HomeMy WebLinkAboutWPO201600059 Bond Estimates 2016-10-14Project Name: Glenmore K2C-II
WPO file number: wpo201600059
Stormwater Management Plan Bond Estimate
Phase I
Item Item
Number
permanent diversion or ditch
standard manhole frame top (not inlet)
drop inlet or grate
manhole structure (per ft. rise)
pipe, rcp, cmp (15 to 48")
aggregate base or drainage stone
earthwork for basin
structures for basin
0.0 in d
0 ES-1,2
0 EC-1
0.0 in d
0.0 ft L
0.0 ft W
height of dam at toe
0 ft
cut at high side
0 ft
height of fill at face
0 ft
cut at face
0 ft
length of dam
0 ft
length of cut
0 ft
top width
0 ft
width of cut
0 ft
(area above transition)
0 sf
(area below transition,
0 sf
(total width of dam)
0 ft
(total width of cut)
0 ft
(height below transitior
0 ft
(depth below transitioi
0 ft
(area below transition)
0 sf
(area above transition
0 sf
(total fill volume)
0.0 Cy
(total fill volume)
0.0 cy
length of spillway
0 ft
JOAL CY estimate)
0 cy
width of spillway
0 ft
(spillway stone tons)
0 tons
riser height
0 ft
riser diameter
0 in
(riser unit price)
$0.00
barrel length
0 ft
base plate or Win
0 0
barrel diameter
0 in
(barrel unit price)
$0.00
barrel collars
0
baffle length
0 ft
trees for Mitigation
shrubs for Mitigation
seedlings
underdrain (LF)
biofilter soil mix (CY)
trash rack/ anti vortex devices
maintenance access road (LF)
rip -rap, placed depth 2 ft length
width 12.0 (tons)
survey and layout (price per 0.1 mi.) acres 13 basins
mobilization
as -built drawings (per facility)
materials testing (per facility)
compaction testing (per dam)
manufactured facilities (attach manufacturer's or contractor's price as a base)
20.0 ft
36
2
No. Unit Unit Cost Cost
installed
490 ft
$13.00
$6,370.00
0 ea
$500.00
$0.00
0 ea
$3,500.00
$0.00
0 ft
$450.00
$0.00
0.0 ft
$0.00
$0.00
0.0 ton
$35.00
$0.00
$13.00
$0.00
$50.00
$0.00
$0.00
$200.00
$0
$0.00
$200.00
$0
$50.00
$0
0 ea
$150.00
$0.00
0 ea
$50.00
$0.00
0 ea
$5.00
$0.00
0 ft
$5.00
$0.00
0 cy
$38.00
$0.00
2 ea
$1,500.00
$3,000.00
0 ft
$50.00
$0.00
$60.00
$2,160.00
$7,500.00
$2,500.00
2 ea
$2,000.00
$4,000.00
2 ea
$2,000.00
$4,000.00
2 ea
$5,000.00
$10,000.00
$0.00
cost sum $39,530.00
contingency $3,953.00
10/14/2016
Project Name: Glenmore K2C-II
WPO file number: wpo201600059
Stormwater Management Plan Bond Estimate
Phase I
Item Item No. Unit Unit Cost Cost
Number installed
Total $43,490
10/14/2016