HomeMy WebLinkAboutARB201600101 Application 2016-08-08 „..v.i...,,..,.
,............,..,,
Albemarle Co - ' i ,
.:•,:,: .,.,:,... ..., .......,.....- '."010"/.0.:8 ,42,4 2'X',-'.-::d 32 F a:,.. 4:::4.
At,.........,,, Planning Application
PARCEL /OWNER INFOR,MATION
Tr'IP 04500-00-00-111C0
...........
Owner(S): FIRST GOLD LEAF LAND TRUST WENDELL W WOOD,TRUSTEE
Application# ARB201600101
!PROPERTY INFORMATION
— „
Legal Description ACREAGE PARCEL B
Magisterial Dist. Rio 1.1 Land Use Primary Unassigned ,
,...._
current LFD Not in A/F District •l Current Zoning Primary' Highway Commercial •!
r.
APPLICATION INFORMATIONi
Entered Sy
Street Address
r---1
El Judy Martin
APPIlf:Pitiorl TYP* Architectural Review Board Li
1818f2016 i___y
Project Northtown Center - Phase 110 - Preliminary
. i 1
Received Date [08/08/16 I Received()ate FF-inal i Submittal Date 08/08/16 1 Total Fees
I
l 1
Clo$ing File Date L., ...I Submittal Dare Email I Total Paid I
Peon Number Camments .
Legal Ad ,
I
I ,
1
1SUB APPLICATION(s)
li ! 1 Suj?_App4rcetrdj, , Comment '
i SIGN ' 08/08/16
1
I.!APPLICANT / CONTACT INFORMATION
conlactil'xpe 1 Name I Address 1CState Zip_ I Phone I_PboneCell
FIRST GOLD LEAF LL LAND TRUST 'AlENDE71,0 E0x 5548
CH:.RLOTTES\ILL Z2905
SCOTT COLLINS 200 GARRETT STREET Y T'E, l.. CHARUOTTESVILL 22902 4'342923719
I
I
i
Signature of Contractor or Authonzed Agent Date
Architectural Review Board Application rfi
Part A: Applicant,Contact and Parcel Information
Project Name: Northtown Center-Phase IIB
Tax map and parcel(s): 45-111C &45-110C Physical Street Address:
Contact Person: Scott Collins
Business Name: Collins Engineering
Address 200 Garrett Street, Suite K City Charlottesville State VA Zip 22902
Daytime Phone( ) 293-3719 Fax#( ) E-mail scott@collins-engineering.com
Owner of Record: FIRST GOLD LEAF LAND TRUST
Address PO BOX 5548 City Charlottesville State VA Zip 22905
Daytime Phone( ) 975-3334 Fax#( ) E-mail
Part B: Review Type and Fee
Select review type
Review by the Architectural Review Board
Conceptual Plan/Advisory Review(for a Special Use Permit or a No Fee
Rezoning)
X Preliminary/Initial Review of a Site Development Plan No Fee
Final Review of a Site Development Plan $1075.00
Amendment to an approved Certificate of Appropriateness $242.00
Building Permit Review $634.00
County-wide Certificate of Appropriateness
Structures 750'or more from the EC,no taller than 5 stories No Fee
Structures located behind a structure that fronts the EC No Fee
Personal wireless service facilities No Fee
Fencing or Equipment or Lighting No Fee
Additions to ARB-approved buildings No Fee
Minor amendments to site or architectural plans No Fee
Building permits where the change is 50%or less of the altered elevation No Fee
NOTE: For SIGNS, use the combined APPLICATION AND CHEKLIST FOR SIGNS.
FOR OFFICE USE ONLY BP# ARB#
Fee Amount$ Date Paid By who? Receipt# Check# By
County of Albemarle Dept of Community Development,401 McIntire Rd,Charlottesville,VA 22902 Voice:(434)296-5832 Fax:(434)972-4126
10/2015 Page 1 of 2
OVER—'•
Part C: Description of Proposal
Describe your proposal.Attach a separate sheet if necessary.
Provided on separate Sheet
Part D: Applicant Agreement
Applicant must read and sign
• Each application package must contain(8)folded copies of all plans and documents being submitted.
Only(1)set of building material samples is required. All submittal items, including building material
samples,become the property of Albemarle County. Applicants are encouraged to maintain duplicate
copies of all submittal items in their own files.
• Only complete application packages will be scheduled for ARB review. The application package is not
complete without the appropriate checklist, completed, signed, and included with the required submittal
materials indicated on the checklist.
1 hereby certify that I own the subject property or have the legal power to act on behalf of the owner in filing this
application. *See submittal requirements below. I also certify that the information provided on this application
and accompanying information is accurate, true, and correct to the best of my knowledge, and that the attached
plans contain all information required by the appropriate checklist.
Signature of owner, owner's representative Date
or contract purchaser
Printed name,Title Daytime phone number of Signatory
*Ownership Information:
• If ownership of the property is in the name of any type of legal entity or organization including, but not
limited to, the name of a corporation, partnership or association, or in the name of a trust, or in a fictitious
name, a document acceptable to the County must be submitted certifying that the person signing above has
the authority to do so.
• If the applicant is a contract purchaser, a document acceptable to the County must be submitted containing
the owner's written consent to the application.
• If the applicant is the agent of the owner, a document acceptable to the County must be submitted that is
evidence of the existence and scope of the agency. Attach the owner's written consent.
11/2010 Page 2 of 2
OVER—
Nose
OF
Architectural Review Board
i'f.-JPreliminary Review of a Site Development Plan
Submittal Requirements Checklist
Part A: Applicant Contact and Parcel Information
Project name: Northtown Center Phase IIB
Tax map and parcel#: 45-111C&45-110C
Physical street address (if assigned):
Location of property(landmarks, intersections, or other): Intersection of Gander Dr. & Seminole Sq.
Contact person: Scott Collins
Business name: Collins Engineering
Address: 200 Garrett Street, Suite K City: Charlottesville State: VA Zip: 22902
Daytime phone: 293-3719 Fax: Email: scott@collins-engineering.com
Part B: Preliminary Site Development Plan Requirements Checklist
Important Note: Submittal packages must contain(8)collated copies of all information unless otherwise
indicated.
A. Written description of the proposal
g Provide a general description of all proposed work.
lJ Explain how the proposal is compatible with the surrounding area and the Entrance Corridor.
B. Site plan showing the following (drawn to the scale of 1"=20',clearly legible and folded):
m Location(s) of proposed building(s)on the site.
WI Schematic layout of parking, travelways, and other improvements.
WI Location of existing and proposed tree lines. Individually identify trees of a 6-inch caliper or greater.
Go Existing and proposed topography drawn with contour intervals of 2-feet, and with sufficient off-site
topography to describe prominent and pertinent off-site features and physical characteristics, but in
no case less than 50-feet outside of the site.
WI Location and size of existing and proposed utilities and easements. Identify type of utility and extent
of easement.
m Conceptual stormwater management plan.
WI Conceptual landscaping that meets or exceeds the requirements outlined in the ARB guidelines.
E1 Sheet number, total number of sheets, date of the drawing, date and description of the latest revision, and
contact information for the firm preparing the drawings in the title block on all drawings.
1
Revised 7/28/10
Nies,
�.,r N.s
C. Appearance of the proposed building(s)
jJ Show a representation of the appearance of the proposed building(s). This must include architectural
elevations drawn to the scale of at least 1116"=1'-0". This may also include perspective sketches, or
photos of the proposed building(s). These documents should provide a basic understanding of:
▪ The size, form, and scale of the building.
WI The architectural style of the building.
• The proposed building materials and color(s).
D. Additional material
gi Provide labeled, color, 8-W x 11" photographs of the site as seen from both directions on the
Entrance Corridor.
1 The applicant is welcome to submit any additional material that will make the preliminary review more
productive. Drawings or other submittal items that clarify topography, visibility, utilities, landscaping,
or other unique or unusual conditions are welcome.
Site sections may be useful.
Part I: Applicant Agreement
Applicant must read and sign
• Each application package must contain (8) folded copies of all plans and documents being submitted.
Only (1) set of building material samples is required. All submittal items, including building material
samples, become the property of Albemarle County. Applicants are encouraged to maintain
duplicate copies of all submittal items in their own files.
• All information in this checklist is required, unless specifically waived by the ARB, prior to processing
a preliminary site development plan review by the ARB. Additional submittal materials may be
required, depending on the proposal.
• Only complete application packages will be scheduled for ARB review. The application package is not
complete without this checklist, completed, signed, and included with the required submittal materials
indicated on the checklist.
In representing the above referenced firm submitting this application for review, I hereby state that the
information provided on this application, and all accompanying information, is accurate, true and correct
to the best of my knowledge, and that the attached plans contain all information required by this checklist.
Signature of person completing checklist Date
Printed Name/Title Daytime phone number of Signatory
County of Albemarle Department of Planning and Community Development
401 McIntire Road, Charlottesville, VA 22902-4596
(434) 296-5832 Tel, (434) 972-4126 Fax
www.albemarle.org
2
Revised 7/28/10
COLLINS Now, *sae 2, 4RRETT ST, SUITE K CHARLOTTESVILLE VA 22902
Sipe Noire'
434.293.3719 PH 434.293.2813 EX
www.collins-engineering.com
NORTHTOWN CENTER- PHASE IIB ARB NARRATIVE
The proposed Northtown project (Phase IIB) includes(4) commercial/retail buildings on the existing
Northtown property where Union Bank and Gander Mountain reside. The total proposed
commercial/retail space is approximately 36,000 SF. The (3) buildings located adjacent to Gander
Mountain have been modified from the original concept plans to provide a more attractive and
pedestrian oriented area (see attached Architectural analysis). The 8,000 sf building along Route 29
adjacent to Union Bank is oriented to relegate the parking behind the building. The side of the building
facing Route 29 will also be architecturally designed with features characteristic of the front of the
buildings,to prevent any issues of the appearance of the back of a building facing Route 29.There will
also be a drive-thru lane and drive-thru window on this site, with the window being positioned on the
south side of the building.
Additional parking areas, landscaping, sidewalks and screened dumpster pads are proposed with this
development. A brick enclosure matching the building's brick facade,with (2)two wooden board-on-
board swinging gates,will enclose and screen the trash container areas from public view. Rooftop
mechanical equipment will also be screened with the building's cornice. Ample landscaping is proposed
to soften the site improvements and provide tree cover.This landscaping supports the existing
landscaping currently located within the large, bordering stormwater management facility to the south.
Improvements to the utility infrastructure are not required since they currently exist onsite or within
adjacent public right-of-way, however connections will be required to serve the proposed building.The
project will connect to an existing waterline within Gander Drive, existing sanitary sewer located onsite
and gas and power lines located within route 29's public right of way. Proposed storm sewer will
channel the run-off to the existing and proposed stormwater management facilities. See the attached
plan for location of the utilities and swm features.
The attached pictures represent current conditions taken from the entrance corridor,viewing the area
proposed to be development with this plan. Also attached are the narratives and diagrams provided by
the Architect for additional details on the site, buildings, and proposed materials. A site plan is included
with the submission as well for additional details on the site design.
`"' fir,
Picture facing north along northbound lanes of the Entrance Corridor, showing the Stellar One Bank
r
1
,.,.vim 1 !
c
it i
A
_T `
, A, 1 ..
•
Picture facing south showing the Gander Mountain Biofilter y
t '. , i
K' , d,. i ‘� i; Y,, *.t� s�. iii*:41.41;
: i )� �� ice!!
t
.mac=-.;, '?�.
..ro
v 5 A
t
••iliti
,•: _ _ '
ot.- ,--..' . �rr,Z'rs: 4 It '
. .....,
Picture facing south towards the site,from southbound lanes on the other side of the Entrance Corridor
iiillNIiiiu.Iiriiiii"l"Ni"""m"."""."""""""."'""li."'"""""""'•"••wAmi.=.m...m,.....i,...........
-• - ..
. . ' ,. • .
• ire- .." .ft “6,,,, :, ":-• . k _ ,.. . _4„,_....
------ _
__
•
, ... .... . ,., ..,'
. —II
pp
0 / \ \
Pil ' ' ,...,
1 I.
Gander Mountain (sits South of the project site)
. ,.
. ,, .T.4.a.***%aiw,..................................................................------s---------.,
.f.
• 4 i.
. , ' Aft '. . . •-t,t.. i : . . ' wc, -.111.,r
. .: . . . ..
ArgnaiLit,-,.,----,---; __ -...:'le-4.• '- .... ..".
--- _--- -.. .
FON.
- -
•
'i''',-•.•,!- Mfga ,
4011W00.01 ._-; .14•1111.11.11......
- ' •
. .-- . . .
. '...,„"i4J,,,,,• . , ", : -
-
,....,-
-m-- ,-
-- _1 - ..e.-- • -.-''''‘11''''`` ..
. .: _:_4- I-'• ...: - c:---
• -.4`' ':, )--,'.:, - ;74.,,-....--,-.. -• - - ,:.,-, ',..:... _._ •- - ... t
,.,.. ..
---','.' `- ......',..z....-i,..,,Z7'..:t.-__ : -,-,,,--- _-_:-.J.,-7-.,.. .--,_ --.-_,..:-...• ' .... —--,' .- - .-„. ...., :: .
Picture facing south along northbound lanes of the Entrance Corridor, showing Stellar One Bank Biofilter
, �
' . ' 4
^ Ps, .•11111,* : . `*••• ' 4, • •
4 '' ' * 1.'1 -'Ws s* ' '''' -' 2?)4, ."/ ._
Picture taken from the Entrance Corridor, facing south, showing the site.
° 1 � i €4t` ;p '`44 vim i ' Vii.
gg �"�7 �, t ►. �g'e': i .SSR '�‘ h.. c_,
'iG, ,a yfis•-, ..-
ird,
,.;
.— .. ...,,-. . ,.7.,...,,.,, ...t...3,.. ....,,, ,
C
irlittastaila