Loading...
HomeMy WebLinkAboutWPO201600048 Bond Estimates 2016-10-06Project Name: North Pointe Sanitary Sewer Extension WPO file number: WP0201600048 Erosion and Sediment Control Bond Estimate Item Item Number stablization (PS, TS) silt fence (SF) safety fence (SAF) diversion (DD, FD, RWD) temporary slope drain (TSD) pipe length 0 ft pipe diameter 0 in earthwork for trap/basin 0 ft width 0 ft height of dam at toe 0 ft cut at high side 0 ft height of fill at face 0 ft cut at face 0 ft length of dam 0 ft length of cut 0 ft top width 0 ft width of cut 0 ft (area above transition) 0 sf (area below transition) 0 sf (total width of dam) 0 ft (total width of cut) 0 ft (height below transition) 0 ft (depth below transitior 0 ft (area below transition) 0 sf (area above transition 0 sf (total fill volume) 0.0 cy (total fill volume) 0.0 cy length of spillway 0 ft (TOAL CY estimate) 0 cy width of spillway 0 ft (spillway stone tons) 0 tons structures for basin riser height 0 ft riser diameter 0 in (riser unit price) $0.00 barrel length 0 ft base plate or fdn 0 barrel diameter 0 in (barrel unit price) $0.00 barrel collars 0 baffle length 0 ft silt fence inlet protection (I P) stone inlet protection (IP) outlet protection (OP) length 0 ft width 0 ft channel (SCC, matted) length 0 ft width 0 ft check dam depth in channel 0 ft channel width 0 ft construction entrance (CE) $600.00 0 $0.00 $0.00 wash rack $0.00 0 $0.00 $0.00 paved construction entrance $6,000.00 3 $2,000.00 $6,000.00 rip -rap, placed depth 0 ft length 0.0 ft width 0.0 (tons) 0 tons survey and layout (price per 0.1 mi.) acres 4 traps and basins 0 mobilization stream crossing (computed independently) No. Unit Unit Cost Cost installed 4.3 acres $5,000.00 $21,500.00 1050.0 ft $5.00 $5,250.00 0.0 ft $5.00 $0.00 0 ft $13.00 $0.00 $0.00 $0.00 $13.00 $0.00 $50.00 $0.00 $2,000.00 $500.00 $0.00 cost sum $41,850.00 contingency $4,185.00 Total $46,040 10/6/2016 $0.00 $200.00 $0 $0.00 $200.00 $0 $50.00 $0 0 $100.00 $0.00 3 $200.00 $600.00 0 $0.00 $0.00 $0.00 0 $0.00 $0.00 3 $2,000.00 $6,000.00 3 $2,000.00 $6,000.00 0 $3,500.00 $0.00 $60.00 $0.00 $2,000.00 $500.00 $0.00 cost sum $41,850.00 contingency $4,185.00 Total $46,040 10/6/2016 Approximate Earthwork computations for sed Assumes all out and fill slopes are 2:1 for simplicty Height of Fill at Face I h1 Cut at High Side h2 transitic w h1 Width of Cut Cut at Fa Fill area above transition = hl(2h1) + hl(w) Fill area below transition; total width of fill (dam) = 2h1 + w + 2h2 height below transition = h2 -h1, area = (width*height)/2 - height x height Length of Cut liment traps and basins Width m point \ Height of Dam at Toe h2 ice Volume= Length of Fill x Fill Area Cut Areas and Volume is the same as fill but using the cut dimensions Fill for Dam (imately) Approximate Earthwork computations for sediment traps and basins Assumes all cut and fill slopes are 2:1 for simplicty Top Width Height of Fill at Face vv h1 Cut at High Side h2 transition point w h1 Width of Cut Cut at Face Fill area above transition = h1(2h1) + hl (w) Fill area below transition; total width of fill (dam) = 2h1 + w + 2h2 height below transition = h2 -h1, area = (width height)/2 - height x height Length of Cut Height of Dam at Toe . h2 Volume= Length of Fill x Fill Area Cut Areas and Volume is the same as fill but using the cut dimensions Fill for Dam (imately)