HomeMy WebLinkAboutWPO201600059 Bond Estimates 2016-10-14 (3)Project Name: Glenmore K2C-II WPO file number: WP0201600059 Erosion and Sediment Control Bond Estimate Phase I Item Item No. Unit Unit Cost Cost Number installed stablization (PS, TS) 13.0 acres $5,000.00 $65,000.00 silt fence (SF) 890.0 ft $5.00 $4,450.00 safety fence (SAF) 0.0 ft $5.00 $0.00 diversion (DID, FD, RWD) 1850 ft $13.00 $24,050.00 temporary slope drain (TSD) pipe length 0 ft pipe diameter 0 in $0.00 $0.00 earthwork for basin #1 height of dam at toe 14 ft cut at high side 9 ft height of fill at face 10 ft cut at face 4 ft length of dam 90 ft length of cut 50 ft top width 8 ft width of cut 15 ft (area above transition) 280 sf (area below transition) 92 sf (total width of dam) 28 ft (total width of cut) 41 ft (height below transition) 4 ft (depth below transitior 5 ft (area below transition) 40 sf (area above transition, 77.5 sf (total fill volume) 1066.7 cy (total fill volume) 313.9 cy length of spillway 100 ft (TOAL CY estimate) 1171 cy $13.00 $15,223.00 width of spillway 12 ft (spillway stone tons) 69 tons $50.00 $3,450.00 structures for basin riser height 12 ft riser diameter 30 in (riser unit price) $65.00 $780.00 barrel length 59 ft base plate or fdn 1 $200.00 $200 barrel diameter 24 in (barrel unit price) $50.00 $2,950.00 barrel collars 2 $200.00 $400 baffle length 60 ft $50.00 $3,000 earthwork for basin #5 height of dam at toe 11 ft cut at high side 16 ft height of fill at face 8 ft cut at face 9 ft length of dam 80 ft length of cut 20 ft top width 8 ft width of cut 50 ft (area above transition) 192 sf (area below transition) 612 sf (total width of dam) 22 ft (total width of cut) 100 ft (height below transition) 3 ft (depth below transitior 7 ft (area below transition) 24 sf (area above transition, 301 sf (total fill volume) 640.0 cy (total fill volume) 676.3 cy length of spillway 55 ft (TOAL CY estimate) 890 cy $13.00 $11,570.00 width of spillway 8 ft (spillway stone tons) 25.3 tons $50.00 $1,265.00 structures for basin riser height 9 ft riser diameter 30 in (riser unit price) $65.00 $585.00 barrel length 82 ft base plate or fdn 1 $200.00 $200 barrel diameter 18 in (barrel unit price) $40.00 $3,280.00 barrel collars 2 $200.00 $400 baffle length 55 ft $50.00 $2,750 earthwork for trap #6 height of dam at toe 3 ft cut at high side 5 ft 10/14/2016 Project Name: Glenmore K2C-II WPO file number: WP0201600059 Erosion and Sediment Control Bond Estimate Phase I Item Item Number height of fill at face 2 ft cut at face 3 ft length of dam 40 ft length of cut 24 ft top width 3 ft width of cut 11 ft (area above transition) 14 sf (area below transition) 51 sf (total width of dam) 6 ft (total width of cut) 27 ft (height below transition) 1 ft (depth below transitior 2 ft (area below transition) 2 sf (area above transition, 23 sf (total fill volume) 23.7 cy (total fill volume) 65.8 cy length of spillway 4 ft (TOAL CY estimate) 74 cy width of spillway 10 ft (spillway stone tons) 2.3 tons silt fence inlet protection (IP) stone inlet protection (IP) outlet protection (OP) length 20 ft width 20 ft channel (SCC, matted) length 490 ft width 12 ft check dam depth in channel 0 ft channel width 0 ft construction entrance (CE) wash rack paved construction entrance rip -rap, placed depth 0 ft length 0.0 ft width 0.0 (tons) 0 tons survey and layout (price per 0.1 mi.) acres 13 traps and basins 3 mobilization stream crossing (computed independently) No. Unit Unit Cost Cost (installed) $13.00 $962.00 $50.00 $115.00 0 $100.00 $0.00 5 $200.00 $1,000.00 1 $1,800.00 $1,800.00 $7,644.00 0 $0.00 $0.00 0 $2,000.00 $0.00 1 $2,000.00 $2,000.00 1 $3,500.00 $3,500.00 $60.00 $0.00 $8,000.00 $2,500.00 $0.00 cost sum $167,074.00 contingency $16,707.40 Total $183,790 10/14/2016