcel owned by the Wood/Von Storch partnership and prepare for this
entrance to be the sole access point for both properties. One acceptable arrangement
would be to provide an access easement to the property line to allow access to the
neighboring parcel through the currently proposed layout.
Please note that the final site plan must show conformance with the VDOT Road Design
Manual Appendices B (1) and F, as well as any other applicable standards, regulations, or
other requirements.
September 13, 2016
Mr. Perez -
Page Two
Please provide two copies of the revised plan along with a comment response letter. If further
information is desired, please contact Willis C. Bedsaul at 434-422.9866.
A VDOT Land Use Permit will be required prior to any work within the right-of-way. The
owner/developer must contact the VDOT Charlottesville Residency Land Use Section at (434)
422-9399 for information pertaining to this process _
Sincerely,
444&, 9 , qRLA--1
Adam J. Moore, P.E.
Area Land Use Engineer
Charlottesville Residency
WE KEEP VIRGINIA MOVING
Project Name:
Date Completed:
Reviewer_
Department/DivisiontAgency:
Reviews Comments:
��.
etter Living O-erkmar - Initial
:ridgy, r°uly X18, 2016
"atthew Wentland
Engineering
Initial Site Plan
Based on plans dated 06 13-2016, the following comments should be addressed on the final site plan and the
VSMP plan -
1. r=': WPO submittal will be required containing ESO and SWM pians and a SWPPP [17-300. 7-301].
2 Provide a barrier/guardrail where retaining walls are next to travelways.
3. Provide curb r, gutter where necessary to control or direct stormwater runoff ['18 4.12.15(g)J
4 Tne County recommends acquiring temporary easements when work takes place within 5'-,f the propery
line.
5- Yate condition and adequacy of the exis'Jng storm sewer may need to be verified for the VSMP submittal.
6.7 -he runoff south of Buildings C & D may need to be directed to an adequate channel or converted to sheet
flow.
SDP201600018
Project Name: utter Living Berkmar - nitial
Date Completed: Vionday, � my ` 1. 2016
Reviewer: Robbie Gilmer
Department/Division!Agency: E Fire Rescue
Reviews Comments:
Based on plans dated 6.113/16.- -- --
Initial Site Plan
r
1 _ Please add a note .o the plans " Knox Box required. please contact Albemarle County Fire Marshal o- ice
for location"
12. Fire Flow test required before fina� approval.
3. Hydrant spacing shall be a maximum of 400' per travel way. Please add a hydrant to the larger island as
you enter the loading & Storage area.
14. FDC shall be located on the address side of the struci;ure.
5. FDC shall have a hydrant with 100' per travel way. This will require a second hydrant located on Berkmar a.
the entrance.
6. Structures over 30' in height require aerial truck access of 26' clear travel way. Please increase the travel
way in the east parking lot to 26' he travel lane to the north of the structure is already 26'. but it shows a
grade of 10% and our aerial trucks can only over come 8% front to back.
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road, North Wing
Charlottesville, Virginia 22902-4596
Phone (434) 296-5832 Fax (434) 972-4126
August 19, 2016
Justin Shimp/Shimp Engineering
201 East Main Street, Ste M
Charlottesville VA 22906
RE: ARB201600039 Better Living — Berkmar
Dear Mr. Shimp,
At its meeting on Monday, August 15, 2016, the Albemarle County Architectural Review Board, by a vote
of 3:0 voted to forward the following recommendations on the above -noted Initial Site Development Plan
to the agent for the Site Review Committee:
• Regarding requirements to satisfy the design guidelines as per § 18-30.6.4(2), (3) and (5):
A Certificate of Appropriateness is required prior to final site plan approval.
1. Revise the plan to clearly show the limits of the "Loading & Storage Area", with hatching
or other method. If the storage area extends to the north side of "Building B Open Shed"
provide additional screening along the north side of the parcel to eliminate visibility of this
area.
2. Screening of the storage area may be provided by walls, plantings or fencing, or a
combination of these. When accomplished by new vegetation, do not provide the
screening in rigid rows. Instead provide a less fon-nal layout and include multiple species
to blend with the surrounding area. At a minimum provide evergreen shrubs 24" at
planting along the chain link fence adjacent to the stormwater management area.
3. If existing trees are to be utilized for screening or any other EC requirements label them as
`preserved', provide tree protection fencing and specify the individual tree locations,
canopy limits, caliper and species.
4. Expand the wording of the note under "Proposed Use" on the coversheet to say, "Items
stored within the outdoor storage area shall not exceed the height of the landscaping, or
other methods of screening installed, and shall not be visible from the Entrance Corridor."
5. Indicate on the plan the walls of the buildings and sheds that will be open.
6. Eliminate visibility of any mechanical equipment from the EC. Specify the location of
mechanical equipment, and method of screening utilized for them, on the site plan.
7. Add the standard mechanical equipment note to the architectural plans.
8. Provide details on how the "Roll Off Dumpster" will be screened from the EC or specify
in the site plan that the "Roll OffDumpster" will be kept within the designated "Loading
and Storage Areas" at all times.
9. Label the stormwater pond that is located east of "Storage Shed E".
10. Provide landscaping to integrate the stormwater areas, on the east and west sides of
"Storage Shed E", into the landscape.
II. Provide proposed topographical information for the "Proposed Storm Water Treatment
Area" at the northeast corner Of "Building C".
12. Provide evergreen shrubs 24" minimum at planting along the north side of the northern
travelway. Update the landscaping calculations to reflect the additional shrubs.
13. Consider providing native plants on the proposed graded slope.
14. Add plants on the terraced retaining walls.
15. Modify the label on the retaining wall to be "James River" color.
16. Provide a material & color sample for this type of retaining wall.
17. If existing trees to remain are not to be "preserved" then do not include them in any EC
required landscaping.
• Regarding conditions to be satisfied prior to issuance of a grading permit:
If existing trees are to be utilized for screening or any other EC requirements label them as `preserved',
provide tree protection fencing and specify the individual tree locations, canopy limits, caliper and
species.
You may submit your application for continued ARB review at your earliest convenience. Application forms,
checklists and schedules are available on-line at www.albemarle.or /g ARB. Please be certain that your ARB
submittal addresses the above -noted issues.
If you have any questions concerning any of the above, please feel free to call me.
Sincerely, �- ?
Patribia Saterny
Senior Plann
cc: B Properties
PO BOX 7627
Charlottesville VA 22906
•
Regarding recommendations on the plan as it relates to the guidelines:
None
`o�
•
Regarding recommended conditions of initial plan approval:
o
Prior to Initial Plan approval
1.
Revise the plan to clearly show the limits of the "Loading & Storage Area", with hatching
4
or other method. If the storage area extends to the north side of "Building B Open Shed"
+ d
provide additional screening along the north side of the parcel to eliminate visibility of this
area, or submit an application for a special use permit.
2.
Screening of the storage area may be provided by walls, plantings or fencing, or a
combination of these. When accomplished by new vegetation, do not provide the
screening in rigid rows. Instead provide a less formal layout and include multiple species
o
to blend with the surrounding area. At a minimum provide evergreen shrubs 24" at
planting along the chain link fence adjacent to the stormwater management area.
3.
If existing trees are to be utilized for screening or any other EC requirements label them as
a
`preserved', provide tree protection fencing and specify the individual tree locations,
43
canopy limits, caliper and species.
f4.
Expand the wording of the note under "Proposed Use" on the coversheet to say, "Items
£
stored within the outdoor storage area shall not exceed the height of the landscaping, or
j
other methods of screening installed, and shall not be visible from the Entrance Corridor."
5.
Indicate on the plan the walls of the buildings and sheds that will be open.
6.
If existing trees to remain are not to be "preserved" then do not include them in any EC
required landscaping.
• Regarding conditions to be satisfied prior to issuance of a grading permit:
If existing trees are to be utilized for screening or any other EC requirements label them as `preserved',
provide tree protection fencing and specify the individual tree locations, canopy limits, caliper and
species.
You may submit your application for continued ARB review at your earliest convenience. Application forms,
checklists and schedules are available on-line at www.albemarle.or /g ARB. Please be certain that your ARB
submittal addresses the above -noted issues.
If you have any questions concerning any of the above, please feel free to call me.
Sincerely, �- ?
Patribia Saterny
Senior Plann
cc: B Properties
PO BOX 7627
Charlottesville VA 22906
Phone 434-296-5832
County of Albemarle
Department of Community Development
401 McIntire Road,
Charlottesville, VA, 22902
Memorandum
To: Christopher Perez
From: Paty Saternye, Senior Planner
Division: ARB
Date: September 27, 2016
Subject: SDP201500039 Better Living — Initial Site Plan
Fax 434-972-4126
I have reviewed the revised Initial Site Plan submittal against the requirements and recommendations approved
by the Architectural Review Board on August 15, 2016, and offer the following comments:
Prior to Initial Plan approval
1. Revise the plan to clearly show the limits of the "Loading & Storage Area", with hatching or other
method. If the storage area extends to the north side of `Building B Open Shed" provide additional
screening along the north side of the parcel to eliminate visibility of this area, or submit an application
for a special use permit.
Rev1: Comment Addressed. Limits of the loading and storage area have been shown as dashed
lines with labels.
2. Screening of the storage area may be provided by walls, plantings or fencing, or a combination of these.
When accomplished by new vegetation, do not provide the screening in rigid rows. Instead provide a
less formal layout and include multiple species to blend with the surrounding area. At a minimum
provide evergreen shrubs 24" at planting along the chain link fence adjacent to the stormwater
management area.
Rev1: Comment Addressed. Screening is being accomplished with buildings and a 16' tall
concrete wall.
3. If existing trees are to be utilized for screening or any other EC requirements label them as `preserved',
provide tree protection fencing and specify the individual tree locations, canopy limits, caliper and
species.
Rev1: Comment Addressed. No existing trees are being utilized for screening and therefore do
not need to be preserved.
4. Expand the wording of the note under "Proposed Use" on the coversheet to say, "Items stored within the
outdoor storage area shall not exceed the height of the landscaping, or other methods of screening
installed, and shall not be visible from the Entrance Corridor."
Rev1: Comment Addressed. The note has been revised.
5. Indicate on the plan the walls of the buildings and sheds that will be open.
Rev1: Comment Addressed. Labels have been provided specifying which sides of the sheds are
open.
6. If existing trees to remain are not to be "preserved" then do not include them in any EC required
landscaping.
Rev1: Comment Addressed. No existing trees are being utilized to meet EC required landscaping
and therefore 00% not need to be preserved.
Please contact Pat err ye in the Planning Division by using psaternye(a)-albemarle.org or 434-296-5832 ext.
3250 for further inf r atif�in.
Christopher Perez
From: Alexander Morrison<am orri son @serviceauthority.org>
Sent: Monday, July 25, 2016 10:31 AM
To: Christopher Perez
Subject: SDP201600018: Better Living Berkmar - Initial
Chris,
I have reviewed the resubmittal and hereby recommend approval of SDP201600018 with the following conditions:
• ACSA construction plan submittal will be required for the final site plan.
• Fire protection on site will be required (fire hydrant placement will be reviewed in the construction plan
submittal).
Let me know if you have any questions.
Alexander J. Morrison, P.E.
Civil Engineer
Albemarle County Service Authority
168 Spotnap Road
Charlottesville, Virginia 22911
(0) 434-977-4511 Ext. 116
(C) 434-981-5577
(F) 434-979-0698
SDP201600018
Project Name: steer Living Berkmar - nitial
Date Completed: Monday, 'une 20, 2016 Initial Site Plan
Reviewer: 'ay Schlothauer
DepartmentrDivisiow'Agency: Inspections
Reviews Comments,
Based on pans revised ,dune 13. 20416.
`' No further comments or conditions.
Project Name. -
Date Completed:
Reviewer:
Department/Division?'Agency:
Reviews Comments,
I NO Objection.
I
r%eview Comments
SDP201600018
atter Living EArkmar - Initial
rhursday, une 23, 2016 Initial Site Plan
E911