Loading...
HomeMy WebLinkAboutARB201600118 Review Comments Miscellaneous Submittal 2016-10-180 ALg� jRGII31P COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, North Wing Charlottesville, Virginia 22902-4596 Phone (434) 296-5832 Fax (434) 972-4126 October 18, 2016 Tammy Brindle Interstate Sign Company 1990 Rockford Street Mount Airy, NC 27030 RE: ARB -2016-118: James River Petroleum Signs Tax Map 61, Parcel 151A Dear Ms. Brindle, I have reviewed the above -noted sign application. The following revisions are requested to make the proposal consistent with the Entrance Corridor Sign Guidelines. All required information pertaining to this sign application is required to be on the sign drawing. The sign drawings are incomplete and do not describe the proposal adequately. 1. Regarding the freestanding sign: a. Revise the sign drawing to: i. Include the Pantone number for the red, blue, green and yellow colors. Red Pantone 485 has been determined to be an inappropriate shade of red. Red Pantone 187 is considered an acceptable substitute. ii. Indicate the sign is internally illuminated. Indicate whether the bulb is existing to remain or to change. If bulb is to be changed to LED, include the following note limiting the intensity of the illumination: "The level of illumination provided by the LED lights will not exceed the illumination produced by a single stroke of 30 milliamp (ma) neon. iii. Include the following note regarding the required opaque background: "All sign cabinets shall have an opaque background, only the text and graphics shall illuminate." iv. Include the following note limiting the intensity of the LED gas pricing: "Daytime intensity of the LED gas pricing is limited to 70% of maximum intensity; nighttime intensity is limited to 16% of maximum intensity with automatic dimming at dusk." v. Include both the original sign drawing date, latest revision date and the tax map and parcel the sign is located on (Tax Map 61, Parcel 151A). 2. Regarding the large canopy Exxon signs: a. Revise the sign drawing to: i. Clearly show the canopy fascia elevation with the Exxon sign. The drawing provided was too light and illegible. You cannot read the canopy edge. ii. Indicate all proposed canopy/canopy sign materials (metal, vinyl, paint, acrylic etc.) iii. State whether or not the Exxon letters are to illuminate. If yes, provide a detail showing bulb location and type, indicating whether the letters are face -lit or halo -lit. If LED, include the following note limiting the intensity of the illumination: "The level of illumination provided by the LED lights will not exceed the illumination produced by a single stroke of 30 milliamp (ma) neon." iv. Propose a different shade of red Pantone. Red Pantone 485 has been determined to be an inappropriate shade of red in the Entrance Corridors. Red Pantone 187 is considered an acceptable substitute. v. Include the following note: "Illumination of the canopy fascia is not proposed." vi. Include both the original sign drawing date, latest revision date and the tax map and parcel the sign is located on (Tax Map 61, Parcel 151A). 3. Regarding the small canopy Diesel signs: a. Revise the sign drawing to: i. Indicate the sign type. If the sign is to be illuminated, provide a detail showing bulb location/type and whether the letters are face -lit or halo -lit. If LED is proposed, include the following note limiting the intensity of the illumination: "The level of illumination provided by the LED lights will not exceed the illumination produced by a single stroke of 30 milliamp (ma) neon." ii. Indicate the proposed red material (paint, vinyl?). iii. Indicate whether any structural changes are proposed for the canopy (e.g. metal panels etc.). iv. Include the following note: "Illumination of the canopy fascia is not proposed." v. Include both the original sign drawing date, latest revision date and the tax map and parcel the sign is located on (Tax Map 61, Parcel 151A). Please respond by email within 15 days of the date of this letter indicating whether you will or will not proceed with these revisions. Your decision to make the revisions will suspend the 60 -day review period associated with your original submittal. If you choose to complete the revisions, please email the revised drawings to me. If you choose not to proceed with these revisions, staff will be unable to approve your application. Failure to respond to this letter shall be presumed to be a request to proceed to action on the application without further revisions. If you have any questions about this action, please contact me as soon as possible. I look forward to receiving your revisions and completing this review with an approval letter. Sincerely, Brent Nelson Senior Planner cc: ARB File