HomeMy WebLinkAboutWPO200800060 Bond Estimates Stormwater Management Plan 2008-11-25 Bond Email 112508.txt
From: Amy Pflaum
Sent: Tuesday, November 25, 2008 3:15 PM
To: 'Todd Philipp' ; 'Mark Green'
Subject: FW: Rivanna Plaza SDP200800090 & wP0200800060
Todd,
Rivanna Plaza WPO Bond Amounts:
Erosion & Sediment Control: $26,300
Stormwater Management: $122,500
Please contact me if you have questions.
Amy D. Pflaum
Senior Civil Engineer
Albemarle County Department of Community Development
(434) 296-5832 x3069
apflaum@albemarle.org
From: Amy Pflaum
Sent: Thursday, November 20, 2008 9:37 AM
To: 'Todd Philipp'; 'Mark Green'
Cc: Patrick Lawrence
Subject: Rivanna Plaza SDP200800090 & wP0200800060
Todd,
Please find the final comment letter for Rivanna Plaza attached. The only outstanding issues that remain prior
to approval of the WPO are the easement deeds (which I understand you will submit to Patrick) and the Stormwater
Maintenance Agreement (you can work directly with Pam shifflet on this). once the deeds have been accepted,
engineering will approve the E&S and SWM plans and hand them off to our inspectors. The Final Site Plan will
have engineering approval once the WPO is approved. WPO Bond amounts will be calculated and sent to you before
the Thanksgiving Holiday.
Thank you,
Amy D. Pflaum
Senior Civil Engineer
Albemarle County Department of Community Development
(434) 296-5832 x3069
apflaum@albemarle.org
Page 1
BOND ESTIMATE-EROSION CONTROL Spreadsheet last revised:12-5-01
PROJECT NAME: Rivanna Plaza
PROJECT NUMBER: SDP200800090
DATE OF ESTIMATE: 11/25/08
ESTIMATE BY: JPD
BASED ON:
WATER ITEM DESCRIPTION UNIT QUANTITY UNIT COST ITEM TOTAL
SEED, FERTILIZE,MULCH ACRE 1.61 $1,500.00 $2,415.00
SILT FENCE LF 1054 $5.00 $5,270.00
SAFETY FENCE LF 689 $3.00 $2,067.00
TEMPORARY FILL DIVERSION LF 0 $3.00 $0.00
DIVERSION DIKE LF 389 $3.00 $1,167.00
TEMPORARY SLOPE DRAIN LF 0 $20.00 $0.00
SEDIMENT TRAP 1 ACRES 1.61 $1,000.00 $1,610.00
SEDIMENT BASIN 1 ACRES 0 $1,000.00 $0.00
CULVERT INLET PROTECTION EA 1 $500.00 $500.00
INLET PROTECTION EA 20 $200.00 $4,000.00
OUTLET PROTECTION EA 0 $200.00 $0.00
EC-2&3 DITCH PROTECTION LF 0 $10.00 $0.00
RIP-RAP LF 0 $55.00 $0.00
CHECK DAMS SQ.YD. 0 $30.00 $0.00
STREAM CROSSING TYPE I EA 0 $1,000.00 $0.00
STREAM CROSSING TYPE II EA 0 $3,000.00 $0.00
STREAM CROSSING TYPE III EA 0 $5,000.00 $0.00
PAVED CONSTRUCTION ENTRANCE EA 2 $2,000.00 $4,000.00
SUBTOTAL 21029.00
CONTINGENCY&ADMINISTRATION LS -----2 io i5'/, fuel k''tot+
TOTAL 2F7RR 25 c
(o /• Coy .
BOND AMOUNT REQUIRED ---µ x3ee4)e' 1-47-iao(12.
.r
PROJECT NAME: I Rivanna Plaza
FILE#: I SDP200800090
DATE ESTIMATED: 125-Nov-08
7
Item 1 Unit IAmount Unit Cost Subtotal
site clearing acre 0 $7,100.00 1 $0.00
Trees&Shrubs seedlings Wla
ttubes 0 $12.50 $04'
1 _
q treatment
bioretention construction volume in cf 0 $6.40 $0 I —
P
trees&shrubs ball/burla _ I planted 0 $100 00
$0
wetland plants planted 0 $2.00' $0 _-_
wetland $1,500 00 $0
underdrain tone cubic and 0.00 depth
yard 0 $1700
0 $50 001 $01
stream stabilization I linear foot _ $0 I biofilter surface 27*1 de tl
stone delivery _ load 0 $45.00 $0
area
underdrain pipe,4"PVC 11inear foot 0 $1.35 $0
i linearfo _ p-
underdraintterfa pipe,6"PVC ♦linear foot 0 10$2 00 $0 b ofilter surface area/27*2 depth
sand/soil mixture cubicyard 0 $20.00'
filter fabric yard 0 $10 00 $0 p h
$0
1
Filterra 4x8 each 1 each 1 $7,100.00 — -- Ii
Filterra Installation ;per project $9,500
Filterra 6x6 ar roect 3 $9,500
8'x16'Precast Concrete StormFilter each 1 $55,500.00
Filterra 6x8 each 1 $9,500.00
$55.00 01 $55,5$0 1
s 1
uare
ECcla-2 EC 3 ditch stabilization-rap linear footrd 0.00' $10 00' $0
class 2 rip-rap square yard 0 $110.00
maintenance road }
pipe
linear foot 0.001 $8.00 $0 1 H
C-2
concrete anti ortex each 0.00
yard 0.00 $1,500.00 $0.00
Concrete i e linear foot 522.00 $25.00 $13,050
matting
- .—Paved concrete ditch linear foot 0.00 $55.00
$Ol
— j
embankment improvements each 0.00. $5,000.001 $0'
pavement demolition I square yard 0.00
green $5.00
roof turf t :cubic
square foot 0.00 $12.00 $0i
square foot 0 00 $5.00 $0 1
RCPunderpavement)ground detention cub c foot installed_ 0.001 $7.00 $0
Conser EasementmRR<50% acre 0.00 0 00 $39 000 000.00 $01
0.00 $25,000.00 $0�
7
Conser Easement RR<50% l
acre
Pond drain gate valve(6") each
Delaware Sand Filter linear foot installed i 0.00 $706.00' $0
Flow Splitter each installed 0.001 $2,000.00 $0' — -r-
SUBTOTAL $97,925
25%contingency
$ ? /5`/E
TOTAL _ x$122,400 /p j, j
I
ROUNDED T
totalmiin` fter reduction 1 '- r