HomeMy WebLinkAboutWPO201600059 Bond Estimates 2016-10-14Project Name: Glenmore K2C-II WPO file number: wpo201600059 Stormwater Management Plan Bond Estimate Phase I Item Item Number permanent diversion or ditch standard manhole frame top (not inlet) drop inlet or grate manhole structure (per ft. rise) pipe, rcp, cmp (15 to 48") aggregate base or drainage stone earthwork for basin structures for basin 0.0 in d 0 ES-1,2 0 EC-1 0.0 in d 0.0 ft L 0.0 ft W height of dam at toe 0 ft cut at high side 0 ft height of fill at face 0 ft cut at face 0 ft length of dam 0 ft length of cut 0 ft top width 0 ft width of cut 0 ft (area above transition) 0 sf (area below transition, 0 sf (total width of dam) 0 ft (total width of cut) 0 ft (height below transitior 0 ft (depth below transitioi 0 ft (area below transition) 0 sf (area above transition 0 sf (total fill volume) 0.0 Cy (total fill volume) 0.0 cy length of spillway 0 ft JOAL CY estimate) 0 cy width of spillway 0 ft (spillway stone tons) 0 tons riser height 0 ft riser diameter 0 in (riser unit price) $0.00 barrel length 0 ft base plate or Win 0 0 barrel diameter 0 in (barrel unit price) $0.00 barrel collars 0 baffle length 0 ft trees for Mitigation shrubs for Mitigation seedlings underdrain (LF) biofilter soil mix (CY) trash rack/ anti vortex devices maintenance access road (LF) rip -rap, placed depth 2 ft length width 12.0 (tons) survey and layout (price per 0.1 mi.) acres 13 basins mobilization as -built drawings (per facility) materials testing (per facility) compaction testing (per dam) manufactured facilities (attach manufacturer's or contractor's price as a base) 20.0 ft 36 2 No. Unit Unit Cost Cost installed 490 ft $13.00 $6,370.00 0 ea $500.00 $0.00 0 ea $3,500.00 $0.00 0 ft $450.00 $0.00 0.0 ft $0.00 $0.00 0.0 ton $35.00 $0.00 $13.00 $0.00 $50.00 $0.00 $0.00 $200.00 $0 $0.00 $200.00 $0 $50.00 $0 0 ea $150.00 $0.00 0 ea $50.00 $0.00 0 ea $5.00 $0.00 0 ft $5.00 $0.00 0 cy $38.00 $0.00 2 ea $1,500.00 $3,000.00 0 ft $50.00 $0.00 $60.00 $2,160.00 $7,500.00 $2,500.00 2 ea $2,000.00 $4,000.00 2 ea $2,000.00 $4,000.00 2 ea $5,000.00 $10,000.00 $0.00 cost sum $39,530.00 contingency $3,953.00 10/14/2016 Project Name: Glenmore K2C-II WPO file number: wpo201600059 Stormwater Management Plan Bond Estimate Phase I Item Item No. Unit Unit Cost Cost Number installed Total $43,490 10/14/2016