HomeMy WebLinkAboutSUB200800115 Bond Release 2016-10-07ALAN FRANKLIN PE, LLC
Civil Engineering, Site Planning, and Land Development Consulting
July 25, 2016
Mr. Frank Pohl
County Engineer
County of Albemarle
Department of Community Development
401 McIntire Road
Charlottesville, VA 22902
RE: Wickham Pond Phase II - Block I Subdivision Roads As -Built Certification
Dear Frank,
This letter is to document and certify the proper installation of subdivision roads and associated
development improvements for Wickham Pond Phase II - Block I.
have reviewed the "as -built" road, water, sanitary sewer, and storm sewer survey data/plans provided
by Lincoln Surveying. Additionally, I have visited the site to evaluate the condition of the installed
development infrastructure and have performed a comparative analysis of the As -Built Plans against
the approved Final Site Development Plans/Subdivision Road Plans. The road alignments, road grades
and widths, curb and gutters, sidewalks, driveway cuts, signs, drainage structures, site retaining walls,
playgrounds, and site/street landscaping have been constructed or installed in accordance with the
approved plans. VDOT inspectors have identified all damaged or substandard infrastructure within the
right-of-way of the streets to be adopted into the State system and repairs have been made to the
satisfaction of the inspectors. Final asphalt surface paving has been installed and nearly all of the
approved residential units have been constructed. All stormwater management measures have been
installed and all temporary erosion control measures have been removed.
Other development improvements such as waterlines and sanitary sewer, which are buried, have been
surveyed and any variations from design are documented on the as -built plans. This letter does not
speak to the condition of the installed storm piping, waterlines, sanitary sewer, or pavement
subgrade/base as I was not present during the installation of these items. An Albemarle County Service
Authority (ACSA) inspector was present during water and sewer line installation, and the owner has
commissioned a firm to provided video inspection and reporting for the storm piping. A geotechnical
engineering firm was present to inspect and report on the subgrade and base preparation and field CBR
reports were provided to this office for confirmation of the proposed paving sections.
Again, please allow this letter to serve as certification that all of Phase II - Block I development
improvements been installed acceptably. Do not hesitate to call if you have any questions or need
anything additional.
Sincerely,
O;rl_ qlL-�Z�
Alan Franklin, PE
cc: Vito Cetta