HomeMy WebLinkAboutSDP201600051 Review Comments Major Amendment, Final Site Plan 2016-10-05County of Albemarle Department of Community Development 401 McIntire Road, Charlottesville, VA, 22902 Phone 434-296-5832 Fax 434-972-4126 Memorandum To: Eric Woolley, P.E. (ewoolley@woolley-eng.com) From: Cameron Langille, Senior Planner Division: Planning Date: October 4, 2016 Rev. 1: February 27, 2017 (and NEW Comments) Rev. 2: May 12, 2017 (and NEW Comments) Subject: SDP 201600051 UVA Research Park Town Center Four — Major Site Plan Amendment The County of Albemarle Planning Division will recommend approval of the plan referenced above once the following comments have been satisfactorily addressed (The following comments are those that have been identified at this time. Additional comments or conditions may be added or eliminated based on further review.): [Each comment is preceded by the applicable reference, which is to the Subdivision/Zoning Ordinances unless otherwise specified.] Comments from Letter dated October 4. 2016: [Comment] This is a major site plan amendment covering Town Centers 3 & 4. The expectation for this site plan is to show all improvements that have been built and approved through previous site plan approvals. Include a sheet or sheets showing the overall site plan for both buildings that incorporates all previous changes to the site approved through previous site plans or amendments. Rev. 1: Comment not fully addressed. The Research Park Total Buildout Statistics in Note 13 on the Cover Sheet appear to be inaccurate in terms of the acreage, development square footage, and total remaining columns—the calculations do not match the "Completed" numbers shown in the table above. Please explain or recalculate the figures. Staff suggests providing a project narrative on the Cover Sheet to identify the site plans and amendments that correspond to all improvements and buildings that have been previously approved and constructed. An example of this can be found on Sheet C-4.0 from the previous site plan minor amendment, SDP200800161, which pertained to Town Center buildings Three and Four. Rev. 2: Comment not fully addressed. After reviewing the previous plans and proffers, staff has determined that the buildout statistics table has been required on previous site plans due to a proffer limiting the "density," or total square footage of structures, that could be built per year in the North Fork Research Park. This is Proffer #3 in ZMA2005-03. The total gross floor area allowed to be constructed in any given year is capped at 200,000 square feet. However, any unused square footage not constructed in a given year is carried over to the next year. The total gross floor area that may be built within the North Fork park is capped at 3,700,000 square feet. It appears that the "Density" column in the buildout statistics table was improperly titled on previous projects. There are two options in order to make the table understandable moving forward. Option 1: Re -title the "Building" column to "Approved Building Square Footage" and re -title the "Density" column to "Total Square Footage Constructed." Option 2: Remove both columns and add a new column titled "Total Square Footage Constructed." This will allow all future projects to be tracked based on the square footage remaining in North Fork. Please re -verify the existing square footage of the projects listed in the table in order to ensure that the existing square footage figures are accurate. 2. [32.5.2(a)] Provide property owner, zoning district, TMP and use of abutting parcels. Rev. 1: Comment Addressed. [32.5.2(b)] Zoning approval is required for reduced parking amounts proposed. Zoning comments, if any, will be forwarded upon receipt. Rev. 1: Comment not fully addressed. The County has not approved a reduction in the number of required parking spaces. The "Traffic Demand Management Reductions" as shown on the Cover Sheet can only be approved once a Transportation Demand Management study/report is formally submitted, reviewed and approved by the Zoning Administrator. Please reference Sections 4.12.2 (c) and 4.12.12 for additional information. You may contact Ron Higgins, Chief of Zoning/Deputy Administrator, at 434-296-5832 ext. 3225 or rhiggins@albemarle.org with additional auestions related to this matter. Rev. 2: Comment addressed. See aanroval from Ron Hieeins in the comments from other reviewer section below. a. The Cover Sheet states that a waiver has been aaaroved to reduce the reauired amount of loading spaces. Staff cannot find a record of a previously approved waiver to reduce the required number of loading spaces. Please either submit evidence of a previously approved waiver or submit a waiver request to the Zoning Administrator. Rev. 2: Comment addressed. The final site plan approved for Buildings 3 and 4 reduced the total required loading spaces to four (4) between Buildings 3 and 4. Two (2) loading spaces have already been installed in the Building 3 oarkine lot. The site Dian amendment fulfills the reauirement for installation of the two remaining (2) loading spaces. 4. [32.5.2 d] Identify acreage of proposed disturbance of preserved slopes and confirm that no additional areas of preserved slopes are being disturbed than was previously approved with SDP2006-113 critical slopes waiver (0.07 acres previously approved for disturbance). Rev. 1: Comment Addressed. [32.5.2(k)] Verify that all necessary easements for proposed water, sewer and drainage facilities have been shown on the plan. Show and label existing and proposed easements on utility plan sheet and indicate if any easements are to be dedicated to public use. Rev. 1: Comment not fully addressed. Please label the utility easements on all the utility drawings where visible. State the width of the easement, type (i.e. water, sewer, stormwater, etc) and whether it is public or private. All water and sewer facilities to be dedicated to public use and the easements for those facilities and shall be identified by a statement that the facilities are to be dedicated to the Albemarle County Service Authority. Please include this language on the next submittal for all public water and sewer easements. For private easements, the owners need to be listed in the easement label (drainage, stormwater, etc.) Please refer to Comment #16 below for additional requirements. Rev. 2: Comment not fully addressed. Per correspondence with Eric Wooley, Kirk Hughes is preparing a subdivision and easement plat to correspond with this project. The subdivision and easement plat must be approved and recorded and all new easements/property parcel information labeled on the plans prior to final site plan approval. 6. [32.5.1(n)] Provide height of proposed building. Rev. 1: Comment not fully addressed. The Cover Sheet states that Building Four is proposed to be 61' in height. All structures exceeding 40' or three stories in height in PDIP must meet the required zoning stepbacks as stated in Section 26.4 and 4.20. Please state the stepbacks on the Cover Sheet. The County will require that the building plans, when submitted, demonstrate compliance with the stepback requirements. Rev. 2: Comment addressed. 7. [32.5.1(n)] Provide height of proposed lighting fixtures. Rev. 1: Please revise the "Lighting Locations" table title on Sheet SL1.0 to state "Luminaire Mounting Heights." The table does not give any details related to light locations, and the "MH" column does not make it clear that the numbers given mean the mounting height of each light. Rev. 2: Comment addressed. 8. [32.5.1(n)] Provide more details on retaining walls. Label maximum height of each wall individually. Rev. 1: Comment not fullv addressed. Please provide a callout to the retainine wall alone the trail on the drawines. Rev. 2: Comment addressed. 9. [32.5.1(n)] Provide proposed paving materials for walks, parking lots, driveways. Rev. 1: Comment AddrPcsPd_ 10. [32.6] Provide details as required for a final site plan. A list of additional detail needed is included below. See final site plan checklist for more info. Rev. 1: Refer to the New Comments section below. Rev. 2: Comment addressed. a. Water and sewer details: location/dimensions of proposed easements, profiles and cross sections, top and invert elevations of each structure. b. Drainage and grading details: Profiles of all storm sewer systems, label plan view to correspond to profile view, a drainage summary table, retaining wall details. c. Street sections: typical street sections, centerline curve data, radius of curb returns or edge of pavement. d. Outdoor Lighting: photometric plan, lighting cut sheets. 11. [32.7.9.6] An area of at least 5% of the paved parking and vehicular circulation must be landscaped. Neither street trees nor shrubs planted between a parking area and a building on the site shall be counted toward the minimum area landscaped area for a parking area. Provide calculations to show this requirement is met. Rev.1: Comment not fully addressed. It appears that the Interior Landscape Area Calculation" table is trying to demonstrate compliance with this requirement. However, there is a discrepancy on the plans regarding the amount of paved parking and vehicular circulation areas being proposed. The "Parking/roads" row in the Landscape Area Calculations table lists 0.60 acres, but the Impervious Area Calculations table states 3.03 acres. The Cover Sheet states that 148,200 square feet (3.40 acres) of "parking and roadways" are proposed. Why is there a difference between these tables? The figures should match across all drawings for the total acreage/square footage of proposed parking and vehicular circulation areas in order to verify compliance with landscaping requirements. Please explain the discrepancy or amend the tables on the next submittal. a. State the quantities of each species being counted toward meeting the minimum 5%, and list the proposed overall percentage of landscaping based on square footage of planting beds. Rev. 2: Comment addressed. 12. [Comment] Additional retaining wall detail is needed to ensure plantings along walls will not impact geogrid. Rev. 1: Comment Addressed. New Comments 13. [General Comment] On the initial submittal, the plans did not label the driveway entrance as "Road B." Is this driveway now proposed to be a private street? The road may need street name approval from E911 and also meet other Albemarle County private street standards. Please clarify. Rev. 2: Comment addressed. 14. [32.5.2 (a)] Please provide the owner name, current use, and zoning district in the property label for TMP 32-6A on Sheet C2.3. Also, please amend the property label for TMP 32-6A on Sheet C2.1 and C2.2 — it is missing a "0" digit. Rev. 2: Comment addressed. 15. [32.5.2 (c)] The limits of Town Center 4 on Sheet C2.4 and other drawings runs through the access drive and parking spaces on the southern end of the development. These improvements need to be shown within the area of development across all drawings, and show the metes & bounds/dimensions of the area. Please revise the lot coverage and proposed lease area calculations and labels as necessary. Rev. 2: Comment addressed. 16. [32.5.2 (k)] A separate easement plat and associated deeds must be submitted and approved for all new easements prior to approval of the site plan amendment. Rev. 2: Comment not addressed. Refer to Comment #5 revision 2 resaonse above. 17. [32.5.2 (r)] Provide a legend that shows all symbols and abbreviations used on the plans. There is no legend explaining what each line type represents. Rev. 2: Comment addressed. 18. [32.6.1 (e)(1)] Please show the setback lines on Sheets C2.4 and C4.0. Rev. 2: Comment addressed. 19. [32.6.1 (e)(6)] All improvements, including structures, parking spaces, loading spaces, walkways, lawns/open space areas, and utilities must be labeled or symbolized with dimensions. Rev. 2: Comment addressed. 20. [32.6.1 (e)(6)] A landscape area is labeled north of Building 4 on Sheet C4.0 but no vegetation is shown on the Landscape Plan, please explain or remove the label. Rev. 2: Comment addressed. 21. [32.6.2 (i)] The parking space lines are not visible in the 17 parking space area in the Building 1 parking lot on Sheet C4.0, please adjust symbology so that each parking space is visible. Rev. 2: Comment addressed. 22. [32.7.3] Please provide a legend on Sheet 2.4 and 4.0 that identifies all HOV, motorcycle, and shuttle parking spaces. Staff cannot verify the exact number of spaces provided per type in accordance with the parking calculations given on the Cover Sheet. An example of a parking legend can be found on Sheet C-4.0 of the previous site plan minor amendment, SDP200800161. Striping and signage details for each parking space type will be required on subsequent versions of the site plan. Rev. 2: Comment addressed. 23. [General Comment] Please provide an enlarged detail of the bicycle enclosure with dimensions and materials to verify that it will accommodate 36 bikes as specified on the Cover Sheet. Rev. 2: Comment addressed. 24. [32.7.8 and 4.17] Please address the following related to site lighting: a. Please add a note to the lighting plan that states "Each outdoor luminaire equipped with a lamp that emits 3,000 or more initial lumens shall be a full cutoff luminaire and shall be arranged or shielded to reflect light away from adjoining residential districts and away from adjoining roads. The spillover of lighting from luminaires onto public roads and property in residential or rural areas zoning districts shall not exceed one-half footcandle." Rev. 2: Comment addressed. b. In the Schedule listed on Sheet SL1.0, please state the lamp type in the "Lamp" column for lamps B, C, and F. Rev. 2: Comment addressed. c. The symbology on SL1.0 is faint and overlaps with footcandle measurements and other features on the drawing. Please adjust the symbology weight so that each luminaire is visible. Staff cannot verify the locations and quantities of each light as currently shown on the plans. Rev. 2: Comment addressed. d. The symbols provided in the Schedule on Sheet SL1.0 for lamp types B and D do not appear to match those used on the actual drawing. Please amend. Rev. 2: Comment addressed. e. On Sheet SL2.0, please identify which cut sheets correspond with the four proposed luminaire types listed in the Schedule on Sheet SL1.0. There are only two luminaire details provided on Sheet SL2.0, but a detail is required for all four lights because each emits more than 3,000 lumens. Staff requests carrying over the lettering used for the labels (luminaire types B, C, D, and F) and stating which detail is for each luminaire. Rev. 2: Comment addressed. f. Please show additional photometric data along the right-of-way line of the driveway entrance along Lewis and Clark Drive. Lewis and Clark Drive is a public road and the maximum footcandles permitted is 0.5 at the property line. The measurements appear to be higher than the maximum half footcandle permitted. Relocating lights to areas further south along the driveway entrance may be necessary upon further review. Rev 2.: Comment addressed. 25. [32.7.9.4 (c) and 4.3] Please show and label all existing landscape features, and show the limits of clearing/tree cutting on the site layout drawing, grading drawings, stormwater management, and landscape plan. Rev. 2: Comment addressed. 26. [32.7.9.8 (c)(3) and 4.12.19] Please show the dimensions and materials of the proposed dumpster pad and proposed screening. Include an elevation cut -sheet detail showing all sides of the dumpster pad area and screening materials. If any landscaping is proposed around the dumpster, show the vegetation on Sheet L1.0 and update the proposed quantities of plant material as necessary. Rev. 2: Comment addressed. 27. [32.7.9.8] Please add a row to the Tree Canopy Calculations table on Sheet L1.0 stating the proposed acreage of the site (6.52 acres) and another row stating the minimum tree canopy acreage required (0.652 acres). Rev. 2: Comment addressed. 28. [32.7.7.9 (c)] Please add a note to the landscape plan that states "All landscaping and screening shall be maintained in a healthy condition by the current owner or property owners' association and replaced when necessary. Replacement material shall comply with the approved landscape plan." Rev. 2: Comment addressed. 29. [32.7.9] Please address the following related to landscaping: a. [General Comment] What do the two dashed line types inside the building footprint represent on Sheet L1.0? Rev. 2: Comment addressed. b. [General Comment] Please adjust the tree symbology so that it is darker on Sheet L1.0. Rev. 2: Comment addressed. c. [General Comment] The Otto Luyken Laurel and Variegated Liriope vegetation shown in the Landscape Legend on Sheet L1.0 are not used on the drawings and the quantity states "0." Please explain or remove these items from the Legend if they will not be installed. Rev. 2: Comment addressed. d. [General Comment] In the Landscape Legend, please move the 4'-0" O.C. note next to Variegated Liriope up two rows to the Willowleaf Cottoneaster row since the label for this feature states they will be installed 4' on center. Rev. 2: Comment addressed. e. [General Comment] What is the black square shown under the tree symbols for some of the trees located around the building on Sheet L1.0? Rev. 2: Comment addressed. 30. [General Comment] Please amend the Loading Spaces calculations in the tables on Sheet C1.0 and C4.0. The total spaces required and provided do not match between the two sheets. Please be sure tc say that two (2) loading spaces will be provided as part of this site plan amendment. Also, since the tables states the overall square footage of buildings per Building 1 and Building 4 to calculate the overall parking required, please add a line to each table stating that 4 loading spaces are already provided in the Building 1 parking lot. Staff conducted a site visit and verified that four loading spaces exist next to the Building 1 dumpster. 31. [32.5.2 (i)] Please provide the deed book and page number for the instrument that created Research Park Drive, and include the type of easement in the label across all drawings. 32. [32.7.9.6 (b)] Please amend the Landscape Calculations table on Sheet L1.0. With the new total of 567 parking spaces across both parking lots, a total of 57 trees are required in the parking lot. Staff counts 65 trees in the Building 4 parking lot alone that qualify toward meeting this requirement. Please update the table to reflect the total trees required and the total provided toward meeting the minimum requirement. Please contact Cameron Langille in the Planning Division by using blangille@albemarle.org or 434-296-5832 ext. 3432 for further information. Albemarle County Service Authority — Alex Morrison, amorrison@serviceauthority.org — See Recommendation: 1. Conditional approval pending receipt of final written approval from RWSA for the Wastewater Capacity Certification. RWSA has granted conditional approval of the Capacity Certification. ACSA signature on the site plan amendment is contingent on receiving the Capacity Certification in writing from RWSA. Rivanna Water and Sewer Authority —Victoria Fort, vfort@rivanna.org — Requested Changes: RWSA will require a wastewater flow capacity certification for this project since the overall development exceeds 40,000 gallons of sewage production per day. Rev. 2: Response to revision2 not yet received from RWSA. Any comments or approvals will be forwarded upon receipt. Albemarle County Engineering Service — Bobby Jocz, riocz@albemarle.org — See Recommendation: Site plan approval is contingent upon WPO approval. The WPO cannot be approved until the easement plat has been approved and recorded and easements are labeled with deed book and page on the site plan. Albemarle County Department of Fire Rescue — Robbie Gilmer, rgilmer@albemarle.org — No Objection Albemarle County Zoning — Ron Higgins, rhiggins@albemarle.org— Approved 1. 1 have reviewed the April 17, 2017 parking analysis and TDM reduction measures submitted by Wooley Engineering and hearby approve the parking reduction from 717 spaces to 567 spaces, a reduction of 20.9%, for buildings one and four of the UVA Research Park Town Center. Cameron Langille From: Cameron Langille Sent: Monday, April 03, 2017 3:06 PM To: 'Sarah Friend Gerke' Subject: RE: SDP 201600051 UVA Research Park Town Center Four Hi Sarah, I apologize for taking the delay in my response, I was out sick on Friday. Comment #11— the attachment appears to identify the correct landscaped areas for the 5% parking/circulation landscaping required by Section 32.7.9.6. Typically we require the site plan to show the locations of all shrubs and trees that are proposed within the planting beds that will count toward meeting the minimum 5% since this is what the Code calls for in Section 32.7.9.6 (a). It looks like only trees are shown on the attachment you sent. You can either show the locations of the additional shrubs and trees on the drawing, or provide a list that identifies what species and quantities of plants are proposed in certain areas. My biggest concern is the triangular shaped central median area that contains seven trees. I imagine that shrubs will also be planted in that area due to its size, and if so please show that on the next submission of this site plan. Comment #22 — I apologize for the confusion regarding the wording of this one. What I meant was that on any future amendments to this site plan, we will ask for a legend of some sort that identifies where each type of parking space is located in case they get moved around for some reason. Just to be clear, I will still need to see where each parking type is located on the next submission for this current amendment as well. Comment #5 — My mention of stormwater easements in this comment was intended to just be a reminder to show those items on the easement plat for the site. I wanted to make sure I mentioned to include all easement types (water, sewer, stormwater, etc.) For specific questions related to identifying stormwater easements as public vs. private, it would be best to contact the Engineering Division since they review everything that falls under the Water Protection Ordinance. Cameron From: Sarah Friend Gerke [mailto:sfriend@woolley-eng.com] Sent: Friday, March 31, 2017 9:58 AM To: Cameron Langille <blangille@albemarle.org> Subject: SDP 201600051 UVA Research Park Town Center Four Good morning - I would like some clarification on a few site plan comments dated February 27,2017 for the Town Center Four project. For comment #11, regarding the 5% of parking/circulation, we have calculated the square footage of planting beds within the lease line but have excluded any area that could be counted as street tree areas or trees between the building and the parking lot. I have attached an exhibit which shows the proposed lease line in pink and what I saw as the applicable planting beds for this calculation. The planting beds for this method totaled 0.64 acres, or 21% of the site. Is this the correct method to satisfy the comment? Do we have to provide a separate list of trees and shrubs which are planted in these beds besides what is illustrated on the plan and separate from the legend? For comment #22 it states that striping and signage details for each parking space type will be required on "subsequent" versions of this site plan. We are planning to include a legend which will differentiate parking types with the next submission. When does the term "subsequent" apply? Would we need to also include signage details in the next submission or is this a reminder for future site plan submissions? For comment #5 we would also like some clarification about private easements for stormwater. If you have a few minutes today we would appreciate if you could call us to discuss more about this requirement (434) 973-0045. Thanks, Sarah Friend Gerke, EIT I WOOLLEY ENGINEERING 220 East High Street Charlottesville, VA 22902 1 (434) 973-0045 sfriend@woolley-eng.com www.woolley-eng.com DISCLAIMER: This communication and any files or attachments transmitted with it may contain information that is confidential, privileged and exempt from disclosure under applicable law. It is intended solely for the use of the individual or the entity to which it is addressed. If you are not the intended recipient, you are hereby notified that any use, dissemination, or copying of this communication is strictly prohibited. If you have received this communication in error, please contact the sender at once so appropriate action can be taken, and destroy any such copies. Cameron Langille From: Cameron Langille Sent: Tuesday, March 14, 2017 12:38 PM To: 'Alexander Morrison' Cc: Rachel Falkenstein Subject: RE: SDP2016051: UVA Research Park - Town Center 4 No problem, Alex. Thanks! From: Alexander Morrison [mailto:amorrison@serviceauthority.org] Sent: Tuesday, March 14, 2017 12:37 PM To: Cameron Langille <blangille@albemarle.org> Cc: Rachel Falkenstein <rfalkenstein@albemarle.org> Subject: RE: SDP2016051: UVA Research Park - Town Center 4 Thanks for letting me know. I thought we had talked before but I am working through my backlog of plans and wanted to send something over. I will let you know once they are approved. Alexander J. Morrison, P.E. Civil Engineer Albemarle County Service Authority 168 Spotnap Road Charlottesville, Virginia 22911 (0) 434-977-4511 Ext. 116 (C) 434-981-5577 (F) 434-979-0698 From: Cameron Langille [mailto:blangille@albemarle.org] Sent: Tuesday, March 14, 2017 12:35 PM To: Alexander Morrison Cc: Rachel Falkenstein Subject: RE: SDP2016051: UVA Research Park - Town Center 4 Hi Alex, I sent comments to the engineer, Eric Wooley, on February 27th. For the ACSA comment I put "Under Construction Plan Review by the ACSA. Final Site Plan approval through the ACSA is contingent on construction plan review approval." Please keep me updated in regard to when the construction plan review is approved by ACSA and I will inform the applicant. From: Alexander Morrison[mailto:amorrison@serviceauthority.org] Sent: Tuesday, March 14, 2017 12:10 PM To: Cameron Langille <blangille@albemarle.org> Cc: Rachel Falkenstein <rfalkenstein@albemarle.org> Subject: SDP2016051: UVA Research Park - Town Center 4 Cameron, The above referenced plan is still under construction plan review by the ACSA. I will recommend approval once the ACSA grants construction approval for the proposed utilities. Alexander J. Morrison, P.E. Civil Engineer Albemarle County Service Authority 168 Spotnap Road Charlottesville, Virginia 22911 (0) 434-977-4511 Ext. 116 (C) 434-981-5577 (F) 434-979-0698 Phone 434-296-5832 County of Albemarle Department of Community Development 401 McIntire Road, Charlottesville, VA, 22902 Memorandum To: Eric Woolley, P.E. (ewoolley@woolley-eng.com) From: Cameron Langille, Senior Planner Division: Planning Date: October 4, 2016 Rev. 1: February 27. 2017 (and NEW Comments Fax 434-972-4126 Subject: SDP 201600051 UVA Research Park Town Center Four— Major Site Plan Amendment The County of Albemarle Planning Division will recommend approval of the plan referenced above once the following comments have been satisfactorily addressed (The following comments are those that have been identified at this time. Additional comments or conditions may be added or eliminated based on further review.): [Each comment is preceded by the applicable reference, which is to the Subdivision/Zoning Ordinances unless otherwise specified.] Comments from Letter dated October 4. 2016: [Comment] This is a major site plan amendment covering Town Centers 3 & 4. The expectation for this site plan is to show all improvements that have been built and approved through previous site plan approvals. Include a sheet or sheets showing the overall site plan for both buildings that incorporates all previous changes to the site approved through previous site plans or amendments. Rev. 1: Comment not fully addressed. The Research Park Total Buildout Statistics in Note 13 on the Cover Sheet appear to be inaccurate in terms of the acreage, development square footage, and total remaining columns — the calculations do not match the "Completed" numbers shown in the table above. Please explain or recalculate the figures. Staff suggests providing a project narrative on the Cover Sheet to identify the site plans and amendments that correspond to all improvements and buildings that have been previously approved and constructed. An example of this can be found on Sheet C-4.0 from the previous site plan minor amendment, SDP200800161, which pertained to Town Center buildings Three and Four. [32.5.2(a)] Provide property owner, zoning district, TMP and use of abutting parcels. Rev. 1: Comment Addressed. [32.5.2(b)] Zoning approval is required for reduced parking amounts proposed. Zoning comments, if any, will be forwarded upon receipt. Rev. 1: Comment not fully addressed. The County has not approved a reduction in the number of required parking spaces. The "Traffic Demand Management Reductions" as shown on the Cover Sheet can only be approved once a Transportation Demand Management study/report is formally submitted, reviewed and approved by the Zoning Administrator. Please reference Sections 4.12.2 (c) and 4.12.12 for additional information. You may contact Ron Higgins, Chief of Zoning/Deputy Administrator, at 434-296-5832 ext. 3225 or rhiggins@albemarle.org with additional questions related to this matter. a. The Cover Sheet states that a waiver has been approved to reduce the required amount of loading spaces. Staff cannot find a record of a previously approved waiver to reduce the required number of loading spaces. Please either submit evidence of a previously approved waiver or submit a waiver reauest to the Zoning Administrator. 4. [32.5.2 d] Identify acreage of proposed disturbance of preserved slopes and confirm that no additional areas of preserved slopes are being disturbed than was previously approved with SDP2006-113 critical slopes waiver (0.07 acres previously approved for disturbance). Rev. 1: Comment Addressed. [32.5.2(k)] Verify that all necessary easements for proposed water, sewer and drainage facilities have been shown on the plan. Show and label existing and proposed easements on utility plan sheet and indicate if any easements are to be dedicated to public use. Rev. 1: Comment not fully addressed. Please label the utility easements on all the utility drawings where visible. State the width of the easement, type (i.e. water, sewer, stormwater, etc) and whether it is public or private. All water and sewer facilities to be dedicated to public use and the easements for those facilities and shall be identified by a statement that the facilities are to be dedicated to the Albemarle Countv Service Authority. Please include this language on the next submittal for all public water and sewer easements. For private easements. the owners need to be listed in the easement label (drai stormwater. etc.) Please refer to Comment #16 below for additional reauirements. 6. [32.5.1(n)] Provide height of proposed building. Rev. 1: Comment not fully addressed. The Cover Sheet states that Building Four is proposed to be 61' in height. All structures exceeding 40' or three stories in height in PDIP must meet the required zoning stepbacks as stated in Section 26.4 and 4.20. Please state the stepbacks on the Cover Sheet. The Countv will reauire that the building plans. when submitted, demonstrate compliance with the stepback requirements. 7. [32.5.1(n)] Provide height of proposed lighting fixtures. Rev. 1: Please revise the "Lighting Locations" table title on Sheet SL1.0 to state "Luminaire Mounting Heights." The table does not give any details related to light locations, and the "MH" column does not make it clear that the numbers given mean the mounting height of each light. 8. [32.5.1(n)] Provide more details on retaining walls. Label maximum height of each wall individually. Rev. 1: Comment not fully addressed. Please provide a callout to the retaining wall along the trail on the drawings. 9. [32.5.1(n)] Provide proposed paving materials for walks, parking lots, driveways. Rev. 1: Comment Addressed. 10. [32.6] Provide details as required for a final site plan. A list of additional detail needed is included below. See final site plan checklist for more info. Rev. 1: Refer to the New Comments section below. a. Water and sewer details: location/dimensions of proposed easements, profiles and cross sections, top and invert elevations of each structure. b. Drainage and grading details: Profiles of all storm sewer systems, label plan view to correspond to profile view, a drainage summary table, retaining wall details. c. Street sections: typical street sections, centerline curve data, radius of curb returns or edge of pavement. d. Outdoor Lighting: photometric plan, lighting cut sheets. 11. [32.7.9.6] An area of at least 5% of the paved parking and vehicular circulation must be landscaped. Neither street trees nor shrubs planted between a parking area and a building on the site shall be counted toward the minimum area landscaped area for a parking area. Provide calculations to show this requirement is met. Rev.1: Comment not fully addressed. It appears that the Interior Landscape Area Calculation" table is trying to demonstrate compliance with this requirement. However, there is a discrepancy on the plans regarding the amount of paved parking and vehicular circulation areas being proposed. The "Parking/roads" row in the Landscape Area Calculations table lists 0.60 acres, but the Impervious Area Calculations table states 3.03 acres. The Cover Sheet states that 148,200 square feet (3.40 acres) of "parking and roadways" are proposed. Why is there a difference between these tables? The figures should match across all drawings for the total acreage/square footage of proposed parking and vehicular circulation areas in order to verify compliance with landscaping requirements. Please explain the discrepancy or amend the tables on the next submittal. a. State the quantities of each species being counted toward meeting the minimum 5%, and list the proposed overall percentage of landscaping based on square footage of planting beds. 12. [Comment] Additional retaining wall detail is needed to ensure plantings along walls will not impact geogrid. Rev. 1: Comment Addressed. New Comments 13. [General Comment] On the initial submittal, the plans did not label the driveway entrance as "Road B." Is this driveway now proposed to be a private street? The road may need street name approval from E911 and also meet other Albemarle County private street standards. Please clarify. 14. [32.5.2 (a)] Please provide the owner name, current use, and zoning district in the property label for TMP 32-6A on Sheet C2.3. Also, please amend the property label for TMP 32-6A on Sheet C2.1 and C2.2 — it is missing a "0" digit. 15. [32.5.2 (c)] The limits of Town Center 4 on Sheet C2.4 and other drawings runs through the access drive and parking spaces on the southern end of the development. These improvements need to be shown within the area of development across all drawings, and show the metes & bounds/dimensions of the area. Please revise the lot coverage and proposed lease area calculations and labels as necessary. 16. [32.5.2 (k)] A separate easement plat and associated deeds must be submitted and approved for all new easements prior to approval of the site plan amendment. 17. [32.5.2 (r)] Provide a legend that shows all symbols and abbreviations used on the plans. There is no legend explaining what each line type represents. 18. [32.6.1 (e)(1)] Please show the setback lines on Sheets C2.4 and C4.0. 19. [32.6.1(e)(6)] All improvements, including structures, parking spaces, loading spaces, walkways, lawns/open space areas, and utilities must be labeled or symbolized with dimensions. 20. [32.6.1 (e)(6)] A landscape area is labeled north of Building 4 on Sheet C4.0 but no vegetation is shown on the Landscape Plan, please explain or remove the label. 21. [32.6.2 (i)] The parking space lines are not visible in the 17 parking space area in the Building 1 parking lot on Sheet C4.0, please adjust symbology so that each parking space is visible. 22. [32.7.3] Please provide a legend on Sheet 2.4 and 4.0 that identifies all HOV, motorcycle, and shuttle parking spaces. Staff cannot verify the exact number of spaces provided per type in accordance with the parking calculations given on the Cover Sheet. An example of a parking legend can be found on Sheet C-4.0 of the previous site plan minor amendment, SDP200800161. Striping and signage details for each parking space type will be required on subsequent versions of the site plan. 23. [General Comment] Please provide an enlarged detail of the bicycle enclosure with dimensions and materials to verify that it will accommodate 36 bikes as specified on the Cover Sheet. 24. [32.7.8 and 4.17] Please address the following related to site lighting: a. Please add a note to the lighting plan that states "Each outdoor luminaire equipped with a lamp that emits 3,000 or more initial lumens shall be a full cutoff luminaire and shall be arranged or shielded to reflect light away from adjoining residential districts and away from adjoining roads. The spillover of lighting from luminaires onto public roads and property in residential or rural areas zoning districts shall not exceed one-half footcandle." b. In the Schedule listed on Sheet SL1.0, please state the lamp type in the "Lamp" column for lamps B, C, and F. c. The symbology on SL1.0 is faint and overlaps with footcandle measurements and other features on the drawing. Please adjust the symbology weight so that each luminaire is visible. Staff cannot verify the locations and quantities of each light as currently shown on the plans. d. The symbols provided in the Schedule on Sheet SL1.0 for lamp types B and D do not appear to match those used on the actual drawing. Please amend. e. On Sheet SL2.0, please identify which cut sheets correspond with the four proposed luminaire types listed in the Schedule on Sheet SL1.0. There are only two luminaire details provided on Sheet SL2.0, but a detail is required for all four lights because each emits more than 3,000 lumens. Staff requests carrying over the lettering used for the labels (luminaire types B, C, D, and F) and stating which detail is for each luminaire. f. Please show additional photometric data along the right-of-way line of the driveway entrance along Lewis and Clark Drive. Lewis and Clark Drive is a public road and the maximum footcandles permitted is 0.5 at the property line. The measurements appear to be higher than the maximum half footcandle permitted. Relocating lights to areas further south along the driveway entrance may be necessary upon further review. 25. [32.7.9.4 (c) and 4.3] Please show and label all existing landscape features, and show the limits of clearing/tree cutting on the site layout drawing, grading drawings, stormwater management, and landscape plan. 26. [32.7.9.8 (c)(3) and 4.12.19] Please show the dimensions and materials of the proposed dumpster pad and proposed screening. Include an elevation cut -sheet detail showing all sides of the dumpster pad area and screening materials. If any landscaping is proposed around the dumpster, show the vegetation on Sheet L1.0 and update the proposed quantities of plant material as necessary. 27. [32.7.9.8] Please add a row to the Tree Canopy Calculations table on Sheet L1.0 stating the proposed acreage of the site (6.52 acres) and another row stating the minimum tree canopy acreage required (0.652 acres). 28. [32.7.7.9 (c)] Please add a note to the landscape plan that states "All landscaping and screening shall be maintained in a healthy condition by the current owner or property owners' association and replaced when necessary. Replacement material shall comply with the approved landscape plan." 29. [32.7.9] Please address the following related to landscaping: a. [General Comment] What do the two dashed line types inside the building footprint represent on Sheet L1.0? b. [General Comment] Please adjust the tree symbology so that it is darker on Sheet 1-1.0. c. [General Comment] The Otto Luyken Laurel and Variegated Liriope vegetation shown in the Landscape Legend on Sheet 1-1.0 are not used on the drawings and the quantity states "0." Please explain or remove these items from the Legend if they will not be installed. d. [General Comment] In the Landscape Legend, please move the 4'-0" O.C. note next to Variegated Liriope up two rows to the Willowleaf Cottoneaster row since the label for this feature states they will be installed 4' on center. e. [General Comment] What is the black square shown under the tree symbols for some of the trees located around the building on Sheet L1.0? Please contact Cameron Langille in the Planning Division by using blangille@albemarle.org or 434-296-5832 ext. 3432 for further information. Albemarle County Service Authority — Alex Morrison, amorrison@serviceauthority.org — Requested Changes: 1. Under Construction Plan Review by the ACSA. Final Site Plan approval through the ACSA is contingent on construction plan review approval. Rivanna Water and Sewer Authority — Victoria Fort, vfort@rivanna.org — Requested Changes: 1. RWSA will require a wastewater flow capacity certification for this project since the overall development exceeds 40,000 gallons of sewage production per day. Virginia Department of Transportation — Adam Moore, adam.moore@vdot.virginia.gov — Requested Changes, See Attached Albemarle County Engineering Service — Bobby Jocz, riocz@albemarle.org — Requested Changes, See Attached Albemarle County Department of Fire Rescue — Robbie Gilmer, rgilmer@albemarle.org — Requested Changes, See Attached Cameron Langille From: Alexander Morrison <amorrison@serviceauthority.org> Sent: Thursday, February 23, 2017 7:45 AM To: Cameron Langille Subject: RE: SDP201600151 - UVA Research Park Town Center 4 - Major Site Plan Amendment For the ACSA response just put "Under Construction Plan Review by the ACSA. Final Site Plan approval through the ACSA is contingent on construction plan review approval." Alexander J. Morrison, P.E. Civil Engineer Albemarle County Service Authority 168 Spotnap Road Charlottesville, Virginia 22911 (0) 434-977-4511 Ext. 116 (C) 434-981-5577 (F) 434-979-0698 From: Cameron Langille [mailto:blangille@albemarle.org] Sent: Wednesday, February 22, 2017 5:45 PM To: Alexander Morrison Subject: RE: SDP201600151 - UVA Research Park Town Center 4 - Major Site Plan Amendment Thanks for getting back to me, Alex. Should I go ahead and send the other reviewer comments and just let the applicant know that ACSA will grant approval to the final site plan once those construction drawings are approved by you guys? Or should I tell the applicant that comments from ACSA will be forthcoming? From: Alexander Morrison [mailto:amorrison@serviceauthority.org] Sent: Friday, February 17, 2017 7:24 AM To: Cameron Langille <blangille@albemarle.org> Subject: RE: SDP201600151 - UVA Research Park Town Center 4 - Major Site Plan Amendment Cameron, The plan is currently under construction plan review by Michael Vieira at the ACSA. Once construction approval is granted for the utilities I will recommend approval of the major amendment. Alexander J. Morrison, P.E. Civil Engineer Albemarle County Service Authority 168 Spotnap Road Charlottesville, Virginia 22911 (0) 434-977-4511 Ext. 116 (C) 434-981-5577 (F) 434-979-0698 From: Cameron Langille [mailto:blangille@albemarle.org] Sent: Thursday, February 16, 2017 5:07 PM To: Alexander Morrison Subject: SDP201600151 - UVA Research Park Town Center 4 - Major Site Plan Amendment Hi Alex, Have you had a chance to review this site plan? I am preparing the comment letter and I don't think I've received anything from ACSA yet. Rachel was the original reviewer of this plan so you might have sent your comments to her, but I am taking it over while she is out on maternity leave. Keep me posted if you need more time! Thanks, Cameron Langille Senior Planner Albemarle County 401 McIntire Road Charlottesville, VA 22902 Ph: 434-296-5832 ext. 3432 blangille(u-albemarle.org COMMONWEALTH of VIRGINIA DEPARTMENT OF TRANSPORTATION 1601 Orange Road Culpeper, Virginia 22701 Charles A. Kilpatrick, P.E. Commissioner February 1, 2017 County of Albemarle Department of Community Development 401 McIntire Road Charlottesville, VA 22902 Attn: Rachel Falkenstein Re: UVA Research Park- Major Amendment to Final Site Plan SDP -2016-00051 Review #2 Dear Ms. Falkenstein: The Department of Transportation, Charlottesville Residency Transportation and Land Use Section, has reviewed the above referenced plan as submitted by Woolley Engineering, dated August 22, 2016, revised January 17, 20, 2017 and find it to be generally acceptable. A VDOT Land Use Permit will be required prior to any work within the right-of-way. The owner/developer must contact the VDOT Charlottesville Residency Land Use Section at (434) 422-9399 for information pertaining to this process. Sincerely, 0dXtA- fit— Adam J. Ne re, P.E. Area Land Use Engineer Culpeper District VirginiaDOT.org WE KEEP VIRGINIA MOVING Review Comments for SDP201600051 11nitial Site Plan Project Name: UA of Va_ Research Park Town Center Four - Initial Date Completed: Monday, February 06, 2017 Department1DivisionfAgency: Review Sys: Bob Jacz E1 CBD En ineerin Requested Changes Reviewer: b]+ 9 9 Comments for Plans Dated January 20th, 2017 1_ [General] WPO submittal will need to be approved before final site plan approval_ —Acknowledged _ [C4.0] Provide roadway signs and pavement markings_ Ensure that one way roadways are clearly marked 3_ [C4.0] Provide dimensions for handicap parking spaces, loading spaces, and for parallel spaces adjacent to travel ways_ 4_ [C4.0] Minimum radius for turnaround/cul-de-sac for mixed/commercial land use is 45'_ Please revise turnaround located on southeast portion of property to reflect [Design manual Chapter T]- 6- [C4.0] Ensure crosswalks are placed at all pedestrian crossings including trails [Design manual Chapter 7 section H]_ 6_ [C4.0] Clarify details of pathway located to the south of the central parking lot (the lot containing stormater structures 94 and 95)_ What is this path made of? What is the width of the path? Is this path to provide main pedestrian access to the parking lots and trails to the west of the property? If so, are crosswalks needed to cross parking areas? 7_ [C4.0] Provide dimensions and pad detail for dumpster_ Provide details on curbing that will allow access to dumpster pad, if different from standard CG -6- 8- [C5.0] Provide height (top of wall, bottom of wall) for 'segmented block retaining wall° located adjacent to the sidewalk near the site entrance_ 9_ [C6.0] Provide drainage computations_ This includes curb inlet compLitations for ally curb inlets oil gradelsLimp. ditch computations for any ditches to prove adequate channel linings are provided for storm,,vater discharge and OLItlet protection computations ensuring proposed changes to stormsewer system does not ovepr5rhelm current OLItfall protection 10_ [C6.0] Provide grate type for drop inlets_ 11_ [C6.0] ensure concrete inlet shaping (I-1) is specified on any structure with a 4: or greater drop and safety slabs (L-1) are included for any structure taller than 12'_ 1_ [C6.3-6.4] All proposed stormsewer are to be designed within open channel flow capacities, it appears that some pipe segments may experience pressurized flow_ 13_ [C7.1] Provide engineering detail for-Freegrates°_ 14_ [L1.0-2.0] Provide details for management of slopes greater than 3:1. Slopes steeper than 3:1 must be permanently stabilized with landscaping vegetation hardier than grass, which }r5,ill not require mo}xing [Design manual Chapter 8]_ Page: County of Albemarle Printed On: F02—)1512017 Review Comments for SDP201600051 11nitial Site Plan Project Name: UA of Va_ Research Park Town Center Four - Initial Date Completed: Tuesday, February 07, 2017 Department1DivisionfAgency: Review Sys: Reviewer: Robbie Gilmer Fire Rescue I Requested Changes Based on plans dated 1120117- 1 _ Hydrant spacing shall be 400' per travel way, not a 400' radius_ Page: County of Albemarle Printed On: 021512017 County of Albemarle Department of Community Development 401 McIntire Road, Charlottesville, VA, 22902 Phone 434-296-5832 Fax 434-972-4126 Memorandum To: Eric Woolley, P.E. (ewoolley@woolley-eng.com) From: Rachel Falkenstein, Senior Planner Division: Planning Date: October 4, 2016 Subject: SDP 201600051 UVA Research Park Town Center Four — Major Site Plan Amendment The County of Albemarle Planning Division will recommend approval of the plan referenced above once the following comments have been satisfactorily addressed (The following comments are those that have been identified at this time. Additional comments or conditions may be added or eliminated based on further review.): [Each comment is preceded by the applicable reference, which is to the Subdivision/Zoning Ordinances unless otherwise specified.] 1. [Comment] This is a major site plan amendment covering Town Centers 3 & 4. The expectation for this site plan is to show all improvements that have been built and approved through previous site plan approvals. Include a sheet or sheets showing the overall site plan for both buildings that incorporates all previous changes to the site approved through previous site plans or amendments. 2. [32.5.1(a)] Provide property owner, zoning district, TMP and use of abutting parcels. 3. [32.5.1(b)] Zoning approval is required for reduced parking amounts proposed. Zoning comments, if any, will be forwarded upon receipt. 4. [32.5.2 d] Identify acreage of proposed disturbance of preserved slopes and confirm that no additional areas of preserved slopes are being disturbed than was previously approved with SDP2006-113 critical slopes waiver (0.07 acres previously approved for disturbance). 5. [32.5.2(k)] Verify that all necessary easements for proposed water, sewer and drainage facilities have been shown on the plan. Show and label existing and proposed easements on utility plan sheet and indicate if any easements are to be dedicated to public use. 6. [32.5.1(n)] Provide height of proposed building. 7. [32.5.1(n)] Provide height of proposed lighting fixtures. 8. [32.5.1(n)] Provide more details on retaining walls. Label maximum height of each wall individually. 9. [32.5.1(n)] Provide proposed paving materials for walks, parking lots, driveways. 10. [32.6] Provide details as required for a final site plan. A list of additional detail needed is included below. See final site plan checklist for more info. a. Water and sewer details: location/dimensions of proposed easements, profiles and cross sections, top and invert elevations of each structure. b. Drainage and grading details: Profiles of all storm sewer systems, label plan view to correspond to profile view, a drainage summary table, retaining wall details. c. Street sections: typical street sections, centerline curve data, radius of curb returns or edge of pavement. d. Outdoor Lighting: photometric plan, lighting cut sheets. 11. [32.7.9.6] An area of at least 5% of the paved parking and vehicular circulation must be landscaped. Neither street trees nor shrubs planted between a parking area and a building on the site shall be counted toward the minimum area landscaped area for a parking area. Provide calculations to show this requirement is met. 12. [Comment] Additional retaining wall detail is needed to ensure plantings along walls will not impact geogrid. Please contact Rachel Falkenstein in the Planning Division by using rfalkenstein@albemarle.org or 434-296- 5832 ext. 3272 for further information. Charles A. Kilpatrick, P.E. Commissioner COMMONWEALTH of VIRGINIA DEPARTMENT OF TRANSPORTATION 1501 Orange Road Culpeper, Virginia 22701 September 21, 2016 County of AIbemarle Department of Community Development 401 McIntire Road Charlottesville, VA 22902 Attn: Rachel Falkenstein Re: UVA Research Park- Major Amendment to Final Site Plan SDP -20I6-00051 Review #1 Dear Ms. Falkenstein: The Department of Transportation, Charlottesville Residency Transportation and Land Use Section, has reviewed the above referenced plan as submitted by Woolley Engineering, dated August 22, 2016 and offers the following comments: Land Use 1. Plan sheet# C4.0, indicates 350'+ sight distance the required distance for a four lane (divided) major collector road (Lewis & Clark) is 480'right and 415' left for sight distance,( see Appendix F, page 34). Please provide plan and profile to ensure there is adequate sight distance at the proposed entrance. Please provide two copies of the revised plan along with a comment response Ietter. If further information is desired, please contact Willis C. Bedsaul at 434-422-9866. A VDOT Land Use Permit will be required prior to any work within the right-of-way. The owner/developer must contact the VDOT Charlottesville Residency Land Use Section at (434) 422-9399 for information pertaining to this process Sincerely, Adam J. M ore, P.E. Area Land Use Engineer Culpeper District