Loading...
HomeMy WebLinkAbout2004-04-07 I ACTIONS Board of Supervisors Meeting of April 7, 2004 April 8, 2004 AGENDA ITEM/ACTION ASSIGNMENT 1. Call to Order. · Meeting was called to order at 9:00 a.m., by the I Chairman. All BOS members were present. Also I I present were Bob Tucker, Larry Davis, and I Georgina Smith. I:' From the Public: Matters not Listed on the Agenda. Neil Williamson spoke regarding a letter he sent the Board concerning the proposed Subdivision Text Amendment. He believes there are several problems with the proposed ordinance. He asked the Board to take into consideration his comments ~ prior to their hearing in May. 5. Presentation of Certificate of Appreciation. · PRESENTED a certificate of appreciation to Michael Matthews. 6.2 Þroclamation recognizing April 2004 as Fair Housing Month. · PRESENTED proclamation to Ron White. 6.3. Proclamation recognizing April 2004 as Sexual Assault Awareness Month. · PRESENTED proclamation to Jessica McLain. ¡ 6.4. Proclamation recognizing April 2004 as Child Abuse , Prevention Month. ¡. PRESENTED proclamation to Saphire Baker. I 6.5. Proclamation recognizing the 50"1 Anniversary of f the University of Virginia Community Credit Union. I. PRESENTED proclamation to Kathy Moorer. i 6.6. Request for Dance Hall Permit - EL RAY del Clerk: Forward letterto applicant. I TACO. I. APPROVED the request for a dance hall permit , from EL RAY del TACO. 6.7. Thomas Jefferson HOME Consortium Annual Plan. Housina Office: Proceed as directed. · APPROVED, the following allocations of HOME ¡ funds for fiscal year beginning July 1, 2004. 0 $98,760 for owner-occupied rehab designating AHIP as subrecipient. 0 $4,600 in admin funds to AHIP 0 $29,740 of regular HOME funds for first- I time homebuyer assistance (administered by Office of Housing and/or PHA). 0 $20,260 of ADDI funds (administered by Office of Housing and/or PHA). 0 $1,396 in admin funds to County. 6.8 Lease Amendment - Charlottesville Waldorf Clerk: Advertise the public hearing. School in Crozet. · SET the public hearing for May 5, 2004. 6.9 FY 2004 Appropriations, $262,161.75 (Forms Clerk: Forward signed appropriation forms to Melvin #2004070,2004071,2004072). Breeden and copy appropriate individuals. ·Page 1- I I ~~ , I. APPROVED FY 2004 appropriations #2004068, #2004070, #2004071, and #2004072. 6.10 Resolution to accept roads in Grayrock Subdivision, Phase 3, into the State Secondary System of Highways. · ADOPTED, the resolution. 7. Transportation Matters: 8. Presentation: Transportation Planning Process, Thomas Jefferson Planning District Commission. · RECEIVED b. Transportation Matter not Listed on the Agenda. Theresa Butter: · Provided update on VDOT activities. David Wyant: · Asked about Jarman's Gap Road and what the design would be like for the bike lanes. Dennis Rooker: 1. Mentioned an email he sent to Jim Bryan about paving over Barracks Road to accommodate ¡ bicyclists and when this would be put onto; the I schedule. Sallv Thomas: I. Mentioned·that she received a letter from a friend who had recently received a traffic ticket on her way into Scottsville. She ask if VDOT could install an intermediate speeding zone sign somewhere before they hit with the 25 mph zone. She will forward the letter to VDOT. 8. Discussion: Use of Jefferson School for Library. · HELD. 9. Board-to-Board Presentation. · RECEIVED. 10. Presentation: Life Long Learning Report. · RECEIVED and APPROVED the work completed by the lifelong Learning group and incorporated the four goals into the County's Strategic Plan's FY 03 FY 05 Plan of Action. o GOAL ONE: Create accessible opportunities for everyone in the community to learn, ensuring all educational services meet the needs of the changing demographics within the community. o GOAL TWO: Meet the teaching and learning needs of all citizens along an appropriate continuum of ages and stages of development. o GOAL THREE: Ensure the education system meets the workforce preparation I I Clerk: Forward adopted resolution to Steve Snell in Engineering. (Attachment 1). Clerk: Forward comments to Jim Bryan. Chuck Proctor: Said VDOT is currently looking at major paved roads that are on bike routes to put them on the schedule for next year for trench widening. Lori Allshouse: Proceed as directed. -Page 2- needs of current and future employees and employers. o GOAL FOUR: Position the County as a recognized leader in educational excellence. 11. Work Session: Stormwater Master Plan. · HELD. 12. Closed Session: - At 12:16 p.m., the Board went into closed session. 13. Certify Closed Session: - At 1 :58 p.m., the Board reconvened into open session . 14. Appointments: I- APPOINTED Joseph Cockran to the ACE Committee to replace Marcia Joseph, with said term to expire August 1, 2005. II - REAPPOINTED William Bolton to the Albemarle County Service Authority to represent the Rivanna ¡ District, with said term to expire April 16, 2008. · APPOINTED Paul Wright to the Architectural Review Board to replace Marcia Joseph, with said term to expire November 14, 2006. - REAPPOINTED Ann Mallek and Milton Moore to the Charlottesville Albemar1e Regional Transportation Advisory Committee (CHART), with said terms to expire April 3, 2007. - APPOINTED Eric Bryerton to the Route 250 West Task Force, with said term to expire. April 7, 2007 · APPOINTED Mike Merriam to the Mountain Overlay Committee, with said term to expire r 15. ZMA 2003-013.Glenwood Station (Sign # 48). I - APPROVED, ZMA 2003-013, by a vote of 5:0, subject to the, 1 condition recommended by the I Planning Commission. 116. SP-2003-092. Glenwood Station (Sign #48). - APPROVED,ZMA 2003-013, by a vote of 5:0, i subject to the 4 conditions recommended by the 1 Planning- Commission. 17. CrozetMaster F'lan Discussion and Update on Review Process. - DISCUSSED and SET a work session for May 5, 2004. Will also hold an additional public informational meeting sometime in mid-to-end- of May, 2004. 18. Work Session: North Pointe. - DISCUSSED and asked for more information to be brought back to the Board aUhe April 14, ~004 meetihg,. 8. From the Board: Matters Not Listed on The Agenda. Sallv Thomas: - Mentioned to the Board that the Mountain Overlay District Committee met yesterday and there were concerns from the members that they have worked for nine months to and now have 3:3 tie vote. They are still trying to come up with some ideas. A I-I Clerk: Prepare appointment letters, update Boards and Commissions book and notify appropriate persons. Clerk: Set out condition. (Attachment 2). Clerk: Set out conditions. (Attachment 2). Clerk: Put work session on May, 2004 agenda. Clerk: Add onto April 14, 2004 agenda. Enaineerjno: Proceed as directed. -Page 3- I suggestion is that an additional person be placed on j the committee or be replaced, or other Board j members attend their meeting. \24. Adjourn. . The meeting was adjourned at 5:06 p.m. /gas Attachment 1 - Resolution. Attachment 2- Conditions of Approval. I -I ATTACHMENT 1 -Page 4- RESOLUTION WHER :AS, the District Home Board for the Counties of Albemarle, Alleghany, Augusta, Bath and Rockbridge, Virginia, and the Cities of Charlottesville, Covington, Lexington and Waynesboro, Virginia, has completed its assigned duties and terminated the operations previously.assigned to it and believes it is the desire of its participating local government that the said Board be formally dissolved, subject to ratification by the respective aforesaid governing bodies; and WHEREAS, in consideration of the foregoing, the District Home Board, by the adoption of this resolution, hereby formally dissolves itself, to be effective upon the ratification of this action by the respective governing bodies of the foregoing counties and cities; NOW THEREFORE BE IT RESOLVED, that the Albemarle County Board of Supervisors hereby ratifies the dissolution of the District Home Board for the Counties of Albemarle, Alleghany, Augusta, Bath and Rockbridge, Virginia, and the Cities of Charlottesville, Covington, Lexington and Waynesboro, Virginia; and BE IT FURTHER RESOLVED that the Board of Supervisors hereby directs the Clerk to forward a copy of this resolution to fiscal agent for the District Home Board. ATTACHMENT 2 -Page 5- n II CONDITIONS OF APPROVAL ZMA 2003-013. Glenwood Station (Sian # 48). Request to rezone 9.31 ac from R-15, w/ special permit approval for office to PRD w/ a special permit for office. TM 61, P 129F. Locon Rt 631 (E Rio Rd), approx 1 mile from intersec of E Rio Rd & Rt 29N, between Fashion Square Mall & Squire Hill Apartments. (The Comp Plan designates this property as Office Service & Neighborhood Service in Neighborhood 2.) Rio Dist. 1) The site shall be developed in general accord with the application plan entitled, Glenwood station/Place, dated December 22, 2003, with minor changes allowed to accommodate the required parking when approved by the Zoning Administrator. SP-2003-092. Glenwood Station (Sian #48). Request to allow office in accord w/ Sec 19.3.2.9 ofthe Zoning Ord. TM 61 PI 129F, contains 9.31 acs & is currently Znd R-15 wI special permit approval for office, but is under consideration for rezoning to PRD. Loc on Rt 631 (E Rio Rd), approx 1 mile from intersec of E Rio Rd & Rt 29N, between Fashion Square Mall & Squire Hill Apartments. Rio Dist. 1. The site shall be developed in general accord with the application plan entitled, Glenwood Station/Place, dated December 22, 2003, with minor changes allowed to accommodate the required parking when approved by the Zoning Administrator; 2. Final elevations of the office buildings shall be reviewed and approved by the Director of Planning prior to final site plan approval to ensure consistency with the elevations provided herein, dated August 25, 2003; 3. The Applicant shall construct, in its entirety, a second commercial entrance to their property from the Mall Access Road in general accord with the concept plan entitled, Conceptual Development Plan Glenwood Station/Place, dated July 11, 2003. Should the County Engineer decide in the future that, for reasons associated with new development on the Fashion Square Mall property, the entrance should be restricted, said entrance shall be converted, by the Applicant, present owner or owner's association into an emergency means of ingress/egress-only by way of installation of gates, bollards or other device. The connection shall be constructed prior to issuance of the 50th building permit. Sidewalks shall be provided along the entire Mall Access Road frontage and; 4. The office buildings shall have a thirty (30) foot front setback and a ten (10) foot parking setback from Rio Road, as well as a fifty (50') foot structure, twenty (20) foot parking and twenty (20) foot undisturbed buffer adjoining the Squire Hill development to the south. -Page 6- 1""'-"1 FAIR HOUSING MONTH WHEREAS, April 2004, marks the thirty-sixth anniversary of the passage of the Fair Housing Act of 1968, which sought to eliminate discrimination in housing opportunities and to affirmatively further housing choices for all Americans; and WHEREAS, the ongoing struggle for dignity and housing opportunity for all is not the exclusive province of the Federal government; and WHEREAS, vigorous local efforts to combat discrimination can be as effective, if not more so, than Federal efforts; and WHEREAS, illegal barriers to equal opportunity in housing, no matter h(JW subtle, diminish the rights of all; NO"Jv,. THEREFORE, BE IT RESOLVED, that in the pursuit of the shared goal and responsibility of providing equal housing opportunities for all men and women, the Board of County Supervisors oj Albemarle County, Virginia, does hereby join in the national celebration by proclaiming APRIL, 2004 as FAIR HOUSING MONTH and encourages all agencies, institutions and individuals, public and private, m Albemarle County to abide by the letter and the spirit of the Fair Housing law. Signed and sealed this 7th day of April, 2004. Lindsay G. Dorrier, Jr., Chairman Albemarle Board of County Supervisors I I SEXUAL ASSAULT AWARENESS MONTH WHEREAS, one in four girls and one in five boys will be sexually abused before the age of eighteen; and WHEREAS, in Virginia one out of eve/y four women and one out of eve/y eight men have been sexually assaulted in their lifetimes; and WHEREAS, The Sexual Assault Resource Agency has provided free, confidential help to over 800 women, children, and men hurting from sexual violence in 2003; and WHEREAS, this experience can be devastating for not only the survivor, but also for the family and friends of the survivor; and WHEREAS, it is imperative that our community support the healing and sense of connectedness for survivors; and WHEREAS, The Sexual Assault Resource Agency is a non-profit organization offering safety and support for survivors with diverse experiences and whose ultimate goal is to create safe communities free of sexual violence; and WHEREAS, The Sexual Assault Resource Agency will join the other 37 Sexual Assault Crisis Centers in Virginia and over 1000 crisis centers across the U.S. in public awareness efforts to generate understanding of the issues surrounding sexual assault; and WHEREAS, our community is dedicated to creating a society free of sexual violence; NOW, THEREFORE, I, Undsay G. Dorrier, Jr., Chairman on behalf of the Albemarle Board of County Supervisors, do hereby proclaim April as SEXUAL ASSAULT AWARENESS MONTH. and encourage community members to participate fully in the wide range of available events and activities. Signed and sealed this 7th day of April, 2004. CHAIRMAN ALBEMARLE BOARD OF COUNTY SUPERVISORS I I CHILD ABUSE PREVENTION MONTH 'WllEREAS, the month of April is recognized as Child Abuse Prevention Month in the Commonwealth of Virginia and across the United States; and 'WllEREAS, during Fiscal Year 2002-2003, 370 qualifYing reports of suspected child abuse or neglect involving an estimated 524 children were investigated in the County of Albemarle; and 'WllEREAS, physical abuse and neglect, sexual abuse, medical neglect, and emotional abuse and neglect, lead to long-term outcomes for children such as developmental delay, mental and emotional disorders, antisocial and criminal behavior, childhood pregnancy, truancy and academic failure, alcohol and drug abuse, and suicide; and 'WllEREAS, the County of Albemarle faces a continuing need to support innovative programs to prevent child abuse and to assist family members when child abuse occurs; and 'WllEREAS, in Albemarle there are dedicated individuals and organizations who work daily to counter the problem of child abuse and neglect and to provide parents with the assistance they need; and 'WllEREAS, all children deserve freedom from verbal abuse, sexual abuse, physical abuse and neglect, and emotional abuse and neglect; and 'WllEREAS, children deserve to have days which include loving hugs, warm homes, tender care, parents and adults who listen and who promote self-esteem, give quality time, provide necessary food, shelter, clothing, and medical attention; and 'WllEREAS, it is vital that we join forces to reach out to parents and children to prevent recurrence of child abuse and neglect; and "WHEREAS, it is indeed appropriate and fitting to focus attention upon the problem of child abuse and neglect in the Commonwealth of Virginia and in the County of Albemarle; NOW, THEREFORE, 1, Lindsay G. Dorrier, Jr., on behalf of the Albemarle Board of County Supervisors, do hereby proclaim the month of April 2004, as CHILD ABUSE PREVENTION MONTH in the County of Albemarle, and do call upon our citizens to observe the month with appropriate programs, blue ribbons and other activities. Signed and sealed this 7th day of April, 2004. UNDSAY G. DORRIER, JR., ClWRMAN ALBEMARLE BOARD OF COUNTY SUPERVISORS I I 5(JTH ANNIVERSARY OF THE UNIVERSITY OF VIRGINIA COMMUNITY CREDIT UNION WHEREAS, the University of Virginia Community Credit Union is celebrating its 5()th anniversary at its annual meeting on May 26, 2004; and WHEREAS, the Credit Union was founded in 1954 by Daniel D. Colcock, a University of Virginia Hospital administrator, wlw brought together a group of University of Virginia employees to form a credit union for the purpose of improving the financial lives of its members; and WHEREAS, the original bylflWs state that, liThe object of this corporation shall be to promote thrift among its members by giving them an opportunity to Save money in small amounts, thus accumulating and investing the savings of the members; to make loans to its members which promise to be of benefit to the borrower; and generally conduct a credit union as hereinafter provided;" and WHEREAS, today the Credit Union has more than 45,000 members, and membership is open tQ all wlw live, work, or attend school in the City of Charlottesville and the counties of Albemarle, Fluvanna, and Greene. The Credit Union operates seven branches througlwut the Charlottesville-Albemarle community; and WHEREAS, the Credit Union offers a wide variety of personalized, high--quality financial services, including deposit accounts, loan accounts, and multiple avenues for convenient account access. The Credit Union is a non-profit, member-awned financial institution, the largest of its kind in Central Virginia; and WHEREAS, for fifty years, the University of Virginia Community Credit Union has made vital contrib1ttions to the financial well-being of tlwusands of residents of this community; NOw;. THEREFORE, 1;(\ Lindsay G. Dorrier, Jr., Chairman of the Board of Supervisors of Albemarle County, Virginia, in recognition of this important anniversary, do hereby congratulate the University of Virginia Community Credit Union for 50 years of service, and call upon all citizens to recognize the essential contributions that the Credit Union makes in enhancing the financial well-being of the residents of our community. Signed and sealed this 7th day of April, 2004. Lindsay G. Dorrier, Jr., Chairman Albemarle Board of County Supervisors COUNTY OF ALBEMARLE AGENDA TITLE: Dance Hall Permit AGENDA DATE: April 7, 2004 ACTION: INFORMATION: SUBJECT/PROPOSAUREQUEST: Application request for a dance hall permit CONSENT AGENDA: ACTION: X STAFF CONTACTCS): Messrs. Tucker, Foley, Davis, Schlothauer, Lowry REVIEWED BY: INFORMATION: ? ATTACHMENTS: Yes BACKGROUND: The attached application (Attachment A) was received requesting a dance hall permit for a restaurant. The Albemarle County Code requires an applicant to obtain a dance hall permit from the Board of Supervisors before commencing operation of any dance hall. A dance hall is defined as "any place open to the general public where dancing is permitted". The County Zoning Ordinance stipulates that "dancing by patrons shall be considered as entertainment accessory to an eating establishment, provided the space made available for such dancing shall not be more than one- eighth (1/8) of that part of the floor area available for dining" (Attachment B) Any dance floor occupying more floor space is permitted only by special use permit. DISCUSSION: Applications for dance hall permits must contain certification from the fire marshal and building offi.cial that the dance hall is in conformity with applicable provisions of the Fire prevention Code and the Virginia Statewide Building Code. Dance halls also are subject to all requirements of the county zoning ordinance. Upon proper application and confirmation of these certifications, the Board has no discretion to deny the permit. The County Code makes no provision for an approval being subject to conditions. The primary restriction on dance halls is that it is unlawful for any dance hall to allow any person under the age of eighteen to enter or remain in a dance hall while dancing is being conducted there unless that person is accompanied by a parent or legal guardian, or by a spouse, brother, or sister over the age of eighteen. Attachment C is the certification from the Fire/Rescue Department demonstrating the applicant's compliance with the Fire Prevention Code. Attachment D is from the Department of Building Code and Zoning Services stipulating that the establishment is in conformance with the Virginia Uniform Statewide Building. A Certificate of Occupancy from the Building Official has been issued. RECOMMENDATION: Since the applicant has received the necessary approvals to operate a dance hall by right as defined above, staff recommends approving the request for a dance hall permit from EL RAY del TACO. 04.047 31-03..,04P11 :01 RCVD ~I·-I '\ EL RAY del TACO EL RAY del TACO 380 GREENBRIER DRIVE CHARLOTTESVILLE, VA 22901 February 27,2004 COUNTYOFALBE~E BOARD OF SUPERVISORS ELLA WASHINGTON-CAREY, CLERK 401 MCINTIRE RD CHARLOTTESVILLE, VA 22902 This is to confirm that I previously complied with your request to provide you with copies of all required building permits (i.e. electrical, plumbing, heating, etc.). Now I am requesting a "Dance Floor Permit" for the below listed property. 1) Owner: Rudy Padilla 2) Manager: Jose Rodrigues 3) location: 380 Greenbrier Rd, Charlottesville, Va 22901 4) Alcohol sales: Yes, we intend to serve alcohol. Sincerely, ELRAY del TACO r I ALBEMARLE COUNTY CODE Sec. 12-102 Intentional false alarms a criminal offense. It shall be a misdemeanor for any person to knowingly and without just cause to activate a security or fire alarm to summon the police department or fire and rescue service in situations where' there is no actual or threatened criminal or reasonable belief of fire activity requiring immediate police or fire response. (Ord. of 4-17-91; Code 1988, § 2.2-2; Ord. 98cA(I), 8-5-98) Sec. 12-103 Charges for false alarms. Aftertwo (2) false alarms in any twelve-month period, users shall be charged for each subsequent false alarm, which results in a police department or fire department response, in such amount as is reasonably calculated to reimburse the county for the' costs of responding to such false alarms. Such amount shall be determined by the county executive and shall be based on the average time, manpower and equipment devoted to a police or fire response· to false alarms. This charge is to reimburse the county for costs expended; it is not a fine; and is not dependent upon a criminal conviction under section .12-102 above. (Ord.of 4-17-91; Code 1988, § 2.2-3; Ord. 98-A(I), 8-5-98) Sec. 12-104 Administration. Administration of this article shall be the joint responsibility of the chief of police and the director of finance under the supervision of the county executive. (Ord. of 4-17-91; CodeJ988, § 2.2-5; Ord. 98-A(1), 8-5-98) Sec. 12-105 Appeals. " Any charge imposed pursuant to section 12-103, or notice of withdrawal of consent Or order to disconnect, as provided hereinabove,,'may be appealed to the board of supervisors by applièation of the owner filed with the county executive within ten (10) days of the date of notice of such chargeor order. Upon receipt of such appeal, the county executive or his designee may granfrelief from such charge or order, or may place the matter on the agenda bfthe board ofšupervisors for hearing. (Ord.of 4-17-91; Code 1988, § 2.2-6; Ord. 98-A(1), 8-5-98) ARTICLE IT. AMUSEMENTS Df\l1SIONl. DANCE HALLS State law referenee-authority to adopt article, see Va. Code §§ 18.2~432, 18.2-433. Sec. 12-200 Dance hall defined. For the purposes of this division, the term "dance hall" meahS any place open to the general public where dancing is permitted. (Code1967,§ 8-1; Code 1988, § 3-11; Ord. 98-A(1), 8-5-98) State law reference-Authority to codify ordinance, Va. Code § 18.2-43:3 12~3 -I I ALBEMARLE COUNTYCODE Sec. 12-201. Permits-- Required;. applications. ì- , A. It shaÌl be unlawful for any person to operate a' dance hall in the county unless such person shall have first obtained a permit from the board of supervisors. B. Applications for such pennits shall be filed with the clerk of the board of supervisors at least two (2) weeks prior to the regular meeting. of the board of supervisors at which the application is to be considered. Such applications shall contain the following information: 1. name of the person owning the darice hall; 2. name ofthe person managing the dance hall; 3. the location of the dance hall; 4.· a statement as to whether or not alcoholic beverages are to be served on the premises of such dance hall; and 5. certification from the building official and fire marshal that such dance hall is in conformity with applicable provisions of the Virginia Uniform Statewide Building Code and the Fire Prevention Code. (4-21-76; Code 1988,§ 3-12;Ord. 98-A(l), 8-5-98) Sec. 12-202 Revocatìon of permit. Permits issued by the board of supervisors pursuant to the provisions ofthis division may be revoked by the board of supervisors for any violation by the permittee ofthe provisions of this division or for any false statement made on the application required by the preceding section. No such permit shall be revoked unless the permittee shall have received reasonable notice that he is entitled to a hearing before the board of supervisors prior to action on revocation. Such notice shall state the time and place such hearing is to be held. (Code 1988, § 3-13;Ord. 98-A(1), 8-5-98) Sec. 12-203 Attendance of persons under eighteen years of age. It shall be unlawful for any person operating a dance hall to allow any person under the age of eighteen (18)years to enter or-remain in such dance hall while dancing is being conducted therein,unless such person is accompanied by a parent or legal guardian or by a spouse, brother or sister' over the age of eighteen (18) years, unless s~chperson has the w-rittenconsent of such parent, legal guardian or spouse. (Code 1967, § 8-2; Code 19""88,§ 3-14;Ord. 98-A(1), 8-5-98) Sec. 12-204 Exemptions. A. The provisions of this division shall not apply to dances conducted Jor benevolent or charitable purposes, or when such dances are conducted under the auspices of religious, educatioñal, civic or militaryorganizations. B. The provisions of this division shall not apply to dance halls in any town in which an ordinance adopted pursuantto the provisions of Virginia Code § °18.2-433 is in effect. (Code 1988, § 3-15; Ord. 98-A(O, 8-5-98) 12-4 I I ALBEMARLE COUNTY CODE Sec. 12-205 Violations; penalties. Any person violating the provisions of this division shall be guilty of a Class 3 misdemeanor. (Code 1988, § 3-16; Ord. 98-A(1f8-5-98) , Sec. 12-206 Relation of article to zoning ordinance. fn addition to the provisions of this article, dance halls shall be subject to all requirements Qf the county zoning ordinance. (4-21-76; Code 1988, § 3-17; Ord. 98-A(1), 8-5-98) DIVISION 2. BINGO AND RAFFLES Sec. 12-207 Local ordinance adopted. Pursuant to Virginia Code § 18.2-340.15 the Charitable Gaming Commission shall regulate bingo, instant bingo and raffles, except as otherwise provided in this division. (Ord. No. 94-3(1), 12-7-94; Ord. No. 96-3(1), 8-7~96; Code 1988, § 3~20; Ord. 98-A(I), 8-5-98) See, 12-208 Limitation on bingo operations. The hours of bingo operatioñ shall be limited to the hours between 6:00p.m. and 11:00 p.m, except on Saturdays and Sundays when the hours of operation shall be limited to the hours between 1 :00 pÆ. and {LOO p.m. (Ord. No. 94-3{l), 12-7-94; Ord. No. 95-3(1), 4-5~95; Ord. 96-3(1), 8-7-96; Code 1988, § 3-28; Ord. 98- A(1), 8-5-98) State law reference--Authority to adopt, Va. Code § 18.2-340.32 Sec. 12-209 Exemption The provisions of this article shall not apply· to bingo operations in any town in which an ordinance adopted pursuantto Virginia Code § 18.2-340.32 is in effect. (Ord. 98-A(1), 8-5-98) ARTICLE III. DEALERS IN PRECIOUS METALS State law reference-Regarding dealers in precious metals generally, see Va. Code §§ 54.1-4100et seq.; authority of county to enact ordinance regula1ing dealers in precious metals and gems, see Va. Code § 54.1-411 L Sec. 12-300 Definitions. For the purposes of this article, the following words shall have the meanings ascribed to them by this section, lIn1ess the context requires a different meaning: (l)Cain. The term "coin" shall mean any piece of gold, silver ,or other metal fashioned into a prescribed shape~ weight and degree of frileness, stamped by authority of a government with certain marks and devices, arìdhaving a certain fIxed value as money. ' 12-5 I I Public Utility: Any plant or equipment for the conveyance of telephone messages or for the production, transmission, delivery or furnishing of heat, chiUed air, chilled water, light, power or - water, or sewerage facilities, either cfuectly or indirectly, to or for the public. Public Water Supply: A water' supply consisting of a well, springs or other source and the necessary pipes, conduits, mains, pUInpingstations and other facilities in_connection therewith, operated by, for, or under the authority öf the Albemarle County Service Authority and/or the Rivanna Water and Sewer Authority. Residential Area (Gross): Tbe total area of land and water within a residential development. Residential Area (Net): That area of land, and water within a development designed for residential , purposes and unoccupied by streets, open space or parking areas, provided that individual private driveways accessory to residential uses shall not be considered streets or parking areas. Residential Density (Gross): The total number of dwelling units within a development divided by the gross residential area and expressed in dwelling units per acre. Residential Density (Net): The total number of dwelling units within a development divided by the net residential area and expressed in dwelling units per acre. :Re.S{CtI1i1;C(ntr., An establishment wherein, for compensation, meals, or', beverages are served for consUInption on or off the premises. The term "restaurant" includes, but is not limited to, those establishments commonly known as restaurants, fast food restaurants, coffee shops, cafeterias, cafes, lunchrooms, luncheonettes, hotel dining rooms, dinner theaters, tavems,and soda fountains; The tenn "restaurant" does not include a snack bar or refreshment stand at a public or nonprofit recreation facility,opeI<ltedsolely .l?ythe9I'efa~or of the, facility ,for th.e . .c?nvenience .of its patrons.pancing by patrons shall' be considered as' cntcrtainment accessory to ,'aresta'Ura:Qt1 provided the spate avai1åble f()rsu.()~dancing shalI not bcmorc than one-:i¥hth (I/8) o~tliå~påi1; of the floor area available. for dinin.g'J?rpvision~ fprdatlcing ma~e~:y~la&l~u~~e.rt~isdefmition ~hall;þe sùbjecttptlJe permit requirements of Chapter 12 of the Code. of Mbemarle. The uses identified' in this chapter as "eating establishment" and "fast food restaurant" are restaurants. (Amended 10-3-01) Retail Sales Area: That portion of the net floor area of a cOmnlercial use devoted to the display and/or sale of merchandise to the public. Storage of inventory, offices, and other such areas not devoted to the sale and/or display of merchandise shall not be considered as retail sales area. , (Added 7-20-88) Retail Stores and Shops: Buildings. for display and sale of merchandise at retail or for the rendering of personal services such as the following, whiph will serve as illustration only and are not to be considered exclusive: drug store, newsstand, food store, candy shop, milk dispensary, dry 'goods and notions, store, . antique store and gift shop, hardware store, household appliance store, furniture store, florist, optician, music and radio store, tailor shop, barber shop and beauty shop. Road: See Street. Roof Fake Mansard: A roof constructed in the fashion of a mansard roof, any portion of which extends below the intersection of the wall face and roof decking. Roof Mansard: Aroofhaving two (2) slopes on all sides with the lower portion having a steeper slope than the upper portion. This defmitioh shall apply to any roof having a flat upper portion ands10pèd sides; , 18-3-13 Zoning Supplement #26, 3~ 19-03' I I I I -:11: OCt 5Ç¡ q.- The County of Albemarle Office of the Fire Marshal Department of Fire & Rescue 401 McIntire Road, Room 222 Charlottesville, Virginia 22902-4596 (434) 296-5833 (434) 972-4123 (Fax) . Pàge 1 of Fire Safety Inspection Relll!r! Business Name: rGL "KAY TJiEL -r1>,rD AddreSs:ae:o ('~R~æ.i2 l)~~VE Phone Day: cU;, tb- 1tJ.'ô'i After Hours: Owner/Manager: Date: 5 -/l~OV Time: B:5(þm Type of Occupancy: A An authorized representative ofthe County of Albemarle's Fire Prevention Office has observed the following violation(s) of the Albemarle County Fire Prevention Code (VSFPC) on your premises. You are hereby requested to correct the said violation(s) on or before the correction date shown below. If you do not understand any part of this report or feel you cannot comply within the allotted time, IMMEDIA TEL Y contact our office at (804) 296-5833. , ÿ~- :J:N.sfEc;rìoÑ'lJt- - No 0dl\lh~ -MiD TNsO€':í:Ji&J- I *-1he ôœ.., ()&..rf IJ.r.cJ.J f7ns Arfí ~ issvd .J.o hu:s,ÀJ~ Af -th/sTÌNl£k I ',', ' -...__.,--_._---,~.__...._--- ----.~_._- _.... - .--.. - ---- -------.,,----- ----- Said Violation(s) shall be corrected by: NoticeofViolation(s) Issued for item(s) Number: Non compliance with this request can result in your being charged with a l!1isdemeanor, punishable by fine or imprisonment as provided in the appropriate court for each offense. Each day that a violation continues after said time litnit, shall be deemed a separate offense. Signing is not an admission of guilt, only that you have been advised of the violation(s) and will be provided with a copy of this report as the property representative of the business that has been inspected by our personnel. .' .. , ~[i <7'i1. ~ ROPERTY REP FI . SPECTOR Made by: PRY # I Violation(s Not Corrected: YELLOW: OWNER/MANAGER -:.-_._-,-,.,- ._~..,...,......",", II ~ \ 05-03 -04P09:32 RCVD COUNTY OF ALBEMARLE Department of Building Code and Zoning Services 401 Mcintire Road, Room 227 Charlottesville, Virginia 22902-4596 FAù((434) 972-4126 TELEPHONE (434) 296-5832 TID (434) 972-4012 MEMORANDUM To: Ella Washington-Carey- Clerk, Board of Supervisors From: Jay Schlothauer - Building Official ~ Date: March 4, 2003 Re: EI Rey Del Taco - Dance Hall Permit This office has recently issued a Certificate of Occupancy for the referenced establishment. The space occupied by EI Rey Del Taco is in confonnance with the Virginia Uniform Statewide Building Code. JS/js cc: file I I I I ~ u z < ~ ~."... ¿ ~ ~ 'rIj = Q 'rIj :..- ,~' .~. = = ~' ,': = , CJ ~ ~ - Qj ~ ~ Q) ~ '~ ,~ .. Q) e ~' z a =. ,= ~ = = ~ . . "'0' ~, = ~" Q) ~ ,.- ;~ (I'j (I'j Q) == .....-4 (I'j = = . . Q. = = ;. ø Q) (I'j þ Q) "'Ø;' "=Q)= .... == ~ Q) . "'Ø~= ~ ~ ~ e - "ª ~Q) ~, ~ ~; c.. 0 = ~ :: u~= ~ "WI rIJ .... , QJ) .....-4 C ~,~ .- ,.Q Q) ,"'0 = == ..., ...... .- , ~ ...... '~ ,;C',. g; " ~ rIJ .' =...\ ' Qj OJ)- '~.- ~ . ~ (I'j .... , ¡$:' ÇI). :- Q.) ..... ~ ......=Q) , ~ ...... = ......., ... (f] ,0) ... , "C = ; == e u.;:: - ~ .c = s¿ ,.', .... 0 -' .- ... "c .~,,' . >-\ = ,QJ "C -'Q)~Q) ",.Q=, ", .....-4 , ' ~ QJ" (I'j (I'j, .~ :- .....-4 ,(I'j :::,;.. ~..... .- ~, fI:J QJ) QJ.' >01 ~ ;.:- == > ~ .,...., "C ~ .", ~ ,~'.:;:: , ~ Q), ,. 'Q) ';;-i _ IIIIiIoo ;. ~Q)~ -= ~ .CJ OJ) ~ ~8'~' ,.:s= "...; ,~.- ;;Q) "Ø ~,.Q"C== =.... == = ~<~,.Q .. "C Q) = (I'j (I'j ~ Q) .... ~ ~ COUNTY OF ALBEMARLE EXECUTIVE SUMMARY AGENDA TITLE: Thomas Jefferson HOME Consortium AGENDA DATE: April 7, 2004 ITEM NUMBER: ACTION: INFORMATION: SUBJECTlPROPOSAUREQUEST: Approval of staff recommendation for allocating funds available July 1, 2004 CONSENT AGENDA: ACTION: X INFORMATION: STAFF CONT ACnS): Tucker, Roxanne White, Ron White REVIEWED BY: ATTACHMENTS: BACKGROUND: The U.S. Department of Housing and Urban Development (HUD) annually provides funding under the HOME Investment Partnership Program to units of state and local government through formula allocations. Only the larger jurisdictions receive funding under the established formulas. HUD does, however, allow smaller localities to form a consortium in order to receive an allocation of HOME funds. Albemarle County has participated as a member of the Thomas Jefferson HOME Consortium (six jurisdictions of the Planning ) District) since 1992 sharing in over $10 million in HOME funds to support affordable housing initiatives in the region. HUD requires that an Action Plan be developed annually prior to receipt of HOME funds. The Plan will include a summary of current year activities and a proposal on how funds will be used for the coming year, beginning July 1,2004. A more detailed annual performance plan will be prepared for HUD after the end of the fiscal year. This report will be presented to the Board at that time. DISCUSSION: Each locality receives an equal annual appropriation estimated this year at $128,500. In addition, HUD has established an additional set-aside for the American Dream Downpayment Assistance Initiative (ADDI) that will bring Albemarle County $20,260 to assist first-time homebuyers. HOME will also provide $5,996 in administrative funds. In prior years, the Albemarle Housing Improvement Program has been designated the subrecipient for the County allowing them to receive and administer the funds. The majority of funds were earmarked for rehabilitation of owner-occupied housing. This year, approximately $89,000 was used to rehab 6 homes (4 complete and 2 pending). $40,000 was used to cover additional costs at Whitewood Village Apartments including some relocation costs. RECOMMENDATION: Staff recommends the following allocation of HOME funds for fiscal year beginning July 1, 2004: $98,760 for owner-occupied rehab designating AHIP as subrecipient $ 4,600 in admin funds to AHIP $29,740 of regular HOME funds .for first-time homebuyer assistance (administered by Office of Housing and/or PHA) $20,260 of ADDI funds (administered by Office of Housing and/or PHA) $1,396 in admin funds to County At its March 10 meeting, the Housing Committee approved this recommendation for allocating HOME funds. 14.041 30-03-04P08:32 RCVD ìi r r·~ COUNTY OF ALBEMARLE EXECUTIVE SUMMARY AGENDA TITLE: Lease Amendment - Charlottesville Waldorf School in Crozet AGENDA DATE: April 7, 2004 ACTION: INFORMATION: SUBJECTJPROPOSAUREQUEST: Request to amend the current lease to allow two six month extensions under Section 1.7 of the agreement. CONSENT AGENDA: ACTION: X INFORMATION: REVIEWED BY: ~ I STAFF .CONT ACnS}: Tucker, Foley, Davis ATTACHMENTS: Yes LEGAL REVIEW: Yes BACKGROUND: The County currently leases the old Crozet Elementary School building to the Charlottesville Waldorf School (CWS). CWS is currently in the process of constructing a new school in Charlottesville and plans to be in the facility by July 2005. However, due to the uncertainties with construction, CWS has requested an amendment to their current lease to allow the option of two six month extensions. They currently have the option to extend the lease only on a month to month basis at double the monthly rent. DISCUSSION: This item has been reviewed with the Board's Building Committee. The committee considered other potential uses of the facility and the timing of any potential use that may effect approval of an extension. Given the time involved in the study and consideration of the ultimate use of this site, the committee felt that allowing an extension of the lease as requested was appropriate. This will also allow the County to continue generating rent on the facility while final plans are developed on reuse of the site. RECOMMENDATIONS: Staff recommends advertisement of a public hearing on May 5th for consideration of an amendment to the lease as proposed. 04.037 01-04-04Pl0:09 RCVD 1 \ RECEIVED DEC 1 9 2003 Charlottesvilhz 12/17/03 County of Albemarle County Executive's Offø Wò/dorf School Larry Davis, Esquire County Attorney County of Albemarle 401 McIntire Road, Room 325 Charlottesville, Virginia 22902 re: Charlottesville Waldorf School Lease Amendment Dear Mr. Davis: As you know, the Charlottesville Waldorf School ("CWS") leases th~old Crozet elementary school from the County. The lease currently expires July 200S;\iâlifhough it has a holdover option for a month-to-monifh lease at double the rent. This is to request that the County agree to a Lease Amendm~nt. We have attached thè~t¿pÖ~eé1T.eáseAmendment for your review. We look " forward to the opportunity to meet with you tødiscuss the Lease Amendment and will call you to set up a meef" In the interim, please feel free to call me with any response or After years of not having a permanent home, CWS has purchased property on Road and has begun a capital campaign to raise funds to build a new schp(}l. We intend to be in the new school by July 2005; however, we recogniiéth'át\ftifiaråls1hgåfia construction may delay us beyondthat]56iiit.Ttfávüid the disaster. expcnsc. and uncertainty of not having a physical place in which to hold school, \VC propose that the County and CWS enter into the attached Lease Amendment. , - . , . -" . , . We believe that C'~~~n'#~~()~'íeJ1~tfortl1e\c;oU11ty, ·:WealsorecÖgrtìi~·" that some County residents 1 oh"ardtoha,fil1gth,e(}ldCr~),zetelementa:iJ' schaol" building put to public use, but we have bcen gi "en 1ø,l.ìt1Õersiahd ß1atnoplçms'háve.beei1 made nor funds budgeted j() " an)' slIch p!lhli(~ use, TÞus.We'vièwtheproposedLease Amendment as a positive ste.ft~~Jb..(}¡h Ç\¥~a.tlqtAeCoiìnty, providif!K$.ec:urity for the school and income for the Co~rY::;~ .: ',: -:' '~, ,. ,,' ',: ; " "',',,;., . , Si}ütits~~ . . .'.,... - N~~ 1408 Crozet Avenue' LEASE AMENDMENT The County of Albemarle, Virginia ("Landlord") and Charlottesville Waldorf School (f/k/a Crossroads Waldorf School) ("Tenant") enter into this Lease Amendment this _ day of WHEREAS, Landlord and Tenant entered into a Lease Agreement (the "Lease Agreement") with a date of July 15, 1999 for the lease of the Old Crozet Elementary School; and WHEREAS, Landlord and Tenant desire to amend the Lease Agreement; NOW, THEREFORE, Landlord and Tenant, for the sum ofTen and NOII00 DoUars($lO.OO) and other good and valuable consideration, the receipt and sufficiency of which is hereby acknowledged, agree as follows: In addition to the Option to Renew set forth in Paragraph 1.5 of the Lease Agreement, Tenant shall have the option to renew the Lease for two (2) terms of six (6) months each. Tenant shall exercise this option to renew by providing written notice in accordance with Section 16.1 of the Lease Agreement on or before January 1,2005. The renewal term shall be on the same terms and conditions of the Lease, except as expressly agreed to by the parties. The rent to be paid by Tenant during the renewal term(s) shall be calculated according to Section 1.7 of the Lease Agreement. I IN WITNESS WHEREOF, the undersigned have executed this Lease Amendment I this -L day of I-I LANDLORD: COUNTY OF ALBEMARLE VIRGINIA By: Its: COMMONWEAL TH OF VIRGINIA COUNTY/CITY OF , to-wit: I, the undersigned, a Notary Public, in and for the jurisdiction aforesaid, do hereby certify that on this _ day of ofthe County of Albemarle did personally appear before me and acknowledge the foregoing Lease Amendment. Given under my hand this _ day of My commission expires: Notary Public Approved as to form: County Attorney 2 \"\ " I TENANT: CHARLOTTESVILLE WALDORF SCHOOL By: Its: COMMONWEAL TH OF VIRGINIA COUNTY ¡CITY OF._, to-wit: I, the undersigned, a Notary Public, in and for the jurisdiction aforesaid, do hereby certify that on this __ day of of the Charlottesville Waldorf School did personally appear before me and acknowledge the foregoing Lease Amendment. Given under my hand this _ day of My commission expires: Notary Public 3' 'rl COUNTY OF ALBEMARLE EXECUTIVE SUMMARY AGENDA TITLE: Requested FY 2004 Appropriations AGENDA DATE: April 7, 2004 ACTION: INFORMATION: SUBJECT/PROPOSAL/REQUEST: Request approval of Appropriation #2004068, #2004070, #2004071, and #2004072, totaling $262,161.75, providing funds for various General Government and School Funds. CONSENT AGENDA: ACTION: INFORMATION: ATTACHMENTS: Yes STAFF CONTACT(S): Messrs. Tucker, Breeden; Ms. White REVIEWED BY: BACKGROUND: The Code of Virginia § 15.2-2507 stipulates that any locality may amend its budget to adjust the aggregate amount to be appropriated during the current fiscal year as shown in the currently adopted budget. However, any such amendment which exceeds one percent of the total expenditures shown in the currently adopted budget or the sum of $500,000, whichever is lesser, must be accomplished by first publishing a notice of a meeting and holding a public hearing before amending the budget. The Code section applies to all County funds, i.e., General Fund, Capital Funds, E911, School Self-Sustaining, etc. The total of these requested additional FY 2004 appropriations is $262,161.75, which is below the threshold level for a budget amendment on its own. It is anticipated that a budget amendment will be proposed in May 2004, and these appropriations would be incorporated into it. STRATEGIC PLAN: 4.2 Fund County services in a fair, efficient manner and provide needed public facilities and infrastructure. DISCUSSION: This request involves the approval of four (4) new FY 2004 appropriations as follows: - Two (2) appropriations (#2004068 and #2004072) in the amount of $190,661.75, for various School programs and grants; - One (1) appropriations (#2004070), totaling $71,000.00, recognizing a state grant award to the Fire Rescue Department and providing funding for suction equipment for the volunteer/rescue departments; and - One (6) appropriation (#2004071), totaling $500.00 recognizing a state grant award to the Police Department; A detailed description of these appropriations is provided on Attachment A. RECOMMENDATIONS: Staff recommends approval of the FY 2004 Appropriations #2004068, #2004070, #2004071, and #2004072. 30-03-04P08:31 RCVD 04.044 I I Attachment A Appropriation 2004068 The following appropriations were approved at the School Board's February 26, 2004 meeting: $186,270.75 - Re-appropriation of $165,524.00 in school carryover funds and $14,429.75 in building rental funds. Policy B-E allows schools to carry forward up to 10% of their budgets from year to year and Policy KG-R returns 40% of the base fees collected for building rental to be returned to each school. · Western Albemarle High School and the Warrior Club received donations in the amount of $300.00. Photoworks Creative Group Inc donated $100.00, Douglas Starns donated $50.00, Andrew and Terri Guertler donated $50.00, and William Dickey, Jr. donated $100.00. These donations will be used to purchase weight room equipment for the new Weight/Wellness Room that is being constructed at the school. Western Albemarle High School also received a donation in the amount of $1,000.00 from the Trustees of the Frederick S. Upton Foundation. Sarah and Douglas Dupont made a matching donation of $1,000.00. This donation will be used for the cultural enrichment program at the school. · Greer Elementary School received a donation in the amount of $150.00 from Mark and Amy Robbins. Mr. & Mrs. Robbins requested that $100.00 be used for the art program and $50.00 be used for the kindergarten program. Baker Butler Elementary School received a donation in the amount of $4,167.00 from the Baker Butler PTO. This donation wil/ be used to purchase 15 I-books (wireless Macintosh computers) for use in the classroom. Appropriation #2004070 $ 71,000.00 - The Fire Rescue Department recently applied for a grant from the Office of Emergency Medical Services to purchase 12 manual/automatic external defibrillators (AED's). The Office of Emergency Medical Services has awarded Fire/Rescue $21,000 to make this purchase, however, the grant funds cover one-half of the costof twelve fully automatic AED's as' opposed to the manual/automatic AED's that were requested. Staff original requested funding for AED's that were manual/automatic that would allow our advanced life support (ALS) providers to use the same defibrillator that was first applied to the patient by basic life support first responders that arrive on-scene earlier. Once the ALS providers arrives on-scene, they can switch the monitor over to manual, interpret the rhythm, and take correction action. Otherwise, the ALS provider would need to switch out the monitor during the emerg.ency call. This appropriation request recognized the $21 ,000 in grant revenues and requests an additional appropriation from the General Fund balance of $39,000 to provide for the one-half matching grant funds and the additional $18,000 to upgrade the AED's to manual/automatic. · In January 2003, the Office of Emergency Medical Services (OEMS) was scheduled to put into place new rules and regulations for EMS agencies. Due to the enormous amount of opposition from volunteer rescue squads, the implementation date was postponed. In the mean time, several of the rules and regulations were challenged by many of the EMS special interest groups. The OEMS revised the rules and regulations and chose to implement them in the latter part of the summer. One of the new revisions now calls for battery operated suction units and various tools on aI/licensed EMS vehicles. Fire Rescue has a number of vehicles that respond to EMS calls upon request and therefore, would need to purchase the required equipment by the latter part of October. This appropriation requests $11,000 from the General Fund Balance to purchase eleven suction units to comply with this new requirement. Appropriation #2004071 $ 500.00 The Department of Motor Vehicles has awarded a grant in the amount of $500.00 to the. Albemarle County Police Department to purchase child safety seats including booster seats. This is in conjunction with child safety seat checkpoints and public awareness for the need to have children properly restrained in motor vehicles. There is no local match. Appropriation #2004072 The following appropriations were approved at the School Board's March 11, 2004 meeting: $ 4,091.00 · Western Albemarle High School and the Warrior Club received donations in the amount of $2,430.00. Raymond and Donna Conley donated $100.00, Linda and Michael Kenney donated $30.00, J.W. Townsend, Inc. donated $1,500.00, Art Kruithof donated $100.00, William and Amy Steers donated $50.00, Donald and Maggie Shreve donated $50.00, D.W. and Amy Munn donated $25.00, Karen Arch with Blue Moon Trading Company donated --'-1 $50.00, J. Bruce Barnes, Inc. donated $500.00, and Parkway Pharmacy donated $25.00. These donations will be used to purchasé weight room equipmentfor the new Weight/Wellness Room that is being constructed at the school. - Baker Butler Elementary School received a donation in the amount of $1 ,661.00 from thé Baker Butler PTO. This donation will be used to purchase two outdoor basketball goals for the school. . The No Child Léft Behind Act (NCLB), Public Law 1 07 ~11 0, authorized the Title II, Part A as a federal grant program thatcombines the Eisenhower Professional Development, School Renovation, and Class Size Reduction Grants into a Teacher Quality grant program that focuses on preparing, training, and recruiting high-quality teachers, principals, and paraprofessionals. Title II, Part A 2003/2004 funding request included $152,925.00 to pay for limited Literacy Specialist staff and benefits. The purpose of these funds were to add time to Literacy Specialists who will teach small groups of students and coach/model for other teachers best practice strategies in the area of reading/writing literacy. These funds were originally included in the regular School fund budget Itis requested that $152,925.00 in expenses and revenues be transferred from the Title II grant funds to appropriately reflect these activities. - During the previous year, several projects were bid and bids received were less than expected, thereby providing available funds to supplement other projects that are scheduled to be bid in the Spring, 2004. These projects appear to be under~funded due to an increase in the scope of work, required regulatory changes and corrective air quality issues. The following is a brief description of the projects that require additional funding: . Walton Middle School The original scope of work included interior renovations and the addition of a strings room. Based on the school's request, with the endorsement of Building Services, the scope of the project has changed to be an HV AC Replacement project because of air qualityconcerns. Implementing a reduced scope of work for interior renovations to accommodate the school's needs in music and guidance will accommodate their needs until the other renovations can occur in three years. The HVAC replacement was scheduled and approved for 2007; we are just changing the order of the year in which the projects occur. The HV AC Replacement budget was $95,320 more than this year's budget for interior renovations., Therefore, we are requesting a transfer of $95,320 to the Walton Renovations account. . Henley Middle School The original scope of work included a bus staging area that we thought could be accommodated in the front of the building. After many options were evaluated, it became evident that in orderto accommodate 39 buses, we would need to move the bus staging area to the back of the building. This also necessitates additional remodeling to create a direct circulation pattern from the addition to the bus area. Our current estimate is that it will take $287,000 to construct the new bus staging area with the necessary heavy-duty pavement. Therefore, we are requesting a transfer of $287,000 to the Henley Renovations account. - Hollymead Gym The original scope of the project included a 7,000 SF gym and an additional 800 SF for restrooms and support spaces. As the design evolved with the school committee, it became evident that additional items needed to be added to the project to make it a fully functional facility. Those items have been identified as follows: 1. Additional 3,000 SF - The connecting corridor from the building to the gym needed to be longer than anticipated, the PE Office, storage, and a small lobby needed to be accommodated, as well asa room for the PE equipment was needed. This was an addition of 3,000 SF. 2. Additional Parking - Parking was needed along with parking lot lights. 3. Storm Water Retention - We will be required to upgrade the storm water retention and water quality aspect for the entire elementary site. 4. Our original budget was $100 per SF, and the current cost estimate indicates that it should be $110 per SF. The following is a summary of additional costs: Cost Escalation -10,800 SF @ $10/SF AdditionalScope - 3,000 SF @ $11 O/SF Parking, Storm Water, Etc Total Transfer Request for Hollymead Gym $108,000 $330,000 $ 90,000 $528,000 - Stony Point HV AC Replacement Persistent air quality difficulties necessitate that we replace the HV AC system in the original building and 4 classrooms in the west wing of the building. This project was scheduled in 2010, but needs to move 1'-1 forward 6 years to insure that we can maintain an acceptable level of humidity in the area. The budget for this project is $248,248. The Monticello Addition bid was extremely competitive, and the project was moved forward but did not remove the inflation factor that was in place for the project. We were hopeful that other projects would come in under budget and we could move theMHS auxiliary gym forward to next year. Unfortunately, this has not happened. As we have worked on the scope and cost of the auxiliary gym, wrestling room, and weight room, it became evident that sufficient, existing funding would not be available to move the project forward, and the money would be better used to adequately fund the four projects listed above. The second year of enrollment reductions at Cale and Walton has emphasized to us the need to revisit the need for a new Southern Elementary school and to evaluate other options to accommodate the enrollment. Therefore, the $40,000 budgeted in the CIP for site selection for the Southern Elementary is not needed for this year and available to transfer to another project. Additionally, the Srownsville and Jouett projects are nearing completion and unused contingency funds are available for transfer. The projects that will receive the transfers are included in the current, approved CIP. The funding level and the project dates have changed to better meet our needs. n I I The Board of County Supervisors of Albemarle County, Virginia, in regular meeting on the 7th day of April 2004, adopted the following resolution: RESOLUTION WHEREAS, the streets in Grayrock Subdivision, Phase 3, described on the attached Additions Form SR-5(A) dated April 7, 2004, fully incorporated herein by reference, is shown on plats recorded in the Clerk's Office of the Circuit Court of Albemarle County, Virginia; and WHEREAS, the Resident Engineer for the Virginia Department of Transportation has advised the Board that the street meet the requirements established by the Subdivision Street Requirements of the Virginia Department of Transportation. NOW, THEREFORE, BE IT RESOLVED, that the Albemarle Board of County Supervisors requests the Virginia Department of Transportation to add the roads in Grayrock Subdivision, Phase 3, as described on the attached Additions Form SR-5(A} dated April 7, 2004, to the secondary system of state highways, pursuant to §33.1-229, Code of Virginia, and the Department's Subdivision Street Requirements;. and BE IT FURTHER RESOLVED that the Board guarantees a clear and unrestricted right-of- way, as de~cribed, exclusive of any necessary easements for cuts, fills and drainage as described on the recorded. plats; and FURTHER RESOLVED that a certified copy of this resolution be forwarded to the Resident Engineer for the Virginia Department of Transportation. ***** Recorded vote: Moved by: Seconded by: Yeas: Nays: Absent: A Copy Teste: Ella W. Carey, Clerk, CMC Board of County Supervisors I I The road(s) described on Additions Form SR-5(A) are: 1) Gravrock Drive (State Route 1381) from the existing end of state maintenance to the intersection of Jarman Lake Road (Route 1380), as shown on plat recorded 01/21/2002 in the office the Clerk of Circuit Court of Albemarle County in Deed Book 2148, page 289, with a SO-foot right-of-waywidlh, for a length of 0.03 mile; and from the end of state maintenance at the intersection of Jarman Lake Road (Route 1380) to the intersection of Russet Road (Route 1385), as shown on plat recorded 01/2112002 in the office the Clerk of Circuit Court of Albemarle County in Deed Book 2148, page 289, with a 50- foot right-of-way width, for a length of 0.08 mile. 2) Jarman lake Road (State Route 1380) from the existing end of state maintenance to the intersection of Grayrock Drive (Route 1381), as shown on plat recorded 01/21/2002 in the office the Clerk of Circuit Court of Albemarle County in Deed Book 2148, page 289, with a 50-foot right-of-way width. for a length of 0.10 mile. 3) Russet Road (State Route 1385) from the northern intersection of Grayrock Drive (Route 1381) to the intersection of Braeburn Street, as shown on plat recorded 01/21/2002 in the office the Clerk of Circuit Court of Albemarle County in Deed Book 2148, page 289, with a 50-foot right-of-way width, for a length of 0.06 mile; and from the intersection of Braebum Streetto the southem intersection of Grayrock Drive (Route 1381), as shown on plat recorded 01/2112002 in the office the Clerk of Circuit Court of Albemarle County in Deed Book 2148, page 289, with a 50-foot right-of-way width, for a length of 0.07 mile. Total Mileage - 0.34 mile. I ! In the County of Albemarle By resolution of the governing body adopted April 07, 2004 The following Form SR-5A is hereby aJtached and incorporated as part of the governing body's resolution for changes in the secondary system of state highways. A Copy Testee Signed (County Of]icial): Report of Changes in the Secondary System of State Highways Form SR-5A Secondary Road$ Divi$íOll 5/1/99 ProjectfSubdivision Grayrock Phase 3 Type of Change: Addition The fonowing additions to the Secondary System of state Highways, pursuant to the statutory provision or provisions cited, are hereby requested, the right of way for which, including additional easements for drainage as required, is guaranteed: Reason for Change: Addition, New subdivision street Pursuant to Code of Virginia statute: §33.1-229 Route Number and/or Street Name · Grayrock Drive, State Route Number 1381 ------~-------------------------------- . Description: From: Existing End Of State Maintenance To: Intersection Of Jarman Lake Road Route 1380 A distance of: 0.03 miles. R;ght of Way Record: Filed with the Albemarle County Clerks Office on 112112002, Deed 2148, Pg 289, with a width of 50 --------------------------------------- . Description: From: Intersection Of Jarman Lake Road Route 1380 To: Esm Intersection Of Russet Road Route 1385 A distancè of: 0.08 miles. R;ght of Way Record: Filed with the Albemarle County Clerks Office on 1/21/2002, Deed 2148, Pg 289, with a width of 50 · Jarman Lake Road, State Route Number 1380 ; -DescfiPt¡;(,: - £;0;;;" -EJdSt¡ñg End Of State Mâ.iriiënãñœ - - - 7' - - - - - - - - - - - - - - - - To: Intersection Of Grayrocl< Drive Route 1381 A distance of: 0.10 roUes. Right of Way Record: Filed with the Albemarle County Clerks Office on 112112002, Deed Book 2148, Pg 289, with a wiclthof 50 · Russet Road, State Route Number 1385 ; -Descrlpti;(,: - £;0;;;" - NÕÏth Intersëëtiôñ GrayroCkDriVe Roüie 1381 - - - - - - - - - - - - - - - - - To: Intersection Braebum Street A distance of: 0.06 miles. Right of Way Record: Filed with the Albemarle County Clerks Office on 112112002, Deed Book 2148, Pg. 289, with a width of 50 ;D~~~-~;;;..lnt~ooB~m~~---------------------- To: South Intersection Grayrock Drive Route 1381 A distance of: 0.07 miles. RÏght of Way Record: Filed with the Albemarle County Clerks Office on 112112002, Deed Book 2148, Pg. 289, with a width of 50 RECEIVED \ MAR 2 4 2004 ~"~, Page 1 ofl I I COUNTY OF ALBEMARLE Department of Engineering & Public Works 401 Mcintire Road, Room 211 Charlottesville, Virginia 22902-4596 (434) 296 - 5861 Fax (434) 972 - 4035 TRANSMITTAL TO: t: l. LA CÆ ~ IS'/ DATE: 3~).'-I~ 0 4 SUBJECT: GA..4. 'I t3d"'~Ð /{ 0 C I( S t::--c:T. -3 ~ç$O t,../)'tfO.Q The following items are being sent ~ Attached 0 Via Fax \lI Copy of Letter 0 Specifications o Plans, 0 Contract o Plat 0 Change Order o Shop Drawings o Other COPIES DESCRIPTION , I ~ ~ ' L<) GI{,/:}'f !,<ocK ¡P t1A ~é! ..3 .' IfiI For Approval o For Your Use Distribution o As Requested 0 Returned for Corrections o For Review and Comment 0 For Bids Due o Approved as Submitted o Approved as Noted o Resubmit o Submit Copies for Approval Copies for o Return Corrected Prints ,20 o Prints Returned after Loan to Us 0 Remarks: Copy: t::.(Lé ,~ ~y Signed: .oS rtf-/) E .s ¡<.Ie?" L<.. If enclosures are not as noted; kindly notify us at once, Dominion Virginia Power P.O. Box 26532 Richmond, Virginia 23261 Dominion'· Virginia Power RCVD 04-03 -04P10:09 March 1,2004 VIRGINIA CASE NO. PUE-2004-00004 APPLICATION OF VIRGINIA ELECTRIC AND POWER COMPANY TO REVISE ITS COGENERATION TARIFF PURSUANT TO PURPA Section 210 To: Local Government Officials Pursuant to the Virginia State Corporation Commission's February 25,2004 Order Establishing CogeneraÜon Proceeding, Virginia Electric and Power Company is providing a copy of that Order. Please take notice of its contents. A copy of Dominion Virginia Power's Application in Case No. PUE-2004-00004 may be obtained in hard copy or electronic (PDF) fonn from Dominion Virginia Power at no cost by written request to Jill C. Nadolink:, Law Department, Dominion Resources Services, Inc., Post Office Box 26532, Richmond, Virginia 23261. ~Ch-~/· Jill C. Nadolillk Senior Counsel Enclosure II COMMONWEALTH OF VIRàîNIA 197 STATE CORPORATION COMMISSI AT RICHMOND, FEBRUARY 25,20 ~ ~.:. APPLICATION OF -1-'1 t""-' ..-,._~ f...._) VIRGINIA ELECTRIC AND POWER COMPANY CASE NO. PUE-2004-00004" To revise its cogeneration tariff pursuant to PURP A Section 210 "... ¡...., 1-", ORDER ESTABLISHING COGENERATION PROCEEDING On February 17, 2004, Virginia Electric and Power Company (''Virginia Power" òr the "Company") filed an application with the State Corporation Commission ("Commission") for approval to modify its cogeneration and small power production payments under the Company's Schedule 19 for 2004 and 2005. According to the application, Virginia Power's proposed 2004 rates for Qualifying Facilities ("QFs") subject to Schedule 19 have been determined by the market based pricing methodology used to establish the 2002 and 2003 Schedul~ 19 rates. This method utilizes the market studies and supporting data approved by the Commission in Case No. PUE-200 1-00306 for use in detemûning wires charges. The Company notes that only PIM West data was utilized as the basis for off-peak energy rates because market data ftom Cinergy was not available for the sample period. The application included a revised Schedule 19 tariff with rates for 2004, schedules reflecting the calculation of the energy and capacity rates, and the supporting data ftom Case No. PUE-2001-00306. Further, the application included data required to determine the energy rates under the Differential ,Revenue Requirement ("DRR") method that Virginia Power fonnerly used to establish its Schedule 19 rates. This data relates to the three remaining QFs with contracts still tied to the DRR methodology. II \ '- .... .: c.: _.,:~- '!"""c, --. G C -.... Virginia Power states that it win update the Schedule 19 tariff for 2005 prices following the conclusionofthis year's wires charges detennination. Virginia Power also indicates that, in accordance with the Commission's January 30, 2004, Order in this proceeding, the Company is currently using its 2003 rates, and that, as soon as the proposed tariff is approved by the Commission, the Company will use the 2004 rates to adjust its payments to those QFs subject to Schedule 19 retroactive to January 1,2004. NOW THE COMMISSION, having reviewed the filed documents, is of the opinion and finds that the application should be docketed and that a procedural schedule should be established. Accordingly, IT IS ORDERED THAT: (1) As providèd by § 12.1~31 of the Code of Virginia and RuleS VAC 5;.20-120 of the Commission's Rules of Practice and Procedure ("Commission Rules"), a Hearing Exaroineris appointed to conduct an further proceedings in this matter on behalf of the Commission. (2) On orbefore March 15, 2004, Virginia Power shaH provide copies of this Order, as well as copies of the Company's application unless otherwise already provide<4 to any existing cogenerator in the Company's service territory and any smaIl power production or cogeneration developer who has contacted the Company within the last year. (3) On or before March 15,2004, Virginia Power shall serve a copy of this Order on the chainnan of the board of supervisors of each affected county and on the mayor or manager of every affected city or town (or equivalent officials in counties, cities, or towns having alternate fonns of government) in which the Company offers service. Service shan be made by either personal delivery or byfirst~class mail to the customary place of business or residence of the person served. I-I - (4) On or before March 19,2004, Virginia Power shall file with the Clerk of the Commission proof of notice as required herein. (5) Any interested person may obtain a copy ofVírginia Power's application by contacting Jill C. Nadolink, Counsel, Dominion Virginia Power, P.O. Box 26532, Richmond, Virginia 23261. (6) On or before March 26, 2004, aily interested person may comment or request a hearing on Virginia Power's application by filing an original and fifteen (15) copies of such comments or requests with Joel H. Peck, Clerk, State Corporation Commission, c/o Document Control Center, P.O. Box 2118, Richmond, Virginia 23218. Any request for hearing shall state with specificity why the issues raised in the request for hearing cannot be adequately addressed in written comments. If no sufficient request for hearing is received, the Commission may consider the application based upon the papers filéd herein without convening a hearing at which oral testimony is received. Interested parties shall refer in their requests to Case No. PUE-2004- 00004 and shall serve a copy upon counsel for Virginia Power at the address set forth in Ordering Paragraph (5) above. (7) On or before March 26, 2004, persons filing a request for hearing and expecting to participate as a respondent in any hearing that may be scheduled in this matter shall file an original and fifteen (15) copies of a notice of participation as required by 5 V AC 5-20-80 of the Commission Rules, as well as an original and fifteen (15) copies of any prepared testimony and exhibits the respondent intends to present. AIl notices of participation and prepared testimony and exhibits shall be filed with the Clerk of the Commission at the address set forth in Ordering Paragraph (6) above. Copies of any notice of participation or prepared testimony and exhibits II - shall simultaneously be served on coUnsel for Virginia Power at the address set forth in Ordering Paragraph (5) above, (8) On or before April16~ 2004, the Staff shall investigate the reasonableness of Virginia Power~ s application and shall file a report, or testimony if appropriate, with the Clerk of the 'Commission and send a copy to counsel for Virginia Power and each respondent (9) On or before April 23, 2004, Virginia Power shall file with the Clerk of the Commission at the address set forth in Paragraph (6) above an original and fifteen (15) copies of any response, or testimony if appropriate~ the Company expects to introduce in rebuttal. The Company also shall serve a copy of such rebuttal testimony upon the Staff and each respondent (10) Virginia Power and each respondent shall respond to all interrogatories and other data requests to written interrogatories within ten (10) calendar days after receipt of the same. Any objections must be filed within five (5) days after receipt of the interrogatory or data request by the .party to whom it is directed., Except as modified above, discovery shall be in accordance with Part IV of the Rules. AN ATTESTED COPY hereof shall be sent by the Clerk of the Commission to all persons on the official Service List in this matter, as well as the Commission's Office of General Counsel and Divisions of Economics and Finan~e and Energy Regulation. The Service List is available from Joel H. Peck, Clerk, State Corporation Commission, c/o Document Control Center, P.O. Box 2118, Richmond, Virginia 23218 the Clerk of the State Corporation Commission. \ A1hJeCopy 0adlb.J2_4. .,' ., ... ., ' Tesf8: qr-:.~~~ , Clñoflle "._~..:._ 811feCa¡a6.Commfselo., ,""' \ \ If Owens, Donald G. Troutman Sanders Mays & Valenti 1111 EMain St POB 1122 Richmond VA Westvaco Corporation John J. Carrara, Esquire 299 Park Avenue New Yark NY Kinnane,Thomas W. Esquire Kinnane & Associates, Ltd. 100 Ridgely Ave Annapolis MD Scott, William Scott Wood, Inc. PO Box 728 Amelia VA LaFratta, Mark J. Esquire McGuireWoods LLP One James Center 901 East Cary Street Richmond VA Robb, CHona M. Christian Barton LLP 909 E Main St Ste 1200 \ Richmond VA Gary, Richard D. Hunton & Williams Riverfront Plaza, East Tower 951 E Byrd St Richmond VA Considine, Frank A. P.O. Box 100 19th & Main Street 23218-1122 West Point Anderegg, Scott M. Esquire PennStuart PO Box 617 VA 10171 Richmond VA 21401 Chau, Andrew N. Esquire Tractebel North America 1177 W Loop S Suite 900 Houston TX Nolte, JoAnne L. Esquire The Conrad Firm 1508 W Main St 23002 Richmond VA Nadolink, Jill C. Esquire Dominion Virginia Power PO Box 26532 23219-4030 Richmond VA Walker, Pamela A. Deputy General Counsel Dominion Resources Services Inc Law Department PH-1 POB 26532 23219-3095, Richmond VA 23219-4074 Browder, C. M. Sr. Assistant Attorney General Office of the Attorney General Division of Consumer Counsel 900 East Main St., Fir. 2 Richmond VA \ \ 23181 23218-0617 77027 23220 23261 23219-6532 23219 · i,f Gambardella, Anthony J. Woods, Rogers P.L.C. Suite 1200 823 East Main Street Richmond I-I VA 23219 ~ 18-03-04P10:50 RCVD COUNTY OF ALBEMARLE Department of Building Code and Zoning Services 401 McIntire Road, Room 227 CharlotteSville, Virginia 22902-4596 FAX (434) 972-4126 TELEPHONE (434) 296-5832 TTD (434) 972-4012 MEMORANDUM FROM: Members, Board of Supervisors ~ Amelia G. McCulley, Zoning Administrator~" ' TO: DATE: March 18, 2004 RE: 2003 Annual Report of the Board of Zoning Appeals Please find the 2003 annual report of the Board of Zoning Appeals attached for your information. This annual report has been expanded to provide additional information on the outcome of the variance and appeal hearings. Toe number of variances received in 2003 decreased by 13, from 27 in 2002 to 14 in 2003. Of the 14 applications, 8 were approved, 2 were denied, 2 were voided, 1 was withdrawn and 1 was deferred to 2004. A total of 11 variances were heard by the Board. The number of appeals in 2003 decreased by 6, from 10 in 2002 to 4 in 2003. Of the 4 appeals, 2 were heard, 1 was withdrawn and 1 was deferred by the applicant for 1 year. The Board upheld the Zoning Administrator on one of the appeals and modified the decision of the Zoning Administrator on the other appeal. In the current year, the Zoning Administrator and the County Attorney's office plan to schedule some training with the BZA which will include case law from the Supreme Court. I.:\CEPtIBCZS\bza~'" report fin. 2003 31so...doc I I I I ALBEMARLE COUNTY BOARD OF ZONING APPEALS 2003 ANNUAL REPORT I. INTRODUCTION The Code of Virginia states thatthe Board of Zoning Appeals shall submit a repiort of its activities to the governing body at least once each year {Sec. 15.2-2308}. This Ireport is a brief outline of their activities. II. PERSONNEL The Board of Zoning Appeals consists of five members. They are appointe~ by the Circuit Court for a term noUo exceed five years. The Board members during the year 2003 were: Member Term Expiration Max C. Kennedy, Chairman Reappointed May 23, 2003 for a five year t~rm - to expire May 23, 2008 George Bailey, Secretary , Reappointed May 23, 2002for a five yeart$rm - to ,expire May 23, 2007 Reappointed May 23, 2000 for a five year t~rm - to expire May 23, 2005 Reappointed May 23, 2002 for a two year tèrm - to expire May 23, 2004 I David Bass, Vice Chairman Richard Cogan Randy Rinehart Reappointed May 23, 2001 for a five yéar t~rm - to expire May 23, 2006 III. OPERATING PROCEDURES Regularmeetings of the Board are held the first Tuesday of each month starting at 2:00 p.m. Special meetings are called in cases of appeals or a high number of sUlbmittals, when the regular schedule does not provide sufficient hearing time. Thes~ special meetings may begin at 1 :00 p.m. ' The Board operates with Rules of Procedure which were adopted November 15, 2002. I I I , \\Cob_fs01\VoI3\DEPT\BCZS\bza newl.annual reportfinal2003 31804.doc I I Albemarle County Board Of Zoning Appeals 2003 Annual Report March 18, 2004 Page 2 IV. EXPENSES The Board of Zoning Appeals does not have a separate budget. Compensation and mileage are included within the budget of the Department of Building Code and Zoning Services, specifically within the Zoning cost center. Funding for Board salaries in the fiscal year 2002-2003 is consistent with prior years ($3,700) and expenses were a total of $3589.75. Board members are paid $45 per meeting and are reimbursed for mileage traveled to the meetings. Staff to the Board includes the Director of Building Code and Zoning Services (Zoning Administrator), Manager of Zoning Administration and the Chief of Zoning Administration (Deputy Zoning Administrator). Support staff includes the Office Associate IV and the Zoning Technician. V. ACTION SUMMARY The Board of Zoning Appeals held 11 meetings in 2003. The number of submittals and actions considered by the Board in 2003 are shown by application type, action taken and other actions in the following tables: Variances Fourteen (14) variance applications were received in 2003. Eight (8) variances were approved, two (2) were denied, one (1) was withdrawn, two (2) were voided and one (1) was deferred to 2004. The following table of variances by type counts only the 10 variances which were either approved or denied. Of these, one variance is listed twice because the request included two different types of variances. VARIANCES BY TYPE TYPE OF Reduce Lot / Septic Structure Signage Area Regulations VARIANCE Area Setback or Frontage Totals per 1 7 2 1 Type \\CdUs01\VoI3\D!=PT\BCZS\bza new\a1nual report firial2003 31804.doc I I Albemarle County Board Of Zoning Appeals 2003 Annual Report March 18, 2004 Page 3 BOARD ACTIONS ON VARIANCES Actions Approved With No Approved With Approved with Denied Conditions Modifications to Conditions Staff Recommended Recommendation by Staff Totals by 1 2 5 2 Action ADDITIONAL ACTIONS Other Actions Deferrals Requests for Rehearing Application Voided . Rehearing Given Withdrawn Totals Other 6 2 1 1 2 Actions A/J/Jeals Four appeals (4) were received in 2003. Two (2) were heard, one (1) was withdrawn and one (1) was deferred by the applicant for one year. APPEALS BY TYPE Type Determination of use Determination of violation 1 3 BOARD ACTIONS Actions Upheld ZA Overturned ZA Modified ZA Totals by Action 1 0 1 . ADDITIONAL ACTIONS Other Actions Deferrals Indefinite Withdrawn Deferrals Totals Other Actions 1 1 1 \\Cob_fsD1\VoI3\DEPTIBCZS\bza new\annual report final 2003 31804_doc I I I I Albemarle County Board Of Zoning Appeals 2003 Annual Report March 18, 2004 Page 4 Søecial Use Permits One (1) Special Use Permit for an off-site sign was received in 2003. Application Type Off Site Sign Approved with Staff Conditions 1 1 VI. COURT ACTIONS The following are court actions taken on Board of Zoning Appeals cases in 2003: . Faulconer Construction Company, Thomas E. Hutchinson, Shawn and Pamela Evans, and Fleet National Bank's appealed the Zoning Administrator's determination that Faulconer's proposed use is a contractor's office and equipment storage yard, a use by right in Light Industry. The BZA upheld the Zoning Administrator. In August, the Albemarle Circuit Court upheld the Board of Zoning Appeals decision to affirm the Zoning Administrator. . Lloyd F. Wood's appeal to the Circuit Court of Albemarle County (filed in 2002) was dismissed by Mr. Wood in 2003 before the Court issued a writ of certiorari. \\Cobjs01\VoI3\DEPnBCZSIbzanew\aMual report final 2003 31804.dac I I !,\,!'I¡ I~~Ë!ít..., i" ot............/i: 1<..... IS'Q';''\ t§i " \~··t ~o: ,~_~ ~U:~ 1118 ~:""~ ~ \tð " '::l ¡ "\ ""!.'? kO"'~~'" ,~ "'=-~... iä':î& {/II\\\\\ """'.#',/,/./JI/J/¡# April 2004 · Mission · Essential Tasks Assessment · Construction & Maintenance · Planning & Traffic Engineering · Issues I Mission The VDOT Charlottesville Residency builds and maintains roads, provides transportation expertise and regulatory authority and facilitates traffic engineering issues for Albemarle and Greene Counties in ways that are: efocused on public safety .fiscally and environmentally responsible .supportive of alternative transportation means .supportive of neighborhood .and regional development \,1!1\lffIJ;';Et"'''''' ,I' t>~ ........II~.. t' t:!: ....~1onwôØ··· ~'\. t~! tJ"\~:\ ~3~(t .'. \\\ ~ ',0 171& ",.-' \ ...~~. . '.' .'a~/~~ ~ "~. HOtt~~·· ~~...-~:..!;f· ESSENTIAL TASKS TASK REMARKS ASSESSMENT (see legend below) - Slurry schedule to start April 7, 2004 - Pothole patching from winter breakup (A) MAINTAIN SECONDARY & PRIMARY ROADS o ROW: mow, ditch, pipes, trim, signs, patrols o ROADWAY: grade, pave, patch 1. - Rt 637 and 677 bridges weight limits lowered to 21 and 7 tons due to structural integrity of beams o EMERGENCY OPS o REPAIR & BUILD BRIDGES o MAINTAIN EQUIPMENT flll,IIIJÙ',,,,,,, ll~~ - '?~~.~,¡~,.... l t-./~~Qnwø;,~...~ '\. ~~i ~..:...\ ~8lC' .. .' \~l ~ ".0 "" ~i ')M§ :. .;t'"", .. .~: ~ ~ "'~~'HO-$;"'~'" § ~ ......... ~~...-<-~ ESSENTIAL TASKS (continued) ASSESSMENT REMARKS (see legend below) . (G) TASK 2. MANAGE CONSTRUCTION PROGRAM _ Award and process contract documents for Airport Road, Rt 649 Rt 708 project scheduled to start mid April Rt 618 project, Greene Co., scheduled to start mid April o PE Activities o Project Construction 1 1\'itlflll~;Ê~ÊZ'--'''~ "' Q~ ........ It "" ""t- ,";O't\WOÖ·· ~ "::. l~/~Y' ".....~~\ ~O: ' l!~ - ~ (I '''US 1iI:)Io:':: "'!-ð~ ,- -$l $ ....:'!..~~J~~... ",",18 '0............ ESSENTIAL TASKS (continued) Remarks Assessment Task (See legend below) 8 (G) - 42 land use permitsissued _ 8 Revised plans reviewed & comments provided as needed _ 3 new site plans reviewed _ 3 Special Use Permits reviewed & comments provided _ 8, developments in planning stages o Rezonings reviewed CONDUCT PLANNING ACTIVITIES 3. o Issue and review permits o Review site plans and rezoning request _ 7 subdivision plan reviews 1 subdivisions inspected for acceptance o subdivish o Conduct studies and advise o Inspect and monitor subdivisions ","#I¡,..¡"-,,J''''I-, ,.tllfl/! 6!~.~.~~ ¡:\. "'~ ~"."W..';'....~" \ l"... ~'tJ " 'i'i 9~i ;;IU¡;:~ ~ 0: ~ 171. il I \U \~,,~ ~,,:Y l ~ . ".~..~~.~., 1\\\ -%..ø;........~~...!/~/~IIJ' II (continued) ESSENTIAL TASKS o Request and advise on signals & signs o Request and advise on studies & data o Assist with design REMARKS 9 Traffic issues submitted 5 Traffic issues outstanding ASSESSMENT (see legend below) . (G) TASK 4. FACILITATE TRAFFIC ENGINEERING ~!!, 'I'I~:É"'i';'''''~" ", o~ ........11(1 "" ~ll!:- .···,·tJ·Q1'SWð<~...":,.'~ f~/ .' ..-"~t.\ ~3l~'t111 ~1!~ \. "'[ò~ -- -~¡ J ~ '..:r..~~.~~~" ~~......l PRELIMINARY ENGINEERING April 2004 Route PPMS Des igner Project Number Des cription Adv. Comments -.._~" -'-'-,--~ .__._---~ ------~~---,--- 53 18897 BAA 0053-002-101,B601 Bridge Replacemellt- Buck Island Creek 9-04 On Schedule (Updated 9-03) ~~ -~._-=------_._~ ___ .Aitport Roa~.__ Contract Awarded ---~=--~--~.._~- ~--~-- 649 2456 SLM 0649-002-158,C501 4-lanes w/sidewalks &bike lanes (Vpdated 02-04) J annan Gap Rd l.llblic Mtg. 11-12-03___ 691 11129 DWS 0691-002-158,C50 I 2-lanes w/bike lanes (Upda ted 4c04) Mcintire Rd. Ext. Ne,:" Alignment !,ubJc Hearing 3-16-04 _.____ d~W~_~~__ 631 2530 BAA 0631-002-128,C502 MeadowCreekP arkway 8-05 6-06 6-08 (Updated 4-04) Free State Rd. Counector --,~--- ~IMo.hla~vity _._.___ .~~-~-~.~-- --~~~-_.~-~~-~'-~-"'---~~" -- 52393 JWH ROOO-002-259,C501 Construct 2 lanes on4-lane R/W (Updated 11-02) -. Gravel Roads ----,-- ~~-.~_. "' Dlckerso n Roa~__ Qrade~~~!i:! and_~!!~~_____ ._~- .._.~-- ~~" 606 54429 0606-002-P,N Gravel road 2-07 2-08 2-04) Beam RO_~,~_.__Grade,dra~~~__ --,~._----~-- . ~_ ~~ble Rural Rustic) 769 59273 0769-002-P ,N Gravel road 2-07 2-08 (Updated 2-04) Woods Edge Rd. .-. .~radeJ drain and surface treat - ~.._"-- --,...,,-~-' _(Po~i~~ Pa~-in-pla~___ 623 59274 0623-002-P ,N Gravel road 3-08 3-09 (Updated 2-04) PRELIMINARY ENGINEERING ¡;;ril ~o~-r=-~~r~~o:n-; Soc ~Ia~~ect sta!;I _r_- Secondary Roads 1111"fINI"'~" t~\I 1 G'R.EE' ........... ", "'~ .......Nt:.... i ¡:. ....~;o't,wòò··· ""~ l~! CJ"\~c:.\ ~8;C' ".. \~\~ ~ ',.0 1715' Iu: s:~ \.<ðt" .$. ~ ~..:.. ',:'!'. uo,,~~··' --=-..,.*.......,~,..... Comments __..__.___~~nd~!E:~~e road~ 6-04 11-05 updated 5-03) ---,-~-~-" Adv. R/W Field Insp. P.H. Field Review Survey Scope De s criptio n BaconHollowRoad ~~-----~---.-I Fr.Rte.615 to Rte 632 projec 0627-039-195,C50 Designer RDL PPMS 51022 --~--~~.~--------_.- Wideu aud Surface Treat - Gravelroad __-----------..........--.1 (updated 10-03) 11-05 N/A N/A N/A N/A -~-~-_.<-~-----~- Watson Road ------~-_._--"'_._--- Fr. Rte.633 to Dead End 0640·039-ß7,N501 2515 640 .,!!!I'·. G\\£i......." è\' oft. ..........NIt .....-:.,. t t ...'~,o't'wøö·· -""~ gr ~"\~'!;, ì::;¡" \\~ ':::. ',0 -171' ..... -,' '::. '.<_ a ø:~" ~ -.?<t ~/ ""- ..:':' HO..'~·· .",~~j....... CONSTRUCTION PAVING & CONSTRUCTION PROJECTS 04 Contract Cost 95 Percent Complete CHARLOTTESVILLE RESIDENCY CONSTRUCTION PROJECTS Project Description 90 25 90 50 95 95 90 25 90 50 95 UOOO- Allsi9~ curb and inci 0737-( Final dressin on weather. (NFO)0020-002-126,C501, B608 Bridge over Hardware~iver Plan to complete bridge pier during first week of April then begin work on the north side bridge abutment. 0650-039-P56,N501 Secöndary Rd Improvement Final dressing and paving possible this month depending on weather. 0810-039-146, C501 Secondary Rd. Improvement Grading final (mid) section of roadway. Anticipate the majority of project work to be completed by the end of April. OZ08-0Q27P?7,N5Q2 Secondary Rd. Improvement an to begin work on pril 1 ,20 0618-039-P57,N501 Secondary Rd. Improvement Plan to begin work during first week of April depending on PM-7B-03 I Asphalt Overlay Plan to begin paving Rts. 623 & 633 in Greene Co. during first week of April. SS-7B-04 I Asphalt Slurry Seal Plan to begin in Albemarle during first week of Apri ization Name Various Int. in the City of Charlottes vi lie Mountain Vista Scottsville Road Taylors Secretarys . Rd Road Various Sec and Primary Roads Various Subdivisions Mayo Road Dyke Road Street /1/l1/N//i"h",,,,,,- i!111~~ ~!:~.~.Þi;..~~~ l't- ....~,O"{'WÓÖ.·..~ '\. g/ Q \'ii,\ :::0' ·.1 I ~U~~ "1& IU¡;:~ \. "'!'ð . Ii -¡ ~ "'~"" HO"~~" l '-c:.~ ';'8"3'&' 1//11\\\\\ -v,..I'J'./.I/.I.IJpIJ MAINTENANCE Yancey Mills Headquarters MARCH APRIL Goal: Cleaning and storing spreaders. Goal: Patch for Slurry seal. Pr MOWING Pr 1 PATCHING RT. 64, 250, 29, 635 RT. 691, 635, 636, 684, 637, 677,708 Pr 2 GRADE/MACHINE/ ADD RT. 637, 633, 634, 689, 811, 611, 698, 748. 682, 745, STONE 818 RT. 702, 745, 683 Pr 3 DITCH/PIPE RT. 633, 634, 637 RT. 682, 240, 634 Pr 6 GUARDRAIL! MOWING RT. 635, 637 RT. 29, 689, 708, 691 Pr 5 GUARDRAIL REPAIR RT. 29, 64 RT. 29, 64 Pr4 EQUIP MAINT Per schedule Per schedule Pr EMERGENCY OPS Stone non-hard surface, holes, mud Pr 7 OTHER Remove dead trees RT.691, 689 Repair shoulder RT. 64. 250 ,\~-!J III~;E";;;"""'" I"' C~ .........~ ","'- ¡<-i'g" ';' i~l --_ ·~\\l ~o: -!-~ ~ u ~.Cö 1"8 _ ~!)ro ~ ~ .,.'d -~.. ¡ "\. "'~"!' HO\\~~" ¡ %_ is'';' ~ 11111\\\\ .........-";'#I/I/I/j/Jf MAINTENANCE Free Union Headquarters March Apri Goal: ~ pothole Patching pothole Patchin ~ MOVVING Brush Removal - Rt 810, 665, 743 Movving Complete Cut Brush L-PATCHING potholes Patched - Rt 29, 250, 664, 743, 810, 606, pothole Patching 601,660,674,677,671 Shoulder Repair - Rt 250, 601, 654 Hard Surface Shoulder Repair - 250 L. GRADE/MACHI NE/ ADD Rt662, 674, 667. 673, 821, 671, 776, 764, 829, 672, Machine and Add Stone - Rt 606, 643, 661, STONE 606, 678, 662, 668, 675, 766 662, 673, 675, 756, 766, 776, 671, 668, 678 ~DITCH/PIPE Cleaned drains - Rt 671, 662, 674, 764, 776, 668, 601 Clean and Repair Drains - Rt 668, 601, 660, Installed Entrance Pipe - Rt 614, 671, 674 676, 606; Subd. Repair Pipe - Rt 664 Pr GUARDRAILI MOVVING ~ GUARDRAIL REPAIR Pr EQUIP MAINT Per schedule; snovv equipment repair and cleanup Per Schedule; snovv equipment repair and cleanup; clean headquarters lot E!!:.- EMERGENCY OPS Accident - Rt 29 Tree Removal - Rt 250 Q OTHER Trash Removal - Rt 606, 676, 664, 665, 810 Customer Concerns Stocking Stone Good Housekeeping Repair VVashout - Rt 671, 672 Trash Pickup - 29/250 Bypass Shoulder Repair ~ Rt 656 !;,--~" .....,,1/1;; '.". , ._~ ....~;·Q"WØô4··~7~~ §~! ~ \~'l ~o: - - --- :~~ ~u~C\_ .'711 -luE>-i:: ~ "'~ð - -- - $.: ¡ ~ ···.~Ir "'Otlc,,~··· ~'\ ~ ......-.:.... \\~'\ ~~~0~...!/~/~/J1'J¡\¡~ MAINTENANCE Keene Headquarters Ma rch Apri GOAL: Cleaning and storing of spreaders. GOAL: 100 % Patch all of the Surface Treatement Schedule Pr 6 MOWING None None Pr 2 PATCHING Asphalt, Rt 729 Asphalt Rts 618,795,712, 708, 602 Cold Mix, Rts 723, 630, 717, 631, 708, 627, 618, 729, 622, 726, 625, Pr 3 GRADE/MACHINE/ ADD STONE Machine Rt 708 FOB Stone Rts 712, 856, 734, 717, 721 Add Stone, Rts 712, 708 722,723,712,713,714,704,703,711, 795,627,735,760,799,697,813,716, Pr 5 DITCH/PIPE Installed, Pipes Rts703, 626 Ditch, Rts 633, 712, Cleaned Pipe, Rt 627, Pr 8 GUARDRAIL Pr 4 EQUIP MAl NT Per schedule As scheduled Pr 1 EMERGENCY OPS Wind Storm, Rts 6,20,742,626, Stock Stone, Clean Out Building At Keene. School- Pr 7 OTHER Confined Spaced, Brush Removal Rt 726 ,,!I'I¡lI~;E'Ë;;""1o ,!'c>~ ....... I$: .., l't: ....~;'o'{$WØÔ~.I.l:,.p~ f~! y \\'< ~o: . :-~ ~U~C'.1711 "':_)oo~ ~ -"C}tj. ¡.:.¡ '- ,..,!:~~.~~.~~~.., \\i ~-o:...o'~~"!/;/~/JIJ III\ MAINTENANCE Boyd Tavern Headquarters March Apri Goal: Gradina non hard surf'ace Goal: To start Intersate 1300rnAxand secondaries. Ditch VVork. Rte. 600, 610, 649, 643, 250, 854, 20, Pr 4 MOWING/Brush cutting 53 Rte. 64,231,53,645 pr'1 PATCHING Rte. 302, 1009, 729, 53, 1034 Rte. 20, 250, 53, 22, 231, 1034 Pr 3 GRADE/MACHINE/ ADD Rte. 865, 769, 640, 784, 60, 785, 746 STONE 645,623,744 Rte. 600, 747, 641, 819, 741. 816 Rte. 641, 747, 649, 819, 22, 621, 20 Rte. 250, 600, 640, 649, Pr 2 DITCH/PIPE 621,612,631,759,250 Forest Lake Subdivision Pr GUARDRAILI MOWING Pr GUARDRAIL REPAIR per contract £!£-EQUIP MAINT per schedule Fencing Rte. 64 Traffic Control- Rio Rd (Drill Cre\IV) Pr EMERGENCV OP5 confined Space Training -Culpeper 1!\!tlll I~;ËÊ~"''''~ /' ofr ;...u...1I~ ....- t t- ....~,a"('$wóö·· ~"\. f ~ f!J' ~ .....~,,\ ~ 0: . ... .. i,':. ,,0\,1; 171& ..:-~ '\ "'~';~. .. ,p.})oo i "' ···?!.~~9.~~~··· ,& ~"'>, :8 ...4.........., Ma STANARDSVILLE HEADQUARTERS ~ Goal: To have all roads for surface treatment and siurrv seal 100% øatched out. Rt. 606, intenance 100% oals were met All Goal: 617 and 644 641 743 605.603.642.637. 667and 619 Rt pr4 MOWING Patch holes and dips for slurry seal Rt.1022, 1023. 1024, 610, 606. 609, 1136 Patched holes and broken up spots Rt. 617. 609 810, 1155, 1156, 637 Grade and replace stone on Rts. 629, 605.614. 632. 626, 630, 628 & 667 plan to treat for dust E!::-:L. PATCHING pr 3 GRADE/MACHINE/ ADD Graded & replaced stone on Rt. 618, 640, 605, 629, STONE 806, 630, 638, 642. 667, 634, 635. plus dust control Replace pipe on Rt. 633, 623. 618 Pr 5 DITCH/PIPE Pr 7 GUARDRAIL/ MOWING Pr 6 GUARDRAIL REPAIR As scheduled as Per schedule Clean & repair snow equipment needed to be repaired A,^,aiting Facilities Mgmt to make repairs as a result of inspection by Safety Officer. Needs Slide on Rt.33 Mt. pr 8 EQUIP MAINT Pr 2 EMERGENCY OPS pr OTHER '11111/fllll"'O';'",.~ l'o~ ~~~~N~~, / t-.....~;O'\\'W(JO...~~ 1\ ~~r ~. \~\ "0' . . : '& i ~u~'"ó 11\' JII:;:~ \ ...."'ð .··..¡l g '\. ...~-"f HÖ\\~~'" l 'Co""""'d....... is',',. {J¡I~\'\~ '"4.>'Üi!/IIJJJ(1! __~PS~~LE~¡:qt;ipæ-:E!- ~~ _ ~ ~~- _"Z~~:-: DAVS SHOP - OPERAT 1'"1:11'1$ 1 . 31 .1 0 . 31 "100~OOo./o , :'::. :;'1.1,.; :,~~~1N~~=-~--~_--__ - ---~:!i=~=--=~:=r:-:--=-- - -:---~~=--===--~~= =-=--=·If=~~= ·--~ig~~i~ : . ,1_ I:!' 1'52-- .~---"'-- -.----..'- .m_-"'~62·---" "--~-- - ö~--·" ".-- ----.-- -62 -,,- ---" - ~ 1Õ'Õ'~'OÖo./o c I U 'VI' TAVERN----- - -------, -.----- ----.-------- --- .------- ------ - 1-;7;'. T~: . ~~~-- __.~~~~:_~f:~Z~ - ' I ~~" 'I I. '1" 30 - 96_77oA; c 1.!lllh 1 -~-----100~00'/o ( II. I_ II -1~- 100_000/0. ( ~1--.~=-=--- __ _.~"pQ.~_2~ ( 196--~--- ---87.56% /.... 61 98.39%,· ¡.··,.,~.-.~.t..~, jilt .' .. . ell -----" - (",. , '"I ( ., , ., C il ,tl!"III;;i...;;;.........;...... l ()~"'1'''''''~ i':\ ll!:-..·..'Q. OOb...~·'!\I !!/(J' \'¡ì ~o: " ._~ ~U~~171& ~r""~ -;" ".<'ó- ~l ! \.. "'~"!' HO"~~" l~ """"" is':!& .,1\1\ """'4'~'¡HI/IPJ1 -'-_·_-~~·_'I·_·_-_·_~-g-_·, ---..- -, ARE·AHE·þ;:6QUARTERS"I~UTHÕRIZED/-¡~~~~~~~ -Ä'P~:6V~~~T~;'~E ~. . -------, ~------~--~-~ PERSONNEL Vance ... lVIilh:¡¡ suþeri~t~ncÌerlt . MaintenanCe supelVisors Operators o o o 8 8" 40 o 3-:-5 22.5 16 48 160 1/1 2/2 11/9 Free Union Superintendent Maintenance Supervisors Operators Boyd Taverri Superintendent Maintenance Supervisors Operators 22 2 "9 14 3" 41 1/1 2/2 12/12 Keene : ;"perintendent ·rv1.~intenance Supervisors ( '"erat6rs o o o 1 5 26 1/1 2/2 12/10 Stanardsville : "Iperinterident 1"i'.'jIntEl"ance Supervisors ( 'perators VACANT o o 3 5" VACANT "2 17 1/1 1/1 7/3 1/1 4/2 Bridge/Sign CreW's : ."perintendent Ivi.~int'ªIlªIJC>EI supervisor ( 'perators Shop :.;1 lOp Supervisor r\~if3:chanics PLANNING Site Plan Review Conceptual site Current Status to be submitted for comment. Comments on proffers submitted to County Staff. New conceptual site plan under review Final road plans under review. Revised site plan comments sent to County Staff. VDOT and County staff are exploring alternative access solutions for the site Comments on traffic study submitted to County Staff. VDOT and County staff are reviewing previous submissions Traffic Study Review Awaiting site plan Site plan under review. Waiting for proffers plan under review. 0' ....Xíi~ ~.,,~ /~1Q"wóò~···J;.i-à f~! (J \\'1. ~ 0: . '-~ ~u ~C'i 1711 lUi~;:: ~. "''}ò . .1." t '" ....~'!'..~~.~~~.... \l -e:..'oQ;..........4~,!/~J~/Jj, II\~ Project Albemarle Towne Center (Sperry) Peter Jefferson/Martha Jeffersoh Site Rivanna Village at Glenmore North Pointe Hollymead Pantops Ridge Moore Brass Tract /II"IIN;,"II'",,""»-':;....... ".f/ GI\U",~""", \\t!1 ()~.."å~$WðÖb...\ '\ /i!:....~.~ ....~\ g/ ..j~~ ~ 3 ',,, 1,71& ~i ¡ \ \~~f.~..~9.~~~.., ~...;:._ 2~ ....."..-............ TRAFFIC ENGINEERING TRAFFIC ENGINEERING ISSUES UNDER REVIEW: ALBEMARLE .-_I.,.. ,.~~---' ~_._._-~_._.- . =-:. .~~._.' . -- Route __ Lt;!cation ~.. I.ssu~!J{pe. . _, Des~!on ., . R~viewer. ~'.._.' 240_~Mort~~_ F ro ze~...~F~.~Od_.~.._,. sp~~" _, '_. __ ~L~/~4.__.~ Re ques~~~~cr.~ase sp~~~~__ ~peper 15D , 643 Int. 643 & 649 Guardrail 2/11/04 2281 Proffitt Road- Mr. Thurman Culpeper TED -~~~----'~~" ...... ~.. . '" ~ -"',-~-~ --="-~=,--~~"""""""'-~-~-~'-~._- -~'" Various ~~~~~__._.__. Signage/Speed 3/29/04 ~eed reduction,stop si~n Culpeper TEE?. .--=---.~~-"""""' ~-~---'~""--<==..-'~-~~-=='~~-." -- " ~~~~~~~~~""""'-~~~" TRAFFIC ENGINEERING ISSUES UNDER REVIEW: GREENE -,,--_."'-'=~ ~ ~--' Reviewer Culpeper TE~ n to CL 607 Rt ~r \!!I'I ~'JG;tlr""~~ \,\...O.......·..~~ ... lþ./·~{JjQ1SWðO~...~~ -:. ~g: \~\ ~ 1,.): C' . . .":" \. \<¡. J7IS ~j;::~ '\. "~~'" Ho,,~..f/ J ~ ........... ~,..:....q:~ ISSUES MCP design public hearing . v// ' CYI?ß/tu:t6- {£' ,?W C':::fefl:e:;c.1MZ- Planning District Commission Regional planning linking transportation, land use, ~çonomy & environment <, City of Charlottesvìl!e Craig Barton Kevin Lynch. Vice-Chair MEMORANDUM Albemarle County Sally H. Thomas David Wyant TO: FROM: DATE: RE: A emarle Board of Supervisors onda Edmunds, TranspOliation Progranl Manger March 25, 2004 Regional Transportation Overview Fluvanna County Norma Hutner Grant Tate Greene County Jeri Allen, Chair Philip Anns Louisa County David B. Morgan, M.D. Eric Purcell In preparation for your upcoming meeting, enclosed are a few handouts which you should find useful in understanding the complex regional tra.Tlsportation plawing process. These documents may not be completely accurate, realizing that localities have made internal changes to increase efficiençy. (For example, the County's recent merger of the Community Planning & Development and Engineering departments). Nelson County Fred Boger Connie Brennan In addition to touching on the enclosed, Harrison Rue and I will speak on specific plans and studies and how they relate to the overall goals. If you have any questions prior to then or would like to ensure specific details are included, please forward any requests via your clerk's office. We would also welcome any individual meetings to discuss these details further. Executive Director Harrison B. Rue 300 East Main Street, P.O. Box 1505, Charlottesville, VA 22902-1505 Telephone (434) 979-7310 Fax (434) 979-1597 Virginia Relay Users: 711 (TOO) email: info@tjpdc.org I web site: www.tjpdc.org 1-""1 Q o -< (]> ¡<p8 ...,8 p:> (]> en g ?<;" >-:rjD. o <"+ (1 Ñ" (]> (]> (j) ~ ~ õ> (1) 0 "0 ","'''0 ~;; 8. (1) 0 ::f 8-. ~ 3" en ::2 rt> 3.Š~ _.(1) CfJ ::s µ ~ o·[ijo 00(") PJ "'"t 0 =-5=-8 ::: CÐ ::::1 (1) ,.., 0.~M: ~. ~ (b 0'" . en »~ "0 '" "0 ;:; g:~ OJ 0. ~ (1) õ' CÞ ~'< ~ ~ >-¡j o p:> ::; p.. l' o (") ~ ;:t> p.. -< ;n' o .:¿ o ~ ¡:r (]> (]> en ~ -<---1 " t1 0 ¡ ! t:r:I ......, !::; o~ 'I:,. ! as. -.J ~I ¡ ~ ~ P> ' ¡(]> >-< ~ ¡>-<g'¡<p. L-,-,-.~J ~ >-¡j o C/) <"+ p:> ~ ¡<p -< t1 tr10 ::;>-:1 <!S.>-:1 ::; >-1 ¿:g § >-1.{g o ;:¡. ~ õ' ::; >-¡j ~ S' f1Q u II, ~ ~~-<~()o f1Qen.......p:> ...... ...... '-' !-h ¡:: ::;p..OH)::; ¿:g g ...,¡<P~ >-1 <"+ .gt"" gog ~OJ (1) - o.~ "0 OJ ~~ ¡:¡ OJ ~.::f ::f Po ( Q '" ~aS. OJ ::f 00 '" (1) '" -< ... (1) en .:¿e: ~ h ;:t ¡;; 5 (I) P ¡¡; ~ o >-t ~ ~ oQ o <"+ 8'-< 8 2:! ......P> ~, § o ...... ::; ;::! (JQ ~ >-¡j o >-:1 (]> (") g õ' ~ o '0 ~ S:. (]> (]> II -o"---·-----¡ ~2:! Q I I ;n' ~. § II ~.~ ~ ! 0 I ¡ ;::! ! !......_--.---.-.--.:... ~Q~.þg~ p) ::J .~. Q.. ~ ~ §' 5 '< .g "0 2. ... "".::t> 0. 8 ::f §@=;¡¡~@-(fQ r-1- ~ '-< . ~ g. (j Onigg-~~ e-: ~. ~ _~. ::: en( ). o. ~ .... 2 ~ ~g 1:: ~. ~C1JÞÞ~~Š· õa-~O(1)::: oo.>-oSSoo E.~o~g(ii ~ ~ ¡;...J g.. fir :S. gSg~~~ ~ ut ~E. & Þ t:;.~ tn ~~~~. (1) OJ "0 :< ::J p;- <1> ;:; 00 Y' ~ ~ Q <"+ '-< o o ¡::: ::; £: , , ~! ° >-¡j 2- õ' '-< to! 0; P>i >-< ' p..! ~ ~ C/) .§ tJ:I 0 (]> 0 0 .... ~ ¡:: $. p.. ;::! en 0 <"+ g I-t) '-< en ~~:7~8~~Ë~ ~ --< e Jod a ~ 0 ~. ~ '-< '" ~ o~ '< ~ s- ~ ::t>"'''O "';000.- < 5. 8 ã1 þ"'1a ·~5·~ ("I) s:; s- =: g:=:- '< -ti < ~ "R g. ~ ~. qQ ó a ~ ~ ~ µ Cd ~ :~ ~ ~ -3 . ~ 8 g ~~ ~ a rb go't:J "1 r» :0 1» (11 ;:t (1}8Q..::S;::::5;·~0" (")<"'°"'-"00 I-rfO '1j ~ en D --- 0.._. ¡....I.. ~ ~ !-+ r-t- ¡:¡ ~ » t=b 8 '-< .ff p. ~ ~ ~g ~ ~'õ ª Ë'" ;=.:.~ :. 'CD 0 ~ &=8 N8 þ",-< ~~:e?:3 ?~ co g c>,~ < ¡¡¡ g¡ ¡;; [5.: ~;:: ...,¡ ~ § ~~ ~ ut ~ 2,Q ~ o ~ o ~ (]> ~ <"+ ::T ..., >-1 p:> ::; en "d o ;:¡. ~ ...... o ::; to o ~ ~u>...,¡>-o...,¡ t-t'.g ï;J8 ,~ CD.-+~(fQ 'êS{j;;1(") <1>O"os>-i ~~~t1tt:O g...~ ~. ~~ ...... tI) 0 I-f '"d Ef ;:; '< >-t 0~S';::'~ ~. ::::~, ~ ~ :::rp>~(b,....,. ...... tn 0 ~. ::T' ::r'p-<:=:;(b (1) ~ (!) 0... (I) '-< ~. ~ s=- s g SOt:! C'D (t ~{JQ ; ~ ~ þó~5: 5 fJ5¡ ~ ~ 5. g¡ is: x' ::1 i-I (tI I 5<1> ><: g ~ ~ en .:¿ ~ :A. ~ .g .... (I¡ ~ 'f (j) I-j g or ~ ;; ,~ tTj O'~ n I-j ~~ Z~ ~~ 'ê CD' w ~ Œ ~ ~ OJ 0 ~~ 10 ~OJ ~. (I¡ ° > ~~ I-j () 0.. ~ ~f.I) 0 Co~Z S-.::r ~o ~ ~ ~ ;;; 0 l ~~ >~ ¡:;o . ;:;¡u ~,OJ t::j ~ ::J ~ ~o..Q 9.»~ ~u '1..1 ~,u ?:' Q a 0 º êI5 0 ::s ~ ""U tn c.:;' OJ W Co ~ W 5' ..;::::: ..... I'V ~ U, I I THE TRANSPORTATION PLANNING PROCESS: How Projects are Proposed, Planned and Implemented Adaptedfrom a graphic prepared by the 17'lOmás Jefferson Planning District Commission, 12/95 CityPubHc Works Dept al1(:l.'N~ighborl1ood Develøpment.Services builds or contracts for smaHprojects, balldles citytraQsit senriceand advises VD();ron contracts for statetfederal projects funded locally, and advises VDOTon contracts for state/federal funded projects. Localirnprov~lllentplans, suchi~s'A.lþelll~rle County's six-)'l~ar roinl plHII, idcnti I}' priorit ics and limdino sources. o Local Capit:al , IIIl.pí:øv¢;rrient.fRl~.n~ inClude projects to be done with local funding. LocaLgovermnents approve allocations to JA;lJ]~']"~~.Cr$e~c:b spring i,IS part Öflhc Im:al c)'cle. Comprel1ensive'.Plans (updated , every five years), special neighborhood or area studies, and ongoing maintenance plans for County engineers and city Public:W or~ department are.prjµlwysources of information. MPO and PDC monitor status ofprojects, may participate in design stuqies in advisory capacity. MPO Transportation lm,Prov¡;)lIl¡;)nt.PrQgram (J'~),llpdatMd~nnllally, identifies federally approved road, transit, andrelated pr(~iccts 10 be c0111plt::tedjnt~e··tµ;ÞaQ, region. Other state, local, or private projects are included in the TIP for information. (Approved in SUIllmer, fonvarded to state for State TIP ~pprovalin fall) MFa Charlottesville Area Transportation Study (CHART) a 20-year plan updated every five years, PDC Rural Area Transportation Plan, ongoing regional traffic modeling assessments, and special studies of the MPO and the PDCare primary sources of information Specific locations and designs developed by Central Office Design/Location Division,' andlorDistrict Engineer. Right Qf Way purchased byROW Division. Construction contracted by District Qr Resident Engineer' s office. Transit grant funding forwarded to local government operators by VDRPT. State Six-Year Improvemcnt.fRrQgraIIl, updated ·annuaUy, idelltifit::sstate. budgets an~aQtiqÜ)~t~d.t:ede:r~1 fµnds..t:ol",'l"p~q"traQ$it, safe.ty, Itlai.ntYll~qeialld congestionredllctiQn projects(Approved in spring). State Transportation Improvement Progr~m (STTP), updiltedannually, ¡dcnlilies f'cdcml ["unds to b~.matclJ.ëdWith.$tat~¡md oth~r sotµ;ces (Approved in fall): State MQltimodalLong RangePtan(20year plan updated every five years) Highway Needs Assessment (ongoing database updates), special area studies, Environmental Impact Statements and annual VDRPTrail plans and transit evaluations are primary sources of information 4) Implementing Projects 3) Planning Budgets and Timetables 2) Assessing Needs & Identifying Projects Public comment is sought prior to the approval of annual budgets, including Capital Improvement Plans, and throughout the process of updating Comprehensive P]¡¡ns. Members of thepub]ic may speak at any local council· or board meetings, and to individual elected officials or planning commissioners. Citizens are also regularly appointed to serve on ]ocalplanning boards and committees. Public comment is sought every year for the Annual update of the TIP, and throughoµt the process of developing the CHART update. Public hearings are held each spring prior to approva] of the MPO annual work program and regarding cOIIlpletion of major MPO or PDC studies. Members of the public may speak at any MPO or PDC meetings, and to any indiyjdua] MPO or PDC member. "-~.~....,--~'~~~---~~._.""".~.~~~-'..~~-~-~~-~~.~...~~-""~ Public comment is solicited every spring at the District and Centra] offices for the annual update of the state six year prqgram, and for each stage of major plans, environmental impact studies, and design and location studies. Members of the public mayta]k with their Commonwealth Transportation Board representatives at any time. 1) Public Input Local· (j.overnmenJ Transportation. Planning City of Charlottesville The Traffic Engineèrinthe office of Neighborhood Development Services works withtheVDO'f Urban Engineer andthePublic-w0rks Departmentto develop phms for roads, sidewalks and bicycle facilities in the city. Projects are funded through the City CapitalImprovements Plan, the Public Works budget, and the "DOT Urban Road program, and are updated through the City Budget approval process eaclispring. The City COUlprehensive J;'lan, updated by the PlanningCoxnxnission and City Council every ,five years, identifies priority transportation improvements to beund,ertaken d u ri ng the 1I pcoming 20-)rear period. Cityproj ects and goals which have regional impacts are also included in the [\'1 PO Transportation Improvement Pro'gram. Albemarle County The Albemarle TransportationPlanner in the office of Planning and Community Development works with the VDßT Resident ElIgineerto identify primary and secondary road needs. Road improvements arefµnded by VDOT and. federal sources, with some County funding {mostlydedieated to minor road impr()vements} throµgh the Capita! ImpI"0vemeníPlan.TheCountyuses acriterijl...based rating system to set priorities for thetimingartd fundingofroadimprovements,andfµlly updates its six- year road plans every other year, yvithminof changes in the off years. County Toad projects slated for federal funds or with regional impact are included in the, MPO Transportation Improvement Program. Fluvanna, Greene, Louisa, and Nelson Çounties The County Adm~lIistrator,andCountyPlanner work with the VDOTResideI1tEngineertoidentify and develop primary and secondary road proj ects for theVDOTSix YearImprovexnent Program and the local Capital Improvementrlan. Some localities have citizen task forces whichassistindeveloping transportation plans. Each locality updates its Comprehensive Plan every five years, working through the Planning Commission aI1dßoardof Supervisors. Transit Servicesl~Charlottesville Transit, University Transit, and JAUNT) CTS, a division of the Charlottesville Puþlic Works Department,conducts transit planning for the City of Charlottesville, and urban Albemarle County routes, which depend upon approval and funding from the County. County route proposals are based on recoxnmendationsfrom CTS, County Planning and Community Development staff, and the general public. JAUNT, the derrtfIDd-response public transit service for urban people wíth disabilities and all rural residents, is a public service corporation owned by Charlottesville, Albemarle, Fluv~a, Louisa, and Nelson Counties. Its plan and budget are developed by an appointed Board of Directors each year and approved by eac}t).local government for funding. CTS and JAUNT contract with private taxi services for night and weekend transportation of people withdisabmties. University Transit Service isa private service of the University of Virginia which carries faculty, students, and staff around the University grounds and to some points off-grounds. It receives no public funds; it is supported by private student activity fees and parking fees. UTS planning and budgeting is developed internally, but several areas of coordination with CTS have been developed over the years, most notably free transfers for riders using both systems, and jointly published schedules and route maps. RideShareisa regional carpool/vanpool matching service and advoc:1cy/promotionagency for all fOTITIS of alternatives to single-occupant vehicles. Located at the Thomas Jefferson Plam1ing District Commission office, the RideShare coordinator can help any resident ofthe planning district, or commuters traveling into or out of the region, find a way to get to work. The RideShare program is funded by a grant rrom by the Virginia Department of Rail and Public Transportation, with matching funds from local governments. CharlottesviIIe-Albemarle Airport Authority The AirportAutbority, appointed by the City and County governments, carries out pImming and budgeting for the airport, including annual budgets and a 20-year master plan. Local Studies and Plans Affecting Transportation City and. County plmming and community development departments conduct a variety.of studies on neighborhoods and growth areas, as well as working on regional studies with entities such as the PDC, the MPO or the Charlottesville-Albemarle-University of Virginia Planning and Coordination Council (P ACC). Local stuœes include Comprehensive Plans, updated every five years; studies of neighborhoods such as the Lewis Mountain and Pantops areas; town and village plans; and corridor design plans such as the IvyRoad design study. Albemarle County is also working with private businesses on Route 29 North developing landscaping and tree replacement plans and funding as part of the Trees for 29 campaign. Loèal Planning Bodies and Citizens Groups In additîon to City Council, the County Board of Supervisors, andMPO committees, severaUocal appointed and volunteer groups have input into transportation depisions,. and conduct studies of their ownwhich are helpful in developing löcal and regional plans. These include: - City and County Planning Commissions · City and County Architectural Review Boards · Local Neighborhood Associations · Task forces working on specific problem areas such as the Georgetown Road Task Force and the Bellair Citîzens Committee · Local civic and business organizations such as The League of Women Voters, local Chambers of Commerce, and environmental groups. RESOLUTION WHEREAS, the District Home Board for the Counties of Albemarle, Alleghany, Augusta, Bath ,and Rbckbridge, Virgi,nia, and the Cities of Charlottesville, Covington, Lexington and Waynesboro, Virginia, has completèd its assigned duties and terminated the operations previously assigned to it and believes it is the desire of .its participating local government that the said Board be formally dissolved, subject to ratification by the respective aforesaid governing bodies; and WHEREAS, inconsideration of the foregoing, the District Home Board, by the adoption of this resolution, hereby formally dissolves itself, to be effective upon the ratification of this action by the respective governing bodies of the foregoing counties and cities; NOW THEREFORE BE IT RESOLVED, that the Albemarle County Board of Supervisors hereby ratifies the dissolution of the District Home Board for the Counties of Albemarle, Alleghany, Augusta, Hath and Rockbridge, Virginia, and the Cities of Charlottesville, Covington, Lexington and Waynesboro, Virginia; and BE IT FURTHER RESOLVED that the Board of. Supervisors hereby directs the Clerk to forward a copy of this resolution to fiscal agent for the District Home Board. ******* I, Ella W; Carey, do hereby certify that the foregoing writing isa true, correct copy of a Resolution duly adopted by the Board of Supervisors of Albemarl,e County by vote of 2 to Q, as recorded, below, ,at a meeting held on April?; 2004. a Mr. Bowerman Mr. Boyd Mr. Dorrier Mr. Rooker Ms. Thomas Mr. Wyant Ave Nay X X X X X X COUNTY OF ALBEMARLE 30-03-04P08:32 RCVD EXECUTIVE SUMMARY AGENDA TITLE: Strategic Direction: Provide Opportunities for Citizens for all Ages AGENDA DATE: April 7, 2004 ACTION: X INFORMATION: SUBJECT/PROPOSAL/REQUEST: Request Approval of Four Goals for Strategic Direction: "Provide High Quality Educational Opportunities for Albemarle County Citizens of all Ages" CONSENT AGENDA: ACTION: INFORMATION: STAFF CONTACTCS): Messrs. Tucker, Ms. White, Ms. Allshouse ATTACHMENTS: Yes LEGAL REVIEW: Yes REVIEWED BY: r--- BACKGROUND: A "Lifelong Learning" work group, compósed of representatives from Albemarle County schools and local government, UV A, Piedmont Virginia Community College, Bright Stars, Jefferson-Madison Regional Library, the Workforce Investment Board, Boys and Girls Club of Charlottesville/Albemarle, Jefferson Institute of Life-Long Learning, Monticello Area Community Action Agency, Charlottesville Area School Business Alliance, Virginia Cooperative Extension Services, and the Chamber of Commerce, have been meeting since September 2003 to develop goals for the County's Education for All Ages Strategic Direction. The group work was facilitated by Lori Strumpf, who also facilitated the Board Retreat last September. STRATEGIC PLAN: Strategic Direction #1 - "Provide High Quality Educational Opportunities for Albemarle County Citizens of all Ages" DISCUSSION: The Lifelong Learning Work Group has completed their work, and is presenting it to the Board for approval and inclusion in the County's Strategic Plan's FY 03 - FY 05 Plan of Action. The complete outline of their work is included as Attachment A. Following are highlights of their strategic planning efforts and the four strategic goals they identified for the Board's consideration: ORGANIZATIONAL OVERVIEW VISION, MISSION AND VALUES ALBEMARLE COUNTY VISION: To maintain Albemarle County's stature as a quality community by promoting the values of education and lifelong learning, historic and scenic preservation, safety, affordability, cultural diversity, citizen participation and economic opportunity that make the County a desirable place in which to grow up, raise a family and grow old while preserving our natural resources, rural character and visual beauty for future generations. ALBEMARLE COUNTY STRA TEGIC DIRECTION: Provide High Quality Educational Opportunities for Albemarle County Citizens of All Ages LIFELONG LEARNING VISION: County residents of all ages embrace the wonder of learning. LIFELONG LEARNING MISSION: Provide lifelong learning opportunities that result in gaining the skills and abilities required to succeed in school, work, and beyond and to inspire every individual that learning is lifelong. STRA TEGIC GOALS The Lifelong Learning workgroup has identified four strategic goals to guide our work over the next three years. They believe that these four goals will help the County become more focused on developing and facilitating quality educational opportunities for all by diversifying delivery systems and structures, broadening our approach to providing services to all learners within our community, and linking education and workforce preparation. GOAL ONE: Create accessible opportunities for everyone in the community to learn, ensuring all educational services meet the needs of the changing demographics within the community. GOAL Two: Meet the teaching and learning needs of all citizens along an appropriate continuum of ages and stages of J development GOAL THREE: Ensure the education system meets the workforce preparation needs of current and future employees and employers. GOAL FOUR: Position the County as a recognized leader in educational excellence. The group also developed action plans that will be forwarded to an implementation team. Membership of the implementation team will include representatives from the initial Lifelong Learning work group. The County will serve as a catalyst for the accomplishment of these goals and members of the County's Leadership Council will have a less direct role than they do for the other areas of the strategic plan. Members of outside agencies and educational organizations will be primarily the ones who will be working on these goals. RECOMMENDATIONS: Staff recommends that the Board approve the work completed by the Lifelong Learning group and incorporate the four goals into the County's Strategic Plan's FY 03 - FY 05 Plan of Action. Staff also recommends that the work of this group, including their initial recommendations for implementation, be forwarded to a Lifelong Learning Implementation Team for future action. 04.043 Attachment A ALBEMARLE COUNTY STRA TEGIC DIRECTION: PROVIDE HIGH QUALITY EDUCA TIONAL OPPORTUNITIES FOR ALBEMARLE COUNTY CITIZENS OF ALL AGES STRA TEGIC ACTION PLAN Fiscal Year 2003 through Fiscal Year 2005 Developed by the Albemarle County Life Long Learning Strategic Planning Team Prepared by Strumpf Associates: Center for Strategic Change INTRODUCTION Creating an informed citizenry and a competitive labor force is a strategic imperative for any community. As part of addressing these imperatives, Albemarle County's strategic plan has as one of four strategic directions to provide high quality educational opportunities for Albemarle County citizens of all ages. The competition created by a global economy, the proliferation of computer technologies, and the growth of decentralized work organizations all increase the need for a workforce with higher levels of initial skills and greater ability for continuous learning. The growing availability and complexity of information and choices adults face make continuous learning increasingly important to function within society. And population demographics are creating new demands for adult learning opportunities. Preparing workers for the next decade provides exciting opportunities for change. To compete and win in the global economy requires a new plan for investment in our current and future workplace. Competition will be heightened. Access to information and knowledge through new technologies will make commonplace opportunities we now only dream about: To keep pace with, and stay ahead of these changes, business increasingly will need to place a higher premium on its supply of knowledge as a key asset. In Agrarian Times success was land mass and brute strength. In the Industrial Era success was in machinery and conformity. In the 21st Century it will be knowledge, creativity and collaboration. Qualified workers with new skills and knowledge will be the key to economic success. The quality of a company's workforce is increasingly its most competitive advantage. Even entry-level jobs will require well-developed skills in reading, math, computer skills, literacy and reasoning. Over the P?st few decades, the number of unskilled jobs ~ those requiring a high school diploma or less has declined. In 1950, unskilled positions represented approximately 60% of the jobs available. By the year 2000, unskilled positions had shrunk to an estimated 15%. To address the ability of people of all ages to be able to successfully participate in their communities at work, in life, and at play requires providing new ways of learning both in and out of classrooms. Continual learning must become a way of life for all who wish to succeed. Learning is Life Long When Governor Warner proclaimed a Virginia Lifelong Learning Week in 2002, he stated that, "Lifelong learning is a lifestyle of recognizing needs and engaging in behaviors that result in accomplishing the learning desired and is essential for growth and success of every citizen in Virginia in our ever-changing world." At its broadest, lifelong learning refers to a process or system through which individuals are able and willing to learn at all stages of life, from preschool years through old age.1 According to the 2000 Census, over 900,000 adult Virginians are in need of a high school diploma. In 2001, 11,380 adults in Virginia earned their GED certificates and 13,000 students dropped out of high schoo\.2 According to the National Institute for Literacy, in 1998 1,000,000 adult Virginians who have finished high school lack basic reading, math, or English skills necessary to fulfill their roles as family members, workers, and community members. The single greatest predictor of a child's educational success is the mother's level of education. Children are five times more likely to drop out of high school if their parents are unemployed and lack a high school diploma. Thirty-four percent of job applicants tested by major U.S. companies in 2001 lacked sufficient reading and math skills to do the job they sought. 3 The National Center for Education Statistic's Report, Participation Trends and Patterns in Adult Education: 1991 to 1999 provides some insights to the growing demand for lifelong learning. This marks a sea change in U.S. education, making compulsory education only one of many in a myriad of learning choices. The report measured participation in six types of adult education learning activities - work-related courses, non-work related courses, ESL programs, ABE programs, apprenticeship programs, and credential programs. The report found that many participation patterns were the same in 1991 and 1999. In both years, adults with higher levels of education participated at higher rates than adults with lower levels of education; retired adults participated at a lower rate than those in all other labor force groups; and those in higher status occupations participated at higher rates than those in lower status occupations. The reports findings that virtually every group of adults examined increased their participation in adult education between 1991 and 1999 are good news. However, upon closer examination, the report concludes that some groups are being left behind. Particularly Hispanics, those with lower levels of education, those with lower status jobs, and those who are employed part time. Our community is set to respond to the challenge of not only providing lifelong learning opportunities for all, but to also inspire and motivate all Albemarle County citizens to keep learning and growing. We will increase learning access and opportunities 1 From a working paper of the National Center for Educational Statistics, July 2000. 2 Virginia Association of Adult and Continuing Education 3 National Institute for Literacy for all, provide learning that meets the needs in ways that are age, stage and culturally appropriate, and work to identify and increase skills needed for the current and future workforce. LOCAL DATA AND STRATEGIC CHALLENGES The strategic planning team conducted an environmental scan by analyzing strategic challenges through the lens of the current state of demographics, the economy, children/youth and families, and education. From these challenges evolved the strategic goals that set our direction over the next three years. STA TE OF OVERALL DEMOGRAPHICS ./ Albemarle County population is expected to reach 97,200 by 2010. (Source: 2010 Projection - VEC's Labor Market Information Data Updated 5/2/03). ./ The County population is aging with the elderly (65+) increasing by 4,517 (84%) and experienced work force (45-64) increasing 7,191 (59%) between 1990-2000. (Source: 2000 US. Census of Population). ./ Six percent of County's population is less than 5 years old, 19% is ages 5-19, 11 % is ages 20-24, 29% is ages 25-44, 23% is ages 45-64 and 12% of the County is 65 years and older. (Source: U S. Census of Population, Table 1, adjusted to include 4,950 additionalpersons, assumed to be in 20-24 age bracket). ./ The population has grown from 55,783 in 1980 to 84,186 in 2000, an increase of 26%, while the number of children under five has increased by 47% during that same time period. (Source: US. Census of Population, Table 1). ./ Sixteen percent of Albemarle County is non-white. (Source: U S. Census of Population, 2000 Table P8). ./ The largest percentage of growth is in the Hispanic population (Between 1990 and 2000, the Hispanic population grew from 867 persons to 2,061 - a 138% rate increase. (Source: U. S. Census of Population, 2000 Table P8). ./ There has been an increase in residents who speak a language other than English in the home from 3.8% in 1980.to 8.6% in 2000. (Source: U S. Census of Population). ./ Population growth in Albemarle County due to migration has been greater than the increase due to natural population increase (In 2001,67% increase due to migration and 33% increase due to natural increase). (Source: Virginia Department of Health) ./ Albemarle County's median family income is $66,175 in 2000. Median family income has increased 17% between 1990 and 2000. (Source: Weldon Cooper Center). STA TEOF THE ECONOMY WORKFORCE TRENDS ./ Albemarle County experienced steady net job growth during the years 1993 through 1997, and witnessed a jump in net job growth in 1998 and 1999. After 2000, the net growth in employment tapered off, with the total number of jobs declining slightly in 2001 and recovering somewhat in 2002 (761 net increase in jobs). (Source: Virginia Employment Commission's ALICE Website, July 3, 2003 and the Virginia Employment Commission's LAUS website, June 18, 2003). ./ The largest local employer is the State government (UV A and the Medical Center) with 23% of local jobs. (Source: VEC ES 202 Report, NAICS Coding). ./ Over the past twenty years the service and trade sectors have become increasingly important as sources of employment, while manufacturing has become less important. Service employment has increased from 14% in 1990 to 24% of all jobs in the County during 2001. Conversely, employment in manufacturing has decreased from 19% in 1990 to 10% of all jobs in 2001. (Source: VEC ES-202 Reports, SIC coding). ./ Albemarle lost 1 ,699 manufacturing jobs between 1998 and 2002, it, however, gained 3,791 jobs total, with at least 500 jobs for each of these five sectors: State government (1,083), health care (785), local government (541), construction (516), and information (520). (Source: VEC ES 202 Report, NAICS Coding). ./ The average annual employment in all jab sectors was 38,718 in 2001. (Source: VEC ES-202 Reports, SIC coding). ./ The participation of males in the labor force (72%) is greater than that of females (61 %). Labor participation among both males and females has increased over the last three decades. (Source: U. S. Census of Population: 1980, 1990 and 2000). ./ Albemarle's average weekly wage ($666) in 2002 was below the state's average of $715. Albemarle has witnessed increased wage growth since 1990, up 9% in inflation adjusted dollars. (Source: Virginia Employment Commission, ALICE ES 202 NAICS Report and Consumer Price Index (CPI) data from BEA). ./ Albemarle has an extremely high level of educational attainment compared to the state and other counties. 53% of the county population has at least an Associates degree while the state level is only 35%. 5.3% of the county population attained less than 9th grade. 7.3% attained between 9th and 1zth. 17.8% attained a high school degree. 16.4% attained some college. 5.5% attained an Associate degree. 24.6% attained a Bachelor's degree. 23.1 % attained a Graduate degree. (Source: U. S. Census of Population: 2000). ./ 51% of jobs in Albemarle County are filled by non-residents. (Source: U. S. Census, 2000). ./ Self sufficiency wage in Albemarle County ranges from $16,634 for a single adult to $39,037 for two adults with a pre- school child and a school age child. (Source: Self Sufficiency Tables, www.vakids.org). ECONOMY TRENDS ./ During the course of the years 1993 through 2002 inclusive, Albemarle typically had an unemployment rate lower than the Commonwealth of Virginia, and the United States. In 2002, the unemployment rate for Albemarle County was 2.3%, compared to the Commonwealth of Virginia at4.1 % and the United States at 5.8%. (Source: Virginia Employment Commission's LAUS website). ./ The total nominal value of residential and non-residential real estate in the County increased in each of the years 1992 through 2001 inclusive, with the sharpest rise taking place in 2001. (Source: Commonwealth of Virginia, Department of Taxation, Annual Report for 1993 through 2002). ./ Total taxable sales in Albemarle County have nearly doubled in the past decade, with the largest increase takingplace in 1993, 1999, and 2000. (Source: Weldon Cooper Center for Public Service Website). ./ The County's per capita taxable sales have increased by about 50% between 1992 and 2001. (Source: Weldon Cooper Center for Public Service Website). STATE OF CHILDREN, YOUTH AND FAMILIES YOUTH DISCIPLINE AND SUBSTANCE ABUSE ./ Alcohol arrests for people 19 and under moved from 2.3/1000 in 1997 to a high of 12/7/1000 in 2001, then down to 9.6/1000 in 2002. Arrests for underage drug and alcohol possession three-year average increased from 3.8/1000 for 1994-1996 to 6.2/1000 in 1999-2001. (Source: Stepping Stones, July 2002). ./ School reports of violence have increased from 26.0/1000 in 1998 to 28.8/1000 in 2001. (Source: Stepping Stones, July 2002). ./ The number of suspensions increased from 72/1000 in 1997 to 122/1000 in 2001. (Source: Stepping Stones, July 2002). HEALTH ./ The number of calls to the Poison Control Center has increased from 7.8/1000 in 1997 to 16/1000 in 2001 for the Charlottesville/Albemarle community. (Source: Stepping Stones, July 2002). ./ There has been an increase in low birth weight babies from 5.3 of total live births on average between 1991-1993 to 6.4 % between 1998-2000. (Source: Stepping Stones, July 2002). ./ The need for accessible and affordable dental care was confirmed as a pressing local need. (Source: Charlottesville/Albemarle Commission on Children and Families' Community Needs Assessment http://ccfinfo.orq/newpaQeslDUblications.htmO. FINANCIAL STATUS ./ Seven percent of the County's population is living in poverty. (Source: U. S. Census of Population, 2000). ./ Hispanic persons had the highest percentage of persons living in poverty. (Source: U. S. Census of Population, 2000). ./ Twenty Percent of Albemarle County's population is either in poverty of considered the "working poor". (Source: U.S. Census of Population, 2000) ./ Overall poverty trends show a slight increase from 7.8% in 1995 to 8.0% in 1998 but a decrease in 1999 to 6.8%. Child poverty trends reflect a similar trend line with a rate of 10.3% in 1995 to 12.3% in 1998 and 9.1% in 1999. (Source: US Census Small Area Income and Poverty Measurements). ./ The average number of children receiving Temporary Assistance for Needy Families (T ANF) has decreased from 34 on average in 1991-1993 to 12 in 1999-2001. (Source: Stepping Stones, July 2002). ./ Food Stamp participation has decreased from 29.7/1000 in 1997 to 23.5/1000 in 2001. (Source: Stepping Stones, July 2002). ./ In 1999,4.7% of the County's elderly population (above age 65) was living in poverty. (Source: U. S. Census of Population 1980, 1990 and 2000). ./ The estimated percentage of persons under 18 living in poverty in the County was 6.7% in 2000. (Source: Stepping Stone, September 2003). ./ Household income emerged as the factor that has the greatest impact on need, access to services and quality of family life. (Source: Charlottesville/Albemarle Commission on Children and Families' Community Needs Assessment http://ccfinfo.orq/newpaqes/publications.htmJ). FAMILY CHARACTERISTICS ./ The number of children in foster care has increased from 8.4/1000 children ages 0-17 in 1997 to 9.3 in 2001. (Source: Stèpping Stones, July 2002). ./ 8.6% of all families in Albemarle County are female headed families that have children under 18. (Source: U. S. Census of Population 1990/2000). ./ Female headed households with children under the age of 18 more than doubled during 1990-2000 (From 4.7% to 8.6%). (Source: U. S. Census of Population 1990/2000). ./ In the FY03/04 budget, the County budgeted $6.7 million for the Comprehensive Services Act Program which supports a system of services and funding to serve troubled and at-risk families and children. (Source: FY 2003/04 Albemarle County Budget Document). EARL Y CHILDHOOD ./ Child Care spaces have decreased from 20/100 children ages 0-5 in 1995 to 16 in 1999. (Source: Stepping Stones, July 2002). ./ The Women, Infants and Children feeding program has decreased from 18.4/1000 in 1997 to 15.8/1000 in 2001 for the Charlottesville/Albemarle community. (Source: Stepping Stones, July 2002) STATE OF EDUCATION POPULATION INFORMATION ./ 15.9% of students in Albemarle County are enrolled in special education programs. (Source: Virginia Department of Education). ./ Though they make up only 4% of all students in Albemarle County (a total of 459 in 2002-2003), Hispanic students are the fastest growing sub population in the County schools. (Source: Virginia Department of Education). SCHOOL DISCIPLINE ./ Alcohol arrests for people 19 and under moved from 2.3/1000 in 1997 to a high of 12/7/1000 in 2001, then down to 9.6/1000 in 2002. Arrests for underage drug and alcohol possession three-year average increased from 3.8/1000 for 1994-1996 to 6.2/1 000 in 1999-2001. (Source: Stepping Stones, July 2002). ./ The number of suspensions increased from 72/1000 in 1997 to 122/1000 in 2001. (Source: Stepping Stones, July 2002). EDUCA TIONAL ATTAINMENT ./ The population of Albemarle is highly educated. Of those 25 years and older, 48% have at least a bachelor's degree while 13% of the total population have less than a high school diploma. (Source: US Census of Population). ./ The County has a high level of educational attainment when compared to the State. (69.6% have some college to graduate degrees). (Source: U. S. Census of Population, 2000). ./ The number of youth needing special education services increased from 86 in 1999 to 116 in 2002. (Source: Virginia Dept of Education). ./ The High School graduation rate is steady but 17% of students do not graduate and 8% of those that do not graduate are in poverty. (Source: Monticello Area Community Action Agency- Community Assessment). ./ The percentage of students enrolled in 9th grade that graduate four years later moved from a low of 73.5% in 1997 to a high of 84.2% in 2001 to 76.7% in 2002. (Source: Stepping Stones, July 2002). ./ The County's dropout rate in 2002 was 0.8%. (Source: Stepping Stones, September 2003). HOUSING IMPACT ON EDUCATION ./ The number of subsidized housing slots has decreased from 81.4 units per 1000 in poverty in 1998 to 70.9 in 2001. (Source: Stepping Stones, July 2002). ./ 34% of housing in Albemarle County is renter occupied. (Source: U. S. Census, 2000). ./ Of the rental units in Albemarle, 38% of occupants paid more than 30% of their income for the rental unit. (Source: U. S. Census 2000). ./ The median gross rent in the County was $712 for 1999, above the State median gross rent of $650. (Source: U. S. Census 2000). ORGANIZATIONAL OVERVIEW VISION, MISSION AND VALUES ALBEMARLE COUNTY VISION: To maintain Albemarle County's stature as a quality community by promoting the values of education and lifelong learning, historic and scenic preservation, safety, affordability, culturaldiversity, citizen participation and economic opportunity that make the County a desirable place in which to grow up, raise a family and grow old while preserving our natural resources, rural character and visual beauty for future generations. ALBEMARLE COUNTY STRA TEGIC DIRECTION: Provide High Quality Educational Opportunities for Albemarle County Citizens of All Ages LIFELONG LEARNING VISION: County residents of all ages embrace the wonder of learning. LIFELONG LEARNING MISSION: Provide lifelong learning opportunities that result in gaining the skills and abilitiesrequiredto succeed in school, work, and beyond and to inspire every individual that learning is lifelong. CUSTOMERS: All County Residents ROLE: The County will play several roles in furtherance of our vision and mission for education for all: · We will be stewards of the educational future of the residents we serve. · We will catalyze change in the community to move it toward our vision for educational opportunities. · We will strategically invest in value added educational services. · We will be a community facilitator and convener to identify issues and act collectively with community partners to address them. LEARNING CORE VALUES Our Common Values: We believe in the following shared principles.... LEARNING We encourage and support lifelong learning and personal and professional growth. · We believe it takes bold acts of courage for individuals to continue learning throughout their life. · We beJieve that education and learning are the great equalizer and open the doors to full participation in a democratic society. · We believe that a strong community is built upon individual development, growth, and learning. STRATEGIC GOALS The County has identified four strategic goals to guide our work over the next three years. We believe that these four goals will help the County become more focused on developing and facilitating quality educational opportunities for all by diversifying delivery systems and structures, broadening our approach to providing services to all learners within our community, and linking education and workforce preparation. By accomplishing these goals, we will better assist all our customers. GOAL ONE: Create accessible opportunities for everyone in the community to learn, ensuring all educational services meet the needs of the changing demographics within the community. GOAL Two: Meet the teaching and learning needs of all citizens along an appropriate continuum of ages and stages of development GOAL THREE: Ensure the education system meets the workforce preparation needs of current and future employees and employers. GOAl FOUR: Position the County as a recognized leader in educational excellence. OPERATING PRINCIPLES The following principles define the way the County approaches the operational aspects of the daily work, in accordance with our values, goals, and strategies. The core processes employed by the organization to accomplish the goals will operate in the following fashion. - Strategies developed will be embedded in research and best practice information to become a knowledge-rich learning organization. - The CQI principle of data-driven decision-making is used in the operational end of all systems and processes. - Ongoing evaluation will provide data to continuously assess the outcomes and appropriateness of programs and delivery systems for which we will hold ourselves accountable. - Strategies are used to strengthen organizational effectiveness by coordinating and maximizing resources (e.g., time, money, people and facilities). - Coordinate with neighboring jurisdictions to strengthen effectiveness and to build capacity. DESIRED OUTCOMES OF THE STRA TEG/C ACTION PLAN At two years: · Increase customer satisfaction with community lifelong learning opportunities o Achieve an 85% customer satisfaction rating from each customer group on annual customer survey. · Residents in all demographic groups are more aware of community learning opportunities. o Community awareness in each identified demographic has increased by 20%. · Develop jobs and workforce opportunities for students that augment workplace and academic competencies. o 75% of all students in a work-based learning opportunity receive a competency rating of proficient or above on a worksite supervisor rating. And o 50% of the teachers surveyed rate work-based learning as a significant learning opportunity At five years: · Increase the level of resources available to meet the learning needs along the learning continuum o Gaps have been continuously evaluated and filled o Measures of effectiveness are in place and utilized to make program improvements · Demonstrate effectiveness in contributing to the community's economic development initiatives through workforce development. o Economic development partners rate workforce development partners as making a significant contribution to economic development in the area. · County-wide lifelong learning efforts have been recognized as 'excellent' at a state and national level o The County's has received one state or national award for excellence. o At least one institution or jurisdiction outside of the County has used the County's lifelong learning system as a benchmarking opportunity. COUNTY OF ALBEMARLE EXECUTIVE SUMMARY 31-03-04A02:15 RCVD AGENDA TITLE: Stormwater Master Planning and Program Development AGENDA DATE: April 7, 2004 ACTION: INFORMATION: X SUBJECT/PROPOSAL/REQUEST: Work session on the stormwater master plan and options to develop the stormwater program CONSENT AGENDA: ACTION: INFORMATION: STAFF CONTACTCS): Messrs.Tucker, Foley, Davis, Graham, Hirschman REVIEWED BY: ATTACHMENTS: BACKGROUND: In the past year, there has been much activity in the field of stormwater management, including: - Completion of a Stormwater Master Plan for the Development Areas, and . County coverage under a federally-mandated stormwater permit program for municipal storm sewer systems. The development of a County Stormwater Master Plan is the product of previo~s work sessions with the Board during the spring of 2000. At that time, the .Board directed staff to pursue the development of regional drainage area plans. Prioritized watershed studies are also listed as a Strategy in Chapter 2 of the Comprehensive Plan, adopted in 1999. Finally, the need to develop regional drainage plans has also been driven by new regulations. The stormwater permit program (NPDES Phase II) went into effect in 2003. The program, in essence, requires discharges from a municipal storm sewer system to be regulated, similar to those from factories or wastewater plants. Under this permit, the County must develop a stormwåter management program that meets standards administered by the Department of Environmental Quality (DEQ). We have arrived at a point in our program development where policy decisions need to be made in terms of implementing a stormwater master plan and funding our growing stormwater demands for existing, mandatory, and expected programs. The April 7, 2004 work session will focus on the Stormwater Master Plan, with subsequent work sessions aimed at establishigg policy guidance for the stormwater program. This executive summary outlines the Stormwater Master Plan, stormwé;!ter program elements, and steps for future decision-making, including program funding. Stormwater Master Plan for Development Areas The County's Neighborhood Model encourages in-fill development, which will create a relatively high intensity of impervious areas and an increase in stormwaterrunoff. This land use pattern provides a challenge to protect water resources. Streams within the Development Areas have already been impacted by existing and former land uses, and future development will also impact streams. Proactive stormwater planning can help mitigate these impacts and promote the restoration of water resources for their ecological, recreational, and cultural values. By its nature, water resources management within the Development Areas requires trade offs: protecting some high-value stream corridors while acknowledging that others may be impacted by development, allowing the development density designated in the Land Use Plan while protecting downstream property and natural resources, and seeking design solutions through the Neighborhood Model that turn water resources into neighborhood and environmental assets rather than liabilities. These trade offs are made with the understanding that higher-density development will likely impact water resources within the 35 square miles of the Development Areas to afford a much higher level of protection for streams within the remaining 692 square miles of the County's rural areas. However, a majority of these impacts can be mitigated through an effective stormwater program. With this framework in mind, the objectives of the Stormwater Master Plan for the Development Areas are to (1) provide guidance for land use planning and neighborhood master planning that is based on the assessment and prioritization of water resources, (2) promote public and private stormwater solutions that are based on needs and opportunities at the watershed scale rather than relying solely on a site-by-site approach, and (3) recommend a financing strategy to implement the Stormwater Master Plan, a County-wide stormwater management program, and attendant programs under the County's municipal storm sewer permit (VPDES Phase II). The components of the Stormwater Master Plan include: .",..,_1",. .",","""""', AGENDA TITLE: Stormwater Master Planning and Program Development April 7, 2004 Page 2 · Stream assessment and prioritization, · Identification of regional stormwater control facilities to address existing and future development, · Identification of watershed projects that can be implemented concurrent with development, including repair of major stream erosion and restoration of stream buffer zones, and - A recommended stormwater financing plan. Stormwater Proqram Elements The County's stormwater program is and will continue to be a fusion of programs that are: (1) existing and established efforts, (2) mandates from federal and/or state regulations, and (3) expected program elements based on Board direction and citizen expectations. · Existing Programs include plan review for erosion control, stormwater management, and stream buffer protection, site inspections, inspections and maintenance for existing stormwater facilities, limited drainage repairs and improvements, flood plain management, and soil & water conservation district programs. - Mandated Programs include six minimum program elements specified in the County's municipal storm sewer permit, administered by the Department of Environmental Quality. Several important program elements are public education, outreach and involvement in water resources protection, elimination of unpermitted discharges to the storm system, and pollution prevention at municipal facilities. Another required program may be the mapping and designation of perennial streams to remain compliant with new regulations associated with the Chesapeake Bay Preservation Act (adopted as part of the County's Water Protection Ordinance). · Expected Programs include expanding our stormwater maintenance obligations, responding to citizen complaints, construction of new regional facìlities in the Development Areas, watershed restoration and sediment reduction programs, watershed monitoring and studies, and a greenway program associated with stream corridors. Proqram Fundinq The method by which the County funds the stormwater program depends on a deliberate policy decision: What "level of service" are we choosing to provide in terms of water protection? Decisions about level of service must be made in the context of the existing, mandated, and expected program elements discussed above. The activities and programs listed above represent, in the staff's opinion, the minimum program elements necessary to meet mandatory commitments, the Comprehensive Plan, and community expectations. Of course, a more vigorous program is possible depending on the availability of funding and other support. Stormwater services range from those geared to protect property, public safety, and quality of life (e.g., flood control) to those that emphasize natural resources, water supplies, and the integrity of our natural systems (e.g., stream restoration, sediment reduction). However, most of these services accomplish multiple objectives across all of these areas (for instance, stream buffers offer natural flood control while protecting the ecology of stream corridors). " Funding mechanisms evaluated in the Stormwater Master Plan include: pro-rata share fees, plan review fees, grants, the general fund, and a dedicated funding source known as a stormwater utility. Stormwater utilities are enabled by State Code and can provide funding for a wide range of program elements based on an assessment of each property's contribution to runoff. In this regard, a stormwater utility establishes a service fee to fund required and expected stormwater services. The concept of a stormwater service fee was previously discussed by the Board in March and April of 2000 (3/1/00 and 4/5/00 meeting dates). For the current work session, we do not anticipate going into detail about a potential stormwater utility, although this topic will be discussed at length at subsequent work sessions. STRATEGIC PLAN: Goal 3.1: Make the County a Safe and Healthy Community in which citizens feel secure to live, work and play Goal 2.2: Protect and/or preserve the County's natural resources. Goal 2.3: Provide for environmentally sensitive government operations at the local and regional level. 't'j' ..1¡ AGENDATITLE: Stormwater Master Planning and Program Development April?,2004 Page 3 DISCUSSION: Past Board information sessions and actions on this and related topics are summarized below: · March 1. 2000: The Board was presented with a list of options for the Stormwater Control Program. The Board authorized the prioritization of CIP funds to complete "regional drainage area studies" (the Stormwater Master Plan), and requested further information on other topics. · AprilS. 2000: Additional information was presented to the Board. The Board authorized that all future subdivision and site drainage easements be dedicated to Public Use. This decision means that the County's "owned and operated" municipal storm sewer system, subject to state and federal regulations, is steadily increasing. Since April, 2000, approximately,,¡¡iO projects have dedicated easements to Public Use. At this meeting, the Board also elected to keep stormwater program administration within the Department of Engineering rather than transferring it to the Albemarle County Service Authority. · February 6. 2002: The Board authorized the signing of a grant agreement with the Department of Conservation & Recreation. The County was awarded a $100,000 grant through the Water Quality Improvement Fund to help fund development of the Stormwater Master Plan. · February S. 2003: The Board authorized County staff to proceed with a "Registration Statement" so that the County could be covered under DEQ'sgeneral permitformunicipal separate storm sewer systems (MS4s). This is a mandatory program under the Federal Clean Water Act. The County's permit coverage became effective on May 13, 2003. · February 4., 2004: The Böardendorsed County staff's involvement in the Rivanna Regional Stormwater Education Partnership, a collaborative effort with the Charlottesville, UV A, VDOT, RWSA, and T JSWCD to help comply with some of the program elements in the aforementioned storm system permit. The Board's cumulative decisions to date have provided guidance, program directions, and several necessary authorizations for mandatory programs. At this point in time, we need to view the stormwater program as ,an integrated whole with program elements, defined levels of service, and an aþpropriate funding strategy to meet program needs. The April 7, 2004 work session is envisioned to be one of several that can ultimately lead to the policy direction needed to establish a defined am;! stable program. This work session will focus on the results and recommendations in the Stormwater Master Plan. Subsequent work sessions Will address specific funding mechanisms. Staff will not be requesting specific direction from the Board u~til completion of the two work sessions. Depending on that direction, certain components of the master plan study will need tc[ße incorporated into the Comprehensive Plan.~' RECOMMENDATION: This work session is for information purposes. 04.042 - I I I I I I I I I I I I I I I I I I I Final Technical Memorandum Stormwater Master Plan Funding Analysis Prepared for Albemarle Còunty, Virginia April 2004 Prepared by CH2MHILL 13921 Park Center Road Suite 600 Hemdon,VA20171 In Association with Albemarte County Department of Engineering - I I I I I I I I I I I I I I I I I I I Final Technical Memorandum Stormwater Master Plan Funding Analysis Submitted to Albemarle County, Virginia April 2004 - I I I I I I I I I I I I I I I I I I I Contents Executive Summary ...... .... ............................ ............................................. .........................................1 Goals and Objectives of the Funding Plan...................................·..........·.....·..·......·....·......·..·1 Recommended Funding Plan ....... ......... ..... .... ....... ............. ...... ...... ........... ............... ...... ..........2 Current Funding and Budgeting ....................... ....... ......................... .................... .... ...............3 Candidate Funding Sources ............................. ................ .... ........... ..... ........... .... ...... ..... ...........4 Revenue-Generating Capabilities of Identified Funding Sources .......................................5 Funding Strategies Analysis ..... ..... ..... ..... ........ ....... ......... .......... ..... ................ ....... .... .... ...........6 Goals and Objectives of the Funding Plan ....................................................................................9 Curren t Fun din g and B u dgetin g............................ ......... ..... ........................................ ..................11 Revenues................................................................................................................................... .11 Operating Budget .......... ....... ........ .... .......... ...... ............. ... ... ....... ..... ...... .................. .......... .... ...12 Capital Improvement Program .... ...... ..................... ............ ...... ...... ...... ......... ........... ........ .....14 Can di date Funding Sources ........................................... ....... .... .............. .............. ....... ...................15 Long- T enn Financing .. ..... ...... .... .......... .... ...... ......... ..... ............... ........ ............. ........... .... .... ....15 Government Obligation (GO) Bonds.......... ............. ............. ............. ........... .......... .....15 Revenue Bonds.. ........ .... ........... .... .... ........ ....... ..... .................. .... .......... ......... ...... .... ........16 State Revolving Fund (SRF) Loans. ............ ......... ..... ..... ...................... ............... ........ ..16 Grants............................................................................................................................. ........ ... .16 Pro-Rata Share. ..... ........ ... ............ ......... .... .... ........... .......... ..... ......... ....... ..... ... ...... ...... ............. ..17 General Fund............... ............. .......... .............. .................. ......... .......... ...................... ......... .....17 Plan Review and Pennit Fees ..... ........ ........... ...... .......... .... .................. .............. ....... ..............18 System Development Charges (Impact Fees) .......................................................................18 Special Taxing Districts . ..... .......... ..... .................. ............... ..... ............ ..... ..... ............... ........ ...19 Watershed Improvement Districts (WlDs) ...........................................................................19 Stormwater Utility ...... .... ..... .......... ........ ............... ........ ........ ........... .......... ..... ... ............... ........20 Revenue-Generating Capabilities of Identified Funding Sources.........................................·21 Stormwater Utility ................ ..... ...... ........ ..... .... ......... ........... ........................... ...... .... ............. ..21 Long- T enn Financing ....... ..... ........... ................... .... ..... .................... ...... ..... ..... ...... ..... .... ........23 Pro-Rata Share.....................................................................··..····..·..···..··················..···..·..······· .25 Plan Review and Pennit Fees .... ....... ....... ........................ ......... ..... ........ ..... ....................... .....26 Funding Strategies Analysis ........................................................................ ..... ......................... .....28 Level of Service..............................................................·..·······..·..·········..···..·..·····..·..··· .......... ..28 Option I-Development Areas .... ..... ......... ........... ......... .... ........... ............ ........ ................... ..29 Option 2 --Countywide ............................................................... ........................................... .33 Option 3--General Fund Only....... ... ..... ....... ...... ...... .... ..... .............. ........... ........... ................34 Recommended Funding Plan....... ...... .......... ............ .............. ....................................... ..................36 Attachment A Stormwater Management Funding Plan Model..............................................·37 WOC033110001 Z1P1llE I I I I I I I I I I I I I I I I I I I STORMWATER MASTER PIAN FUNDING ANALYSIS Tables E5-1 Revenue-Generating Capabilities of Selected Funding Sources E5-2 LOS Options For Maintenance of Drainage System E5-3 LOS Options For Maintenance of BMP Facilities E5-4 Estimated existing, newly mandated, expected costs for Option 1 E5-5 Estimated existing, newly mandated, expected costs for Option 2 1 Funding Sources and County Estimated Current Funding 2 Breakdown of Expenditures, Revenue, and Net Cost for Engineering and Public Works Department 3 Assumptions for Preliminary Estimate of Countywide Stormwater Utility 4 Assumptions for Preliminary Estimate of Stormwater Utility Limited to Development Areas 5 Pro-Rata Share Revenue Estimates Based on Preliminary Regional BMP Feasibility Study 6 Fee Schedule for Erosion and Sediment Control 7 Fee Schedule for Stormwater Management 8 LOS Options For Maintenance of Drainage System 9 LOS Options For Maintenance of BMP Facilities lOa Summary of existing, newly mandated, and expected program costs under Option 1 lOb Option 1-Development Areas 11a Summary of existing, newly mandated, and expected program costs under Option 2 11b Option 2-Countywide Figures ES-1 Recommended Funding Plan ES-2 Breakdown of Engineering and Public Works Operating Budget for FY 2004 Adopted Budget E5-3 Stormwater Projects: Approved CIP and Capital Needs Assessment 1 Breakdown of General Fund Revenues for FY 2004 Adopted Budget 2 Breakdown of Engineering and Public Works Operating Budget for FY 2004 Adopted Budget 3 Stormwater Projects: Approved CIP and Capital Needs Assessment 4 Preliminary Estimate of Countywide Stormwater Utility Revenues in Albemarle County-Varying Assumptions for Area of the ERU 5 Preliminary Estimate of Countywide Stormwater Utility Revenues in Albemarle County-Varying Assumptions for Monthly Fees per ERU 6 Preliminary Estimate of Stormwater Utility limited to Development Areas Revenues in Albemarle County-Varying Assumptions for Impervious Area Per ERU 7 Preliminary Estimate of Stormwater Utility limited to Development Areas Revenues in Albemarle County-Varying Assumptions for Monthly Fees Per ERU 8 Target Debt Service Limit for Albemarle County II WDC033110001Z1PILLE I I I I I II I I I I I I I I I I I I I Final Technical Memorandum Storln:water Master Plan Funding Analysis Prepared for Albemarle Còunty, Virginia April 2004 Prepared by CH2MHILL 13921 Park Center Road Suite 600 Herndon, VA 20171 In Association with Albemarle County Department of Engineering I I I I I I I I I I I I I I I I I I I Final Technical Memorandum Storln:water Master Plan Funding Analysis Submitted to Albemarle County, Virginia April 2004 I I I I I I I I I I I I I I I I I I I Contents Execu ti ve Summary ... ...................................................... ................ .................................... ...............1 Goals and Objectives of the Funding Plan..............................................................................l Recommended Funding Plan ........... ......... .... .......... ...... .................. .... ..... ......... .... .... ... ............2 Current Funding and BudgetÍI\g ...... ......... ...... ..................................... ..... ......... ....... ...............3 Candidate Funding Sources ......... ..... ......... .......... ..... ............................ ........................ ............4 Revenue-GeneratÍI\g Capabilities of Identified Funding Sources .......................................5 Funding Strategies Analysis ......... ... .......... .... ........ .......... .......... ..... .................... ................. .....6 Goals and Objectives of the Funding Plan ....................................................................................9 Curren t Funding an d Budgeting .......................................... ..................... ........... ............. .............11 Revenues................................................................................................................................... .11 OperatÍI\g Budget ....... ......... ..... ...... ..... ........ ...... ..... ... ....... ..... ......... ........ ...... ... ..... ..... ..... ... ...... .12 Capital Improvement Program ............. ........................... ....... ................... ........... .... .......... ...14 Can did ate Fun ding Sources. .................. ..................... ... .............. ........... .............. ......... .................15 Long- T eI'IIl Financing .... ..... ..... ............ .... ... ..... ............ ......... .... ........ ... ........... ..... ....... ... .... .... ..15 Government Obligation (GO) Bonds ................. ..... .............. ............. ........... ..... ........ ..15 Revenue Bonds.. .... ....... ......... ...... .... ... ..... ..... ...... .... ..... ... ....... ....... ..... ... ...... ...... ..... ... .......16 State Revolving Fund (SRF) Loans ............ ............... ..... ............ .......... ............... ..........16 Grants........................................................................................................................................ .16 Pro-Rata Share ....... ......... ...... ........ ....... ......... .......... ....... ......................... ......... ........... ............. ..17 General Fund....... ...... ...... ..... .... ....... ... .......... .... ............ ........ ............. ..... ..... .... ..... ............ ....... ..17 Plan Review and Permit Fees . ...... ....... ...... .... ........... .......... .... ............ ............ .......... ..... .........18 System Development Charges (Impact Fees) .......................................................................18 Special Taxing Districts ..... ....... ......... .............. .... ......... ........... ..... ....... ..... ................ .... ........ ...19 Watershed Improvement Districts (WIDs) ......... .... ...... ............. ............ ......... ............ ...... ....19 StOI'IIl water Utility................................................................................................................... .20 Revenue-Generating Capabilities of Identified Funding Sources..........................................21 StoI'IIlwater Utility ... .... ....... ....... ... ..... ..... .................... ... ....... ... .... ................. ... ... ... .... ....... ..... ...21 Long- T eI'IIl Financing .... ..... ......... ..... ..... .... ........... ...... .... ........ ........... ...... ..... .......... ..... ..... .... ...23 Pro-Rata Share.................... ...... ...... .... ... .......... ..... ........ ... .... ................ ........ ... .......... .... ...... .... ...25 Plan Review and Permit Fees ... ....... ............. ............... .......... ................. ...... ......... ..... ........ ....26 Funding Strategi es Analysis ............................... ............................................................................28 Level of Service....................................................................................................................... ..28 Option I-Development Areas...... .... ............... .... .......... .............. ........ .... ...... .......................29 Option 2--Countywide .... ........... .... .............. ........... ...... ............................. ........... .... ........ .....33 Option 3--General Fund Only.......... ..... ..... .............. ......... .............. ........... ........ ...... ........ .....34 Recommend ed Funding Plan................. ...... .......................... .... ............ ...... ............................... ....36 Attachment A Stormwater Management Funding Plan Model ...............................................37 WDC033110001.l1P1llE I I I I I I I I I I I I I I I I I I I STORMWATER MASTER PLAN FUNDING ANALYSIS Tables E5-1 Revenue-Generating Capabilities of Selected Funding Sources E5-2 LOS Options For Maintenance of Drainage System E5-3 LOS Options For Maintenance of BMP Facilities E5-4 Estimated existing, newly mandated, expected costs for Option 1 E5-S Estimated existing, newly mandated, expected costs for Option 2 1 Funding Sources and County Estimated Current Funding 2 Breakdown of Expenditures, Revenue, and Net Cost for Engineering and Public Works Department 3 Assumptions for Preliminary Estimate of Countywide Stormwater Utility 4 Assumptions for Preliminary Estimate of Stormwater Utility Limited to Development Areas S Pro-Rata Share Revenue Estimates Based on Preliminary Regional BMP Feasibility Study 6 Fee Schedule for Erosion and Sediment Control 7 Fee Schedule for Stormwater Management 8 LOS Options For Maintenance of Drainage System 9 LOS Options For Maintenance of BMP Facilities lOa Summary of existing, newly mandated, and expected program costs under Option 1 lOb Option i-Development Areas lla Summary of existing, newly mandated, and expected program costs under Option 2 llb Option 2-Countywide Figures E5-1 Recommended Funding Plan E5-2 Breakdown of Engineering and Public Works Operating Budget for FY 2004 Adopted Budget E5-3 Stormwater Projects: Approved CIP and Capital Needs Assessment 1 Breakdown of General Fund Revenues for FY 2004 Adopted Budget 2 Breakdown of Engineering and Public Works Operating Budget for FY 2004 Adopted Budget 3 Stormwater Projects: Approved CIP and Capital Needs Assessment 4 Preliminary Estimate of Countywide Stormwater Utility Revenues in Albemarle County-Varying Assumptions for Area of the ERU S Preliminary Estimate of Countywide Stormwater Utility Revenues in Albemarle County-Varying Assumptions for Monthly Fees per ERU 6 Preliminary Estimate of Stormwater Utility limited to Development Areas Revenues in Albemarle County-Varying Assumptions for Impervious Area Per ERU 7 Preliminary Estimate of Stormwater Utility limited to Development Areas Revenues in Albemarle County-Varying Assumptions for MontWy Fees Per ERU 8 Target Debt Service Limit for Albemarle County WDC033110001.l1PILLE II I I I I I I I I I I I I I I I I I I I Executive Summary Albemarle County's Comprehensive Plan designates specific Development Areas (DAs), with the remainder of the County designated as Rural Areas. Within the Development Areas, the land use designation, zonin~ and infrastructure allow for relatively intensive development patterns. The County's Neighborhood Model for the Development Areas encourages infill development, which will create an even higher intensity of impervious areas and stormwater runoff. While concentrating development activity within the limited bounds of the Development Areas provides an overall watershed management framework that is consistent with the Chesapeake 2000 Agreement, it also provides a challenge to protecting water resources within these areas. Streams within the Development Areas have already been impacted by existing and former land uses, and future development will also impact streams. Proactive stormwater planning can help to mitigate these impacts and even promote the restoration of water resources for their ecological, recreational, and cultural values. In an effort to protect these resources a Stormwater Master Plan is being developed for the Development Areas. One of the key elements in the Master Plan is the development of a funding strategy that can support the program throughout its implementation. This memorandum summarizes the analysis of potential funding alternatives and recommends a funding strategy that can meet the goals of the program. Goals and Objectives of the Funding Plan County staff members identified the following funding goals and objectives as being important to the program: ~ Equity is important because property holders expect to pay their share of the costs for services provided (stormwater management). ~ Support for infill development within the development areas will help deter development in rural areas. ~ Availability of funding for programs of interest to stakehòlders will help build community support for the proposed funding plan. ~ Maximum use of pro-rata share and development fees before implementing a stormwater utility or other funding will have more support from the public, and may be more cost effective in the short-term. ~ Efficient billing and administrative systems will help keep operating costs down. It may be the case that existing staff and databases can be used to support a billing system for a stormwater utility. ~ Understandable user charge methods will help ensure successful implementation of the funding plan. ~ Support for educational programs will help citizens gain a better understanding of the need for stormwater management. WOC033110001.ZlP/llE I I I I I I I I I I I I I I I I I I I STORMWATER MASTER PlAN FUNDING ANALYSIS Recommended Funding Plan The recommended funding plan (Figure ES-l) consists of the following: - Implementation of a countywide stormwater utility - Continued and expanded use of pro-rata share program · Continued use of Erosion and Sediment Control, Plan Review, and Permit fees. · Use of grant funding when applicable and available FIGURE E8-1 Recommended Funding Plan ~- ~~ ;~~~:''-~;.', !,~i~ :~-l r--. ,~.: :;~;:' ,'~:~ ~ ~,,::-:- 'r' ; ::~ ¡"''',11 ';',' :;~; ;~.. '1 r' ';'';''~':T:'~, t~:';-=:r-'l f- ~7~'¡, ~'i~~~~-;r;~"-'1 ~ ' .. '. " , !, .. , " I", ' , '" , ¡ , ~,' 11 .... , ... , i " ï ' , j c. ".. ., -, 't .'...' --. ""~.' :_J~_, .. U .d'.=-..,__ JL.. " ¡'~"" ·u",'· J~ ".'~,~_u,_..J General Fund General Fund General Fund General Fund General Fund WDC033110001.l1PIlLE 2 I I I I I I I I I I I I I I I I I I I STORMWATER MASTER PlAN FUNDING ANALYSIS Under the recommended funding plan, the stormwater utility will provide a dedicated funding source for stormwater management programs countywide. The stormwater utility can help fund programs that help reduce flooding, improve water quality, improve natural habitats, and benefit natural resources for recreation uses. The utility can also help fund maintenance of stormwater management facilities. The pro-rata share program will continue to collect fees to help fund regional stormwater management facilities. As development continues in the County, the E&S control, plan review, and permit fees can help pay for the administrative cost of reviewing development plans and performing site inspections. Current Funding and Budgeting As reported in the FY 2004 Adopted Budget, the Operating Budget for Engineering and Public Works is approximately $4.2 million. A breakdown of this budget is provided in Figure E5-2. AGURE ES-2 Breakdown of Engineering and Public Works Operating Budget for FY 2004 Adopted Budget Engineering and Public Works Public Works 58% Engineering 37% Water Resource Management 5% Stormwater management activities are shared by Public Works, Engineering, and Water Resource Management (names may be different based on reorganization). The stormwater- related functions for Engineering and Water Resources include the following: · Erosion and sediment control (plan review and inspection) · Stormwater management review of development applications and plans (e.g., site plans) - Stormwater management facilities (inspection and maintenance) - Management of stormwater capital projects in the CIP - Water resources management - Compliance with the County's municipal storm sewer permit program under NPDES Phase II WDC033110001.ZIPIUE 3 I I I I I I I I I I I I I I I I I I I STORMWATER MASTER PlAN FUNDING ANALYSIS Based on the FY 2004 Adopted Budget, the total CIP (Engineering and Public Works) for FYs 2004-2008 is reported to be $2.35 million and the total CIP for FYs 2009-2013 is reported to be $3.25 million. Figure £5-3 shows the annual CIP requirement (stormwater projects only) assumed in the FY 2004 adopted budget. FIGURE E8-3 Stormwater Projects: Approved CIP and Capital Needs Assessment FY 2004 - 08 Approved CIP and FY 2009 - 13 Capital Needs Assessment $700 $600 - g $500 ~ ~ $400 f $300 ca - Õ $200 C $100 $0 FY 04 FY 05 FY 06 FY 07 FY 08 FY 09 FY 10 FY 11 FY 12 FY 13 Candidate Funding Sources There is a variety of funding source candidates for stormwater management, including the following: · Long-term financing (GO Bonds, Revenue Bonds, State Revolving Loan Funds) - Pro-rata share · General Fund · Plan Review and Permit fees · System Development Charges (impact fees) - Special Taxing Districts · Watershed Improvement Districts - Stormwater Utility It is important to identify candidate (alternative) funding sources to supplement traditional funding sources (e.g., General Fund), because the availability of additional General Fund revenues varies from year to year. Alternative funding sources can help stormwater management officiaJs fund additional program elements. WDC033110001.l1PAl£ 4 I I I I I I I I I I I I I I I I I I I STORMWATER MASTER PLAN FUNDING ANALYSIS Revenue-Generating Capabilities of Identified Funding Sources Table ES-l provides a summary of the revenue generating capabilities of identified funding sources. TABLE E5-1 Revenue-Generating Capabilities of Selected Funding Sources Funding Source Estimated Revenue Potential (Annual) [a] Notes Countywide - Stonnwater Utility Development Areas - Stonnwater Utility $12 per year per ERU, ERU = 2,000 sq. ft., == 75,100 ERUs Ic] $901,200 * Programs funded by countywide utility are for the entire county. $510,000 * $12 per year per ERU, ERU = 2,000 sq. ft., == 42,500 ERUs [c) Programs funded by utility are limited to Development Areas. FY 2003 revenues were approximately $7,500 Revenues will vary depending on the number of plans submitted for review. Plan Review Fees $7,500 Erosion and Sediment Control Fees $135,000 FY 2003 revenues were approximately $135,000 Revenues will vary depending on the number of plans submitted for review. FY 2003 revenues were approximately $10,000. An increase in the revenues from pro rata share fees was identified as an objective of the program. This estimate is based on regional BMP capital costs, a 20- year build out schedule and assumes 80 percent of drainage areas are developable. Limited based on County's debt management policies. Based on Adopted FY 2004 budget, net debt as a percent of the estimated market value of taxable property should not exceed 2 percent, or the ratio of debt service expenditures as a percent of general fund and school fund revenues should not exceed 10 percent [a) Except for long-tenn financing. Bond funds distributed to bond holder and repaid over a specified payment period. [b) This estimate assumes that the operating budget and debt service remains unchanged in FY 2005 at $186,163,000 and $12,691,000, respectively. This estimate does not consider retired debt. [c) Some values used are preliminary estimates. Before implementing a Stonnwater Utility, the ERU basis, the actual total number of single family residential properties, and the actual total impervious area for nonresidential properties will need to be detennined. * Does not include credits. Pro-rata Share $30,000 Long-tenn Financing $5.9 million [bJ WDC033110001.ZlPA.LE 5 I I I I I I I I I I I I I I I I I I I Funding Strategies Analysis STOAMWATER MASTER PLAN FUNDING ANALYSIS The CH2M HILL Project Team analyzed three funding strategies: Option I-Development Areas and Option 2-Countywide, described below; and Option 3--General Fund Only. The primary difference between Options 1 and 2 is the use of a Development Area stormwater utility instead of a Countywide one. In addition, costs associated with the following specific program elements were increased in Option 2 to account for implementation of the programs countywide. - E&S Plan Review and Inspection · Stormwater Plan Review - Stream Assessments - Watershed Studies · Perennial Stream Determination - Greenways (Other Capital Projects) · Drainage Improvement Projects (Other Capital Projects) · Floodplain Management (Year 5) Option 1-Development Areas · Stormwater Utility limited to Development Areas · Preliminary stormwater utility rate is $2.14 per month per ERU (5-year average) · Assumes no General Fund revenues for stormwater management after Year 1 · Assumes use of pro-rata share for regional facility construction costs · Assumes use of Plan Review and Permit fees and E&S Plan Review fees to supplement administrative costs · Program costs for Option 1 are approximately $1.9 million less than Option 2 (over the 5-year study period) · Program costs are less because some services would be limited to Development Areas. Programs for the remainder of the county would have to be funded through the General Fund. Advantages: · A majority of the services are provided within the Development Areas, which is where most of the impervious areas is located. Therefore, the residents that live in the DAs direcUy receive services for which they pay. · The billing system could be implemented through the Service Authority with relative ease. Disadvantages: · Residents and business owners within DAs may feel it is unfair (not equitable) that they pay for some countywide services. · It might create a disincentive to live within the DAs (which is contrary to the intent of the DA). WDC033110001.l1PiUE Option 2-Countywide · Countywide Stormwater Utility · Preliminary stormwater utility rate is $1.65 per month per ERU (5-year average) · Assumes no General Fund revenues for stormwater management after Year 1 · Assumes use of pro-rata share for regional facility construction costs · Assumes use of Plan Review and Permit fees and E&S Plan Review fees to supplement administrative costs · Program costs for a countywide Stormwater Utility are higher because additional services are provided countywide Advantages: · Program equity. The intent of creating the DAs is to protect the rural nature of the areas outside the DAs. This approach requires focused storrnwater management within the DAs. All county residents can benefit from the protection of the rural areas. Therefore, all residents should pay an equal share of the cost of preserving the rural area. · There is a higher revenue potential (i.e., ratepayer base) with a countywide fee. which enables the County to fund a comprehensive stormwater management program. Disadvantages: · Without proper community outreach residents of the county may perceive that they are paying for services that favor the DAs. 6 I I I I I I I I I I I I I I I I I I I As a third option, the County could use the General Fund in combination with increased usage of pro rata, plan review fees, and other funding sources. It is estimated that $1.5 million in year one, growing to $2.1 million in year five, will be needed to fund the stormwater management programs countywide at the recommended level of service. Without significant increases in other funding sources, the general fund allocation to stormwater will need to be increased by approximately $500,000 to $1,100,000 over the current funding. The revenue requirements for stormwater management programs depend on the level of service the County adopts and the scope of funding (i.e., countywide versus development area). Based on input from County staff, CH2M HILL developed a recommended level of service for each funding item. Tables ES-2 and ES-3 summarize the levels of service evaluated during the kick-off meeting with County staff. The levels selected during the meeting are shaded in gray. The level of service assumptions will be adjusted during utility development based on input from the County Board. TABLE E5-2 LOS Options for Maintenance of Drainage System Activity Inspection Low ~~9;i~t '~~', .,.... '.,:+ Emergency maintenance onl No information mana ement High Maintenance Data Management TABLEES-3 LOS Options For Maintenance of BMP facilities Activity BMP Inspection Low BMP Maintenance Inspect partial number of BMPs eve ear Emergency maintenance onl No program administration funded BMP Data Mana ent Table ES-4 provides a summary of the estimated existing, newly mandated, and expected costs under Option 1 (Development Areas). TABLE ES-4 Estimated existing, newly mandated, expected costs for Option 1 Year 1 Year 2 Year 3 Year 4 Year 5 Existing Newly Mandated $ 560,000 $ 240,000 $ 600,000 $ 220,000 $ 650,000 $ 180,000 $ 690,000 $ 110,000 $ 740,000 $ 110,000 WDC033110001.lJPILlE 7 I I I I I I I I I I I I I I I I I I I STORMWATER MASTER PLAN FUNDING ANALYSIS TABLE ES-4 Estimated existing, newly mandated, expected costs for Option 1 Year 1 Year 2 Year 3 Year 4 Year 5 Expected Total $ 360,000 $1,160,000 $ 390,000 $1,210,000 $ 420,000 $1,250,000 $ 460,000 $1,260,000 $ 620,000 $1,470,000 Table ES-5 provides a summary of the estimated existing, newly mandated, and expected costs under Option 2 (Countywide). TABLEES-5 Estimated existing, newly mandated, expected costs for Option 2 Year 1 Year 2 Year 3 Year 4 Year 5 Ex/sting $ 660,000 $ 700,000 $ 750,000 $ 790,000 $ 840,000 Newly Mandated $ 240,000 $ 220,000 $ 180,000 $ 110,000 $ 120,000 Expected $ 560,000 $ 610,000 $ 670,000 $ 730,000 $1,110,000 Total $1,460,000 $1,530,000 $1,600,000 $1,630,000 $2,070,000 WDC033110001.l1P/llE 8 I I I I I I I I I I I I I I I I I I I Goals and Objectives of the Funding Plan During a meeting of key staff from Engineering, Public Works and Water Resources, County staff members discussed the key goals and objectives of a successful funding plan. The staff identified the following funding goals and objectives as being important to the program: · Equity · Support economic development within development areas · Fund programs of interest to stakeholders · Maximize fees from pro-rata share and development · Utilize efficient billing and administrative systems · Use charge methods that are understandable, and · Develop supporting education programs Equity is important because property holders expect to pay their share of the costs for services provided (stormwater management). Structuring funding mechanisms so that they offer an equitable way of funding stormwater management programs supports a defensible funding plan. Supporting economic development plans within development areas will help deter development in rural areas. 11ús is important to the County to protect the rural watersheds and streams. Recent surveys indicating that the public values the recreational and aesthetic benefits offered by rural areas provide additional support for this approach. Availability of funding for programs of interest to stakeholders will help build community support for the proposed funding plan. For example, stakeholders interested in the preservation of natural resources and water supply protection will most likely be supportive of a funding plan that provides for development of Greenways, restoration of natural resources, and that emphasizes development in development areas. Further, existing stormwater management facility owners would likely be interested in a program whereby the County maintains stormwater management facilities. Maximum use of pro-rata share and development fees before implementing a stonnwater utility or other funding will have more support from the public, and may be more cost effective in the short term. However, these fees are dependent upon sustained growth and development. Efficient billing and administrative systems will help keep operating cost down. It may be the case that existing staff and databases can be used to support a billing system for a stormwater utility. For example, if a stormwater utility is limited to development areas, then if may be cost effective to have the billing mechanism administered through the Service Authority, which covers about 90% of Development Areas. Understandable user charge methods will help ensure successful implementation of the funding plan. That is, a Stormwater Utility user fee that is a flat rate for all residential single- family detached and attached (i.e., townhouse) homes is easier to understand than a multitier rate schedule. WDC033110001 ZlP/LlE 9 I I I I I I I I I I I I I I I I I I I STORMWATER MASTER PlAN FUNDING ANALYSIS Developing supporting educational programs will help citizens gain a better understanding of the need for stonnwater management. Educational programs can help citizens understand the importance of stonnwater management, link it to reduced flooding, improved water quality, protection of wildlife habitat, and lead to increased public health and safety. It is crucial that these programs make the link between funding stonnwater management programs and the benefits received. Of the goals and objective described above, there is consensus among County staff that support for development within the development areas is probably the highest priority goal for the funding program. There was lengthy discussion on how residents and others would perceive paying for improvements. Countywide surveys indicate that residents rank water resources and preservation of natural resources as being more important than other public services; however, often the link is not made between stonnwater management and protection of these natural resources. In addition, owners of properties with poorly maintained facilities would likely support a County program that provides for maintenance of those facilities. On the other hand, while there is support for getting some program elements accomplished, there may not be support for the additional fees and charges to accomplish this. Given the range of goals and objectives the following sections attempt to present a funding strategy that is responsive to each. WDC033110001.l1P/LLE 10 I I I I I I I I I I I I I I I I I I I Current Funding and Budgeting Current funding sources for stormwater management related functions include the following: · General Fund · Pro-rata share · Plan review fees · Development fees The FY 2004 operating budget for stormwater functions primarily falls under the Departments of Engineering and Public Works. These are currently being reorganized; however, both current and future evaluations are presented under the previous organization for consistency. Revenues A majority of the revenues that fund stormwater management activities are derived from the General Fund. A small portion is derived from a combination of funds from pro-rata share, plan review fees, development fees, and grants. As reported in the FY 2004 Adopted Budget, General Fund revenues are approximately $128.3 million. The breakdown of General Fund revenues is illustrated in Figure 1. AGURE1 Breakdown of General Fund Revenues for FY 2004 Adopted Budget General Fund Revenues Other Local Revenue 3% Transfer / Fund Balance 2% State Revenue 14% General Property Tax 56% WDC033110001.l1P/ll£ 11 I I I I I I I I I I I I I I I I· I I I STORMWATER MASTER PlAN FUNDING ANALYSIS Stormwater management activities are shared by Public Works, Engineering, and Water Resource Management. The stormwater functions for Engineering and Water Resources include the following: · Erosion and sediment control (plan review and inspection) · Stormwater management review of development applications and plans (e.g., site plans) · Inspection and maintenance of stormwater management facilities · Management of stormwater capital projects in the CIP · Water resources management · Compliance with the County's municipal storm sewer permit program under NPDES Phase II Table 2 shows a breakdown of expenditures (i.e., salaries, benefits, operating, capital outlay), revenue (local and transfers), and net cost (assumed to be covered by General Fund) for the entire Engineering and Public Works Department, and an estimate of the portion specifically related to stormwater management. TABLE 2 Breakdown of Expenditures, Revenue, and Net Cost for Engineering and Public Works Department FY 2002 (Actual) FY 2003 (Revised) FY 2004 (Adopted) Engineering. Public Works and Water Resources Management Expenditures $2,826,966 $3,376,235 $4,163,607 Revenue $381,488 $516,351 $907,918 Net Cost $2,445,478 $2,859,884 $3,255,689 Stonnwater Management Related Activities Expenditures $469,600 $512,897 $520,561 Revenue $102,361 $142,517 $137,550 Net Cost $367,239 $370,380 $383,011 According to the FY 2004 Adopted Budget, the decrease in local revenue for Stonnwater Management is due to the elimination of Watershed Management revenue. WDC03311000121PIUE 13 I I I I I I I I I I I I I I I I I I I STORMWATER MASTER PlAN FUNDING ANALYSIS Capital Improvement Program Based on the FY 2004 Adopted Budget, the total CIP for FYs 2004-2008 is reported to be $2.35 million and the total CIP for FYs 2009-2013 is reported to be $3.25 million. Figure 3 shows the annual CIP requirement that is documented in the FY 2004 adopted budget. FIGURE 3 Stormwater Projects: Approved CIP and Capital Needs Assessment $700 $600 - g $500 q ~ $400 ~ $300 CG Õ $200 C $100 $0 WOC033110001.ZIPIlLE FY 2004 - 08 Approved CIP and FY 2009 - 13 Capital Needs Assessment FY 04 FY 05 FY 06 FY 07 FY 08 FY 09 FY 10 FY 11 FY 12 FY 13 14 I I I I I I I I I I I I I I I I I I I Candidate Funding Sources There is a variety of candidate funding sources for stonnwater management, including the following: · Long-tenn financing (GO Bonds, Revenue Bonds, State Revolving Loan Funds) · Pro-rata share · General Fund · Plan review and permit fees · System development charges (impact fees) · Special taxing districts · Watershed improvement districts · Stonnwater utility It is important to identify candidate (alternative) funding sources juxtaposed to traditional funding sources (Le., General Fund), which vary year-to-year in their ability to generate revenues. Alternative funding sources can help stonnwater management officials identify funding for additional program elements, such as those that will arise from mandatory compliance with NPDES Phase II. Long-Term Financing Government Obligation (GO) Bonds Brief description and most likely applicability. Counties can use their general borrowing powers to issue bonds for capital projects that support stonnwater management activities. The projects would need to be relatively substantial for the process of issuing bonds (and the associated issuance costs) to be worthwhile. Potential for revenues. The potential revenues are considered high because of the existing combined property tax base of taxable property in the County. Primary advantages. Substantial funding can be secured in a short time. The borrowed funds can be repaid over an extended period of 20 or 30 years, if the facilities being developed have useful lives of that duration. GO bonds carry lower interest rates than some other borrowing options, because the full faith and credit of the County are used to support the bond issue. Primary disadvantages. Use of GO bonds requires voter approval, which may delay or jeopardize availability of funding. GO bonds cannot be used for activities that are categorized as operation and maintenance. Financing costs (e.g., issuance costs) need to be incurred. Interest rates will depend on credit rating and market conditions. Additional implementation considerations. The debt service for GO bonds could be repaid through taxes on real property or other contributions, such as a stonnwater utility charge based on an impervious area-tbased fonnula. WDC033110001.l1PIUE 15 I I I I I I I I I I I I I I I I II I I STORMWATER MASTER PLAN FUNDING ANALYSIS Revenue Bonds Brief description and most likely applicability. If the County develops a utility fee that covers stormwater CIP projects, the revenues from the user fees could be used to leverage revenue bonds. The projects would need to be relatively substantial for the process of issuing bonds (and the associated issuance costs) to be worthwhile. Potential for revenues. The potential revenues are considered high because the combined service base of the communities is significant, and the ability to spread repayments over time increases the amount of funds that could be raised in comparison with funding sources that need to be immediately charged to customers. Primary advantages. Substantial funding can be secured in a short time. The borrowed funds can be repaid over an extended period of 20 or 30 years, if the facilities being developed have useful lives of that duration. Primary disadvantages. Revenue bonds cannot be used for activities that are categorized as operation and maintenance. Financing costs (e.g., issuance costs) need to be incurred. Interest rates will depend on credit rating and market conditions. Revenue bonds typically carry higher interest rates than general obligation bonds, because they are not backed by the full faith and credit of the property holders within the issuing jurisdiction. Additional implementation considerations. The debt service for revenue bonds could be repaid through fees based on impervious area or a more simplified flat fee formula. As such, there are opportunities to use a repayment basis with a strong connection with the contributions to the stormwater conditions being addressed by projects. State Revolving Fund (SRF) Loans Brief description and most likely applicability. Funding may be available to support some capital projects through the SRF programs. Potential for revenues. The availability of funding is considered moderate because of the application process and competition with other jurisdictions. Primary advantages. This program provides access to low-interest-rate loans. Reduced financing costs also are achieved by eliminating closing and issuance costs. Repayments and interest costs are deferred until project completion. Primary disadvantages. Competition with other Virginia jurisdictions and with other non- watershed projects (Le., wastewater) may be strong. Federal regulations allow SRF funds to be used to address stormwater and urban runoff issues. The availability and applicability of these program options in Virginia is based on the approved Priority Project List (pPL) and Intended Use Plan (IUP). Grants Brief description and most likely applicability. Funding may be available through some other state or federal programs to support watershed improvements or programs. The most notable federal grant programs include the following: WDC033110001.ZlP/llE 16 I I I I I I I I I I I I I I I I I I I STORMWATER MASTER PLAN FUNDING ANAlYSIS · Nonpoint Source Implementation Grants (319 Program) · Water Quality Cooperative Agreements · Small Watershed Program Potential for revenues. Grant income is low and dependent upon variable program funding levels. Primary advantages. Provides additional revenues that are not required to be repaid. Primary disadvantages. Program funding criteria change from year to year. Grants may require matching funds. There is no guarantee that funding will be provided. The funding received in comparison to the amount of effort and resources committed to securing the grant is generally low. In addition, there is often stiff competition for grant funds. Note: The County has received funding through several grants, including Clean Water Act (Section 319), State Water Quality Improvement Fund (WQIF), and other smaller grant sources for components of the water resources program (i.e., development of the Stormwater Management Master Plan). Pro-Rata Share Brief description and most likely applicability. A pro-rata share program requires developers to pay for the cost of building facilities that benefit the new development, such as a regional stormwater management facility. The County currently has a pro-rata share program and has expressed interest in maximizing its use prior to implementing a stormwater utility or other funding source. Potential for revenues. Low to moderate, limited to the improvements needed for new development. Primary advantages. Developers pay for growth. Provides an equitable way of funding improvements associated with new development. Primary disadvantages. Payment by developers is not made until development occurs. It is likely that improvements such as regional stormwater management facilities should be completed before development occurs. Thereby, the County will need to fund the construction of the facilities and receive pro-rata share payments in the future to repay its infrastructure investment. General Fund Brief description and most likely applicability. Surplus general fund balances could be used to fund all elements of the stormwater program. These surpluses would be funds available from unused property tax revenues and interest income from prior years' general fund budgets. Potential for revenues. The funds available from this source could range from low to high. In general, there are no significant funds that could be used without increases in property tax rates or other sources of general fund revenues. WDC033110001.l1PIllE 17 I I I I I I I I I I I I I I I I I I I STORMWATER MASTER PLAN FUNDING ANAlYSIS Primary advantages. The mechanism for administering general fund revenues is already in place. Primary disadvantages: General Fund balances may fluctuate significantly from year to year and may not match the expected needs for the stormwater program. In addition, the sources of these funds, such as property tax surpluses, may not relate well to stormwater needs. Stormwater program may need to compete for funding against politically charged issues like education and social programs. Plan Review and Permit Fees Brief description and most likely applicability. The County maintains a "plan review" procedure, which outlines how the review of a project's plan is administered. There may be other permits and approvals that are required for a particular project, including developer's agreements, right-of-entry permits, easements, curb cuts, street closure permits, and utility agreement/permits. Stormwater affects nearly every aspect of construction/development. To the extent possible, additional fees could be collected to offset plan review and permitting costs associated with stormwater management. In general, plan review fees are based on flat fees and acreage of disturbed areas. Potential for revenues. The availability of funding may be low if the number of plans submitted for review is small. Primary advantages. The County is currently authorized to collect plan review and permit fees. Developers pay for fees. Primary disadvantages. The amount of revenue generated may be insignificant because of too few plan reviews. System Development Charges (Impact Fees) Brief description and most likely applicability. System Development Charges (SOCs) are fees that are collected from developers and help pay for infrastructure improvements associated only with new development. In essence, SDCs help pay for new growth in the system. SDCs only apply to new customer demand and the fees are based on the value of a system's capacity and the amount of capacity required for new development (growth). In general, SDCs can be developed for water, wastewater, transportation, and stormwater systems. However, transportation impact fees are not authorized in Albemarle County; and stormwater impact fees are not allowed in Virginia at this time. (VA Code Section 15.2-2319) Potential for revenues. Low to moderate. Primary advantages. Helps finance capital improvements in rapidly developing/ growing jurisdictions in a equitable and defensible manner. Typically, impact fees can be used to leverage bond financing. Primary disadvantages. Fees are limited to new growth, so the potential for revenues is limited to the rate and extent of growth. WDC033110001.l1PIlLE 18 I I I I I I I I I I I I I I I I I I I STORMWATER MASTER PLAN FUNDING ANALYSIS Stormwater Utility Brief description and most likely applicability. A stormwater utility is a method of providing a dedicated funding source for a stormwater management program. A countywide stormwater management utility could be created with a fee structure, ranging from flat fees to a formula tied more specifically to a property's contributions to stormwater problems. (VA Code 15.2-2114) Potential for revenues. Moderate to high, depending on political support and policy decisions related to the fee structure. Primary advantages. A stormwater utility fee represents a dedicated funding source that is not in competition with other uses. The fee basis is tied to contribution to stormwater problems (e.g., impervious area). This mechanism provides the basis for an ongoing, stable source of revenue to support the County's recommend stormwater management program. Primary disadvantages. Data required to set up a fee structure are significant and depend on the formula selected. There is a time lag to develop and implement the fee system and to conduct the public information and involvement programs that would be required. There would be at least a moderate cost to develop and maintain databases and billing systems required to implement this option. Note: Implementing a stormwater utility fee structure would require a number of data gathering, policy, and analysis activities on the part of the County. Some of these efforts are currently underway or have been completed. To be in a position to collect revenues from a Stormwater Utility User Fee, the County should begin considerations for the following: · Developing the billing system mechanism (Le., property tax assessment or water/sewer utility bill) · Consolidating property databases · Calculating the Equivalent Residential Unit (ERU) The process of determining the ERU basis, developing the billing system mechanism, and consolidating databases could require 6 to 8 months. Given this time frame, it is also important to consider the schedules for adopting ordinances and the billing cycle for the property tax assessments. For example, the tax bills may go out during the 6- to 8-month development phase and stormwater utility would not be able to generate revenues until a year later. WDC033110001.l1PILLE 20 I I I I I I I I I I I I I I I I I I I Revenue-Generating Capabilities of Identified Funding Sources The following sections describe the revenue generating capability of selected candidate funding sources. Stormwater Utility A Stormwater Utility would provide a dedicated funding source based on a user fee per ERU. A common rate schedule for a Stormwater Utility includes a flat fee for single-family detached residential properties, while the amount multifamily residential and nonresidential properties pay is based on their actual impervious area. As mentioned earlier, a Stormwater Master Plan is being developed for the Development Areas. One of the key elements in the Master Plan is the development of a funding strategy that can support the program throughout its implementation. County staff identified, as one of the goals for program, not to make it more expensive to live in the development areas. However, it is also important to note that special services (including stormwater) may be required in the Development Areas due to the development patterns, therefore a fee to residents within the Development Areas may be justified. Further, the County indicated that residents value the natural resources of the rural areas. This report analyzes two hypothetical Stormwater Utilities, one that is countywide and the other that is limited to development areas. The primary difference is that the ratepayer base is higher for the countywide utility. As demonstrated below, the ratepayer base for the countywide utility would be about three times that of a utility limited to DAs. Therefore, the revenue potential for a countywide utility is greater. TABLE 3 Assumptions for Preliminary Estimate of Countywide Stormwater Utility Assumption Growth Rate*** 2.0% Number of Developed Residential Parcels* Number of Developed Acres Nonresidential and Multifamily Residential Institutional 25,392 2,136 2,888 Assumed Imperviousness for Existing Commercial/Industrial Development ** Institutional 66% 28% Assumed Imperviousness for Future Commercial/Industrial Development ** Institutional Credit/Delinquency Rate * Single-family dwellings ** Based on the weighted average percent imperviousness for commercial, multifamily, industrial, and institutional properties. *** Does not applv to institutional properties 66% 28% 15% Table 3 provides the assumptions used to estimate revenues that could be generated from a countywide Stormwater Utility. Based on these assumptions, Figure 4 shows the revenues based on varying assumptions for the area of the ERU. Alternatively, Figure 5 shows the revenues based on varying assumptions for monthly fees per ERU, where an ERU is assumed to be 2,000 square feet. WDC033110001.ZlPILlE 21 I STORMWATER MASTER PLAN FUNDING ANALYSIS I AGURE 4 Preliminary Estimate of Countywide Stormwater Utility Revenues in Albemarle County- Varying Assumptions for Area of the ERU ($ Thousands) I $1.200 I $1.000 I g $800 : ~ ~ . .. "I. . . ~ . . . · ;:, c · $600 > · a: ii ;:, c c c( $400 $200 '"*" ERU = 1500 sq ft, $12 Amual fee per ERU ~ ERU = 2000 sq ft. $12 Annual fee per ERU .... ERU = 2500 sq ft, $12 Annual fee per ERU $ 2003 2004 2005 2006 2007 2006 2009 2010 2011 2012 2013 2014 Year FIGURE 5 Preliminary Estimate of Countywide Stonnwater Utility Revenues in Albemarle County- Varying Assumptions for Monthly Fees per ERU ($ Thousands) $ 3,000 I I I I I I I $ 2.500 I I I Ô $ 2.000 o o ~ · ;:, c ~ $ 1.500 · a: ii ;:, c c c( $ 1.000 I . . . . . . . . . . $500 ..... ERU = 2000 sq ft, $36 Annual fee per ERU '"*" ERU = 2000 sq ft, $24 AmuaI fee per ERU ~ ERU = 2000 sq ft, $12 Annual fee per ERU $ 2003 2004 2005 2006 2007 2006 2009 2010 2011 2012 2013 2014 Year I I I WOC033110001.l1PIllE 22 I I I I I I 'I I I I I I I I I I I I I STORMWATER MASTER PlAN FUNDING ANALYSIS As stated in the FY 2004 Adopted Budget, the County is allowed to issue General Obligation (GO) bonds secured by a pledge of its full faith and credit. The Constitution of Virginia and the Public Finance Act provide this authorization. To ensure that principal and interest payments can be made on GO bonds the County is required to levy ad valorem taxes on all taxable property as may be necessary; The issuance of GO bonds must be approved by a public referendum, except for bonds issued to certain state authorities. Table 4 provides the assumptions used to estimate revenues that could be generated from a Stormwater Utility limited to development areas. Based on these assumptions, Figure 6 shows the revenues based on varying assumptions for the area of the ERU. Alternatively, Figure 7 shows the revenues based on varying assumptions for monthly fees per ERU, where an ERU is assumed to be 2,000 square feet. Long-Term Financing TABLE 4 Assumptions for Preliminary Estimate of Stormwater Utility limited to Deve~entAleas Assumption Growth Rate *** 2.0% Number of Developed Residential Parcels* Number of Developed Acres Nonresidential and Multifamily Residential Institutional Assumed Imperviousness for Existing CommerciaVlndustrial Development ** Institutional 11,370 1,646 1,105 66% 28% Assumed Imperviousness for Future Commercial/Industrial Development ** Institutional Credit/Delinquency Rate * Single-family dwellings ** Based on the weighted average percent imperviousness for commercial, multifamily, industrial, and institutional properties. *** Does not apply to institutional properties 66% 28% 15% Revenue bonds could be issued without a public referendum and principal and interest payments are paid through the revenues generated by user fees, such as a stormwater utility. The revenue generating capability is assumed very low because even if a stormwater utility is established in the County, a bonding agency would likely require a track record of revenues before issuing revenue bonds secured by the stormwater utility. However, it could be possible to issue "double-barrel" bonds where the County uses a pledge of its full faith and credit in addition to the stormwater utility revenues. Depending on availability of funding and the priority of identify projects, the County could seek an SRF loan. At any rate, if the County seeks long-term financing for major stormwater management capital projects, there are debt management and debt service policies that limit the debt capacity. The two principal guidelines include: . Net debt as a percentage of the estimated market value of taxable property should not exceed 2 percent, or ' . The ratio of debt service expenditures as a percent of general fund and school fund revenues should not exceed 10 percent. WOC033110001.ZIPILLE 23 I I STORMWATER MASTER PLAN FUNDING ANALYSIS I FIGURE 6 Preliminary Estimate of Stormwater Utility limited to Development Areas Revenues in Albemarle County-Varying Assumptions for Impervious Area Per ERU ($ Thousands) $100 ---" - - k- - - '" -- ...- - - - .- -*"" ERU = 1500 sq ft, $12 Annual fee per ERU -+-ERU = 2000 sq ft, $12 Annual fee per ERU ___ ERU = 2500 sq ft, $12 Annual fee per ERU $700 I $600 I $500 I ô ... ... .,; ';"$400 :2 c: . > . 0:: ãi $ 300 :2 c: c: c( , I I I $200 I $ 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 Year I I I FIGURE 7 Preliminary Estimate of Stormwater Utility limited to Development Areas Revenues in Albemarle County-Varying Assumptions for Monthly Fees Per ERU ($ Thousands) $200 - -- - - - - - - .. - - . - - - -- - . -- ~ . . . . . . . . . . ___ ERU = 2000 sq ft, $36 Annual fee per ERU -.- ERU = 2000 sq ft, $24 Annual fee per ERU -+- ERU = 2000 sq ft, $12 Annual fee per ERU $ 1,600 $ 1,400 $ 1,200 I I I I ô g $ 1,000 !:i . :2 c: ~ $800 . 0:: "i :2 ê $600 c( I $400 $ 2003 2004 2005 2006 2007 2008 2009 Year 2010 2011 2012 2013 2014 I WDC033110001.l1PIU£ 24 I I I I I I I I I I I I I I I I I I I STORMWATER MASTER PLAN FUNDING ANALYSIS Based on the FY 2004 Adopted Budget, the proposed total debt service remains below these guidelines (Figure 8). For example, if the assumed operating budget remains unchanged in FY 2005, then approximately $5.9 million in GO bonds could be issued. This assumes the operating budget in FY 2005 is $186,163,000 and the debt service is 12,691,000 and does not consider retired debt. FIGURE 8 Target Debt Service Umit for Albemarle County Debt Service as a % of Operating Budget 12% 10% 8% 6% 4% 2% 0% FY 04 FY 05 FY 06 FY 07 FY 08 FY 09 FY 10 FY 11 FY 12 FY 13 -+- Debt Service as % of Operating Budget ___ Debt Policy (10%) Pro-Rata Share The revenue generating capability for pro-rata share programs is low to moderate and depends on the need of regional facilities to support new developments and the costs to construct the necessary regional facility. According to the FY 2004 Adopted Budget, "pro- rata contributions will be required to support construction of regional facilities in the future, after required studies are completed for the establishment of regional stormwater facilities." The payment of a pro-rata share of the regional facility costs is required by Albemarle County Code Section 17-316. Data from the August 1, 2003, Preliminary Regional BMP Feasibility Study were used to estimate the revenue generating capability of the pro-rata share for regional stormwater management facility capital costs. The complete build-out schedule is assumed to be over the next 20 years. A pro-rata share fee was estimated for each BMP drainage area, assuming 80 percent of the drainage area will be developed over the next 20 years. Pro rata share fees are often based on the area of impervious surface, and not the total developed parcel area, as estimated here. When more detailed information is available, these fees will need to be refined accordingly. Based on this build-out assumption, the annual pro-rata share revenue is estimated to be approximately $30,000. (Table 5) WDC033110001.l1PIlLE 25 I I I I I I I I I I I I I I I I I I I STORMWATER MASTER PLAN FUNDING ANALYSIS TABLE 5 Pro-Rata Share Revenue Estimates Based on Preliminary Regional BMP Feasibility Study Estimated Developed Pro-Rata Annual Pro- Acreage Share fee Rata Share Fee (Assume 80 % of Project Cost per future Revenue based Development BMP Drainage Drainage Area Is (Low Developed on 20-Year Area Location Area (Acres) Developable) Estimate) Acre Bulld-Out Hollymead HOL-3 149 119.2 $154,000 $1,292 $7.700 HOL-4 247 197.6 $267,000 $1,351 $13,350 Piney Mountain PM-1 90 72 $97,000 $1,347 $4,850 Crozet CR-10 $123,500 CR-11 115 92 $74,000 $804 $3,700 CR-12 110 88 $73.500 $835 $3,675 Neighborhoods Lagoon $68,000 Total 711 569 $857,000 $1,126* $33,275 *Average Pro-Rata Share fee per developed acre. Plan Review and Permit Fees The revenue generating capability of Plan Review and Pemùt fees is low because it depends on the number of plans submitted for review and fees generally are set to recover approximately half of the administrative costs for reviewing plans. Table 6 provides the Erosion and Sediment Control (E&S Control) fees according the Albemarle County Code Section 17-209. These fees apply to review of erosion and sediment control plans. For FY 2003, the County indicated that approximately $135,000 in E&S Control fees was generated. However, in some cases inspection and re-inspection fees are currently not being collected. TABLE 6 Fee Schedule for Erosion and Sediment Control Section 17-209 Fee Category Fee A. land-Disturbing Activity: Single-Family Dwelling Unit Agreement in lieu of a plan if single-family dwelling unit located in a residential development Agreement in lieu of a plan if single-family dwelling unit not located in a residential development: Plan for a single-family dwelling unit: Each reinspection $20 $30 $130 $30 WDC033110001.l1PIllE 26 I I I I I I I I I I I I I I I I I I I STORMWATER MASTER PLAN FUNDING ANALYSIS TABLE 6 Fee Schedule for Erosion and Sediment Control Section 17-209 Fee Category B. Land-Disturbing Activity: Nonexempt Agricultural Land Plan: Fee Each reinspection: C. All Other Land-Disturbing Activity Plan: $130 $30 $320 + $125 per acre of disturbed area or portion thereof, not to exceed $3,000 Annual renewal of approved plan Major amendment of plan Each reinspection $320 $150 $70 Table 7 provides the Stormwater Management fees according the Albemarle County Code Section 17-310. These fees apply to review of stormwater management/BMP plans. For FY 2003, the County indicated that approximately $7,500 in Stormwater Management fees was generated. TABLE 7 Fee Schedule for Stormwater Management Section 17-310 Fee Category Fee Major amendment of plan Request for exception (section 17-308) Request for development in a stream buffer or for reduction or modification of stream buffer (section 17-322) and mitigation plan (if not part of another document) (section 17-322) Each inspection $310 $100 $240 $70 Plan $60 WDC033110001.l1PILlE 27 I I I I I I I I I I I I I I I I I I I I Funding Strategies Analysis Level of Service The revenue requirements for storm water management programs depend on the level of service the County adopts and the scope of funding (i.e., countywide versus development area). Based on input from County staff, CH2M HILL developed a recommended level of service for each funding item. Tables 8 and 9 below summarize the levels of service evaluated during the kick-off meeting with County staff, and the levels selected during the meeting. The level of service assumptions will be adjusted during utility development based on input from the County Board. TABLES LOS Options for Maintenance of Drainage System Data Management High Activity Inspection Maintenance Emergency maintenance on No intonnation man ement TABLE 9 LOS Options For Maintenance of BMP facilities Activity BMP Inspection Low BMP Data Mana ment Inspect partial number ot BMPs eve ear Emergency maintenance onl No program administration funded BMP Maintenance The recommended level of service includes the following program elements for cost and revenue estimates: . Program costs Stream corridor restoration projects - New regional facilities - Inspection and maintenance of existing BMPs - Maintenance of drainage system VPDES phase II implementation costs Program administration costs WOC033110001.l1PIllE 28 I I I I I I I I I I I I I I I I I I I STORMWATER MASTER P1AN FUNDING ANALYSIS Other capital costs (i.e., Greenways and drainage improvements) Plan review and site inspection - Stream assessments . Revenues other than stormwater utility fees - Watershed studies - Perennial stream determination - Stormwater education and outreach (NPDES Compliance) - E&S Control fees - Stormwater Management fees - Pro-rata Share fees - General Fund (Year 1 only) . Revenues from stormwater utility fees . Revenues based on estimated number of ERUs The following sections describe each of the funding strategies in detail. Option 1-Development Areas Option 1 is a funding strategy in which the County develops a stormwater utility limited to development areas. This Option assumes no General Fund revenues for stormwater management after Year 1, assumes use of pro-rata share for regional facility construction costs, and assumes use of Plan Review and Permit fees and E&S Plan Review fees to supplement administrative costs. Table 10 provides a five-year funding plan and associated dollar amount for the elements identified above. As shown, the estimated revenues required from the stormwater utility (Year 2) are approximately $1.2 million. With an estimated 45,500 ERUs in the development areas, the resulting stormwater utility fee is estimated to be $2.03 per month per ERU. This assumes no transfer from the General Fund and about $170,000 from other fees. The program costs for Option 1 are approximately $1.9 million less than Option 2 (over the 5-year study period). The costs vary, compared to the countywide utility for the following categories: · E&S plan review and inspection · Stormwater plan review · Stream assessments · Watershed studies · Perennial stream determination · Greenways (other capital projects) · Drainage improvement projects (other capital projects) WOC033110001.l1PIllE 29 I I I I I I I I I I I I I I I I I I I These program costs are lower because some service would be linùted to Development Areas. These programs could be implemented on a countywide basis, however for equity reasons, funding for programs outside DAs would be required from the General Fund. Some advantages of a Stonnwater Utility linùted to Development Areas include the following: · A majority of the services are provided within the Development Areas, which is where most of the impervious areas is located. Therefore, the residents that live in the DAs directly receive services for which they pay. · The billing system could be based on the databases maintained by the Service Authority with relative ease. Some disadvantages of a Stonnwater Utility linùted to Development Areas include the following: · Residents and business owners within DAs may feel it is unfair (not equitable) that they pay for some countywide services. · It might create a disincentive to live within the DAs (which is contrary to the intent of the DA). TABLE 108 Summary of existing, newly mandated, and expected program costs under Option 1 Cost Category Cost Range Comment Plan Review and Site $ 300,000 Inspection Soil & Water Conservation $ District Programs Total Existing $ 560,800 Maximum $ 178,400 Increases annually due to inflation and additional facilities. Expected to continue to rise after Year 5 $ 125,000 Increase $25,000 annually, includes only maintenance. Expected to level off after Year 5. $ 344,000 Range reflects potential for admin costs to increase as programs are increased. The model currenUy assumes lower cost to approximate current staff commitments. $ 300,000 No significant change anticipated. Existing Minimum Existing BMPs $ 113,300 Drainage System $ 25,000 Program Administration $ 122,500 (Salaries) $ - Funded by other program(s) $ 947,400 Newly Mandated VPDES Program $ 106.000 $ 234,000 Decreases over time due to implementation of WÐC033110001Z1P/Il£ 30 I STORMWATER MASTER PlAN FUNDING ANALYSIS I I TABLE 108 Summary of existing, newly mandated, and expected program costs under Option 1 II 3,800 $ Comment several new programs. Costs anticipated to level off after Year 5. Change due to salary increases Cost Category Cost Range I Perennial Stream Detennination Total Newly Mandated $ 4,200 $ 109,800 $ 238,200 I Expected Stream Corridor Restoration Projects New Regional Facilities $ 125,000 $ 300,000 I 19,400 $ Increased number of projects over time. Anticipated to level off at Year 5 Start Year 2, Increases over time, maximum at Year 5. Capital costs anticipated to end after Year 9. Change due to salary increases $ $ 177,900 I Program Administration: Billing and GIS (Salaries) Program Administration: Billing and GIS (software expense ) Other Capital Projects Stream Assessment $ 21,800 I $ $ 150,000 One time expense in Year 1 Watershed Studies $ 50,000 $ - Not included in Option 1 20,000 No significant change in program cost anticipated over time. 50,000 No significant change in program cost anticipated over time. One time cost anticipated every 5 years. $ $ 20,000 $ $ I I Floodplain Management $ $ 50,000 Total Expected $ 214,400 $ 769,700 Note: Salaries are increased by 3% per year to account for inflation. Project costs, such as stream corridor restoration and drainage maintenance, were estimated on an average annual cost Specific projects have not been targeted for specific years at this level of evaluation; since these project-specific factors are more significant than escalationlinflation, no escalation or inflation has been applied to the project costs. I I I I I I I I WDC033110001.zJPILLE 31 10b TABLE Scenario Year 1 - $1,163,000 $1,210,300 $1,248,900 $1,264,600 $ 135,000 $ 35,000 $ 35,000 $ 135,000 $ $ 7,500 $ 7,500 $ 7,500 $ $ $ 30,000 $ 30,000 $ 30,000 $ 30,000 Comment Source Assumes start with one erosion and 1 buffer project and Storm water Master Plan Cost Estimates Stormwater Master Plan Cost Estimates Stormwater Master Plan Cost Estimates Assumes 1 st built in 2005, 1 per year after 2005 Stormwater Master Plan Cost Estimates Assumes 1 facility per year starting in 2006 CH2M Hill BMP I&M Cost Estimate Tool Assumes 1 facility per year starting in 2005 CH2M Hill BMP I&M Cost Estimate Tool Assumes 3% inflation CH2M Hill BMP I&M Cost Estimate Tool Assumes 3% inflation CH2M Hill BMP I&M Cost Estimate Tool Assumes 3% inflation VPOES Phase II Cost Estimate rCH2M Hill Assumes 3% inflation VPDES Phase II Cost Estimate (CH2M Hill Assumes 3% inflation VPDES Phase II Cost Estimate (CH2M Hill Assumes 3% inflation VPDES Phase II Cost Estimate (CH2M Hill) Assumes 3% inflation VPDES Phasé'1I Cost Estimate (CH2M Hill Assumes 3% inflation VPDES Phase II Cost Estimate (CH2M Hill - lmes 3% inflation lmes 3% inflation - - Jmed not to be funded by utili fee for dev, areas - dev, Areas - - CH2M Hill En ercent CH2M Hill En CH2M Hill En CH2M Hill CH2M H Status P art of Phase II Use Areas Development 1 Program Costs First 5 Years Utility Fees $ 450,000 $ - $ - $ $ - Input from County $ 50,000 $ - $ $ - $ - Input from County $ 250,000 $ - $ $ - $ - Input from County Revenues Other Than Stormwater E&S Fees Stormwater Management Plan Fees Pro-Rata Share General Fund CIP BMP Maintenance Plan Review Total Revenues Other Than Stormwater Total Program Costs 2. $172,500 $172,500 $922,500 $172,500 $172,500 Utility Fees Fees $1,300,100 41,667 42,501 43,351 44,218 45,102 Global Inputs not in Year 1 $ 2.03 $ 2.01 $ 2.06 $ 2.40 Calculated $0 $1,037,800 $1,076,400 $1,092,100 $1,300,700 Calculated $0 $0 $1,092,100 $0 $0 -$240,500 Minus 2) 5. Balance to be funded by General Fund or Other Source ACSMFA_v6_NEW acres_CLE.xls\Table 10b (1 Utility Utility Charge/Month/ERU Utility Charge Revenues 3. Revenues Required From Storm water 4. Estimated Stormwater Number of ERUs Rate/MonthfERU Estimated Stormwater I I I I I I I I I I I I I I I I I I I Option 2-Countywide Option 2 is a countywide funding strategy that assumes no General Fund revenues for stormwater management after Year 1, assumes use of pro-rata share for regional facility construction costs, and assumes use of Plan Review and Permit fees and E&S Plan Review fees to supplement administrative costs. Table 9 provides a 5-year funding plan and associated dollar amount for each program element. As shown, the estimated revenues required from the stormwater utility (Year 2) are approximately $1.5 million. With an estimated 75,100 ERUs countywide, the resulting stormwater utility fee is estimated to be $1.51 per month per ERU. This assumes no transfer from the General Fund and about $170,000 from other fees. As mentioned earlier, the program costs for a countywide Stonnwater Utility are higher because additional services are provided to the entire county. Some advantages of a countywide Stormwater Utility include the following: · Program equity. The intent of creating the DAs is to protect the rural nature of the areas outside of the DAs. This approach requires focused stormwater management within the DAs. All county residents can benefit from the protection of the rural areas; therefore all residents pay an equal share of the cost of preserving these rural areas. · There is a higher revenue potential (Le., ratepayer base) with a countywide Utility, which helps enable the County to fund a comprehensive stormwater management program. A disadvantage of a countywide Stormwater Utility is that without proper community outreach, residents of the county may perceive that they are paying for services that favor the DAs. TABLE 11a Summary of existing, newly mandated, and expected program costs under Option 2 Cost Category Cost Range Comment Existing Existing BMPs $ 113,300 $ 178,400 Increases annually due to inflation and additional facilities. Expected to continue to rise after Year 5 Drainage System $ 25,000 $ 125,000 Increase $25,000 annually, includes only maintenance. Expected to level off after Year 5. Program Administration $ 122,500 $ 344,000 Range reflects potential for admin costs (Salaries) to increase as programs are increased. The model currenUy assumes lower cost to approximate current staff commitments. Plan Review and Site $ 400,000 $ 400,000 No significant change anticipated. Inspection Soil & Water Conservation $ $ Funded by other program(s) District Programs Total Existing $ 660,800 $ 1,047,400 I I I I I I I I I I I I I I I I I I I STORMWATER MASTER PlAN FUNDING ANALYSIS TABLE 118 Summary of existing, newly mandated, and expected program costs under Option 2 Cost Category Cost Range Comment Newly Mandated VPDES Program $ 106,000 $ 234,000 Decreases over time due to implementation of several new programs. Costs anticipated to level off after Year 5. Perennial Stream $ 7,500 $ 8,300 Change due to salary increases Detennination Total Newly Mandated $ 113,500 $ 242,300 Expected Stream Corridor Restoration $ 125,000 $ 300,000 Increased number of projects over time. Projects Anticipated to level off at Year 5 New Regional Facilities $ $ 177,900 Start Year 2, Increases over time, maximum at Year 5. Capital costs anticipated to end after Year 9. Program Administration: $ 19,400 $ 21,800 Change due to salary increases Billing and GIS (Salaries) Program Administration: $ $ 150,000 One time expense in Year 1 Billing and GIS (software expense) Other Capital Projects $ 125,000 $ 225,000 Increased $25,000 per year. Anticipated to level off after year 5. Stream Assessment $ 40,000 $ 40,000 No significant change in program cost anticipated over time. Watershed Studies $ 100,000 $ 100,000 No significant change in program cost anticipated over time. Floodplain Management $ $ 250,000 One time cost anticipated every 5 years. Total Expected $ 409,400 $ 1,264,700 Note: Salaries are increased by 3% per year to account for inflation. Project costs, such as stream corridor restoration and drainage maintenance, were estimated on an average annual cost. Specific projects have not been targeted for specific years at this level of evaluation; since these project-specific factors are more significant than escalation/inflation, no escalation or inflation has been applied to the project costs. Option 3-General Fund Only As a third option, the County could use the General Fund in combination with increased usage of pro rata, plan review fees, and other funding sources. It is estimated that $1.5 million in year one, growing to $2.1 million in year five, will be needed to fund the stormwater management programs countywide at the recommended level of service. Without significant increases in other funding sources, the general fund allocation to stormwater will need to be increased by approximately $500,000 to $1,100,000 over the current funding presented in Table 1 (Le., $902,000, for General Fund and other fees). WDC033110001.ZIPIlLE 34 11b :2 TABLE Comment Assumes start with one erosion and 1 bufter project and slowly add Status Part of Phase II Use Year 5 Year 4 Year 3 Year 2 Year 1 First 5 Years CH2M HILL CH2M HILL CH2M HILL CH2M HILL CH2M HILL CH2M HILL Cost Estimate Cost Estimate Cost Estimate Cost Estimate Cost Estimate Cost Estimate CH2M HILL Engineer Judgement II II II IT II II Program Costs 1. $8,304,500 $2,072,300 35,000 7,500 30,000 ! ! $ ! $ $ $1,638,800 7,500 30,000 ! ! $ $ ! $ $1,597,800 30,000 ! ! $ $1,534,100 35,000 30,000 $1,451,700 $ ! $ Utility Fees Total Program Costs Revenues Other E&S Fees Stormwater Mngt Plan Fees Pro-Rata Share General Fund CIP BMP Maintenance Plan Review Total Revenues Other Than Storm water Than Storm water 2. $172,500 $172,500 $172,500 Utility Fees Calculated $1,899,800 79,742 1.99 ,899,1100 $1,455,100 78,178 ! $ $1,425,300 1.55 $1,381,500 $539,200 73,669 in Minus 2) (1 3. Revenues Required From Storm water Utiiity Fees Utiiity Charge/MonthlERIJ 4. Estimated Storm water Number of ERUs Rate/MonthlERU Estimated Storrnwater $ ,465,100 ! $ $ Utility Charge Revenues $1,9211,000 $ $2,2118,000 $ $2,254,000 $ $2,245,000 (539,200) $0 $ 5. Balance to be funded by General Fund or Other Source Balance Available for Activities at $4IERU fee structure 1b ACSMFA_v6_NEWacres_CLE.xls\Table I I I I I I I I I I I I I I I I I I I Recommended Funding Plan The recommended funding plan (Figure 9) consists of the following: · Implementation of a countywide stormwater utility · Continued use of pro-rata share program · Continued use of Erosion and Sediment Control, Plan Review, and Permit fees · Use of grant funding when applicable and available FIGURE 9 Recommended Funding Plan [Ì"~)~~ .~'. : ' ~.r:..:' ,." L " ,,".] [ ~~..' ,:.. '~".~j General Fund General Fund General Fund General Fund General Fund Under the recommend funding plan, the stormwater utility will provide a dedicated funding source for stormwater management programs countywide. The stormwater utility will fund programs that help reduce flooding, improve water quality, improve natural habitats, protect streams and reservoirs, and benefit natural resources for recreation uses. The utility will also fund inspection and maintenance of stormwater management facilities. The pro-rata share program will continue to collect fees to help fund regional stormwater management facilities. As development continues in the County, the E&S control, plan review, and permit fees will help pay for the administrative cost of review of development plans and E&S site inspections. WDC033110001.ZIPIlLE 36 I I I I I I I I I I I Attachment A . I Stormwater Management Funding Plan Model I I I I I I I Source 2,000 IAssumed, no detailed statistical analysis completed 25,392 IEmail From David Hirschman To Cheri Edwards, August 21,2003, cenano Development Are~ 2,000 ,370 1 tions for Scenarios Number of Properties Residential Single Family Detached Residential Sinole Familv Attached Multifamily Commercial Industrial Institutional I I I 2003, 2003, 2003, 2003, From David Hirschman To Cheri Edwards, August 21 From David Hirschman To Cheri Edwards, August 21 From David Hirschman To Cheri Edwards, August 21 From David Hirschman To Cheri Edwards, August 21 Emai Emai Emai Emai __n....__. _................._ ...'V.......... I" ._...... Residential Sino Ie Family Detached na na Residential Single Family Attached na na Multifamily 326 542 Commercial 860 956 Industrial 460 638 Institutional 1,105 2,888 I I 23,611,267 41,643,523 27,791,388 125,801,771 na na 14,198,612 37,461,746 20,037,678 48,133,988 na na Estimted Parcel Area (Square Feet) in Year 1 Residential Single Family Detached Residential Sinole Family Attached Multifamily Commercial Industrial Institutional I September 5, 2003, September 5, 2003, September 5, 2003, September 5, 2003, Edwards Edwards Edwards Edwards From David Hirschman to Cher From David Hirschman to Cher From David Hirschman to Cher From David Hirschman to Cher Emai Emai Emai Emai . ____...__ . .....__.n .... ....0................___ _...., ._,n ..................tn.......n' Residential Single Family Detached na na Residential Single Family Attached na na Multifamilv 58% 58% Commercial 61% 61% Industrial 80% 80% Institutional 28% 28% I I From David Hirschman to Cheri Edwards, September 5, 2003, From David Hirschman to Cheri Edwards, September 5, 2003, From David Hirschman to Cheri Edwards, September 5, 2003, From David Hirschman to Cheri Edwards, September 5, 2003, Emai Emai Emai Emai .-,,--.......__. _.__.... .....,.... ........................_ . ...L........ LI.........."'...........n' Residential Sinole Family Detached na na Residential Sinole Family Attached na na Multifamily 58% 58% Commercial 61% 61% Industrial 80% 80% Institutional 28% 28% I I .. ---- .. _.... _ . .. . __.._... .Jevelopment Residential Single Family Detached 11,370 25,392 Residential Sinole Family Attached Multifamily 4,118 6847 Commercial 11,426 12,701 Industrial 8,015 11,117 Institutional 6,739 17,612 Total ERUs 41,667 73 669 D, C Y, d ERU A I I CH2M HILL Engineer Judgement CH2M HILL Engineer Judgement CH2M HILL Engineer Judgement CH2M HILL Engineer Judgement CH2M HILL Engineer Judgement CH2M HILL Engineer Judgement CH2M HILL Engineer Judgement percent Dave 80% 80% MarkG, 10% 10% Paul 10% 10% Stephen 40% 40% MarkC, 10% 10% Dan 10% 10% Clerical 10% 10% n:II:__ __.J ,..¡roo Program Administration (est. time required for stormwater management Administration I I 20% CH2M HILL Engineer Judgement 20% CH2M HILL Engineer Judgement 1õ%]CH2M HILL Engineer Judgement 22,507 19,365 7,532 20% 20% ! $ $ 5% 22,507 19,365 3,766 tions I Estimated Program Administration Costs Administration Billing and GIS Perennial Stream Determination I Global In 43,560,.!.Z. -2 2% 3% Acres to Square Feet Round (argument for roundin Growth factor for ERUs Growth factor for Expenses or Salaries I I of 3 Page ACSMFA_v6_NEW acres_CLE,xls\Globallnputs I CH2M HILL Engineer Judaement nt nt ent CH2M HILL Engineer Source buffer project and slowly add only) Comment Assumes start with one erosion and Status Part of Phase I - - - - $539,2001 73,669 75,143 76,646 78,178 79,742 GloballnDuts not in Year 1 $ 1.51 $ 1.55 $ 1.56 $ 1.99 Calculated $ . $ 1,361,600 $ 1,425,300 $ 1,466,100 $ 1,899,800 Calculated 3 3 $ (539,200) $ $ $ $ $0 $2,245,000 $2,254,000 $2,286,000 $1,928,000 Scenario 2 First 5 Years 1. Program Costs Stream Corrid New Program Admi Salaries rotal Program Cas 2. Flevenues Other Than Stormwater Utility Fees E&S Fees Starmwater Mngt Plan Fees Pro-Rata Share General Fund CIP BMP Maintenance Plan Review Total Revenues Other Than Stormwater Utility Fees 3. Revenues Required From Starmwater Utility Fees (1 Minus 2) 4. Estimated Starmwater Utility Charge!Mcmth/ERU Number of ERUs Rate/Month/ERU Estimated Stormwater Utility Charge Revenues 5. Salam::e to be funded by General Fund or Other Source Balance Available for Activities at $4/ERU fee structure ACSMFA_v6_NEW acres_CLE.xls\Scenario 2 Countywide I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I Fi na 1 Stormwater Action Lists Summary Report Prepared for County of Albemarle, Virginia December 2003 CH2MHILL Herndon, Virginia I I I I I I I I I I I I I I I I I I I Stormwater Action Lists Summary Report Albemarle County's Comprehensive Plan designates specific Development Areas, with the remainder of the County designated as Rural Areas. Within the Development Areas, the land use designation, zoning, and infrastructure allow for relatively intensive development patterns. The County's Neighborhood Model for the Development Areas encourages in-fill development, which will create an even higher intensity of impervious areas and stormwater runoff. While concentrating development activity within the limited bounds of the Development Areas provides an overall watershed management framework that is consistent with water resources objectives on a regional level (Chesapeake 2000 Agreement), it also provides Albemarle County Development Areas a challenge to protect water resources within these areas. Streams within the Development Areas have already been impacted by existing and former land uses, and future development will also impacts streams. Proactive stormwater planning can help mitigate these impacts and promote the restoration of water resources for their ecological, recreational, and cultural values. By its nature, water resources management within the Development Areas requires trade-offs: protecting some high-value stream corridors while acknowledging that others may be impacted by development, allowing the development designated in the Land Use Plan while protecting downstream property and natural resources, and seeking design solutions through the Neighborhood Model that turn water resources into neighborhood and environmental assets rather than liabilities. These trade-offs are made with the understanding that higher- density development is being concentrated within the 35 square miles of the Development Areas in order to afford a much higher level of protection for streams within the remaining 692 square miles of the County's rural areas. With this framework in mind, the objectives of the Stormwater Master Plan for the Development Areas are to (1) provide guidance for land use planning and neighborhood master planning that is based on the assessment and prioritization of water resources, (2) promote public and private stormwater solutions that are based on needs and opportunities at the watershed scale rather than relying solely on a site-by-site approach, and (3) recommend a financing strategy to implement the Stormwater Master Plan, a County-wide stormwater management program, and attendant programs under the County's municipal storm sewer permit (VPDES Phase II). j-- (~ ( j -,,/ The Stormwater Master Plan followed the progression of activities outlined below: I I I I I STORMWATER ACTION LISTS REPORT EXECUTIVE SUMMARY I I I I I I I I I I I I I I 1. Stream Assessments were conducted for streams within the Development Areas. This involved walking the stream corridors and collecting information on the basis of established protocols. Habitat conditions as well as the relation of each stream reach to "community values" (e.g., natural aesthetic, recreation potential) were assessed. Problem areas (e.g., stream erosion, inadequate stream buffers) and infrastructure (e.g., pipes, utilities, road crossings) were inventoried on data sheets. 2. Information from the stream assessment phase was entered into a database and geographic information system (GIS) and analyzed in order to help identify High-Value Stream Corridors. Various techniques were applied to identify these priority streams, including citizen and County staff committees and data analysis. High-Value Stream Corridors are important for land use and neighborhood planning, to help prioritize County capital projects for stream improvement, and to guide development review and implementation of the Water Protection Ordinance. Selected High-Value Stream Corridors were subsequently monitored for biological integrity by the StreamWatch citizen monitoring program. This biological monitoring is important to assess existing stream conditions in conjunction with the stream assessment results. 3. The stream assessment data were also analyzed to identify and prioritize Stream Corridor Restoration Projects, including repairing stream erosion, enhancing stream buffers, cleaning up dump sites, and repairing infrastructure problems (e.g., utility crossings, stream blockages). 4. Priority Regional Stonnwater Control Facilities were identified through the analysis of the stream and GIS data, stakeholder input, field investigations, and a feasibility analysis. The intent is that critical regional facilities can treat areas with high impervious cover, help to protect downstream High-Value Stream Corridors, and be integrated functionally and aesthetically with existing and future development patterns. 5. The Stormwater Master Plan also aims to coordinate various Stormwater Programmatic Elements, including development review, inspections, capital projects, education and outreach, and funding strategies. Many of these elements are included in the County's Phase II permit for municipal discharges, a permit program required by the Clean Water Act and administered by the Virginia Department of Environmental Quality. Under this permit, the County is required to implement minimum control measures covering six program areas. 6. Once the above activities were complete, Stormwater Action Lists were assembled for each Development Area. These lists include prioritized stream corridor restoration projects (based on a cost-benefit analysis) and prioritized regional facilities. The lists also include planning-level costs for identified projects. It is intended that the lists will be used to prioritize County capital stream and watershed improvement projects and to coordinate private development activities (e.g., stormwater plans, proffers) with the Stormwater Master Plan. 7. A Stormwater Financing Plan is recommended to implement the Stormwater Master Plan. The Financing Plan will analyze various stormwater funding strategies and recommend an approach that will give the County a dedicated and sustained source of WDC033090011.ZIPIT AF 2 I I I I I I I I I I I I I I I I I I I STORMWATER ACTION LISTS REPORT EXECUTIVE SUMMARY funds to carry out mandatory permit requirements and other elements of the Master Plan. 8. Finally, the report offers recommendations for implementing the stormwater master plan and guidance on the concrete steps to be taken to make sure the plan becomes useful for County planning and program development. The following sections briefly describe each of these eight activities and the process outcomes. Stream Assessments In an effort to provide a solid foundation to support the Stormwater Master Plan, the initial step was to conduct stream assessments within the Development Areas. The purpose of the assessment was to collect information on and document the following: · Habitat conditions · Impacts on the stream from specific infrastructure and problem areas · Typical stream cross sections · General stream characteristics · Community values related to the stream corridor A baseline assessment was conducted on 418 reaches covering 100 miles of streams throughout the County's Development Areas. The stream. assessments comprised a habitat assessment and an inventory of physical stream features and were based on protocols from the Environmental Protection Agency (EP A), Maryland Department of Natural Resources, and several stream assessment projects conducted by other counties in Virginia. Additional protocols were developed by the County to evaluate other stream corridor values, such as a sense of refuge from surrounding land uses (natural aesthetic) and recreational use (these were termed" community values"). The habitat (scoring of various habitat parameters), the inventory (characterization of physical features such as pipe outfalls, utilities, and buffers), and the community values together provide a baseline of overall stream conditions, which can be further extrapolated to indicate the condition of the associated watershed. The stream assessments were performed almost continuously from November 2001 through February 2002 with at least two teams in the field each day. The monitoring period was generally dry, although not technically categorized as a drought. A total of 418 reaches covering approximately 100 miles were assessed. Figure ES-l depicts the streams that were assessed or partially assessed in each Development Area. The inventory assessments yielded approximately 1,021 inventory points, as summarized in Table ES-l. WDC033090011.ZJPIT AF TABLE ES·1 Summary of Inventory Points by Category Impact Score Total Deficient stream buffers 194 Stream crossings 199 Ditches and pipes 285 Dumpsites 63 Stream bank erosion 114 Head cut 27 Obstruction 63 Utility 76 Total 1,021 3 I I The into collected during the stream assessments were entered into a database and digitized for incorporation into a Stream Assessment Tool. The Assessment Tool of a Microsoft Access 2000 database linked to an Arc GIS 8.3 tool to allow for data management, visualization, and reporting. I I I I I I I I I I the Thomas Jefferson Soil and Water Conservation District assist with stream assessment along Uckinghole Crazet. I I I the Development Areas, it is impractical to protect every stream valley, large and all impacts. From the perspective of the Land Use Plan and Development Plans, it is critical to identify stream valleys and corridors that should be protected of ecological integrity and open space/recreational value within the matrix. Once identified, these corridors can be protected through planning process, acquisition of easements, private initiatives, and other High-Value Stream Corridors therefore become the building blocks for the rest of the master planning process. of High-Value Stream Corridors I The of prioritizing than that applied corridors in the Community of was somewhat the other Development Areas, for the following reasons: I I I 4 I I I I I I I I I I I I I I I I I I I STORMWATER ACTION LISTS REPORT EXECUTNE SUMMARY · Crozet is the only Development Area that overlaps the Water Supply Protection Area in the Water Protection Ordinance; it therefore is the only Development Area to which more-stringent stream buffer requirements apply · Crozet was the first development area selected by the County for a master planning process, spearheaded by the Department of Planning and Community Development As part of the master planning process in Crozet, a citizens' task group (the "Green Infrastructure" committee) was formed to address stream prioritization and other environmental and greenway issues in Crozet. Gtizens and County staff worked together to define high-value stream corridors based on an analysis of stream assessment data and other important factors, such as creating a stream and greenway network through the community. The resulting High-Value Stream Corridors were the main stem of Lickinghole Creek and Slabtown Branch. Since the other Development Areas could not benefit from a concurrent master planning process, such as in Crozet, another method for prioritization was selected. These Development Areas will undergo master planning in the future, according to funding and a schedule determined by the Planning Department and Board of Supervisors. In the interim, an internal staff task group was formed to review the stream assessment data and evaluate the streams. The task group decided that a use designation approach would best fit the prioritization goal. On the basis of group discussion, the following stream designations or objectives were derived: · Pocket natural area - These areas have high habitat and natural aesthetic values. Stream corridors should be protected to preserve these values, as well as water quality and living resources. · Community and private use/trails - The primary objective of these stream corridors is to provide for access to natural refuge and trails in proximity to developed areas, especially residential areas. · Designed urban water feature - These stream corridors are located in areas designated for high-density residential/ commercial/ mixed use. As an alternative to complete piping, these corridors can be managed to provide open space, pocket parks, and water features. It is assumed that these channels will require engineering intervention of one type or another (limited piping, channel engineering, ponding). · Urban/engineered - These streams are first and second order streams in areas designated for high-density residential/ commercial/mixed use. In most cases, existing conditions are degraded for habitat or natural aesthetic. Some amount of piping, filling, or channelization is expected. After the use designations were defined, the task group sorted through stream assessment results, reach photos, the Land Use and Greenway Plans, and personal knowledge of the streams, and assigned a designation to each stream and reach. Based on this ranking, category 1 (pocket natural area) and category 2 (community and private use/trails) are considered "high value" with regard to planning deliberations and, ultimately, protection under the WPO (this will require ordinance amendments). WDC033090011.ZIPITAF 5 I I process of the methods to all Crozet natural area). All use / trails) because Reservoir assigning stream designations was complete, County staff in Crozet and the other Development Areas by assigning use High-Value Corridors were assigned category 1 streams in Crozet were assigned category 2 (community and are protected by the WPO as tributary streams in the South I I I I to the identification of High-Value Stream Corridors¡ seven sites were selected corridors for biological monitoring. Biological monitoring involves sampling macro invertebrates to gage the relative biological integrity of a stream. To accomplish County contracted with the StreamWatch citizen monitoring program, which is monitoring streams throughout the Rivanna Watershed. included in the biological monitoring included: Biscuit Run (Foxcroft)¡ Carroll Creek Flat Branch (North Fork Park), Lickinghole Creek (Western Ridge), Creek (below Bellair), Powell Creek (Forest Lakes), Slabtown (at Crozet In genera!; biological results correlate well with the stream assessment results, During the stream assessment Slabtown was rated with a based on the biological sampling, it is a notably high-quality stream compared in the Development Areas and even other streams across the Rivanna Watershed. while supporting good habitat conditions¡ does not appear to have a macroinvertebrate community. The other monitored streams support a range conditions, dependent on habitat quality, land uses, other I I I I shows the use categories for each stream assessment I I I I I I I I I This reach of Flat Branch in Hollymead is an example of an identified High-Value Stream Corridor 6 I I Corridor Restoration Projects I I identification of High-Value Stream Corridors for protection, the stream data were used to identify the highest priority restoration projects in area. The stream assessments identified areas where streambank erosion is place, stream buffers can and should be enhanced, and other repairs to the stream and nearby infrastructure are needed to reduce erosion and/ or enhance habitat and (e.g., eroding pipe outfalls and utility crossings, stream obstructions, I I erosion and buffer restoration projects are the most significant projects in to overall stream conditions. As such, they were ranked independently from other projects. Within each drainage area, erosion and buffer projects were on of (1) severity of the problem, (2) feasibility of a restoration project, (3) extent the project would be consistent with master plans and community goals. of this process was a benefit-cost score assigned to each buffer and erosion project, a prioritized list of projects (see the subsection on stormwater action lists, below). of the infrastructure projects was primarily related to ongoing maintenance by specific County departments, other public or owners. consist of exposed public utility lines, road crossings, dump sites, pipes ditch problems. Problems that posed an imminent threat to water quality were to the responsible agency for corrective actions. Other, less threatening reported to the responsible parties for repair or dean up during the master process. Dumpsites along streams have also been identified for potential and/ or private cleanups or improvements during nearby development. I I The I These and I will I I I I I I I I I A candidate stream erosion restoration project identified along Biscuit Run. I I Regional I Within the Development enhance stormwater development projects. they can capture and treat functionally and Regional facilities can be impervious cover (e,g.¡ Corridors. In this way¡ the areas upstream. Once public! private I I I I I I Regional stormwater and data evaluation¡ field investigations. The within the pocket natural the facilities upstream of I I I I I I After completing several one in Hollymead¡ and construction by the potential retrofits of a stormwater treatment provide additional proposed by developers as shows the I I I I WDC033090011.lIPIT AF Control Facilities appropriately designed and placed regional facilities can and serve as amenities for neighborhood centers other are not a and should only be used where large impervious area and fit into development patterns useful when designed to serve areas high upstream from identified High-Value can function to control high storm flows developed regional facilities can be programmed into the CIP or can be sought to build the facilities. facility locations were identified and evaluated through a GIS with Department of and Public Works staff¡ and goal was to avoid regional stormwater management facilities and community and private use!trails areas¡ and to locate areas to prevent degradation. proposed to be upgraded to serve as a reg/anal storm water facílíty. of screening a total of five new BMP (three in Crozet¡ Piney Mountain) were for possible design and! or developers. Two additional sites were identified facilities. These include retrofitting a converted lagoon to create retrofitting an (Hollymead Lake) to Finally sites were added to the list that have been of development plans recently submitted to County. of the 11 regional BMP sites. 8 I I STORMWATER ACTION LISTS REPORT EXECUTIVE SUMMARY Stormwater Progr~mmatic Elements I I Albemarle County has de\{eloped a plan to implement several stormwater management efforts tlu-oughout the Coq.nty as part of its municipal storm sewer permit (Phase II permit)¡ administered by tfie Department of Environmental Quality. The County's goal is to upon the existing stqrmwater management program to reduce the discharge of pollutants from the munic~pal storm sewer system to the maximum extent practicable (MEP), to protect water quþlity, and to satisfy the appropriate water quality requirements of both the Clean Water Act ctnd the State Water Control Law. I I The program includes elelitents in the following six required program areas, referred to as /I minimum control measuries": I I I $ Public education and o~1treach on stormwater impacts · involvement anqi participation .. Illicit discharge detectiqn and elimination · Construction site stonnwater control · Postconstruction storn1water management in new development and redevelopment $ Pollution prevention/ good housekeeping for municipal operations elements of the pl~n are summarized in Table I is an example of education and outreach efforts to be conducted as part of the I I I I I I I I This display of innovative County's stormwater program, I WDC033090011ZIPrr AF 9 I I I Stormwater Lists I Individual stormwater included high-value and regional stormwater element of the stormwater Storm water Master Plan. stream and watershed (e.g.¡ stormwater plans, keys to successful projects¡ a strong public obtain consensus¡ and a completed through the outreach initiatives in II stormwater in underway. lists were developed for each Development Area. These lists corridors for protections¡ stream corridor restoration projects¡ In addition a general approach to implementation of each list was developed to help plan the next steps of the is intended the lists will be used to County capital projects and to private development etc.) with the Stormwater Master Plan. of the will be a defensible list of prioritized and participation program to engage public and funding source to support it. project lists have been described in this document. has several public and will undertake additional efforts as part of VPDES plan. the initial evaluation of funding alternatives I I I I I I I I I I I I I I Iii The Stream Assessment GIS and the progress of project Tool will provide a means of identifying projects to be addressed and tracking WDC033090011ZIPfT AF 10 I I I I I I I I I I I I I I I I I I I - - STORMWATER ACTION LISTS REPORT EXECUTIVE SUMMARY Stormwater Financing Plan The Stormwater Financing Plan is the critical element that enables the Master Plan. The Financing Plan is currently under development, utilizing information from the County's existing funding sources and other alternatives. The goal of the Financing Plan is to secure a stable source of funds so the Master Plan can be implemented and stormwater services provided to the residents of the Development Areas. A draft Financing Plan has been developed and is under review and discussion to reach a consensus on the final recommendations. Recommendations for Implementing the Stormwater Master Plan 1. The Stormwater Master Plan should be adopted into the Comprehensive Plan, and ultimately incorporated by reference into the Natural Resources and Cultural Assets chapter. One outcome of this is that High-Value Stream Corridors will be considered during land use decisions and coordinated with other efforts, such as the Greenways Plan. 2. The Water Protection Ordinance should be amended to incorporate the findings of the Master Plan, particularly with regard to stream buffer limits within the Development Areas. This amendment can be coordinated with needed amendments to bring the ordinance into compliance with revised Chesapeake Bay Preservation Act regulations. 3. Implement the Stormwater Action Lists through the CIP and in conjunction with development projects through incorporation into proffers and stormwater management plans. Work with the appropriate agencies to make the necessary infrastructure improvements to protect water quality and stream health. 4. Pursue discussions with the Board of Supervisors on an appropriate stormwater financing strategy, implement a strategy to fund elements of the Stormwater Master Plan, including those that are compliance issues with the County's municipal storm sewer permit (VPDES Phase II permit). Seek an appropriate staffing level to phase in implementation of the plan and permit compliance. 5. Meet with personnel from the Department of Environmental Quality and Army Corps of Engineers to seek consensus on implementation of the Stormwater Master Plan, including regional basins and the stormwater action lists. These agencies must issue permits for much of this work to move forward. 6. Make the results of the Stormwater Master Plan available to planners, the private sector, and the public through an appropriate Web presence, documents, and maps. 7. Conduct outreach to landowners and County citizens about problem areas that can be corrected through private initiative. Incorporate this effort into general public education programs that are part of the VPDES Phase II public education program. WDC033090011.ZIPITAF 11 I STORMWATER ACTION LISTS REPORT EXECUTIVE SUMMARY I TABLE ES·2 Proposed NPDES Phase I Postconstruction Stormwater Management in New Development and Redevelopment Control Measures Public Involvement and Participation Implementation Schedule for Public Education and Outreach on Stormwater Impacts I I Pollution Prevention/Good Housekeeping for Municipal Operations Develop set of metrics and data base tool to measure and track program implementation. Develop set of metrics to measure program implementation Construction Site Stormwater Runoff Control Develop set of metrics to measure program implementation. Discharge Detection and Elimination Begin scoping task of compiling map of public and related private storm sewer system in GIS format. licit Evaluate opportunities for public involvement and develop a strategy for involving the public in each program element. Meet with partners (Charlottesville VDOT, University of Virginia, RWSA) to develop list of targeted audiences and collaborative programs. Year Year 1 I storage around Begin to develop stormwater pollution prevention plans (SWP3s) for maintenance yards and bus shop. Identify activities that need SOPs and begin development of the SOPs. Begin installation of secondary aboveground storage tanks. Conduct funding evaluation for operations and maintenance of BMPs and storm water improvements based on prioritization plan. Complete stormwater master plan and watershed action lists for Development Areas Initiate illicit discharge ordinance development. Begin process of forming Stormwater Enforcement Task Force Work with citizen committee in conjunction with Development Area master plan. Identify individual(s) responsible for education program. Begin the development of stormwater educational information. I I Identify training programs needed and begin development of training materials in conjunction with partners. Develop a stormwater education Website. I Add one commercial certification to maintenance staff and begin training for remaining staff. Develop GIS tool to track program implementation Develop GIS tool to track program implementation Develop protocols and methods for inlet stenciling and outfall inspection Complete secondary storage around aboveground storage tanks. metrics and store in GIS Collect tool. Complete bus shop and maintenance yards SWP3s. Continue SOP development of training materials. Add one commercial certification to maintenance staff and complete training for remaining staff. Begin planning for County BMP maintenance crew. Continue development Develop educational materials for BMP owners, Begin to implement items on watershed action lists. program Begin storm system mapping in phases. Prioritize areas for potential pollution problems. Develop GIS tracking tools. Finalize ordinance enactment Set up inlet stenciling and outfall inspection programs with volunteers and stream groups. Develop GIS tracking tool. Continue meetings with partners to refine and produce educational messages and media. Year 2 I Work with citizen committee in conjunction with Development Area master plan. Begin to disseminate educational message Meet with school curriculum personnel to dovetail stormwater/ water quality education with SOLs I Work with relevant agencies and partners to begin planning for hotline and tracking system for water complaints, I Enforcement Finalize Stormwater Task Force. metrics and store in tracking tool Collect metrics and store in tracking tool Collect I Complete SOP development. Set up complaint hotlinelWebsite Develop maintenance and inspection training program Set up complaint hotlinelWebsite metrics and store in GIS Collect tool. Implement inlet stenciling and outfal inspection programs. Implement inlet stenciling and outfal inspection programs Evaluate stormwater public education program, and evaluate public school education partnership. Year 3 I Continue development and deployment of training materials. Investigate effectiveness of household hazardous waste collection program Work with citizen committee in conjunction with Development Area Master Plan. Complete and update bus shop and maintenance yards SWP3s, Set up a County Maintenance Crew. mapping and Continue storm sewer GIS development. I Implement items on watershed action lists. Implement hotline and tracking system for water complaints. metrics and store in tracking tool Collect tracking tool metrics and store In Collect Continue ordinance enforcement by Stormwater Enforcement Task Force. Continue prográm, implement revisions as necessary. Year 4 I Update bus shop and maintenance yards SWP3s Implement items on watershed action lists. metrics and store in GIS Collect tool. Continue programs from previous years. Continue and evaluate program mplement training programs. I tracking tool metrics and store in Collect I. tracking too metrics and store In Collect Continue program and evaluate overall program. Year 5 Update bus shop and maintenance yards SWP3s Implement items on watershed action lists, metrics and store in GIS Collect tool. Continue and evaluate programs from previous years Continue and evaluate program I 2 mplement training programs Collect metrics and store in tracking tool tracking tool metrics and store in Collect .lIPrrAF WDC03309001 I I ------------------- Legend Stream Status Habitat anq Inventory Assessment Inventory ~ssessment Only Habitat As~essment Only No Assessment Base Map Fe~tures ... County Bo~ndary Major Roa~s Streams Figure ES..1 Assessment Status of Stream Reaches In Development Areas Albemarle County N Crozet Neigh borhoods Pantops 0 Penn Park I Rivanna 1 2 3 I I I Miles Charlottesville Darden Towe Park Hollymead Piney Mountain H2MHIll ------------------- Legend Use Codes Not ry Pocket Natu Area Community serrrails Urban Wate Feature Urban ngin red Base Map Streams - County Boun ary Major Roads gure ES-2 Designated Use Categories for Assessed Reaches in the Development Areas bemarle County N Charlottesville Neighborhoods Crozet Pantops 0 Darden Towe Park I¡¡II Penn Park I Rivanna 3 1M Hollymead Piney Mountain CH2MHILL ------- ----------- Hollymead Neighborhoods Pantops Penn Park Piney Mountain Legend Stream Status Recomended BMP Basemap Features Streams -- County Boundary - Major Roads ] Charlottesville Crozet Darden Towe Park " Figure ES-3 Recommended Regional Stormwater Facilities Albemarle County Rivanna N o I 3 I Miles H2MHILL COUNTY OF ALBEMARLE EXECUTIVE SUMMARY AGENDA TITLE: CPA 2003-07 Crozet Master Plan Comprehensive Plan Amendment AGENDA DATE: April 7, 2004 ACTION: x INFORMATION: SUBJECT/PROPOSAL/REQUEST: Amend the Land Use Plan section of the Albemarle County Comprehensive Plan by replacing the existing profile of the Crozet Community with new land use policies, guidelines, recommendations, goals and strategies for future development within the Crozet development area. CONSENT AGENDA: ACTION: INFORMATION: STAFF CONTACT(S): Tucker, Foley, Davis,Cilimberg, Echols, Thomas REVIEWED BY: ATTACHMENTS: BACKGROUND: The Renaissance Planning Group, technical consultants for the Crozet Master P an, presented its final report to the Board of Supervisors and Planning Commission on July 9, 2003. At that time, the Board of Supervisors directed the Planning Commission to review the proposed plan and bring back its recommendation to the Board for amending the Comprehensive Plan to incorporate the Master Plan. In August the Planning Commission commenced a series of five informational work sessions, during which it reviewed content of the entire document. In November, December and January (2004) the Commission continued its work by holding a series of five facilitated work sessions in which it identified and agreed upon specific revisions and modifications to the original document. The Commission spent the majority of its time during its eight-month study period reviewing and editing the narrative, land use maps, design guidelines, and non-capital implementation priorities contained in the July 9, 2003 Master Plan final report. The proposed amendment was an outgrowth of the consultant's recommended Master Plan for Crozet. The Planning Commission took major sections of the consultant's report, made some changes to it to "customize" it more for Crozet, then put it in "comprehensive plan language" for adoption into the Comprehensive Plan. Although their review was extensive, the Commission largely left specific discussion of funding needs related to implementation called for by the plan to the Board of Supervisors. A public hearing was held March 23, 2004 to receive public comment on the Planning Commission's revisions to the original document. After taking public comment, the Commission voted unanimously to recommend to the Board of Supervisors that the revised language be adopted as part of the Comprehensive Plan, with a request that priority be given to the funding for the infrastructure to support it. If adopted, the amendment would replace the existing section on Crozet in the Land Use portion ofthe Comprehensive Plan. As with the rest of the Comprehensive Plan, the amendment would provide a guide for future land use development and public decision-making on service provision and infrastructure investment in Crozet. It is not zoning and does not mandate specific actions, but it does provide the basis for desired initiatives and decisions affecting the Crozet Community. 'C " STRAGEGIC PLAN: 2.1 Protect and/or preserve the County's rural character; and, 3.3 Develop and implement policies that address the County's growth and urbanization while continuing to enhance the factors that contribute to the quality of life in the County. DISCUSSION: The purpose of the work session on April 7 is to decide on a process for the Board of Supervisor's review of the proposed Comprehensive Plan Amendment. The Planning Commission's recommended CPA language is attached, for reference only. It is not intended that it be a part of the process discussion on April 7. Staff believes that the process which will best enable the Board to review and address the Plan's key issues for amendment into the Comprehensive Plan is as follows: 31-03-04P11 :01 RCVD -}. AGENDA TITLE: CPA 2003-07 Crozet Master Plan Comprehensive Plan Amendment April 7, 2003 Page 2 1. Understanding the role ofthe Crozet Master Plan within the context ofthe Comprehensive Plan, Strategic Plan and other growth management policies adopted by the County. The first work session cov~ring this topic would involve a staff presentation and question and answers. 2. Understanding how the plan itself is organized and wh~t it says. Important points are the organizing principles contained within the Master Plan from a 'big picture's standpoii)t, how the places of Hamlet, Neighborhood and Downtown hierarchy work together, and the recommendations for road and pedestrian connections, community facilities, neighborhood- scale commercial development, downtown revitalization, and increased employment opportunities. The first worksession could be used to cover this topic as well, with a staff presentation and question and answers. " 3. Discussion ofthe critical elements ofthe plan and implementation measures settorth inthe plan, specifically capj,tal items and policy changes necessary to implement the plan. Key elements include the land use map, transportation ,and infrastructure, parks and greenways, and the costs, funding and timing of infrastructure. After the first two topics noted above have been covered, one or more facilitated work sessions are recommended for this discussion. As recommended by the Planning Commission, the Comprehensive Plan amendment would provide the guide for initiatives and decision-making regarding Crozet. It is envisioned that this ultimately would be accomplished through land use decisions, zoning text amendments, CIP programming, and general budget commitments. Like the rest of the Comprehensive Plan, these initiatives and decisions will ultimately be determined by available resources and the deliberations of future Planning Commissions and Boards. RECOMMENDATION: Based on the Commission's work, staff suggests that the Board take these steps: 1. Decide if it wishes to take additional public comment beyond that it will receive in its required public hearing. 11so, decide how, when and where this additional public input should be received. 2. Affirm or modify the proposed process of review indicated in the section above and set the first work session date. ~~f: :A,ì¡ 04.045 COUNTY OF ALBEMARLE Departmer¡t of Planning & Community Development 401 McIntire Road, Room 2.\8 Charlottesville, Virginia 22902-4596 (434) 296 - 5823 Fax (434) 972 - 4012 MEMORANDUM 'TO: DATE: Robert W. Tucker, Jr., County Executive Susan E. Thomas, Senior Planner F March 30, 2004 " FROM: RE: CPA-03-07 Crozet Master Plan ;/ The Albemarle County Plarining Commission, at its meeting on March 23, 2003, unanimously recommended approval of the above-noted comprehensive plan amendment. The COmmission requested that priority be given to the funding for the infrastructure to support it. The Albemarle County Board of Supervisors will hold a work session on the Crozet Master Plan at its April 7th meeting. Attached please find a staff report which outlines this amendment. If you have any questions, please do not hesitate to contact me. 01-04-04A02:10 RCVD MEMORANDUM DATE: RE: Albemarle, County Planning Commission Susan Thomas, AICP Senior Planner March 23, 2004 Public Hearing on Draft Crozet Community Profile, Comprehensive Plan (CPA 2003-007) TO: FROM: Background The Renaissance Planning Group, technical consultants for the Crozet Master Plan, presented its final report to the Board of Supervisors and Planning Commission on July 9, 2003. At that time, the Board of Supervisors directed the Planning Commission to review the report and bring back its recommendation to the Board for amending the Comprehensive Plan, to incorporate the Master Plan. In August the Planning Commission commenced a series of five infonnational worksessions, during which it reviewed the entire document. In November, December and January (2004) the Commission continued its work by holding a series of five facilitated worksessions in which it identified and agreed upon specific revisions and modific,ations to the original report. The product of these facilitated session is included as an attachment to this memorandum. n Public Hearing The Crozet Master Plan, as revised by the Planning Commission, is recommended to the Board of Supervisor as a Comprehensive Plan Amendment which would replace the current Crozet Community Profile in the Comprehensive Plan, Land Use Plan. The recommended CPA includes the narrative portion of the original document, along with some but not all of the associated maps, charts, tables and drawings. The Commission is recommending that the July 9, 2003 final report remain in its original fonn,reflecting the consultant's work and the community process. The array of charts, tables and drawings in the document will continue to be a valuable reference for guiding development in Crozet, although in the Commission's view this full level of detail is not appropriate for adoption into the Comprehensive Plan. In a technical sense, therefore, the July 9,2003 fmal report itself will be a supplement to and not a part of the Comprehensive Plan. The proposed revisions to the original document recommended for adoption into the Comprehensive Plan primarily involve the following areas: 1. General editing to Sections I, II and III [narrative portion of the document] in corifonnance with accepted Comprehensive Plan language 2. Clarification and some re-ordering of recommendations by three geographic sectors (Downtown, Crozet - West and Crozet - East) contained in Section I 3. Editing to implementation strategy for land development contained in Section II 4. Clarification and some re-ordering of priorities contained in Chart A, Crozet Priorities 5. Clarification and some re-ordering of implementation tables to confonn to sector recommendations 1 6. Incorporation of the Built Infrastructure Map infonnation into the Place Type and Site Development Guidelines Map 7. Elimination of the Process Summary Map 8. Identification of existing and proposed open space/park features on the Green Infrastructure Map 9. Clarification/editing of provisions in Tables 1 and 2 (development guidelines) 10~ Qualification of the role ofthe Comprehensive Plan as a note on tables and maps Fonnat Comprehensive Plan Amendments, when adopted, are fonnatted consistent with the existing Comprehensive Plan, including page numbers and general organization. For simplicity and convenience of review, the draft Crozet CPA is organized with the narrative presented first, followed by charts, maps, tables and other illustrations. The document will be re-formatted in final fonn when adopted by the Board of Supervisors. Attachments: Draft Crozet Community Profile 2 2 I. CROZET COMMUNITY GUIDE A. The Crozet Master Plan Albemarle County has.committed itself to preserving the scenic beauty, agricultural heritage andsocio- economic health of its rural and urban areas. For more than 30 years, land use policy decisions have sustained that effort at critical moments. The identification of Rural Areas and areas designated as repositories for growth preceded the adoption of the Neighborhood Model in 2001, an amendment to the 1996 Comprehensive Plan. The Neighborhood Model emerged fromthe workofthe Development Areas Initiatives Steering Committee (DISC) over a period offour years. The DISC report acknowledged that existing growth patterns were endangering the county's natural resources and under~uti1izing its developable land. It al~o recognized that a more efficient utilization ofthe Development Areas could only be achieved through a new, more "urban" form of development. By formally adopting the Neighborhood Model as part of the Comprehensive Plan, the County made a strong commitment to creating more livable urban neighborhoods which will attract residents through a combination of pedestrian-friendly stJ:teets and inter-connections, appropriate infrastructure and public amenities, and convenient, supporting neighborhood scale commercial development. This new form has identifiable centers and edges, and promotes walkability in its scale and organization. The adopted Neighborhood Model describes the new form in its Twelve Principles, and it further outlines a master plan process which defines and guides future development in all of the designated development areas. Crozet was selected for the first Master Plan by the Board of Supervisors in October 2001, based on the community's strong interest and high level of development activity. Since the coimnencement of the planning process in March 2002, residents have joined county planning staff and project cotisÙltants in nearly a dozen public events and several dozen Small Task Group working sessions. Thedevelopment community has also participated in the public events, and worked cooperatively with the consultants on design issues.. Early in the process, community input coalesced into a series of Guiding Principles which reflect, to a large degree, the Twelve Principles of the Neighborhood Model. These principles served as a consistent reference for the consulting team, county staff, developers, and residents during the ebbs and flows of what became an intensive, very public year-long process. The tangible result of this public process is the Crozet Master Plan, adopted as part of the Albemarle County Comprehensive Plan and intended as a general guide for future development and systematic change in the Community of Crozet. The Comprehensive Plan is advisory in nature and, with its accompanying maps, charts and other supplementary information, it sets forth the County's long-range recommendations for the development ofland within its jurisdiction. The Comprehensive Plan al~o serves as a guide for the development and implementation of the Zoning Ordinance. Development guidelines contained in the maps, charts and other supplementary materials in the Comprehensive Plan are intended as targets rather than specific requirements, consistent with the advisory nature of the document. The Crozet Master Plan is illustrated graphically by two maps supported by a series of tables, drawings, and guidelines. The maps are: Place Type and Site Development Guidelines Map - This is the land use map,' showing recommended designations in the form of transect types ranging from the Urban Core to the Development Area Preserve, 3 organized around a hierarchy of Downtown, Neighborhood and Hamlet., A correspondirig set of Site Development Guidelines further describes the land use designations. It also illustrates proposed infrastructure such as roads (by type), trails and community facilities. The Place Type Map is found on page _ . Green Infrastructure Map - This map depicts the open space and preservation area system throughout the community, showÏ11g streams and lakes, floodplains, slopes, and proposed improvements such as parks and natural areas, neighborhoods and centers, roads and community facilities. A corresponding set of guidelines further describes green infrastructure recommendations. The Green Infrastructure Map is found on pages _ and _; the map on page_further describes parks and open space types and functions. The tables and drawings provide additional detail on design elements such as thoroughfares (roads), open space, block and lot type and examples of Hamlets, Neighborhoods and Downtown development and redevelopment. This document accompanies and complements the Master Plan maps and drawings referenced above. It describes the process used to fonnulate the, Master Plan's implementation strategies, identifies key steps that the partners in Crozet's development as a community must take, and includes the graphic and technical products required to achieve the desired physical characteristics of Crozet twenty years out. Sections I, II, and III are intended to replace the current Community of Crozet Profile in the Comprehensive Plan, Land Use Plan. Section I sets the context and summarizes the Plan's major findings, recommendations and implementation strategies. Section II, Strategies for Development, further articulates the fiscal and regulatory policies by which this vision for Crozet can be realized. Section III, Process and Fonn of Development, provides planning and process tools required to physically apply this visiontó Crozet. Although this condensed version of all three sections has been adopted as part of the Comprehensive Plan, Land Use Plan, it is envisioned that the Master Plan in its entirety will serve as a reference and source of additional guidance for the Community's on-going development. B. Master Planvs. By-Right Development: Why a Master Plan Through its implementation strategies, the Master Plan provides opportunities for the community to support and realize a quality of life envisioned by the "GuidÏ11g Principles" developed early in this planning process. Conversely, "by-right development" of the growth area under existing zoning could yield significantly negative and disconnected patterns of development, affordÏ11g virtually none of the benefits envisioned by the County's Neighborhood Model. Additionally, by-right development in certain critical locations throughout the Community may make it impossible to fully implement the Master Plan. Compact, pedestrian-oriented, mixed-use development that is environmentally sensitive is central to the Neighborhood Model approach as are the corresponding benefits of rural area preservation afforded by the concentration of growth within designated Development Areas, including Crozet. c. Public Process Public Ï11volvement in the creation of the Master Plan was a central organizing element. Plan activities targeted resident stakeholders, county agencies and departments, the develoþment community, and elected/appointed officials. From the beginning of the planning process, the county maintained an ongoing Crozet Master Plan e-news group with over 300 active subscribers. The e-news group was used on a regular basis (average of three emails monthly) to communicate meeting infortnation and general information about the progress of the plan, including links to relevant website materials. The Master Plan website was used for regular information posting and updating, and during 2002 and 2003 registered approximately 20,000 hits annually. The planning process included a two-part Planning Academy (January '02), Master Plan kick-off session (March '02), Developers Open House (October '02), six community meetings (May '02 through April '03), Board of Supervisors!Planning Commission work sessions (December '02; Janruuy and April, o 2 4 0, 03), and a fmal presentation to the Board ofSupervisorslPlanning Co.mmission in July '03. Attendance for the community meetings ranged from 200 people at the Master Plan kick-off to approximately 15 at the individual Small Task Group meetings. There were seven Small Task Groups, which met approximately six times each. To publiciZe community meetings, flyers were distributed, e-news was sent, information was placed in the local media outlets (including paid advertisements in the newspaper), a banner was hung in Crozet, and publicity iterns were distributed to schools and neighborhood associations. Critical materials generated during the process were posted online and displayed at the Crozet Library, the Post Office, and the County Office Building among other locations. Participation was extensive and influential throughout the development of the Master Plan. Göa1s were to: · Maximize participation and consensus opportunities. It was important that all stakeholders were represented in the process. Diverse opinions were presented and heard. · Link well with the deliver abIes of the Technical Consultant. Public participation was tied into the planning process and products. In maximizing participation, various processes were employed based upon the targeted outcome, time available for the participation, and number of people involved. The complete Community Process Documentation can be found in the appendix to theJuly 9, 2003 final report. D. Preliminary Findings and Recommendations History The community ofCrozetbegan as whistle stop on the Chesapeake and Ohio Railroad in 1876 that WaS established at the request of the Miller Manual Labor School (the Miller School), which had been founded a year earlier. . It was named for Colonel B. Claudius Crozet (1789-1864), a French born civil engineer and artillery officer under Napoleon who is best remembered as the chief engineer for the seventeen mile long railroad tunnel through the Blue Ridge Mountains. Since its inception, it has functioned as a distinct settlement with a unique history of agriculture, small business enterprises, and a dynamic civic spirit. Crozet in particular was known for its fruit industry, and in the 1930's itlead the state in the production of Albemarle Pippin and Winesap apples. It also was known as the Peach Capital of Virginia. With the arrival of Acme Visible Records and Morton Foods (ConAgra) in the 1950's, year-round employment was available to balance the area's seasonal economy. The Master Plan draws on these unique traits in the creation of a place that is distinctly 'Crozet': · The east/west organization of downtown Crozet exists in conjunction with the early railroad alignment and the position of Route 240 along a ridge line. The emergence of Route 250 adds to the east/west arrangement, and the two major routes frame the Lickinghole Creek watershed and the Crozet Development Area. The role ofthelandscape has always been important within the community, fust as a working agrarian setting and more recently in the community's concern for the beauty ofthe Blue Ridge Mountains and various view sheds. The downtown area has been a vit¡;¡,l part of the community since its inception. Residential growth has beglin to sprawl out from the downtown center following the patterns produced under by-right zoning. Traffic concerns have emerge~ with the growth that has already taken place, and the existing topographic and land-holding configuration represent important challenges that the Master Plan has addressed. · · · · Basic Assumptions Implementation strategies for the Master Plan are based on several assumptions. These assumptions emerge from the pattern of development in the Master Plan itself and the County's Neighborhood Model. 3 5 "Service Planning" standards form the analytical basis for evaluating needs within the commumty. In most cases, this analysis ties directly to population, which is projected to reach 11,200 - 12,000 in a twenty year build-out~ This build-outnumber compares with the current population of 3,000 within the Crozet Development Area, and to a by-right population build-out under current zomng of 12,500. Guiding Principles Guiding Principles were developed by the community early in the planning process, and they were consistently referenced throughout the building of the Plan. These principles represent the fundamental aspirations of residents for their own community. They serve as the basis for both the physical and policy aspects of the plan. The principles follow: 1. The physical design of Crozet is built upon distinct neighborhoods, a historic downtown area and other smaller centers, which are appropriate in scale and type to the community's planned growth patterns. 2. Linking us both within the community and to our neighbors, Crozet values multiple transportation options and infrastructure to support ease of access throughout the community. Of particular note, the commumty promotes pedestrian and bicycle options for alternative transportation choices. 3. Offering diversity, affordabïlity, and choice in its housing stock, Crozet attracts people from many social and economic experiences. 4. Crozet values the contributions oflocally grown business in providing both jobs and enhanced quality oflife for residents. 5. Through a variety of cultivation, recreation, and conservation efforts, Crozet values its natural resource assets. 6. Our families and our individual and shared histories provide the foundation for our identity. Crozet is a place that encourages a sense of commumty in its diverse activities, institutions, and interests. 7. Crozet actively supports its many community facilities and the role they play in the lives of its citizens and believes that these facilities must accommodate the changing needs of the community as it grows ovÙ time. Major Findings and Recommendations The following list highlights the findings and recommendations forCrozet. Additional detail can be found for all of these recommendations elsewhere in this report. 1. Roads: Two major north/south connector roads will be required as baseline infrastructure development. A new Main Street is needed south of the 'CSX tracks to provide an additional interconnection throughout the community and to downtown. Main Street is intended to provide an east/west orientation. 2. Greenways: A greenways-trails network should serve as an armature for both the preservation of natural riparian resources and pedestrian movement within the Crozet Development Area. 3. Centers: Individual centers within the Crozet Development Area will serve as the foundation for walkable neighborhoods supporting both residential uses and local economic activity. 4. Downtown: The largest and. most important of these centers will be the Downtown area. 5. Development Phasing: Development in the immediate future should focus on the redevelopment and invigoration of the downtown area. 6. Design Guidelines: Design guidelines outlined in the Neighborhood Model are "calibrated" to fit the specific conditions of Crozet, and they provide the tools that will guide the form of development. 7. Place Making: The creation of a strong place identity within the Crozet area requires attention, initiative, coordination and collaboration between local government, the business/development community and residents. 4 o 6 8. Development Review Process: New strategies for implementing the Master Plan (based on the Neighborhood Model) may be needed to counter the option of doing strictly by-right development. These strategies, if adopted, should identify both short and long tenn solutions. 9. Local Businesses and Community Economic Development: County staff and officials must engage in public/private partnerships with local businesses to realize the development of Crozet as more than a ~bedroom community' to the City of Charlottesville. Jobs that keep residents of Crozet working in Crozet will be key to revitalizing downtown and mitigating a deteriorating traffic condition on Routes 240 and 250. 10. Affordable Housing: County staffand officials should support the development ofa comprehensive Affordable Housing Ordinance to support a broad demographic mixture within the Development Areas. 11. AdjacentRural Areas: A strong Rural Areas policy should be put in place to assist in focusing growth within the Development Areas and to help in mitigáting cumulativ~ impacts .öfadditional traffic on Routes 240 and 250. This policy will also be important to maintaining a clear boundary between Development and Rural Areas. E. Context This Profile, based upon the July 9,2003 Master Plan report, is intended to build upon the Crozet community's identity, which embodies a collection of unique places that vary in character and intensity of development across a spectrum ranging from small, almost rural hamlets to more urban neighborhoods and downtown. The three sections of this Community Profile describe the physical, social, economic, and political conditions necessary for these places to exist and thrive, ,as well as the actions and strategies· that will be required for design and implementation of the Plan's recommendations. Three Geographic Sectors: Recommendations For purposes of the Master Plan, the Community of Crozet is considered as three geographic sectors in which future development and redevelopment projects are focused. They are the downtown area, the area west of Crozet A venue and the area, east of Crozet A venue. Each area holds unique characteristics and challenges. This section of the Guide identifies the priority implementation strategies for each area and outlines specific tasks required to -carry out those strategies. Chart A, Crozet Priorities (p. ->, organizes these strategies in visual fonn by geographic location and level of urgency, and includes additional actions that while also desirable rank lower in priority. Downtown Initial development in the Downtown area should emphasize the completion ofthe sidewalk system (per the recommendations of the Crozet Downtown Sidewalk and Parking Study of2001), placement of the new library on Crozet A venue, and creation of the first two blocks of Main Street. Spe-cific recommendations and tasks identified in the Master Plan for downtown include the following: 1. Adjust development boundary to encompass existing downtown area north of Route 240, and to allow mixed-use, infill development in support of downtown. 2. Implement sidewalk plan (per Downtown Sidewalk and Parking Study). 3. Construct the new library on the west side ofCrozetAvenue near Mountainside. 4. Convert current library (depot) to civic center function, perhaps as a museum 5. Construct Main Street by building the fITst segment from Crozet Avenue to the Barnes Lumber property. (This will take trucks off "the Square.") 6. Develop guidelines for renovating historic structures and for new buildings (scale, materials, setbacks), and initiate establishment of a Historic District. 7. Encourage development in blocks adjacent to downtown core. 5 7 "·I~ 8. Create bike lanes to and indowntown. 9. Create downtown COIl1Illunity green at "the Square." 10. Develop signage for greenway trails. 11. Create a pedestrian railroad crossing in downtown core (below or above grade). 12. Explore alternatives to current lUlderpass at Crozet Avenue. 13. Explore opportunities for redevelopment of Con Agra and Acme as an extension of downtown. 14. Reuse Historic Crozet Elementary School. The former school could eventually serve as an Albemarle County satellite facility for county services, public meetings and other community uses. If north downtown is included in an adjusted definition of the Development Area, it could be adaptively reused with some public and private residential functions in relation to the surrounding residential neighborhood. 15. Continue construction of Main Street east from Crozet A venue, including pocket parks in block development. 16. As opportunities arise for redevelopment of the lumber yard, focus on a mixed-use form that emphasizes employment. Crozet - West Development in the area west ofCrozet Avenue should emphasize neighborhood related road creation and other improvements. Specific recommendations and tasks for Crozet~West include the following: 1. Encourage mixed use development in the center of the western area. 2. Protect Route 250 from further commercial development. 3. Implement improvements to Jarman's Gap Road 4. Construct W estern Avenue. 5. Discourage improvements intended to increase capacity of Half Mile Branch Road in ån effort to encourage use of West em Avenue. (This does not apply to site distance and safety improvements.) 6. Encourage development of western area starting from the south up (from Route 250). 7. Propose East-West Drive { with bridge across Slabtown Branch), and safety improvements to Meadows intersection with Route 240. 8. Establish Western Park with public/private collaboration. 10. Upgrade playing fields at Henley Middle School. 11. Create frontage road for school (avoiding existing fields and working in conjunction with current improvements). Crozet - East Development for the area east ofCrozetAvenue should focus on tl:1e construction of public amenities such as the school and parks in addition to the creation of roads and bridges. Specific recommendations and tasks for Crozet-East include the following: 1. Construct Eastern A venue, Main Street, and primary neighborhood streets within the two or three major properties available for new development. 2. Construct Lickinghole Bridge on a time-line appropriate to demand. 3. Construct crossing of CSX tracks between Acme and Con Agra buildings (below or above grade options). 4. Establish greenway trail (for pedestrians and bikes) from Lickingho1e Creek Basin to Crozet Park and downtown. 5. Construct new neighborhood elementary school on time-line appropriate to demand, in general location shown on plan. 6. Exploreand develop potential access points to Lickinghole Creek Basin. 7. Establish Eastern Park with public/private collaboration. 8 6 Partners in Crafting the Master Plan The Master Plan engaged three primary partners who will also be key to its implementation: community residents, local government, and the business community. Throughout the year-long process, all three groups dedicated substantial time, effort and good will, contributions that are reflected in the Plan's comprehensive recommendations. The Crozet Community Process Summary Map (p.14) serves as a record of these evolving conversations. Outlined below are discrete actions associated with each of the three groups; these actions TIÙght parallel a capital project (new road or public facility) or occur on an on-going yearly basis (community gardening program). Some of these initiatives may take years to accomplish, while others are relatively simple. Considered together, they are intended to start building the mosaic of public and private actions that are critical to creating a healthy urban community. Community Residents: Recommendations Community residents hold the distinct capacity to invigorate a place with a sense of unique identity. This has already been accomplished by the deep level of civic engagement that both pre-existed and carried through the master planning process. Inparticular, the Small Task Groups identified many opportunities, large and small, that are best suited for community leadership. The following recommendations focus on the role of community residents: 1. Library a. Set up a 'Library Action Group' oflocal residents to help focus efforts on the development of a neW library. 2. History a. Set up a Historic Preservation Committee to work with County staff toward the creati.øn·of defined districts for the National Register of Historic Places for the downtown and Yancey's Mill area. b. Investigate the idea of creating a 'Crozet Museum' within the new library or .at another location in the community. 3. Gardens and Nurseries a. Create an area for community gardens and/or a tree nursery to enhance the agricultural identity and existing ecological networks of the Development Area. b. Establish an Urban Forestry group to work with County staff in tree preservation, reforestation, and streetscape programs in the community. 4. Local Governance a. Partner with County staff through (staff proposed) Community Teams and a Board appointed Community Council in the review and adoption ofthe Master Plan, implementation activities, and updates and revisions to it. b. Join County staff and the private sector in studying local taxing and funding options for downtown business and revitalization efforts. c. Investigate the creation of a Community Development Authority to help create funding opportunities for local projects. d. Publicize fairs, festivals and local celebrations. 5. Diversity and Identity a. Create links between community festivals and school activities. b. Create history days in schools for storytelling by local residents. 6. Small Businesses a. Encourage diålogue within the Community Association regarding small business development and marketability of the area. b. Organize a merchants' association to promote downtown and represent community businesses. 7 9 7. Greenways a. Establish a not-for-profit Crozet Trails Foundation (like the RivannaTrails Foundation) for design, construction, and maintenance. b. Create an Adopt-a- Trails program. c. Gather and distribute information on tax incentives for landowners to donate easements for Greenways (floodplains). d. Organize the gathering of GPS data for mapping these routes: these could be collected by groups such as students, Boy Scouts and other volunteers. 8. Water a. Work with current citizen groups to protect streams. Local Government: Recommendations Local government works to balance community desires, market forces, and equity throughout all of the neighborhoods and areas in Albemarle County, while maintaining a long term vision. This involves the creation of a strong network of infrastructure and services that evolve concurrently with development forces. One of the primary responsibilities oflocal government is the creation of public facilities such as schools, libraries and parks. The development of the Master Plan recognizes these community elements as more than buildings or areas that house a service or amenity.· They are in fact centers of community life and their development needs to reflect the identity and pride of the community. Just as facilities can be thought of as an inftastructure for community identity, public services are the supporting network for the ebbs and flows of everyday life. Fire and rescue, police, and social services create the essential framework of a community. The Master Plan outlines this framework of support, how it will be influenced by future development, and how it can be best supported by local government. Perhaps because it developed as a transportation hub and agricultural center, the Crozet community is particularly concerned about creating vital networks for both transportation and the environment. In Crozet this has been done though the careful study and planning for bothmajor road improvements and streets that connect existing and new neighborhood, supplemented by a greenway trail system along the riparian corridors. These networks are essential to the success of the Crozet community as it grows over the next twenty years. Support and guidance from both local government and private developers will be required throughout the growth process to maintain a level of concurrency with the population as it develops. The most tangible role oflocal government will be found in the capital projects identified during the master planning process, listed by priority on pages _, and also described in Section II of this Profile. Similarly, the funding and programming of services generally is the responsibility of local government, although there is a need for community initiative in the face of strong competition for revenues. Business Community: Recommendations The Master Plan anticipates that the private sector will build many of the features outlined within the Master Plan as a part of new development in Crozet. Two aspects of desired community development identified by the residents rely on the business community in particular: local economic diversification and neighborhood development. Successful implementation of the Master Plan will depend on the support of local business and on a collaborative relationship between county staff and the private sector. Perhaps most central to the Master Plan will be the overall development of new neighborhoods and the redevelopment of existing areas such as downtown. Working with the Neighborhood Model as a framework, the Crozet Master Plan establishes both a cohesive built environment that honors the area's history and a green-inftastructure that recognizes the strength and vitality of existing natural systems. It is hoped that the development community will carry out the vision and goals of the Master Plan in the o 8 10 projects undertaken in Crozet, and make choices in land use, form, and density that create distinct, livable neighborhoods. To move proposed development scenarios forward, site development guide1inesand suggestions for a more streamlined development review process are included in Sections II and TII. 9 11 Future Actions Any long range plan must be revisited, and the Crozet Master Plan will be updated at regular intervals. The following essential principles will guide any such adjustments within Crozet: Reinforce focal points for development and redevelopment Provide multi-modal transportation linkages (pedestrian, bike, cars, buses) Create opportunities for creating a range of housing types and affordability Support and create opportunities for locally-owned businesses and jobs Preserve historic and natural landscape features Provide public facilities which foster a sense of community and civic pride Site issues and market forces will also influence development decisions. For example, while certain key roads are indicated in very specific locations (Eastern Avenue, Western A venue and Main Street), the precise location of these and other streets within individual development may have to adjust based on timing, road engineering requirements, and other constraints and circumstances. Fundamental to the success of development or redevelopment projects within the Community of Crozet is a strong system of roads, sidewalks, bicycle facilities and public transit.Detailed transportation modeling has shown that the master planning process and the Neighborhood Model form of development can anticipate and help to mitigate the negative impacts of by-right development patterns on transportation. Public and private implementation of the transportation component of the Master Plan will help to achieve a higher level of concurrency between transportation needs and residential development. F. Summary Recommendations for the Crozet Development Area As stated earlier, the creation ofa strong sense of place, predicated on Crozet's Guiding Principles, will require the concerted effort of local government, the business community, and local residents. Sustaining that effort will entail literally building and rebuilding places, delivering services to people, and establishing connections between people and places. To emphasize the multi-faceted nature of the effort required to enable the Master Plan, these recommendations have been organized according to these three categories: Services, Facilities, Programs, Utilities, and Connections. Services Fire and Rescue Service for Crazet In the years 2004-2005, a combined fire and rescue station is planned for the Ivy area which will help assist the Crozet Fire Department and augment services provided by these two volunteer groups. Although an additional station in Crozet will not be required, maintenance and improvement of the existing downtown fITe station will be needed or the relocation of the current building should be sought. The possibility of an additional fire/rescue/police station is under consideration for the area in 2012. Police :'1' !i ì :1 I II I' Current policy of police services recommends an average response time of 10 minutes for all Development Areas. To this end, police satellite offices are recommended within a service sector to help achieve these desired response times to all police emergency calls. Currently the department is undergoing a Long Range Facilities Study which will be completed at the end of May, 2003. Once long range goals have been established within the department, they could be integrated into the Master Plan. 10 12 ii Ii Social Services Various social services perforril important functions within the community. Currently services are provided in several ways through the elder population settings of Mountainside and the Meadows and tln'ough the county schools. As growth occurs, the county will need to consider augmenting these services and perhaps creating a central location within the Development Area where these services can be accessed. Affordable Housing County staff and officials should support the development of a comprehensive Affordable Housing Ordinance in order to support a broad demographic mixture within the Development Areas. Local Governance The Master Plan reflects current direction of Albemarle County Government that new mechanisms for local governance will be needed within each of the Development Areas once a Master Plan has been adopted. One of strongest aspects of the plan development process, has been the intense level of public involvement. This civic participation should be structured and encouraged in the future by assigning a Neighborhood Planner to serve as a liaison with the Community and a steward of the Master Plan's. implementation. A Board-appointed Community Council will work with the Neighborhood Planner and other County staff in the many activities associated with implementation. Local Businesses and Community Economic Development County staff and officials must encourage public/private collaboration in order to support the development of Crozet as something more than a "bedroom community" to the City of Charlottesville. In particular, the expansion of existing and development of new small businesses in Crozet is essential to increase the vitality of the downtown, provide employment oppOJ:tunities, meet residents' needs for goods and services, and reduce increasing traffic impacts to Routes 240 and 250. A local business/economic development and redevelopment program is recommended for Crozet, supported by a 'point-person' in County government who can respond to inquiries from existing and prospective businesses. The establishment of this point- person position will also be critical to coordinating redevelopment activities through the public/private partnerships and other mechanisms that will be an integral part of Master Plan implementation. Fairs, festivals and local celebrations County staff should serve as a resource for local organizations engaged the planning and funding of local celebrations, festivals and community-oriented events that support the local market and tourist activities in the Crozet area. Assignment ofa Neighborhood Planner will assist community members by directing them to the appropriate departments or programs within local government, and helping them identify other resources that can support their efforts. Facilities Schools (' The primary Master Plan recommendation is for a new elementary school to be developed in the eastern portion of Crozet. County long term planning has identified construction oF-this facility to be completed in 2011 with a budget of $12.4 million. In the approved 2003/04 to 2012/13 Capital Improvement Program (CIP), a Heilley addition is scheduled for completion in 2005 and additional High School capacity will be addedto the existing High Schools between 2008 and 2013. The School Board is aware that as development oCCurs in Crozet it may need to move students that are currently in the feeder pattern for the Western Albemarle High School. The redistricting of students to either the Monticello or Albemarle High School feeder pattern may be necessary as new schools and additions are completed in those areas to help accommodate the growth ofCrozet. The Master Plan also recommends that the Heilley expansion to 900 11 13 students should occur in the near future. This expansion will help to accommodate immediate growth needs within the area. Libraries The enlargement of the Crozet library is a central concern of many within the community. The Master Plan recommends that a new library facility be built within the heart of downtown, on Crazet A venue. The County CIP currently has $5.4 million in funding starting in 2005. The Master Plan concurs with this timing, if possible, as a way to catalyze redevelopment of the downtown area. Parks and Recreation The strategy for the design of Parks and Public Space in the Crozet Development Area is to create a network of public parks and greenwaysthat will work on a number oflevels: 1. To protect sensitive natural systems (centered on the Lickinghole Creek drainage system) 2. To reserve public areas of topographical, historical, or cultural interest that characterize Crozet 3. To create areas for structured and unstructured recreation 4. To link neighborhoods to downtown, schools, parks, squares, greens and the larger region. This network forms the centrally positioned spine of the development area, structured around the Lickinghole Creek watershed. It maximizes the community benefit from unbuildable land. Due to the rolling terrain and dendritic stream patterns of Crozet, a large portion (35% flood plain and steep slopes) of the development area can be preserved in this system as potential recreational space. In addition to its stream valleys, the region is also characterized by high points and views of the nearby Blue Ridge Mountains. Rather than developing all of these high points, the Master Plan reserves a few key areas so that these features can be appreciated by the entire community, in the form of the proposed Eastern and Western Parks. This aspect of the Master Plan strives to meet the goal expressed by the community to "preserve the rurâl character" while balancing the needs of private development of properties. It is anticipated that the dedication of these parks to public use will occur in the course of the review and approval of a unified development plan for the property around them. Individual park plans will be needed to guide the development of both Eastern and Western Park. Programs Local Job Creation Fostering private, locally owned businesses will be an essential step in the building of Crozet within the framework of the Neighborhood Model. The ability to work in close proximity to home will both mitigate traffic impacts and create healthier neighborhoods. Local business development of various types and forms, including small restaurants, local retail stores and offices, will need to be actively supported and developed. Development of larger enterprises within the Development Area at sites such as Con Agra and in the downtown area will also be vitally important to realizing the Master Plan. The County's economic development point-person, the Neighborhood Planner, the downtown merchants group, and the community itself will all playa significant role in achieving this goal. Neighborhood Development In addition to local business development and job creation, private developers and local govemment staff should coordinate efforts to implement the Neighborhood Model as applied to Crozet. Acknowledging and complementing existing centers, new centers are identified as potential focal points for future walkab1e place-types, namely downtown and its surrounding neighborhoods and hamlets. All of these place-types support residential uses and economic activity, in varying degrees. Site Development Guidelines, first outlined in the Neighborhood Model (as Design Guidelines), have been applied to fit the specific (J 12 14 o conditions of Crozet They are the tools that guide the form of development. Suc'Cessful implementation of the Neighborhood Model in Crozet is predicated on two factors: 1. New strategies which counter the option of strictly by-right development, and 2. A strong rural area policy which channels growth into the development areas, thereby mitigating traffic impacts on Routes 240 and 250, This a critical corollary to the development area policy embodied in the Neighborhood Model. Historic District Designation (Downtown, Yancey's Mill) In order to preserve the historic fabric of the Crozet Development Area, the Master Plan recommends that community residents, in collaboration with county staff and the Historic Preservation Committee, begin the process of registering the Downtown and Yancey's Mill areas with the National Register for Historic Places. Though mostly honorary in nature, listed status on the National Register will allow planning staff to make future.development decisions based upon the knowledge that the historic nature of many of Crozet's built structures must be considered when change is proposed. The establishment ofa downtown district can playa significant role in the revitalization effort. Downtown Redevelopment One of the pril11ary mechanisms available for local business owners to fund desired improvements is through a self-directed taxing and funding option, such as a Community Development Authority (CDA). A CDA can complement and augment funds allocated within the county's capital budget. It is voluntarily imposed and the revenues it raises must be expended within its identified boundaries. Downtown is the largest and most important place-type in Crozet, and activity in the immediate future should focus on the redevelopment of this area. Utilities Solid Waste The growth of the Crozet area is not expected ~o significantly change the overall needs for solid waste and recycling with the County. The largest anticipated change would occur if an industrial user comes to the current Con Agra site. However, even with that change, no additional land area would be required within the Crozet Development Area to handle the added need. Recycling Despite budget constraints the county maintains a strong interest in the recycling process. As such three new "drop-off centers" are proposed within the county's current CIP plan. The exact nature and location of these drop-off centers will need to be determined but the Crozet Master Plan recommends that one of these facilities be located within this development area and incorporated into the rehabilitation or relocation of the area's fire and rescue station. ' Water The Rivanna Water and Sewer Authority (RWSA) and the Albel11arle County Service Authority (ACSA) have already begun planning for the necessary expansions to serve expected growth in Crozet Treatment plant equipment has been upgraded and preliminary design work has been done to accommodate an expansion to 1.3 million gallons per day. When demand reaches 80% of capacity the process will begin for final design and construction of the expansion to this level. The estimated cost of the expansion will be $1,145,000. Funding and strategizing for water capacity (including wastewater) within the Crozet Development Area is the domain of the RWSA and the ACSA. 13 15 Wastewater The Crozet interceptor is currently able to handle 2400 gallons per IIÚnute (gpm). Capacity needs to be expanded to 3600 gpm in order to handle the projected build out population of 12,000. This will be accomplished through a planned replacement of the pump stations by RWSA. Connections Transportation 1. Roads: The Master Plan's recommendations for increased employment opportunities and a more connected road system will reduce the congestion that would result from a build-out population of 12,000 under the current development trend. Moderate congestion levels are anticipated only on Route 240 east of downtown and Route 250 east of the growth area boundary. If development occurs under current zoning and no additional :roadway improvements are made in the area except the Route 240/250 connector (east of Crozet A venue), significant congestion is expected on Routes 240 and 250 and also on Crozet Avenue. Future volumes on US 250 will be near or slightly exceed the roadway's capacity, putting pressure on the Virginia Department of Transportation to widen it to four lanes. To maximize capacity, the county must limit the amöunt of development on properties adjacent to the Route 250 from 1-64 to Route 240 as called for in the Master Plan. This strategy will keep the number of entrances to .a minimum and reduce pressure for traffic signals (and slowdowns) beyond those recommended for the intersections of Route 250 with Route 240, Eastern Avenue, Crozet Avenue and Western Avenue. The primary road recommendations include the following: a. Build W estern Avenue as part of the Old Trail private sector development (this includes stream crossings of Slabtown Creek and Lickinghole Creek). This improvement will serve to connect' numerous neighborhoods and haßÙets west of Crozet Avenue. Ideally, construction phasing should begin from the south (Route 250), and the entire length of Western Avenue should be constructed by the developer. In other words, "dead ends" off Jarman's Gap Road or Route 250 should not be pennitted. Aside from construction itself, truck traffic should not be allowed on this road. b. Build the long anticipated nortb/south road east of Crozet A venue (called Eastern A venue in the Master Plan, formerly referred to as the 240/250 Connector). This baseline infrastructure improvement will involve a bridge over Lickinghole Creek, a bridge or underpass to cross the CSX tracks to the north, and numerous connections to neighborhood streets. Construction phasing . should begin from the south (Route 250). Aside from construction itself, truck traffic should not be allowed on this road. The private sector should be responsible for funding and building Eastern Avenue with the exception of Lickinghole Creek bridge. c. Plan and initiate the fITst stages of a new "Main Street" parallel to and south of the CSX tracks running from Crozet Avenue eastward. This will ensure critical linkages between downtown and new development to the south and east. Construction phasing. should begin from the west (Crozet Avenue). Barnes Lumber is the primary beneficiary in the creation of this new road segment connecting their property with Crozet A venue and should therefore participate substantially in its funding. d. Other road improvements are key to the short, mediUII1, and long-range succeSs of the Master Plan including Jarman's Gap R.oad sidewaJkfbike lane improvements, downtownsidewalks, and other Crozet A venue issues, including safety improvements and possibly a modified entrance at the Meadows. 14 16 e. Streets within residential/mixed-use areas should be pedestrian-friendly, developed according to site development guidelines of this Master Plan, funded and constructed as apart of private development. The gridded neighborhood street pattern indicated on the Place-Type Map is intended to emphasize the expectation that inter-connections will be a part of future neighborhood block and street design, and should not be considered a plan for specific street locations or interconnections. 2. Bus Transit: Two types of transit improvements were considered for the Crozet area - a circulator system that serves trips beginning and· ending in Crozet and a connector for trips between Crozet and Charlottesville. Express bus service, most likely in the form of Bus Rapid Transit (BRT), on Interstate 64 appears to be the most economically viable service given the ridership potential. The route could begin in downtown Crozet, travel south and west along Crozet A venue and Route 250, then use 1-64 and the US 29 Bypass to reach the University of Virginia and downtown Charlottesville. The local circulator service could include two róutesthat converge in downtown. The fIrst route could travel east/west along Route 240 and Main Street into downtown. The second route could travel north/south from ,the employment center along Western A venue to downtown. Each route could require two buses to attain a 15 minute headway (time between buses). 3. BicyclefPedestrian Paths and Sidewalks: Each community or new center recommended in the Master Plan is specifIcally designed to provide destinations within a quarter mile of residential areas, a comfortable walking distance for most people. All roads within the communities should have,. sidewalks tofuriher encourage and £acilitate walking,. and may include marked bike lanes as well. Bicycle and walking paths should follow theproposed.greenways, which purposely connect the community centerS; providing convenient pedestrian and bicycle access throughout the Crozet growth area. Bike, lanes will also be estabHshedon major roads, as identifIed in adopted regional plans. Greenways In order to protect the prominent natural features and functioning ecological systems of the Crozet area, almost 50% of the Development Area is dedicated to natural lands, public parks, and school grounds. The greenway system, a linear network of open space, will serve to preserve and protect these sensitive areas while fostering connections between the people of Crozet and their natural, recreational, commercial, and cultural resources. This system will interconnect neighborhoods, hamlets, and downtown while linking the Development Area to the larger region. It is recommended that the development of this greenway system be done through joint efforts of both local citizens and county staff, and that existing funds be increased to accelerate the completion of this vital green inftastructure within the community. ~ " 15 1-7 ¡- II. STRATEGIES FOR IMPLEMENTATION A. Costs and Strategies for Funding Improvements Implementation of the recommendations of the Master Plan will take place in several different forms: through county capital expenditures, land use decisions, private sector investment, community initiatives, and programs and services provided by the county. Existing and recommended capital expenditures, additional programs, fmancing tools, and land use options are described below. As outlined in the charts that follow, some of the needed infrastructure and facilities improvements within the Crozet Development Area can be funded from county Sources. Several of the future expenses have already been included in the Capital Improvement Program (CIP) as indicated below. It is also important to emphasize that many other sources of funding for community infrastructure and facilities exist. In particular, the Master Plan begins to define the role that private developers and the local citizens need to take in gathering and directing funds towards the creation of dynamic neighborhoods. It is important to note that several of the items already identified in the CIP may take more time to accomplish than originally projected in the currentCIP. As one example, locating the library on the Mountainside block downtown may well result in a longer development process, because of the need to coordinate with other uses and property owners on the block. A more realistic time-frame for completion of that project is around 2008-10 given the public/private collaboration that will be involved. The following list refers to currentCIP dates, since new timelines have not yet been established. Current CIP funded items. recommended by the Master Plan: · New library: $5,378,000 (2005-2007 CIP) · Henley Middle School renovation: $4,433,000 (2003-2005 CIP) · Additional High School capacity: $7,500,000 (2007-2008 CIP, all high schools) · New Crozet Elementary School: $12,388,000 (2008-2011 CIP) · St. George's Avenue sidewalk: $124,000 (2004-2005 CIP) · Downtown sidewalk/streetscape: $300,000 (2004-2005 CIP) · Railroad A venue sidewalk:: $67,000 (2006-2007 CIP) · Design of road projects related to various Neighborhood Master Plans: ($200,000 each year for all areas, CIP) · Street lamp Program: exact amount to be determined · Road Construction Revenue Sharing for traffic calming measures: exact amount to be determined Items not yet funded but recommended bv the Master Plan for inclusion in future CIP budgets: · Eastern A venue design and engineering: $500,000 (2004-2005) · Eastern A venue bridge: $4,000,000 (2008-2009) · Recycling Center: $250,000 (2007). [Currently three recycling centers are recommended for county as a whole but specific locations have not been selected. Given the anticipated growth in the area, it is recommended that one of the -centers be located in Crozet.] 16 18 · Greenway development: as much funding should be allocated per year as may be available to meet the objectives of the Master Plan. [Currently $25,000 is allocated per year for the -county as a whole. Citizen volunteer effort will be critical to building greenway trails.] Items recommended for private sector funding: or public/private collaboration: · Western Parkestìmated $2,000,000 (2005-2006, private development) · Eastern Park estimated $2,000,000 (2005-2006, private development) · Downtown Park (Main Street): estimated $400,000 (public-spirited development) · Neighborhood Parks: estirrtated $200,000 each (private development) · Greenway development: estimated $30,000 per year - see note aböve (land is dedicated through private development) · Western Avenue: $4 million (20Q4-2005, private development) · Main Street at Crozet Avenue: $500,000 (2005-2006, private development or public/private partnership; this should be a cost sharing arrangement with the lumber business, since they are the principal beneficiary ofthe initial block( s) öf Main Street, east of Crozet, A venue) · Eastern Avenue: $4 million (2004-2007, private development) · Eastern Avenue underpass: $1 million (2005-2006, private development) · Main Street extensions: $2,500,000 (2006 -?, depending upon the pace of private development) · Bike/pedestrian improvements in developing neighborhöods: $TBD (2007-2011, private development) Tables The following tables identify in graphic form various.projects in the Crozet Development Area. Some of these are underway or scheduled as a part of the County's Capital Improvement Program or through VDOT. Some are recommended for the future. In the latter case, preliminary cost estimates are provided. In the case of CIP and VDOT projects, currently allocated amoUIits are included. B. Strategy. for Business and Community Development One of the twelve principles of the Neighborhood Model is the incorporation of mixed use development into the fabric of neighborhood centers. At the neighborhood level, this development can take the form of small businesses which provide goods and services within walking distance of nearby residential areas. Similarly, employment opportunities can be located within neighborhoods in these mixed use centers and also in adjacent districts öf more concentrated business activity. The Place-Type Map and Design Guidelines, the land use components ofthe Crozet Master Plan, illustrate the relationships between these mixed use centers and districts, and the proposed hamlets, neighborhoods, and Downtown.. However, an organized economic development program that clearly spells out priorities, funding expectations and relationships between public and private activities is needed to make the vision of the Master Plan a reality. As noted previously, the Master Plan recommends that the County establish a small business development 'point-person' position to coordinate and respond to business inquiries, and assess options and incentives. This position is critical to achieving the desired Neighborhood Model form of development, particularly the viability of neighborhood centers and the mixture of uses they are intended to attract. The development community has been cautious historically about building the non..,residential uses recommended by the Neighborhood Model and the Master Plan, since the concept is new and represents a departure from a typical segregated zoning approach. The point-person should assist with the coordination of this element of new development, and her/his role eventually may evolve into a more proactive stance where specific types of local business development are targeted and sought. Opportunities for adaptive reuse of the Con Agra and Acme properties are likely to involve public-private partnerships, another area where the small business point-person's role will be critical to success. This position is uniquely linked to understanding and achieving the implementation of the Master Plan. 17 19 One key economic development possibility exists with respect to the Barnes Lumber property. If this property owner decides to sell, or if relocation can be. viably considered, the central location would afford a tremendous and positive opportunity for high density, pedestrian-oriented, mixed-use development reinforcing the ''urban core" of the Crozet downtown area. Retail, commercial offices, and residences could be combined within mixed-use buildings and blocks in this area, reinforcing the central role of downtown. Local government needs to anticipate this eventuality and be ready to assist with the conversion process for this property if and when it occurs. c. Strategy for Affordable Housing To encourage and maintain a diverse population within the Crozet Development Area, one of the Guiding Principles identified early in the Master Plan process, affordable housing options must exist. Affordable housing is defined as housing that does not exceed 30% ofa household's income. Current Albemarle County affordable housing policy targets rental housing representing 0-80% of the current median household income, and 'for purchase' housing at 50-80% of the current median family income. Affordable housing options targeting these income ranges would continue the tradition of 'starter' homes that characterizes many of Crozet' s neighborhoods today. Market based housing developed within the Master Plan Site Development Guidelines has the potential to provide up to 800 units of affordable housing through "accessory units". These "granny flats" would take a nwnber offorms, and they would provide access to housing for those who could not afford a full single family home in a relatively expensive area like Crozet. These units might be located above garages in the back of properties or as stand alone units associated with larger homes. Within the context of the county's current zoning ordinance, they would have to be rental units. In addition to the housing diversity already provided by the Meadows and Mountainside Senior Living properties, and the diversity inherent in the Master Plan's call for increased residential density and product options within existing and new centers (through both infill and greenfield development of townhouses, multiplexes, apartment buildings, mixed- use residential buildings, live-work units, etc.), these accessory units may be another opportunity for the private sector to support a community of diverse ages and income levels. In addition to having affordable units available on the market, it is also important that the units themselves be dispersed throughout the development. Dispersing units (as opposed to collecting units within one area of Croz~t or within one area of a development) would reflect the Guiding Principle of community diversity on both a large and small scale within Crozet. The C<~unty' s affordable housing policy, adopted by the Board of Supervisors in February 2004, can be found on page ~ of the Comprehensive Plan. D. Strategies for Financing Improvements The following list identifies several sources of funding; with a large project, one or more sources might be combined to provide an adequate budget. The Master Plan affords the opportunity to leverage private sector and community support in addition to current funding sources through Albemarle County itself. Local Government 1. Current revenue sources (property taxes, sales taxes, business taxes, water/sewer revenues) 2. Increased revenues resulting from new development within the community (property taxes, sales taxes, etc.) 3. Bonds 18 20 4. Tax Increment Financing (TIF) · This option involves issuing bonds to fund improvements within an identified geögraphic district. Increased tax revenues resulting from rising property values (triggered by the funded improvements) go to repay the bond expense. TIF requires a general referendum just lìke other bonds, and uses the general interest bond which tends to have lower interest rates. 5. Community Development Authority (CDA): · The CDA is another mechanism for funding improvements within a designated area. A CDA is established by local government for a specific public or community purpose, and requires a vote by a maj ority of property ovvners within the defined area. In Crozet" establislunent of a CDA is recommended to more quickly upgrade infrastructure dovvntovvn. Limited public funding for improvements such as sidewalks, streetscaping, redevelopment of the Square and other pedestrian-oriented items would be supplemented by revenues generated by the CDA. A CDA would operate in the following manner: · Issue bonds to finance improvements within the CDA · Provide infrastructure necessary to meet the increased demands placed upon the localìty as a result of the development withinthe CDA district. · Generate monies to pay for improvements through special ad valorem taxes or assessments on property within theCDA district. 6. PublicIPrivate Transportation Act - PubliclPrivateEducation Act · Opportunities avaìlable under this legislation may be appropriate for projects in which constructing a public project depends on the participation of one or more private landovvners. When this situation occurs, a public/private partnership could coordinate different aspects öf design and construction. Creation ofa partnership may be preferable to holding a bönd referendum. 7. VDOT Six Year Plan 8. State and federal grants TCSP (Ttansportation and Community and System Preservation Pilot Program) TEA-21 Enhancement Grants ' Businesses 1. New development: pröffers associated with legislative actions (special pennits, rezonings) · Maintaining, not improving service standards · Improvements directly benefiting development (nexus test) Local Community 1. Grants 2. Community sweat equity 3. Fund-raising campaigns E. Strategy f.or Land Use The adoption of the Neighborhood Model as a part of the Albemarle County Comprehensive Plan represents a new approach towards. community development, one which encourages the creation of distinct neighborhoods with identifiable centers and edges, using design to achieve a more convenient, lìvable form. The Master Plan reflects the principles of the Neighborhood Model, applied to a specific place - the Community of Crozet. Changes to the development review process will be necessary to achieve the vision set forth by the Master Plan. This -section addresses possible ways in which Albemarle County can modify 19 21 its current land use practices to accommodate the inevitable growth in Crozet consistent with the community's vision for itself. Several of these regulatory tools would necessitate fundamental changes that would take time to achieve; others are modifications to processes that are already in place. Still others may require statutory changes at the State level which would involve political action on the part of Albemarle County. Because the Crozet Master Plan is the frrst of the master plans for the Development Areas to be completed, it can provide a preliminary template for preparation and implementation of future master plans. Therefore, it may be beneficial to investigate new approaches to development review that may not be easily achieved within the County's current regulations, in the interest of broadening the discussion and identifying innovations tbat are appropriate for Albemarle County. i/\ '0 Parameters for evaluating and recommending changes to the existing development review process include: · Consideration of provision of incentives for good design and reduce complex and lengthy procedures whenever possible. · Provision of greater predictability in the outcome of the development process, a key factor in attracting appropriate development. · Revising of the regulations addressing "by-right," development to incorporate Neighborhood Model principles, a process that is already underway. It should be remembered that statutory limitations on the County's regulatory authority will make implementation of the Master Plan more difficult, particularly in the area of regulating design and achieving concurrency between infrastructure and development. StafImg requirements and other costs associated with implementing regulatory changes should be considered. Finally, it is important to respect existing development entitlements while providing incentives for developments that are consistent with the master plan. By-Right Development The term "by-right" means that development can occur under the property's approved zoning designation without the need to seek a zoning change or a special use permit. There are ways in which by-right development will help implement the Crozet Master Plan. First, determining compliance with the Crozet Master Plan for larger projects should occur through the administrative development review process, including review of subdivision requests and site plan review. Staff should review by-right proposals emphasizing conformity with the Master Plan, and encourage voluntary compliance. Amendments to the zoning and subdivision regulations (the Albemarle County Code) are underway to allow implementation of the Neighborhood Model. These amendments include requirements for curbing, sidewalk, and street trees. They also include reduced setback requirements and added commercial uses in some residential districts. Adoption of the amendments will also facilitate implementation of the Crozet Master Plan. By-right development creates certainty for the developer and the community by specifying the kinds of uses, density and form of development that may occur on a particular property. For the developer, this provides an incentive by reducing both risk and time involved in undertaking project; for the community, it removes the need to closely track individual development proposals and repeatedly attend hearings to debate rezoning requests for individual properties. The primary risk and the disincentive to creating entitlements through zoning relates to local government's diminished ability to achieve concurrency between available infrastructure and growth. In reviewing a rezoning request, the Planning Commission and Board of Supervisors consider the adequacy of services for the proposed development, and there is an opportunity for the developer to proffer (commit to) to provide appropriate infrastructure improvements in support of his proposed development. These voluntary contributions, or proffers, must address impacts generated by the rezoning, but they givelocal government a much-needed avenue for including private dollars in the funding of public capital projects. By-right development review is an administrative process, since the use was approved when the zoning was originally established. ,With no legislative action required, there is no opportunity for local government to tie impacts to contributions. The Crozet Master Plan includes advanced infrastructure planning that would 20 22 (\ make the need for review of individual projects and their impacts on the larger community less necessary, provided that the identified capital improvements are funded and built. Modified Rezoning Process For legislative actions (projects that ultimately require approval by the Board of Supervisors), a two-step or tiered review process is offered that provides developers with guidance and feedback from the Planning Commission earlier in the process. In the initial review step of this ptocess, an overall fmding of consistency (or inconsistency) with the Crozet Master Plan would be made before detailed development plans were prepared. The consistency finding would consider the land use program, densities and intensities, as well as general site layout. The second tierofreview, the detailed zoning review, would focus on more specific site design criteria. This two-tiered process has recently been initiated, and may undergo further refinement as it is put into regular use. Developer Initiated Rezoning For many years, Albemarle County has implemented its Land Use Plan through developer initiated rezonings. If this practice continues on a site-by-site basis, properties would be rezoned cOnsistent with the Master Plan, with the increased opportunities for density and design flexibility offered by the Neighborhood Model serving as the incentive. The requested zoning district could be Planned Development, Neighborhood Model District, or a conventional district with a proffered Plan. An entirely new zoning district developed for implementation of the Crozet Master Plan could also be made available. . Neighborhood ModelPlanned Development Albemarle County amended its zoning regulations in March 2003 to create the Neighborhood Model - Planned Development district (NMD) (Chapter 18, Section 20A). The district establishes the standards for development to occur consistent with the Neighborhood Model. An applicant seeking rezoning to NMD is required to submit, among other requirements, a general development plan and a code of development. These submittals establish the types and allocation oflandt;lses and green space. and the design guidelines and regulations for the district. Approval of a NMD for a particular property must be consistent with the Comprehensive Plan, Land Use Plan and Master Plan for the Development Area, and the Neighborhood. The NMD is not equivalent to by-right development consistent with the Master Plan, because a rezoning is still required. The use of this tool is significant. The NMD provides for the most flexibility of all zoning districts and does not rely on new zoning or subdivision text amendments before Neighborhood Model type development can take place. This rezoning is applicant initiated, and thus preserves the County's ability to address concurrency at the time of rezoning. Because it requires a public hearing, a rezoning request also involves the community in the review of the development proposal. It allows the County to work closely with a developer to ensure that the proposed development achieves consistency with the Neighborhood Model, which may be particularly important for the first projects that occur. . Planned Development District or Conventional District with proffered Plan Planned development districts have been used for a number of years to provide developer flexibility with setbacks and open space as well as to achieve the goals of the County for land use in a particular area. Rezonings to the planned districts, such as PRD (Planned Residential Development) and PD-MC (planned Development -- Mixed Commercial) can implement the Crozet Maste:r Plan as can rezoning to a.conventional district with a proffered plan. Rezonings to these districts will likely occur on smaller parcels than rezonings to a NMD. 21 23 County Initiated Rezoning If the Crozet Master Plan is implemented solely through developer initiated rezonings, an "either or" situation arises. Either a developer initiates a rezoning and goes through what can be a lengthy process involving proffers or the by-right development occurs. In exercising their by-right zoning, landowners could choose to by-pass the master plan requirements. Also of concern is the issue of development or redevelopment of smaller properties, for which the planned district rezoning might be perceived as too cumbersome. The Planned Development process is generally more suitable for larger, vacant parcels where an overall plan of development is required prior to subdivision into multiple parcels. An area of particular concern to the community is lack of unified control of development for downtown Crozet. Because so many small developed parcels already exist, an overall rezoning of the downtown by a developer would be unlikely. Therefore, other zoning tools must also be examined to ensure comprehensive implementation of the Crozet Master Plan. . Crozet Zoning Overlay One option would be for the County to create a zoning overlay district for all or a portion of Crozet. An overlay would establish development standards that would apply to all by~right development These new requirements would apply in addition to those associated with the underlying zoning district. This tool could work in concert with the NMD wherein smaller properties could develop under their by-right zoning, while larger properties would be encouraged to rezone to NMD consistent with the Master Plan. This strategy would require development and adoption of a comprehensive set of regulations for the Crozet Development Area. The extent to which a zoning overlay could implement all aspects of the Master Plan may be limited by the County's police powers. Generally, the Virginia Code allows the County to regulate the use ofland, buildings, and structures; the physical characteristics of structures such as size, height, area, bulk, location, construction, removal and alternation; and the areas and dimensions of use and open space. While these powers clearly allow implementation of many of the design aspects of the Neighborhood Model, the degree to which architectural controls and streetscape requirements can be implemented must be further explored. The limitation of this approach is that it focuses on the physical development of the area, but does not comprehensively address the issues of land use types, the land use mixture, and the density and intensity of development. 22 24 . New Zoning Districts for portions of Crazet Another option would be for the County to create new zoning districts for portions of Crozet to help implement the CrozetMaster Plan. For example, the County could create a specific district for downtown Crozet to establish separate uses, setbacks and parking standards than for any other zoning district in the County. A different possibility might be to create a specific district in an area ripe for redevelopment to open opportunities for mixed use. It should be recognized, however, that any County initiated rezoning for a specific zoning district likely would need substantial support by owners of the property to be'rezoned. . CrozetZoning Code Establishment of a Crozet zoning code represents the most comprehensive approach towards implementation of the Master Plan. The zoning code would identify different districts corresponding to the Plan's recommended land uses and place types, with each district accpmpanied by standards appropriate for implementation. The districts would also establish the required types and mixture of uses. Similar to the zoning overlay district, the extent to which architectural design controls can be adopted merits further investigation. Nonetheless, real benefits would accrue from the control of land use and employment of form-related standards. While the Crozet Zoning Code might guide the review and approval of individual rezoning requests as development occurs over time, the most effective means of implementing the Crozet district would be to undertake a comprehensive rezoning of the area. This wpuldsupport the by- right development potential envisioned in the development of Neighborhood Model and its product, the Crozet Master Plan. The potential controversy associated with a comprehensive rezoning is a factor in considering this option, but that controversy may be mitigated by the extensivecommmrity involvement in developing the Master Plan. It is certainly possible that a few properties would be assigned less density under the Master Plan-directed rezoning than they currentlypossess,·amotmting to a downzoning. However, a dOWttzoning is considered to be valid if it meets certain conditions, including the requirement that it result from a dètailed study, such as the Crozet Master Plan. The Crozet Master Plan provides a detailed land use plan which could easily be translated into a specific, tiered district. However, for larger properties that will undergo additional master planning, the NMD would still be an option. Additionally, the Crozet district could offer development flexibility within larger properties by allowing transfer of densities and uses within the property. Before undertalcing a comprehensive rezoning for Crozet, decisions would need to be made regarding the type of zoning code that is appropriate. Options include a transect-based code, a modification of the existing County Code, or another type of code. At present, a transect-based code for Crozet is not envisioned as appropriate. Therefore, any new code would need to be developed in a way that allows staff to effectively and efficiently enforce specific zoning rules for Crozet as well as for the rest of the County. f' Entrance Corridors Albemarle County adopted the Entrance Corridor Overlay District ordinance (Article 18, Section30.6) in order to preserve and protect certain roadway corridors considered to be significant entryways for tourist and for historic resources. Entrance Corridor (Ee) Overlay districts are established on parcels ofland contiguous to the EC streets identified in Section 30.6.2.c of the Zoning Ordinance, from the edge of the right-of-way to the greater of either: 1) the full depth of the parcel, as the parcel existed on the original adoption date of Section 30.6; or 2) a depth of 500 feet Within the study area, SR 240 and US Highway 250 are designated Entrance Corridors. Within the designated corridors, a certificate of appropriateness must be obtained, based on the review of development proposals for consistency with the site development 23 25 guidelines established for that corridor. The site development guidelines may address both the appearance of structures and landscaping elements. The Entrance Corridor ordinance is significant because it is an existing tool that can assist in implementing the types of design regulations set forth in the Crozet Master Plan. For the existing corridors, the Entrance Corridor site development guidelines should be implemented in compliance with the Crozet Master Plan. The County should also review other roadways for designation as entrance corridors, particularly Jarman's Gap Road, and the proposed Main Street, and Eastern and W estern Avenues. Architectural Design Guidelines Voluntary architectural design guidelines provide another potential tool to encourage development consistent with the Master Plan, particularly with regard to building design. For NMD projects, guidelines will be incorporated into the code of development required as part of the NMD approval process. Such voluntary guidelines could also provide invaluable assistance to smaller properties whose owners may wish to develop consistent with the Master Plan but who lack financial resources to develop guidelines for individual properties. The County could mandate review of projects consistent with these guidelines, but allow for voluntary compliance except in the case of Entrance Corridor and NMD projects. The design guidelines would also be available to developers for incorporation into deed restrictions for enforcement through private property owner associations. Establishment of Historic Districts Crozet is rich in historic resources that help defme its unique character. Through adoption of a historic preservation ordinance, the County can locally designate such resources. Virginia Code allows for adoption of ordinances creating a historic district as well as protection of those resources. A local preservation ordinance is a type of zoning regulation referred to as "historic district zoning;" it is an overlay district, which means that the adopted ordinance will not affect the underlying zoning classifications. Property owners in the historic overlay district would be subject to an additional set of restrictions that relate directly to the preservation of historic resources. Although the County has not yet enacted an historical preservation ordinance, if and when this regulation is adopted, it could provide a valuable tool for protection of resources within the Community of Crozet. Conservation Easements The Crozet Master plan includes a network of public parks and greenways structured around the Lickinghole Creek watershed. Portions of the open space system within the Lickinghole Creek floodplain are already owned by the County; others will be acquired or donated for community parks. Some portions of the greenway system that are integrated into development projects may remain in private ownership. These areas could be designated voluntarily as conservation easements. Outside of the Development Areas, landowners may apply to participate in the County's Acquisition of Conservation Easement (ACE) program. The ACE program allows the County to purchase easements for protection of open space, and natural or historical resources may also be privately obtained through the Virginia Conservation Easement Act by charitable organizations. Within the designated Development Areas, one tool to allow property owners to participate in this preservation of open space is a Conservation Investment District. This would enable property owners to invest in conservation of open space within the boundaries of the district by raising local funds that can be matched with funds from other sources, such as individuals, foundations, and existing federal, state and county conservation programs. These funds may be spent by the district solely to preserve open space Recommended Strategy The implementation of the Crozet Master Plan will occur through a combination of short~term and long- , term strategies. In the short term, large development parcels should pursue the NMD Planned Development option. This will assist developers who are ready to obtain the necessary rezoning, while proffering necessary infrastructure improvements in anticipation of the longer-term capital improvements 24 26 for the area. Importantly, rezoning to this district will also provide an opportunity for demonstrating to the community that the Neighborhood Model can produce positive development outcomes. Development of a successful project will prove the value of the New Urbanist concepts, and may create support over the longer term for considering a comprehensive rezoning to a distinct Crozet zoning district. A zoning district specific to the downtown and other areas for which specific regulations are desired should be created to ensure that development and redevelopment occurring on smaller properties conform to the Master Plan goals. In order to create the type of compact, interconnected community envisioned by the Neighborhood Model, development patterns must be uniform, and not random and inconsistent. In the long term, the Master Plan calls for the programming, of inftastructure and development of programs necessary to support the development that will occur. Once these tools are in place, the Master Plan might be most thoroughly implemented through a Crozet Zoning Code and a comprehensive rezoning. This approach would create the ,certainty needed by developers and by the community and ensure the uniform, successful development of Crozet as a true model neighborhood. F. Indicators: Measures of Success Indicators for the success ofCrozet's long term development will be important for all of the, participants in Master Plan implementation. It is recommended that a Master Plan Assessment Program be created to set forth detailed methods for evaluating the following services and infrastructure: Local Government 1; Water quality and availability 2. School ratings 3. Quality of parks and roads 4. Traffic/Transportation measures 5. Level of services - meeting or missing service standards Businesses 1. Profitability 2. Evolving markets 3. Diversity Local Community 1. Quality of Life 2. Walkability 3. Affordability 4. Location and diversity of employment 25 2'7 III. PROCESS AND FORM OF DEVELOPMENT A. Framework for Creating Distinctive Places within Crozet Relationship of the Master Plan to the Comprehensive Plan The Master Plan is an adopted part of the Albemarle County Comprehensive Plan, Land Use Plan, and replaces the current Crozet Community Profile (both narrative and map). In the future the same process will occur in all of the Designated Development Areas as individual master plans are completed. Relationship of the Neighborhood Model to the Master Plan The Neighborhood Model provides the policy foundation for the Crozet Master Plan. With the adoption of the Neighborhood Model, Albemarle County set forth the guiding goals and objectives for the form of future development. The Crozet Master Plan will serve as the first example of how the Neighborhood Model can unfold within a designated area and how it can be tailored to reflect a distinctive place. Central elements of the Neighborhood Model: 1. The Neighborhood Model (NM) organizes development not by land use designations but by neighborhood 2. The neighborhood is not organized by land use type, but by a type of distinctive "place" that is oriented toward the pedestrian 3. Neighborhood is the building block for development 4. Pedestrian-oriented place-making involves focal points and boundaries in the landscape where the ideal distance from focal point to boundary approximates a 1/4 mile radius (i.e. the 5 minute walk) 5. Focal points and boundaries organize land uses in meaningful ways 6. A discernible place with amenities does many things, including: Orients people Provides convenience ' Ensures intentionally designed open space Encourages pedestrian activity (which has proven health benefits) Allows for the possibility of diminished vehicle trips Distinctive Place Types In applying the Neighborhood Model to Crozet, further gradations of "place" have been discove~d. Not every place is a neighborhood, but each place shares the characteristics of being linked together through a roadway or greenway network. Additionally, the different places in Crozet can vary in size, scale ànd 26 28 r-"\ intensity of development (i.e. the degree ofland use mix, density and activity.) Places are grouped in the following categories, ranging from low intensity to high intensity development: Hamlet: small settlements which fit the NM's prescription for a center and edge. Due to topography and the proximity of other mixed used places, Hamlets are less intensely developed. Half the land area is open space and most of the land use is residential. NeighborboodNillage: settlement which most closely fits the NM's ideal in terms of intensity and amount of area developed. Due to the riparian network and topography of Crozet, the neighborhood's shape is not a perfect circle and distances from the focal point to the boundary may range from 1/4 to 1/2 mile. Downtown: historically Crozet's "district-wide" focal point for cultural and commercial activities. It is the largest place-type in Crozet (approximately equal in area to three neighborhoods). Its core, where the neighborhood centers coalesce, exhibits the greatest degree of mixing, density, and intensity of development in Crozet. Each place-type retains its own distinctive center, with radiating middle and edge "bands". The center is the most intensely developed, while the middle and edge bands become progressively more residential, less mixed use and less dense. This pattern reflects the concept of the "transect" outlined in the Neighborhood Model. Places are organized along a continuum of lesser to greater intensity of development, thus creating focal points and boundaries and a variety of dwelling types and lifestyle options (from natural landscape to urban downtown). Fringe Areas Most of the periphery of the Crozet Devèlopment Area is recommended for the lowest density of development, consistent with the Rural Area designation in the Comprehensive Plan. The importance of Route 250 as a scenic by-way has been reinforced throughout the public process of developing the Master Plan. This recommendation supports the preservation of the rural setting along much of Route 250 West as well as the eàstern portion of Route 240. Commercial and mixed-use functions were considered for the segment of Route 250 west of the DevelopmentArea. However, the sensitivity of historic Yancey Mills, the value of the Route 250 viewshed itself, and the central role of downtown Crozet as the commercial focus for the area support the fringe area recommendation, that of maintaining the lowest possible density for future development. Downtown Downtown Crozet is unique. Until the action by the Board of Supervisors to amend the development area boundary, half of the developed "downtown" was located in the designated rural area on thè Land Use Plan. The Master Plan recommended including the developed area north of the boundary in the DevelopmentArea through a boundary amendment. Infill and mixed-use development of the downtown commercial district on Route 240 along with other economic development possibilities north of ConAgra demonstrate the importance of integrating this area with existing development south of Route 240 and the CSX tracks. Limited residential development between Firehouse Lane and ConAgra will be possible and appropriate when stormwater management facilities are constructed at one or more strategic locations on Beaver Creek, between the reservoir and downtown. This public/private investment will also manage and improve runoff water quality for the existing downtown commercial and residential areas that currently lie outside the Lickinghole'Creek drainage basin. The inclusion of "north downtown" in the Crozet Development Area adds approximately 700 residents; however, this number is significantly fewer than the foregone development potential originally reconnnended for the southeast quadrant of the Development Area (a net reduction of approximately 800 residents when the two actions are considered together). Other issues related to downtown include the possibility of an historic overlay or design control district along with infrastructure improvement strategies including the establishment of a Community Development Association (CDA) for downtown businesses and property owners. This would afford a dedicated funding 27 29 stream to support the self-identified priorities of those within the CDA downtown area. A CDA would be established by Albemarle County, with the majority support of businesses and property owners within the designated and dermed CDA area. B. Services (All figures cited are current estimates that are anticipated to change over time.) Local Governance Recommendation One of the central characteristics of the Crozet Master Plan has been the depth of public involvement and the positive interaction among and between residents, County staff, developers and other agencies that developed as a result of that process. To fully benefit fÌom the civic involvement inspired by the planning process, it is recommended that a mechanism be established to foster and sustain a working partnership between local government and Crozet residents in the implementation of the Plan. The Board of Supervisors has approved a strategic plan for addressing local governance issues; however; some of the action items described below still require review and authorization by the Board of Supervisors: 1. Appoint a Neighborhood Planner. A position in the County's Department of Planning will be established/designated to work with the community and implement the Master Plan. 2. Appointa Crozet Community Council. This entity will include Board-appointed representatives to work with the Neighborhood Planner in implementing the Master Plan. The goal is to gather input fÌom diverse interests and to work collaboratively with County staff, businesses, and developers. 3. Establish Community Teams with to work on specific master plan issues such as housing, safety, park development etc. These would include residents and appropriate County staff. Fire and Rescue Recommendation At a full population build out an additional fire and rescue station will not be needed within the Crozet Development Area. The primary reason for this is that a combined fire and rescue station is planned for the Ivy area in the years 2007-2008, which will also serve Crozet. CIP funds of approximately $4,500,000 are' allocated for this project. Althoughan additional station in Crozet will not be required, maintenance and improvement of the existing downtown flTe station will be needed. Another alternative would be to relocate the current building. Other possible changes include the addition of rescue services and the possible integration of a police satellite office. With the creation of a new fire station in the Ivy area, a full build out population of 12,000 will still only necessitate a volunteer force in Crozet, along with the possibility of an additional flTe/rescue/police station in 2012. Existing Conditions The County is in the process of updating its Fire and EMS Service Standards. When updated, standards governing response time within the Development Areas will be established and the recommendations that follow should reflect those new standards. The current fire services capital improvement program extends through the year 2010. There are no plans to expand facilities in the Crozet area during that period. However, in the year 2008-09, a combined fire/rescue station is planned for Ivy, which would serve as a backup for the Crozet area. Additionally, the 28 3C new "County Office Building South" on Fifth Street south of Charlottesville will support the coordination and expansion of fIre, police, and emergency services through the Charlottesville-Albemarle region, although it will not have a direct impact on Crozet. Currently the Western Albemarle Rescue Squad occupies a different building than the fIre station. Although the 2800 square foot rescue squad building is ADA compliant, the bays do not meet current OSHA requirements and there is no room for expansion. In light of the County's commitment to co- locating fIre and rescue services, it would be desirable to combine the rescue squad operations with fire stations. With the creation of the neW Ivy facility, the downtown Crozet stations will continue to serve as backup or supplemental stations. Both the Ivy and the Crozet stations would have afIre engine and one or more ambulances. This arrangement supports optimal fIre and rescue response time within the Crozet Development Area as well as the surrounding rural area. In addition to buildings, the CIP calls for the replacement of existing rolling stock (fITe engines, ambulances, etc) as it ages. A need for additional rolling stock is anticipated to occur at full build-out in Crozet. Another major impact of population growth will be an increase to volume and frequen.cy of calls, so staffmg will become an additional focus. The County expects to continue supporting the volunteer system in Crozet in order to meet the increasing deroandsofa growing population. A model for this arrangement is the Seminole volunteer fire department, which serves approximately 30,000 people using a combination of professional and/volunteer staff. In the future, the Ivy station will probably require professional staff to supplement its volunteer team. With Ivy playing a major role in the western part of the County, staffing for the fITeand rescue squads currently serving Crozet can remain volunteer. Police Recommendation As the population grows, it is recommended that a police satellite office be created for the Crozet se]'Vice sector to maintain desired response times to all police emergency calls. The department has recently conducted a Workload Allocation Study. Once long range goals are established, exact response times and personnel service standards will be computed for the Development Areas. Existing Conditions Crozet is served by the Albemarle County Police Department, which has one central office in Charlottesville. The Virginia State Police patrol Interstate 64, accessing Crozet at the Yancey's Mill exit. The current County standard calls for three police officers to serve the area; these officers are assigned to the sector that includes Crozet, but they also cover the broad territory of Western Albemarle County. This arrangement may change when the Police Department long range study is completed. There is currently no official police satellite office in Crozet; officers use a small room in the Meadows Community Center to write reports. At build-out, Crozet would benefIt from a police satellite office out of which officers can operate during their shift. This satellite office could be located within the fIre or rescue stations, or all three could be successfully combined if a renovation of the existing buildings is deemed necessary. 29 31 C. Programs Fairs, festivals and local celebrations Recommendation County staff should work with local organizations to help procure supplemental funding for local celebrations and festivals. The establishment of a tradition of events unique to Crozet will encourage both the local market and tourism in the area. Existing Conditions One of the primary venues for creating a sense of unique community identity is the creation oflocal fairs, festivals and celebrations. Crozet residents are currently very active in these efforts, with a series of community events including but not limited to the following: 4th of July Parade; 4th of July Carnival at Claudius Crozet Park; Christmas Tree Lighting; Mountainside Fall Festival; Community Clean-up Days; Crozet Arts and Crafts fairs; Crozet Lions Variety Show; Mint Springs Trout Fishing Day for kids; Crozet Farmer's Market; and Make a Difference Day (schools). As the population grows and development occurs these events might grow to include activities related to greenway trails development or festivals that highlight the specific history ofthe area. There are also opportunities to work with Nelson County in promoting the Claudius Crozet tunnel through the Blue Rìdge Mountains as a tourist destination. Social Services Recommendation Various social services providers and programs are important to the community~ Currently, services oriented to seniors are provided in several ways through Mountainside Senior Living and the Meadows, as well as through the county schools. As growth occurs, the county will have to consider augmenting these services and perhaps creating a central location within the Development Area where these and other services can be accessed. Existing Conditions One of the primary recommendations of the Community Diversity Task Group was to acknowledge the already diverse demographics that exist within Crozet. Task Group members were concerned that the current population of lower to middle income families not be pressured out of the area through market forces. The Task Group recommended that the county take a strong role in protecting and helping these populations. It was also recognized that beyond the provision of services, active support for a diverse area would mandate physical changes as well such as the installation of sidewalks, additional parks, and well- sited public facilities which would encourage people of different backgrounds to meet informally throughout the day. Crozet, like the rest of Albemarle County, has become home to a growing population of seniors with a variety ofliving arrangements ranging from assisted living to "empty-nester" townhouses. A number of low/moderate income residential opportunities also exist in Crozet. Future development of units of this type should include funding for associated, necessary services. 32 30 D. Utilities Solid Waste and Recycling Recommendation Solid Waste: The growth of the Crozet area is not expected to significantly change the overall needs for solid waste and recycling with the Cou.nty. The largest anticipated change would occur if an industrial user comes in at the current ConAgra site. However, even with that change, no additional land area would be required within the Crozet Development Area to handle the added need. Recycling: Despite County budget constraints, residents maintain a strong interest in the recycling process. Three new "drop-off centers" are proposed within the County's current CIP. The exact nature and location of these drop-off centers has yet to be determined but it is the recommendation of the Crozet Master Plan that one of these facilities be located within the Development Area and incorporated into the rehabilitation or relocation of the area's fire and rescue station. Existing Conditions Waste: Albemarle County handles the processing of solid waste through the Rivanna Solid Waste Authority. Trash and recycling materials are collected by about 26 private haulers, who pay tipping fees to the RWSA. The Ivy facility, once a County landfill, is now a transfer center at which trash is collected (except for construction debris) and loaded onto trucks that take the waste to landfills operated by a private frrm(BFI). This arrangement is expected to continue for at least the next 20 years, assuming these landfills have adequate space. ' Recycling: One issue that will require attention within the next few years is the need for alternative mechanisms for collecting recyclable materials. Albemarle's private trash haulers currently collect glass, plastic, and newspaper for recycling. County residents can also take these items plus mixed paper and cardboard to the McIntire recycling center in Charlottesville and various smaller drop sites located throughout the County. The County currently contracts with the RWSA and a local private vendorto process recyclables. However, the future of the recycling programs is uncertain. The recycling· center only breaks even selling the fiber (paper) products it collects, and the market for glass and plastic is currently inconsistent. These items must often be thrown in landfills because there is no pI:ocessing facility within a reasonable distance to buy them. If this trend continues, the funding for recycling will drop to the point where private haulers will , likely discontinue collecting recyclables from County residents. The County's 'Blue Bag' program whìch helps with the recycling of plastic, glass and metal was stopped on July 1, 2003 due to funding shortfalls and poor cost effectiveness. Another alternative to the issue of recycling materials economically would be to encourage manufacturers who recycle glass and plastics to locate within a marketable distance of Albemarle County. The ConAgra site, or a portion of it, might be one location for such a facility. The County is working with RWSA to launch a new long-range plan for county-wide solid waste and recycling programs (due for completion in July of 2004) that would revisit the existing plan that was developed prior to the closure of the Ivy landfill and the sharp drop in the market for recyclables. The growth in Crozet is not expected to significantly change the overall needs for solid waste and recycling within the County. However, as Crozet's economy grows, a concentrated effort to bring in businesses that buy recyclable materials, especially glass and plastic, could help solve the region's recycling crisis as well as provide a sustainable source of employment. 31 33 "I Water and Sewer [All figures cited are current estimates and are expected to change over time.] Recommendation Water: The Rivanna Water and SewerAuthority (RWSA) and the Albemarle County Service Authority (ACSA) have already begun planning for the necessary expansions to serve expected growth in Crozet. Treatment plant equipment has been upgraded and preliminary design work has been done to accommodate an expansion to 1.3 million gallons perday (current capacity is 1 million gpd). When demand reaches 80% of capacity (800,000 gpd), the final design and construction process will begin for this expansion. Currently, the estimated cost of the expansion is $1,145,000. Planning, financing and engineering to meet water capacity needs within the Crozet Development Area, including wastewater, is the responsibility of the RWSA and ACSA. Wastewater: The Crozet interceptor will have to expand its capacity to 3600 gallons per minute in order to handle the projected build-out population of 12,000, from its current capacity of2400 gpm. This will be done through a planned replacement of the pump stations. Existing Conditions Water: Beaver Creek reservoir, the source ofCrozet's public water supply, currently has a raw yield of2 million gallons per day. This water supply is designated solely for Crozet at the present time. As a result of the recent drought, the ACSA is examining all water supplies for possible benefit to the entire County and City service area. The Crozet system is being considered for its potential contributions to the urban area's water supply, but no change will be considered which would decrease the availability of water for Crozet's own current and future needs. As noted, the current treatment plant capacity for the Crozet public water supply is 1 million gallons per day (gpd). During the recent drought, the town's water use was about 257,000 gpd. Under normal conditions, the Crozet area averages 370,000 gallons per day for household, commercial, and public service uses. This translates to 124 gallons per day per person; included in that figure is related use by fITe services, schools, business, etc. At this rate, at build-out the community's 12,000 people will be using an average of 1,488,000 gpd. When it was active as a frozen food plant, ConAgra used approximately 500,000 gpd in addition to the average town use at the time of about 300,000 gpd. A new use for the plant has not yet been established, but any new facility would have to upgrade the water efficiency of the building significantly prior to approval. Wastewater: The Crozet interceptor was constructed in the early 1980's to handle two thirds of the expected build-out of Crozet within 50 years. The intent of the original design was to lÍI!1Ít the nutrient loading to the water supply and to preclude the need for a water treatment plant in Crozet. The interceptor handles 2,400 gallons per minute (gpm) now and will need to be expanded to 3,600 gpm in order to handle build-out as originally planned. This can be accomplished through a planned replacement of the pump stations, which is currently estimated to cost $1.5 million. Funding: Funding and strategizing for water capacity within the Crozet Development Area is the domain of the Rivanna Water and Sewer Authority and the Albemarle County Service Authority. Funding is developed through revenue bonds issued by the RWSA which are repaid through ACSA and City water user fees. A cost-sharing agreement between ACSA and the City to repay the bond is brokered before a new project is undertaken. Connection fees include components for System Development and Rivanna Capacity Charges. In this way new development brings equity into the system to offset a portion of the 32 34 user fees. Cost sharing on projects in the Urban Areas is negotiated. The debt service on Crozet improvements is the Service Authority's responsibility. Stormwater A storm water management strategy has been fundamental in determining the limits of the Crozet Development Area from its inception. The construction of a large sediment control facility - Lickinghole Basin - has created a protected watershed for development in which sediment from new construction is detained.before making its way further downstream into the Mechums River and ultimately the South Fork Rivanna Reservoir. In addition to its functional role, this protective environmental measure is also a remarkable public amenity for the community in the form of Lickinghole Basin. The community should seek opportunities to protect the Basin through the use öf innovative storm water management that, like the Basin, facilitates infiltration, allows sediment to settle, and provides for cleaning of the water by wetland vegetation. Stormwater management should be emphasized in areas adjacent to impervious surfaces such as roofs, parking lots and paved roads. Permeable paving, porous asphalt and modular pavers allow increased water infiltration and should be considered for any impervious surface. Retention ponds and swales planted with native grasses, shrubs and trees provide excellent holding areas for water quality improvement while creating diverse wildlife habitats. These elements are sized and designed for the areas that drain into them. In many cases, they can be small, linear plantingsthat add to the aesthetic qualities of the neighborhoods. E. Connections Greenway Trails: citizen organized, citizen driven Recommendation In order to protect the prominent natural features and functioning ecological systems of the Crozet area, roughly one third of the Development Area is designated as natural lands, public parks, and school grounds. The greenway system, a linear network of open space and trails, will serve to preserve and protect these sensitive areas while fostering connections between the people of Crozet and their natural, recreational, commercial, and cultural resources. This system will interconnect neighborhoods, hamlets, and downtown while linking the Development Area to the larger region. Trails have been constructed at Western Ridge, along portions of Lickinghole Creek, behind the Meadows and Brownsville and Henley schools, and in Mint Springs Park. Implementing and maintaining a greenway system will require a public/private partnership involving many different people and groups. Currently 20 percent of the proposed 22-mile greenway system crosses or includes small, private, individually-owned properties. Access and use for these areas will have to be negotiated over time. It is expected that large sections of the green way system will be built, as opportunities arise, by civic groups and/or members of the development community. An advisory committee made up of appointed citizens or a new Crozet Trails Foundation could facilitate communication between the various groups. Albemarle County's Parks and Recre.ation Department could be primarily responsible for maintenance of the system. However, to minimize cost, portions of the system.could be adopted by volunteer groups, under an Adopt-A- Trail program. The greenways in the Development Area are primarily located along the stream corridors (powells Creek, Lickinghole Creek, Slabtown Branch, and Parrot Branch). They protect the stream vegetation, wildlife habitat, and water quality, while providing areas for storrnwater filtration and runoff, aquifer recharge, and flood controL" These contiguous forest areas not only protect corridors for wildlife migration but also create an alternative transportation route for Crozet residents, reducing reliance on the automobile and hence reducing traffic congestion. After construction, pedestrian trails will link neighborhoods, commercial 33 35 areas, schools, and natural areas and provide access to recreational opportunities such as hiking, canoeing, and picnicking. In areas that are less environmentally sensitive, primitive trails can eventually be upgraded to create bike paths that could link Lickinghole Basin Preserve to Mint Springs Recreational Area. Segments of urban greenway will extend from the riparian corridors into downtown along tree-lined streets and sidewalks. Existing 'Conditions Community and neighborhood accessible portions of the greenway trail system currently exist in the vicinity of West em Ridge and behind the Meadows and Brownsvi1le and Heilley schools. Roads The demand for and feasibility of roads, sidewalks, bicycle facilities, and public transit varies with the density, design, mix, and location ofland use. Traffic modeling has been conducted for the Crozet Growth Area and its immediate environs, and the results and analysis are included below. Although useful as a general forecast, traffic modeling remains somewhat theoretical and thus open to interpretation depending upon specific development patterns and events. However, the modeling clearly demonstrates that if employment opportunities are improved within Crozet, development in accordance with a Master Plan can mitigate negative impacts of "by right" development patterns on transportation. The interdependency between the creation of additional jobs in the community and acceptable levels of congestion is one of the most important findings of the planning process in Crozet. Recommendation The increased employment opportunities and the added roadway network of the Master Plan can combine to minimize congestion in and around the Crozet Growth Area. With these two changes, moderate congestion levels are anticipated oilly on Route 240 east of downtown Crozet and Route 250 east of the growth area. If development occurs as envisioned by current zoning and no additional roadway improvements are made in the area except the Route 240/250 connector(east ofCrozet Avenue), significant congestion is expected on Routes 240 and 250 and on Crozet Avenue. Future volumes on US 250 West will approach or slightly exceed the roadway's calculated capacity, putting pressure on the Virginia Department of Transportation to widen it to four lanes. To maximize capacity, the county must limit the amount of development on properties adjacent to the Route 250 from 1- 64 to Route 240. As called for in the Master Plan, the recommendation to remove the southeastern quadrant of the current Development Area resulted in part from the need to reduce pressure on this section of the highway. This strategy would keep the number of driveways to a minimum and eliminate the need for traffic signals beyond those recommended for the intersections of Route 250 with Route 240, Eastern Avenue, Crozet A venue and W estern Avenue. Major road recommendations include the following: 1. Build the north/south road west ofCrozet Avenue (called Western Avenue in the Master Plan) as part of the Old Trail private sector development (this includes stream crossings of Slabtown Creek and LickingholeCreek), as well as numerous connections to neighborhood streets. Ideally,construction phasing should begin from the south (Route 250). Aside from construction itself, truck traffic should not be allowed on this road. 2. Construct Main Street parallel to and south of the CSX tracks running from Crozet A venue eastward by building the first segment from Crozet A venue to the Barnes Lumber property. (This will take trucks off "the Square.") This could be funded by the private sector, or through some form of public/private partnership. The primary beneficiary of the fIrst leg of Main Street (off Route 240) is the Lumber Yard. 3. Construct Eastern Avenue, Main Street, and primary neighborhood streets within the two or three major properties available for new development in the area east ofCrozet Avenue. 36 34 4. Consttuct Lickinghole Bridge on a time-line appropriate to demand. 5. Other road improvements are key to the short, medium, and long-range success of the Master Plan, including Jannan' s Gap Road sidewalk!bike lane improvements, downtown sidewalks, and Crozet Avenue issues (i.e., safety improvements such as the intersection with the entrance to the Meadows). 6. Streets within residential/mixed-use areas should be pedestrian-rriendly, developed according to design guidelines of this Master Plan, consttucted and paid by private sector developers as part of their developments. Methodology and Modeling The TRANPLAN travel demand model used for the Eastern Planning Initiative (EPI) was used to forecast trafficin the Crozet Growth Area. Forecasts were generated for two scenarios: 1. Trend - reflects build out of the Crozet Growth Area as allowed by existing zoning 2. MasterPlan - reflects the Framework Plan as endorsed by the Albemarle Board of County commissioners (The Jefferson Area Eastern Planning Initiative (EPI) was a regional land use/transportation study by the Thomas Jefferson Planning District Commission (TJPDC), with funding rrom the Federal Highway Administration Transportation and Community and System Preservation (FHW A TCSP) program. Under the premise that community design affects important factors such as daily trave1and human interactions, the project team inventoried 20 urban, suburban and rural community types or "elements" throughout the region, and created ideal future designs based on citizen feedback. The elements then became building blocks to create alternative 50-year land use and transportation scenarios for evaluation by residents, using a software model created for the project called CorP Ian. The consensus was the region should avoid a dispersed, low-density pattern and plan for clustered enhanced communities along major corridors and key crossroads. Citizens noted the dispersed scenario resulted in no feasible alternatives to highway expansion, whereas the clustered patterns provided for pedestrian~ fiiendly, transit-oriented communities and set the stage· for a future rail or bus rapid transit system. ) The EPI's CorPlan land use model was used to develop land use and socioeconomic inputs for both scenarios. Regional land use information rrom the Nodal 2025 development scenario of the EPI was modified in the Crozet growth area to reflect the development patterns of the two scenarios. Total population within the Crozet growth area fOr both was roughly 12,000, while total employment potential was around 3,000 for the Trend scenario and 6,000 for the Master Plan scenario. The Charlottesville Area Regional Transportation Study (CHARTS) network, reflecting the Metropolitan Planning Organization's Long Range Transportation Plan (LRTP), was the base network for both scenarios. The Crozet area was detailed in the network by adding roadways and splitting traffic analysis zones. Route 250 from Charlottesville to 1-64 west of Crozet is in the LRTP as a four lane facility, but given Albemarle County's rejection of a corridor study recommending four lanes along this section of Route 250, the network was modified to assume only two lanes. The Route 240/250 connector programmed for 2006 was the only major roadway improvement added to the base network to create the Trend scenario network. Major roads rrom the Framework Plan were added to the base network for the Master Plan scenario. Future congestion levels on roadways were estimated by dividing the forecast volumes by capacities. Congestion is assumed significant if the volume to capacity ratio exceeds 1.2 and moderate if the ratio ranges rrom 0.9 to 1.2. Forecasts Results Figure 1 presents the traffic forecasts for the Trend scenario and Figure 2 presents traffic forecasts for the Master Plan scenario. Table 1 compares the volume forecasts for both scenarios against existing volumes. 35 37 Future congestion levels shown in Table 2 were estimated by dividing the forecast volumes by capacities developed by the Florida Department of Transportation (FDOT). Congestion is assumed significant if the volume to capacity ratio exceeds 1.1 and moderate if the ratio ranges from 1.0 to 1.1. The capacities listed in Table 1 differ because they assume differing roadway operational characteristics- pIÌ.rt1arily differences in the number of signalized intersections and cross streets per mile. Signal densities and cross streets are lowest on Route 250, resulting in the highest capacities, while capacities are lowest on non-state roadways, where cross streets are more frequent. It should be noted that the capacity of Jarman's Gap Road is currently not 12,000 because of the substandard lane widths and difficult geometry along the roadway. The higher capacity assumes the road will be reconstructed at some time during the planning horizon. Operational improvements may also be needed along Crozet Avenue to improve its capacity. According to the transportation forecasts, congestion levels are significant only on Route 250 east of Route 240 and west of CrozetA venue in the Trend scenario. Congestion levels are moderate on the same sections of Route 250 in the Master Plan scenario because oflower volumes. According to the transportation forecasts, congestion is not a problem on Crozet Avenue and Route 240 near downtown in either scenario. 36 38 Table 1 - Daily Volumes on Key Roadways (see attached table at end of document) Table 2..;.. Congestion levels on Key Roadways (see attached table at end of document) 37 39 "I Figure 1 - Trend Scenario Traffic Forecasts (see attached table at end of document) Figure 2 - Master Plan Scenario Traffic Forecasts (see attached table at end of document) Transit Services Two types of transit improvements were considered for the Crozet area - a circulator system that serves trips beginning and ending in Crozet and a connector for trips between Crozet and Charlottesville. A sketch planning method was used to estimate potential ridership for both improvements. To estimate potential ridership, one to five percent of the 88,000 total daily person trips forecast by TranPlan model are assumed to shift to transit, resulting in between 880 to 4,400 transit trips per day. Typically, less than one percent of all person trips use transit so the range is comparatively high yet not unrealistic because the Master Plan is purposely designed to promote walking and transit trips. The lower end of the range reflects moderate service levels (buses pass stops once every 30 minutes) while the high end reflects high service levels (buses pass stops once every 10 minutes). Around 20 percent of the future traffic generated in Crozet is destined for Charlottesville, which is a reasonable proportion to assume for transit trips. Thus from 200 to 900 of the total Crozet transit trips are estimated to use the connector routes and the remaining 700 to 3,500 transit trips will use the circulator system. The high estimate of ridership on the connector service (900 daily trips) is not enough to make light rail or commuter rail transit economically feasible options. Recent "New Starts" applications for light rail approved by the Federal Transit Administration (FTA) have daily ridership estimates of 10,000 or more. Whileit is possible to reduce construction costs by using the freight rail tracks from Crozet to Charlottesville, it has proven extremely difficult to reach agreements with private railroad companies for 38 40 the use of their tracks because of safety and other concerns. Furthennore, operating costs, born mostly by the state and local government are high in relation to the anticipated ridership. Bus Rapid Transit (BRT) service on 1-64 appears to be the most economically viable service given the ridership potential. A route could begin in downtownCrozet,travel south and west along CrozetAvenue and Route 250, then use 1-64 and the US 29 Bypass to reach the University of Virginia and downtoWn Charlottesville. A local circulator service could include two routes that converge in downtown. The first route would travel east/west along Route 240 and Main Street into downtown. The second route would travel north/south fiom the employment center along W estern Avenue to downtown. Each route would require two buses to attain 15 minute headway (time between buses). Existing Conditions JAUNT on-demand transit service is currently available in the Crozet area. Bicycle Routes and Sidewalks Each community in the Master Plan is specifically designed to provide destinations within a quarter mile of surrounding homes, a comfortable walking distance for most. All roads within the communities will have sidewalks to further encourage walking. Bicycle and walking paths are recommended along each of the proposed greenways, which purposely connect the community centers, providing convenient walklbicycle access throughout the Crozet growth area. Existing Conditions Sidewalks and pedestrian pathways exist in various neighborhoods in Crozet, among them St. George Avenue, Three-Notch'd Road fiom ConAgra to Downtown, Downtown to Charlottesville Waldorf/Crozet Elementary School, Western Ridge, Grayrock Orchards, Waylands Grant, and Parkside Village. Thereare currently no designated bicycle routes in Crozet. F. Distinctive Places Historic Districts Recommendation During the Master Plan process both Crozet and Yancey's Mill residents expressed interest in preserving their historic resources in the face of increasing development. To preserve the historic fabric of the Crozet Development Area, the Master Plan recommends that community residents begin the process of applying for historic landmark status for downtown by listing it with the National Register for Historic Places. In the future Yancey's Mill residents may also wish to pursue National Register listing. Though mostly honorary in nature, the status of being listed on the National Register will encourage and/or require local, state and federal government staff to consider the historic nature of many of Crozet' s built structures when weighing options for publicly-funded improvements. Existing Conditions Registration for both the Downtown area and Yancey's Mill areas is a task that in many ways has already begun with the adoption of Albemarle County's Historic Preservation Plan into the Comprehensive Plan in September of2000. The extensive historical research behind this report highlights the mány valuable 39 41 structures located in the Crozet area, Of particular note to future development in Crozet is the Preservation Plan's recommendation that both downtown and the Yancey Mills possess have the necessary resources for registration on the National Register of Historic Places. The next step, <.:ompleting the registration process, is one that can and should be taken up by local residents. Schools Recommendation The primary Master Plan recommendation is for a new elementary school to be developed in the eastern portion of Crozet. County long term planning has identified construction of this facility to be completed in 2011 with a budget of$12.4 million. In the approved 2003/04 to 2012/13 Capital Improvement Program (CIP), a Henley addition is scheduled for completion in 2005 and increased capacity will be added to Western Albemarle High School between 2008 and 2013. The School Board is aware that as development occurs in Crozet it may need to move students who are currently in the feeder pattern for the Western Albemarle High School. The redistricting of students to either the Monticello or Albemarle High School feeder pattern may be necessary as new schools and additions are completed in those areas, to help accommodate the growth of Crozet. The Master Plan also recommends that the Henley expansion to 900 students occur in the near future. This expansion will help to accommodate immediate growth needs within the area. Existing Conditions Methods used by School Facilities Planning to estimate school population growth are complex formulas that take into account live birth and emollment data for the school district. In addition, specific capacity formulas are used to compute the available classroom space for elementary, middle and high schools. Given the complexity of this task, it is difficult to make detailed assumptions about school populations for more than a five year period. However, on a larger scale, master planning process some basic assumptions about school emolhnents can be made based on an increase of population from approximately 3,000 to 12,000 people. Based on conversations with School Board staff, a new elementary school will definitely be needed within the area. The timing of this planning decision combined with the schedule for private development proposals creates an opportunity to implement the vision of the Neighborhood Model, in which schools are integrated into the physical fabric of a community from its inception. Growth in the Crozet area will also require decisions regarding the development of additional capacity at both middle and high schools. Although the Neighborhood Model calls for schools to be placed within the neighborhoods they serve, the consulting team recognizes that the issue of school growth and school siting as it pertains to the Neighborhood Model is still one in which new development patterns must conform to internal School Board policy considerations and existing school locations. Libraries Recommendation The enlargement of the Crozet library is a central concern of many in the community. The Master Plan recommends that a new library facility be built within the heart of downtown, on Crozet Avenue. The County CIP currently has $5.4 million in funding starting in 2005. The Master Plan co~urs with this timeframe as a way to catalyze the redevelopment of the downtown area. At build-out, Crozet will require 22,567square feet oflibrary space with 42 parking spaces plus bike racks. The community consensus is that expanding the current library space is not advisable given the site and building constraints. The estimated cost and committed funding for the new building with associated parking is $5,400,000. The agency responsible for planning and funding new libraries is the Jefferson Madison Regional Library 42 40 (" System, a public service unit operated jointly by Albemarle County, the City of Charlottesville, and Nelson, Louisa, Fluvanna, and Greene counties. Existing Conditions Crozet currently has one branch library Qf 1,864 square feet. Many within thecQII1Il1unity believe that the facility is already inadequate for their needs. Parks and Recreation Recommendation The strategy fQr the design of Parks and Public Space in the CrQzet DevelQpment Area is tQ create a netwQrk Qf public parks' and greenways that will work on a number of levels: 1. To prQtect sensitive natural systems (centered on the LickinghQle Creek drainage system) 2. TQ reserve public areas of topographical, histQrical, Qr cultural interest that characterize Crozet 3. TQ create areas for structured and unstructured recreation 4. To link neighbQrhoQds to downtown, schoQls, parks, and the larger region. This netwQrk forms the centrally PQsitioned spine Qf the development area, structured arQund, the LickinghQle Creek watershed. It maximizes the cQmmunity benefit frQm unbuildable land. Due tQ the rQllíng terrain and dendritic stream patterns ofCrQzet, a large PQrtion (35% is in flQQd plain and steep slQpes) Qfthe development area can be preserved in this system as PQtential recreational space. In additiQn tQ its stream valleys, the. region is also characterized by high points and views of the nearby Blue Ridge MQuntains. Rather thandevelQping all of these high PQints, the Master Plan reserves. a few key areas- mQst prominently, Eastern and Western Parks - SQ thatthese features can be appreciated by the entire cQmmunity. This aspect of the Master Plan strives tQ meet the goal expressed by the community to "preserve the rural character" while balancing the needs Qf private developers. Existing Conditions According to the Albemarle County Community Facilities Plan, the development area currently has sufficient parks and recreation resources to handle the populatiQn growth. With the projected population of 12,000, the facilities plan recommends that the Development Area have approximately 34 acres Qf community park space, 67 acres of district park space, and 112 acres of county park space. Neighborhood parks, defined in the Facilities Plan as private areas associated with developments, are also meant to relieve some of the pressure on the public parks. These figures are already accounted for with 43 acres of community park (Crozet Park and Crozet Elementary), 125 acres of district park (W AHS complex), and 637 acres of county park (Beaver Creek and Mint Springs). However, the strategy in the Master Plan is to preserve and nourish a system integral to the community rather than accounting for minimum standards for parks and associated facilities and developing all remaining land. The proposed open space system can serve to mitigate stormwater runoff, nourish the plant and animal communities of Crozet, create new pedestrian and bike routes, and attract tourism. Neighborhood Model Standards The Master Plan follows the principle of the Neighborhood Model that every resident should be within a quarter mile of a focal point, whether that is a commercial center or a park. According to the Master Plan, at no point in the development area is one more than a quarter of a mile from the open space netwQrk. In addìtion to integrating all of the riparian corridors and existing parks into this network, the plan proposes adding several new district, community, and neighborhood parks. Lickinghole Creek Basin, entirely within the floodplain and currently owned by the county, is designated asa dìstrict recreatiQnal preserve. In opening this area to the public for the first time, a commitment will be made to protect and enhance the beauty and ecological dìversity of this area through minimal disturbance. Two community parks, 20 acres 41 43 each, are centrally located (at high points)· on each side of the Development Area, Each provide views to the Blue Ridge Mountains and downtown Crozet and each has multiple trail access points. Both of these parks will be modeled in size and relationship to surrounding neighborhoods on the existing Crozet Park. They will be located on high ground, and will have a mix of recreation uses (sports fields, trails, picnicking, and preserved areas). They are also positioned to be centrally located relative to developable area in the eastern and western portions of the Crozet Development Area, The addition of a new elementary school on the eastern side of the development area will bring an additional 8, acres of field space and an adj acent neighborhood green (3.5 acres) that might seek to preserve the form of the former industrial water filtration ponds as an artifact of the old. ConAgra plant. ,The potential construction of an additional middle school will bring additional public space and sports fields. A three- acre trailhead park, centrally located on Crozet Avenue, will provide parking and access to the greenway system, Other small pocket parks and greens, averaging I acre in size, will serve new and old neighborhoods. These neighborhood parks would be created through private funding or by developers fulfilling their open space requirements. Urban Forestry The Master Plan also encourages the maintenance of a 50% forest canopy through an urban forestry plan, Urban forestry is recommended for a number of reasons, Recent research on urban forestry recommends a minimum of 40% tree canopy to maintain a healthy environment. This canopy mitigates air and water pollution, reduce glare, reduce energy costs, absorb noise, create micro climates, increase property values, create character, and attract new businesses. This percentage can be achieved through preservation of open space, tightened regulations monitoring clearing in new developments, and additional planting on all new properties, existing properties, and along all streets. Implementation of this urban forestry plan will require a public/private partnership that might include tax incentives for participants, led by community organizations and programs within the schools. This plan encourages the establishment of a community tree nursery that could supply parks, neighborhoods, and streets with additional trees. Community Nursery and Gardens The creation of a tree nursery in Crozet would recall the community's agricultural history, especially its orchards. Similarly, community gardens would add another agricultural element to the urban environment, providing productive grounds for community members to grow food for themselves or others in a cooperative activity. These gardens could occupy portions of the parks, school grounds, or spaces that might otherwise be considered residual. The gardens would be created through a publici private partnership with the majority of the design, construction, and management reserved for those who will use them. Facilities The Crozet Development Area currently has 1 stadium, 9 multi-purpose fields (for soccer, football, lacrosse, and hockey), 5 baseball/softball fields, 1 outdoor swimming pool, and 6 tem1Ís courts, Recent National Parks and Recreation Association Standard Goals for Urban Areas suggest that the Development Area should have an additional I soccer/football field, 2.5 baseball fields, I tennis court, 8 playgrounds, 4.5 miles of nature trails, and 4.3 miles of bike trails, Additionally, the Virginia State standards recommend having 8,400 square feet of indoor recreational space for the growth area. The relevance of current standards is under debate. Albemarle County is conducting a recreation facilities study to calculate more precisely the needs for these growing communities. Until further data is available regarding facility needs, recommendations center on the improvement of existing facilities at Henley Middle School and Crozet Park, and the addition of a baseball diamond and soccer field in both Eastern and Western Park. A new field would also be part of the new elementary school grounds. Also recommended 42 4,1 , .. . is the construction of an indoor recreational facility, including a swimming pool, to serve both competitive and recreational needs in the area. G. Form: Maps and Site Development Guidelines Crozet is a collection of existing and potential places which vary in size, scale and intensity due to the dramatic topography carved out by a branching, riparian network. It is and will continue to be home to a variety of businesses and households due to its agricultural past and proximity to Charlottesville and the University of Virginia. Given the physical and social diversity ofCrozet, a clear, flexible planning tool for organizing development is required. Therefore, as articulated in the Neighborhood Model, the "transect" concept is used whenever and wherever appropriate, with several benefits. It identifies and organizes distinctive places according to the principles ofthe Neighborhood Model (NM). These places are organized along a continuum of lesser to greater intensity of development, have discernible focal points and edges within a "pedestrian shed" (i.e. the distance from focal point to edge is within walking or biking distance), and accommodate a variety of dwelling types and lifestyle options. Deviations from the Neighborhood Model Unlike the Neighborhood Model which focused exclusively on the "neighborhood" as the fundamental unit for planning within the County's designated Development Areas, other types of places have been identified in Crozet. In addition to neighborhoods there are hamlets and a downtown. These new place-types take Crozet's unique physical, economic and social forces into account. One modification in particular results from the riparian network and topography of Crozet. Typically the shape of a neighborhood or hamlet is a circle where distances from focal point to edge range from 3/16 to 3/8 mile. Within Crozet, these shapes adjust to meet the current residential and topographic conditions. . Site Development Guidelines Through a year-long public participation process (consisting of six community meetings and numerous task group and developer meetings), existing places with discernible centers as well as potential sites for new development were identified in Crozet. In addition to the built environment, distinctive natural features were identified as potential district-wide centers for neighborhoods and hamlets. The Built Environment: Place-Type Once potential redevelopment (infill) and/or new development (Greenfield) areas were identified, their potential size, scale and district-wide function were explored. The area detennined to have the most redevelopment value from an economic and cultural standpoint is downtown Crozet. The physical extent of downtown is approximately equal in area to three neighborhoods. After downtown, and second in size, scale and intensity of development are the neighborhoods. Neighborhoods have relatively large developable areas (close to the 125 acre ideal neighborhood size) and lie within 1/4 mile to 2 miles of downtown. Third in size, scale and intensity are hamlets, with a small developable area (60 acres +/-) and a distance from downtown typically of a mile to two miles. Districts are special areas defined by a single use, which do not take up more than 20% of the place-type. In Crozet, districts are areas designated for employment (i.e. professional, commercial office or light industrial); they still exhibit the desired physical characteristics of the mixed use development. . The Built Environment: Transect Applied to Place-Type Transect zones with associated site development guidelines were then applied to each place as a means of further defining its character, scale and function in the n;gional context. Design guidelines outlined in the Neighborhood Model were developed and applied to fit the specific conditions of Crozet. Like the zones associated with the Neighborhood Model continuum, each Crozet transect zone has its own distinctive set of site development guidelines. These guidelines define the zones in general terms (such as function, area 43 4~ ,} and land use) as well as specific physical terms (such as density, spatial enclosure, building siting and infrastructure.) Specific correlations are as follows: · Development Area Preserve: environmentally sensitive, protected · Development Area Reserve: very low density, i.e. either an active farm or a site with difficult terrain · Urban Edge: supports center with predominantly residential uses · Urban General: supports downtown or neighborhood core with variety of residential types and some mixed use · Urban Center: supports the downtown core with a mix of uses, residential types and amenities · Urban Core: commercial hub for several neighborhoods and/or villages · District: special single uses which are either incompatible with neighborhood land use or large enough to be shared by neighborhoods, villages, towns and cities · Corridor: linear settlement occurring along a major thoroughfare, with most intensive uses adjacent to the road All of these place-types can be "built" by combining three or more of the six transect zones listed above. The distinctive scale and intensity of each place, (i.e. Hamlet, Neighborhood or Downtown,) is demonstrated along its own center to edge continuum. The combinations of transect zones (referred to as Crozet Transect or CT) for each place type are as follows: Hamlet [insert description from p. 49] Edge Zone: Development Area Reserve or Preserve (Cn & CT2) General: Urban Edge (CT3) Center: Urban General (CT 4) Neighborhood [insert description from p. 49] Edge Zone: Urban Edge (CT3) General: Urban General (CT4) Center: Urban Center (CT5) Districts: Employment area designated Downtown [insert description from p. 49] Edge Zone: Urban General (CT4) General: Urban Center (CT5) Center: Urban Core (CT6) District: Employment area designated The Built Environment: Corridor-Type Not all of the developable land in Crozet falls neatly within the definition ofa place-type. With corridors, existing settlement follows a linear pattern along an important thoroughfare and the continuum is inverted. Instead of the least intense development occurring on the edge or fringe, adjacent to the thoroughfare, the most intense pattern has developed over time to take advantage of visibility and easy access from the road. Like place-types, however, these corridor-types can be "built" by combining three or more of the six transect zones listed above. The "building" of the corridor-type incorporates what has already occurred along major thoroughfares and seeks to use it to create a distinct character for the place. Corridor-Type Edge Zone: Urban Center (CT5) or General (CT4) General: Urban Edge (CT3) Center: Development Area Reserve (CT2) or Preserve (Cn) 44 46 . . . The Natural Environment: Open Space System and Rural Character With the construction of the Lickinghole Basin, the Crozet Development Area boundaries began to be established as the watershed limits of the basin. This important first act revealed an intention on the part of Albemarle County to think of the Development Area as interconnected systems occupying the same watershed. The Public Space Network of Crozet seeks to reinforce and build upon this concept. Natural areas, unstructured recreation areas, meadows, reserves and preserves are linked to the fullest extent possible through the dendritic pattern of streams and the 22 mile Greenway network. The Greenways follow the stream corridors within the 100' wide stream buffer through both public and private land. In situations where the Greenways access urban areas, they COIll1ect with the urban infrastructure of sidewalks and bike lanes. In more rural areas within the community, they may serve multiple users, including equestrians, hikers, and bikers. These connections from the public open space into and through the urban areas reinforce the idea of natural systems woven into the fabric ofCrozet. The character of the Greenway varies as it traverses different terrains throughout the development area. Preservation of the rural character of Crozet is an issue that came from discussions between the community and the technical consultants. At the foot of the Blue Ridge Mountains, Crozet offers significant views to the mountains and the surrounding forests and farms, and the community sent a clear message that it wanted to preserve both the aesthetic qualities and agricultural history and character in the face of significant growth. To honor this community request, several elevated parcels were identified and recommended for preservation as open space. The intention is that they will be maintained as meadow and in some cases woodlands for passive recreation and be linked, via the Greenway, to the surrounding neighborhoods. The preservation of areas and parcels of community significance identified in the planning process in something close to their original state is a unique reflection of Crozet, past and present, and a fundamental recommendation of the Master Plan. Natural Environment: Stormwater The environmental benefits of storm water retention are extensive; both at the scale of the Development Area and the individual parking lot or yard. The Master Plan seeks to address both of these situations through the Site Development Guidelines, as well as design proposals like the Greenway and trail network leading to Lickinghole Basin. The primary goals of storm water retention are the replenishment of aquifers through water absorption, and the improvement of water quality through sustained contact with plants and sediment removal. Paving materials should be selected for permeability and durability. Swales, rain gardens and small retention areas should be used to further facilitate groundwater recharge. Natural Environment: Recreation The Public Space Network of Crozet simultaneously provides a wide variety of recreation opportunities for the citizens while serving as the environmental spine of the Development Area. Public space amenities have been sited to profit from natural features, nearby institutions, and views in a way that underscores the many natural qualities of the upland Piedmont Virginia landscape. Natural Environment: Dark Skies During the year-long Master Plan process, the subject of the community's viewshed as an irreplaceable resource was noted by residents on a number of occasions. In addition to a stated desire to protect and preserve Crozet's exceptional mountain views, there was concern that the unspoiled night sky of Western Albemarle County might be adversely affected by growth within the Community of Crozet, and the outdoor lighting that often accompanies residential and commercial development. These concerns were articulated in the Small Task Group meetings as well as at Design Day. The Master Plan recommends that street lighting, commercial and roadway lighting, and other exterior lighting be carefully monitored within Crozet. Furthermore, outdoor lighting should be minimized in areas which are widely visible from other parts of the community, such as upland areas or flat expanses which do not have the benefit of a visual buffer created by topography, vegetation or existing structures. 45 47 . . . lot behind Mountain Side from system of trails and proteoted 48 mplementation Timeline Facilities: Library, Schools, and Parks . rail costs shown in thousands unless otherwise indicated] Estimated Population 3000 5250 7500 9750 12000 Year 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2017 2022 Fiscal Year 02/03 03/04 04/05 05/06 06/07 07/08 08/09 09/10 10/11 Library CIP proposed New Facility 22,567 sQ,ft CIP proposed amount 427 3618 1333 MP recommended MP recommended amount Schools CIP proposed WAHS Henley renovation addtian New Eastern Crazel Elementary School CIP proposed amount 600 2833 1000 2500 400 5688 6300 MP recommended MP recommended amount . funding for additional high school capacity amounts to $7.500,000 which will be divided by three schools - including Western Albemarle High School. Timing is approximate. Parks CIP proposed Cro7P,t Pnrk colllµletion CfP proposed amount 9;> MP recommended Western Park (developer); Downtown althletic Eastern Park Neighbor- Park (Main fields (developer) hood parks Street) MP recommended amount 2,000 2,000 200 400 . . -I ~ . . . mplementation Timeline Services: Police and Fire/Rescue all costs shown in thousands unless otherwise indicated] ~ 12000 2õ22 9750 2õ17 T 7500 2õ12 2011 1õ7i1 2010 õ9ï1õ 5250 2õõ9 õãiõ9 2008 õ7iõã 2007 r 06/07 2006 õ5tõ6 2005 õ4!õ5 2004 õ3iõ4 3000 2õõ3 õ2ìõ3 Estimated Population Year Fiscal Year Fire/Rescue CIP proposed T ì ì 1 New Fire station for I Ivy Area approximatelv 4,500* T ntegrated Fire Station (fire, police, rescue) ~ bond issue one in the development area in FY05 and a second L * CIP funding has allocated $9,000,000 for the building of two new fire stations station in the 250/IVV area in FY 07 CIP proposed amount MP recommended MP recommended amount Police CIP proposed CIP proposed amount MP recommended establish police satelite office?* T - TBD L --1 __ _ . to be confirmed with the completion of the POlrce Department lonQ Range Study MP recommended amount '--- ðì mplementation Timeline Water, Sewer and Solid Waste in thousands unless othelW¡se indicated] r I Utilities 12000 2022_ -1 =1 9750 mo r I 7500 2012 2011 10/11 2010 Õ9Ï1Õ ~ 2009 õ8iÕ9 2008 õ7iÕ8 I 2007 Õ6iÕ7 2006 Õ5iÕ6 2005 04/05 3000 2õõ3 õ2iõ3 [all costs shown [ Estimated population Year F~ca/Year T r 3 RecYCllnç¡ D.!2Q.-Off Centers' 750 T 2004 õ3tÕ4 -t-- Solid Waste CIP proposed CIP proposed amount MP recommended I Crozet Recycling Center 1 1 1 250 1 1 J CIP funding currently allocates $750,000 for the construction of 3 recycling œnters. However exact Iocaoons have not yet been detennined, MP recommended amount --' Water: The ACSA and RWSA have already begun planning for the neceessal}' expansions to serve expected growth in Craze!. Treatment plant equipment has been upgraded and preliminal}' design work has been done to accommodate an expansion to 1.3 million gallons per day. When demand reaches 80% of capacity the process will being for final design and construction of the expansion to this level. The estimated cost of the ex ansion will be $1,145,000. Wastewater: The Crozet inerceptor is currenlty able to handle 2400 gallons per minute. This needs to be expanded to 3600 gpm in order to handle the ro 'ected buildout 0 ulation of 12,000. This can be done throu h a lanned re lacement of the um stations. Funding: Funding and strategizing for water capacity within the Crozet Development Area is the domain of the Rivanna Water and Sewer Authority and the Albemarle County Service Authority. Funding is developed through revenue bonds issued by the RWSA which are repaid through ACSA and City water user fees. A cost-sharing agreement between ACSA and the City to repay the bond is brokered before a new project is undertaken. Connection fees include components for System Development and Rivanna Capactiy Charges. In this way new development buys equity into the system to offset part of user fees. Cost sharing on projects in the Urban Areas is neqotiated. The debt service on Crozet Improvements are the Service Authoritv's responsibility. Water and Sewer c~ -- . . . mplementation Timeline Transportation and Trails thousands unless otherwise indicated] Connections in 7500 2012 5250 2009 08/09 3000 2003 02103 all costs shown Estimated Population Year Fiscal Year 12000 2022 9750 2õ17 2011 10/11 2010 09/10 2008 07/08 2007 06/07 2006 05/06 2005 04/05 2004 03/04 Railroad Ave, sidewalk ($67) 51. Georges Ave sidewalk ($124); Downtown sldcwalk/strectscape Transportation CIP proposed amount - Neighborhood Plan Imp/. Pgm CIP proposed amount Transportation Improvement Program VDOT Funding in place or in process - 6 year plan Dcslgn of road proJccts related to vanous Neighborhood Master Plans ($200,000 each year for all areas) Route 240/250 Connector $500 Gap Improvements $5,3 million Jarmans 5 1 Jarman's Gap Improvements $5, million CIP proposed amount - Road Const. Revenue CIP pro¡;~sed amount Street/amp Program MP recommended"· Main Street extension & Route 240/810 connection north Eastern Avenue Bridge see note below see note below Eastern Avenue Underpass $1 million private Eastern Avenue Design Eastern : Avenue ¡ $4 million private Main Street atl Crozet Ave, Western Avenue Bike/ped improvements in development neighborhoods $4 million public Main Street extension C5X track crossing Public and Private $4 million fJrivate MP recommended amount Private & fJublic Private funding Pnvate $500 J)ublic $500 private Greenways CIP proposed CIP proposed amount MP recommended CounlYGreenwayProgram $25,000 per year for county as a whole Crozet Crozet Crozet Crozet Crozet Crozet Crozet Crozet easement easement easement easement easement easement easement easement purchase and purchase and purchase and purchase and purchase and purchase and purchase and purchase and construction construction construction construction construction construction construction construction Crozet easement purchase and construction Crozet easement purchase and construction Crozet easement purchase and construction 810 150 Railroad Ave, sidewalk (Rt. 789 to Rt 150 30 Road Construction Revenue Sharing: Traffic calming proTects have been identified in the urban and rural village areas, including Crozet. Exact amounts TBD Street Lamp Proaram: Proiects under this prOQram include: Rts. 240, 810 (downtown and to Crozet School), Tabor, St. GeorQe Ave. sidewalk (Rt. 789 to Wayland Avenue 30 30 30 30 30 30 30 MP recommended amount ~ . Table 1 - Daily Volumes on Key Roadways (as percentage of change) EXisting Base Trend Master Plan Link From To Volume Volume % change Volume % change Volume % change Route 250 NA 1-64 6,400 7,600 19% 16,000 150% 15,400 14'1% Route 250 1·64 Qozet Ave 7,800 5,300 -32% 19,000 144% 16,800 115% Route 250 Crozet Ave Route 240 4,800 4,800 0% 10,000 108% 10,200 113% Route 250 Route 240 ¡Woods Road 9,200 9,100 -1% 18,400 100% 16,800 83% Crozet Ave. Route 250 'SR 810 5,900 1,200 -80% 9,600 63% 6,000 2% Route 240 SR 810 ·Old 3 Notchd 5,900 2.400 -59% 8,600 46% 6,000 2°10 Route 240 Old 3 Notchd Route 250 4,900 4,200 -14°/0 10,800 120% 8,300 69% Jarmans G.ap West ,Qozet Ave 220 800 264% 8,000 3536% 4.500 1945% E. Connector Route 240 Route 250 NA NA NA 3.600 NA 4.100 NA W. Connector Jarmans Gap ¡Route 250 NA NA NA - NA 5,600 NA Main St E. Connector 'Qozet Ave NA NA NA - NA 4,000 NA Total: 45,120 ;:$b.4uu -2:¿% 104,000 130% 97,700 117% Table 2 - Congestion Levels on Key Roadways (as volume to capicity ratio) . Link From To , Route NA 1-64 . ~Route 250 1-64 Crozet Ave 16,300 rute 250 Crozet Ave Route 240 16,300 R'oute 250 Route 240 Woods Road 16,300 'etozet Ave, Route 250 SR 810 14,600 fRoute 240 SR 810 Old 3 Notchd 14,600 : ROute 240 Old 3 Notchd Route 250 14,600 e Trend Master PI an Volume VlCr Volume V/Cr Volume VlCr 7,6 0.47 16,000 0.98 15,400 0.94 5,300 0.33 19,000 1.17 16,800 1.03 4,800 0.29 10,000 0.61 10,200 0.63 9,100 0.56 18.400 1.13 16,800 1.03 1,200 0.08 2,400 0.16 4,200 0.29 Jarmans Gap West Crozet Ave 800 E. Connector Route 240 Route 250 NA W. Connector Jarmans Gap Route 250 NA Main 8t E. Connector Crozet Ave NA Source: (1) Florida Department 0 ransportation," uality/evel of Service Note: Capacìty is Level of Service E volume threshold estimated by FOOT. 9,600 0.66 6,000 0.41 8,600 0.59 6,000 0.41 10,800 0.74 8,300 0.57 8,000 0.66 4,500 0.37 3,600 0.30 4,100 0.34 5,600 0.46 4,000 0.33 . S3 PfO~cl RI1¡tfú:ad ~""""'''''M>·''''''IIH·'''''',*""""Wi'''' 5 Aît.'.1 N;¡ od . . . PROPOSED ADDITION/SUBTRACTION - FROM DEVELOPMENT AREA -::::::::~--^.--::'-::' . Dti\ltí! DEVELOPMENT AREA BOUNDARY - bícycle, or Vi Potentia! elementary Schoo! Site Potential library requirements . . DISTRICT POTENTIAL FUTURE EMPLOYMENT ölS'fR;tCT URBAN CORE fCT 6¡ URBAN CENTER fCT 5J URBAN GENERAL rCT 4j URBAN EDGE rCT 31 DEVELOPMENT AREA RESERVE [CT 2 DEVELOPMENT AREA PRESERVE [Cr SVltD JI:-t t J .. (revised 3/5/04) .. oyment center which may gle use or mixed use ea. 111\111:' C!' exhibits a '\!" or Ha Is the commercial "hub" for several and/or hamlets, affecting a arket area approximately 2 to 5 miles out from its center, n r and cultural cities, land use and ofa neighborhood, from its center to edge is radius(aS minute It is from center to late¡y me area of a circle I'll! with a focal point and oounoary (Le, places of worship) or preserve or point to its w or natural mix of is 1/4 ora s to ,uw~ a mix of nay residential r types and use or mlKed use an area to 5 miles out Its cen onhe total rea, deteched. and some £ of¡ l¡X nt¡al of '''' uses, f pes and a very mixture of uses, f no area. 10-30% area, Two 61 Downtown center. Downtown 30;5"0% of the total area, 30-50% of the total Neighborhood area. the however the total area, Up to 50 % of the total Hamlet area, of the total Hamlet Sfd, sfa 8. up to 12 d,uJac, for anda¡ 18 d,uJac, in use to 12 d,u/ac,; up to 18 In a m/Ked use setting in use setting 3,5-4,5 units/ecre. {6,S if accessory for 50 % of Sfd, sfa & up to 12 d,uJac, for !s and apartments; 18 d,uJec, In mixed use to 12 'up to 18 in a m¡Ked use seffing no unltf20 acres ... _·11 :it." .jj OJ! minimum, 80 2500 SF 60% minimum, ¡WI lot size, 100% coverage 40% , Max¡mlm Perimeter NA ~.!::$'!; nneter , Maxim¡m Perimeter I from main entry stories by @ Maxim¡m , 1-2 stories from maIn street level. (2,5- 3 stories exception,) MaKimim Perimeter stories from main stories from entry street level. e, \ t:::>u-~ -, Max¡mim PerImeter NA :::31 n....¡rS:V1 - . Maximum ralio=1:4, Mlnlmu ratio 1 :6, Minimum ralio =1 :2, ratìo=1:A Minimum NA 1:6, oyat NA 1 :2, Minimum ';:: ! ratio H. Maximum ratIo =1 :2, M¡nlmu ratio=1;¡i. =1:2. =1:3, spatial 1:3, enclosure_, Spat¡ai enclosure by canopy east 1:3, lots, falls reta¡ 'J! retal ^ multifamily, and townhouse lots, cottage and village 'ots, townhouse, ~nrl NA for CT1 IlIIage Primarily Iota, Estate iots, Crozet VA :::31 - norlOh8. some Arcades, porch 8. fence, Arcade and Stoop, Common lawn Arcades, dooryards, porch 8. fence, lots, NA design porch & fence, Common porch 8. . ::::rozet VI' July 9, 2003, ';¡:¡I design porch & fence, speeds) speeds} 5·20' maximum, 5-20' maximum, ,,", sets forth the County's long-range contained in the maps, charts and other supplementary materials In the as targets rather than specific requirements, 0-15' maximum, 0-8' maximum, 5-20' maximum, change in the or The of the Zoning Ordinance, ",,' 0-15' maximum, of the NA and 5-30' maximum, PIRn as a general guide TOr ru¡ure also serves as a guide for the l~IU..i r .. . TABLE 2 (revised 315/04) ,I LAND USE & 101 Arc ! 1ft'II:;;:) Land Uses I, ,.... L , """",y", ,ICT3\ Summary Lis! ¡Limited, Detached Very Open. ¡Op~rÍ: 13'$, inns, D'D'. I~~d~~¡xed , B &8's, inns, Izone. Airport", regional . ""' "Y ~"" ' ,"W I~",;~;-~~ I~:,~,. "Y .h. '" '!::I" child care, comer shop corner Home, stores on 1st floors', comers . 'I civic use; comers i'_~L ^" , Home, I,"". , (one storef300 du.) 1~~kC~:~O AI I "~,,.h;:, AI I civic Residential BlIildlng Type Row Cottage, House, Accessory CT2 ONLY: Row Accessory Row RQW ~, Cotlag';, unit, Accessory UnIT. CT1; ~~", "." Iho".e,,,;,,h: ~,_,_ u; ~:", wOlÎ<unit Live: WQrk unit, House, Live work unit Live work unit work unit retaillcommercîaL ¡residential. Lodging ~6nrmh¿~ 12 rooms, school Inn uþ to 5 rooms (inc. 8- .& 8'$ NA ¡~:~it~ 12 rooms, $Chool Inn up toS lOOms (inc. B & 8'$ ,Inoup ton u~ to 12 rooms, school to " - to 12 rooms, Office live-work Unit/Home office NA Uve-.work UnîtlHome office Live-.work unit, w/residentlal over Retail Services Grooeoy, smetl reJait building CT2 ONLY: Smetl retail GrPcery. sman '''. ¡Groceoy, small relaHbulldlng Small (i.e. comerstore) ,_. -, ~;:~:;:~ '"~",., NA -~,,- restaurant, kiosk ç~rt 0: ,~_... . 0- "', . CIvic 8. Civil Support ILlve tœater, Sman movie Fountain I",~:';':":.='~""'''' ,Fi'" 'or ""btio0"; .";,,,, ,,:, ICOO1eta'1 :;, " Funeral '1.~, Fun",,, home -,,- :,: home ;,~,~: Q, -~' :h'::::: ¡,~"" -", Educatio" Sd1oof,Chi!d~care center Schoo!, ChUd-care center NA School, Chnd~care centéf School, Child"care œnter Child-care center $chooJ, Chik!--care center Scl1OO, Child~re œntêf t;oIlege, Htgh school, Trade school Automotive, Industrial 8. Other NA CT1 11 CT2 ONLY: Rest stop, &. Drive- & Drive- NA NA , ~" -... ,',"" ,,'"" m", :".;, Agriculture NA Stable &. Kenne! CTi & CT2: Grain storage, NA NA Greenhouse, St"ble & Kennel NA NA NA Greenhouse, Stable, -... I~,." vet, Parks & Open Space See ,_. Greenway, Gn"enbelt, '.0 OPEN SPACE MA TRIX ' "',~"..YI w ..y ,'~ rara, n:; -,;." Parket reslds~1i~¡, J! ¡, Green, Plaza ,'"-~;-" " '''.d~., Perllst ground floor), Green, Plaza ground floor), Green, Plaza :_" . Parll, Eyebrow Park, c. ~;, Golf course, Parll, Park, Eye¡;;"", Sources: The Neighborhood Model (Tortl"Gallis,CHK), Lexicon of the New Urbanism (DPZ) The Comprehensive Plan is advisory in nature ¡document: Ordìnance^ in the maps, specific requirements., (revised 3/5/04) DEVELOPMENT AREA . . CROZET OPEN SPACE Maintenance ow: monthly/ annually (storms, blowdowns, etc,) Ownership community groups and public government Materials Class B (primitive) traits:AII natural materials, to include mulch, soil, and sand. Wood edging where needed, Class A trails: compacted crushed stone Lighting Limited to trailhead parks, Grading Minimal grading needed, stabilize paths, Plant Communities Maintain stream buffer of ideally 100', Use all hydric/mesic plants (native to the Piedmont) in owfand areas. Design Guidelines Stormwater Trail Management,Stream bank work when necessary to avoid erosion of trail Description Interconnected network of trails for pedestrians and cyclists linking more urban areas with the rural periphery of the development area. It is also intended to connect the, greens, schools and different parks together providing meaningful destinations for the user and encouraging vigilance over the traiis for safety, Greenway . episodically absolute low private natural materials, AI none none Mesic forest and grasses native to Piedmont region of Virginia. These areas should be less managed than other areas and successional forest encouraged to thrive. No infrastructure. Monitor eroding areas and plant native species as groundcover. This public space provides an area for unstructured recreation and gatherings while preserving the natural state of an undisturbed (relatively speaking) area, This space allows for the natural succession of native Piedmont plant species and protects the habitat of local wildlife, It might also serve as a large-scale stormwater retention area, providing habitat fo native weiland plant and animal species, Preserve This public or private area of land is protected from future development through easement. These areas are selected for their ecological, cultural or historical significance. Reserve none Forest, meadow, and agricultural activities encouraged. Establishment of native grass and wildflower meadows through managed burn encouraged, Minimal infrastructure Limited to functional buildings, absolute low annual to biannual mowing or bum ow: private public/private materials. natural materials, naturai AI AI Some intial clearing to aid inlnone establishment of meadow grasses may be necessary, hay and Plants native to the upland Piedmont. Primar native grasses and wildflowers under management. Could also be cultivated fOI feed. Protect eroding areas. Use si fencing during seeding. This public space provides a location for unstructured recreation and gatherings. The plant palette consists of plants native to the upland Piedmont that would require little maintenance apart from infrequent scheduled mowing. Mowing times should be determined with careful attention paid to breeding and nesting times of small mammals and birds to encourage healthy wildlife POPulations in these areas, The meadow parkland is at a topographic high point in the growth area and would afford broad open views to the surrounding countryside and protect the rural character of Crozet. Meadow weekly medium to high (dpending on scale) mowing during growing season. Wooden benches where needed. public/private Otherwise natural materials, none Leveling of fields to aSSure proper drainage will be required for sports fields. Plant shade trees around seating areas, Do not use fruit or pod producing plants that interfere with play areas. Encourage large, long~ived hardwood native trees. These fields should be located in places that offer potential connections to/Assure proper drainage of fields, both near and distant neighborhoods via the greenway network. Particular Have bioretention area to collect attention should be paid to stormwater management of the fields to protect any water laden with inorganic runoff laden with fertilizers from reaching the adjacent streams, fertilizers, Biofiltration areas, rain gardens and recharge areas should be planted with native grasses and shrubs that further enhance the wildlife corridors within Crozet. NEIGHBORHOOD Field Grade to accommodate stormwater runoff from adjacent road. Space should accommodate Plant with native grasses and native specimen runoff from adjacent roads. The (trees. area could be edged by infiltration swales or serve as a shallow basin. occupiable public A green space created by the division Of a street. This space is edged by one-way streets. Eyebrow some mowing and general ow to medium: cleanup. public/private Wooden or steel benches where /PUblic/PriVate needed. Minimize impervious pavements for walks and parking, MinirTÙze impervious surfaces. Medium: some mowing, weeding, pruning, mulching and general cleanup regularly, Medium to high: sweeping, trash pickup on a daily basis pUbiic Wooden or steel benches where needed, Stone, brick and concrete as well as other urban construction materials appropriate for paving and structures. Hardwood canopy trees and native small fiowering Some grading may be Contextual lighting for trees and shrubs, Some formal gestures such as required to accommodate a pUblic or gathering allees or bosques of trees would be gathering space given the areas. appropriate,Native grasses should be encouraged local topography. in order to avoid irrigation. Generally urban in character, formally structured Grading should be done in Contextual lighting for tree plantings appropriate providing a diversity of coordination with road and public or gathering shaded seating and gathering spaces. Reiiance on sidewalk construction. areas. native plants encouraged, Slopes should be minimized to increase accessiblity in the urban environment. none Visible retention and infiltration 0' stormwater within the bounds of the Green. The green serves as an open space of limited size, edged by building frontages. The space might consist of grassy areas, shade trees, and simple native plantings. It would be used for unstructured recreation and require limited maintenance, It could also function to absorb some local stormwater runoff. Green . Curb and gutter primary system with possible mix of above ground drainage and treatment system, This public space typically occurs at the intersection of important streets and might be edged by civic buildings, These spaces could be used for civic purposes, such as markets, fairs, etc. The space might include durable pavement to accommodate frequent use. In addition, it could be planted with shade trees, Square Native grasses shouid be used for lawn areas, with I Grade to accommodate native hardwood trees for shade. stormwater runoff from adjacent road, Open swales can allow for infiltration from surrounding impermeabie road surfaces. Entire close area could also function as an infiltration area. A green surrounded by a driveway or narrow road that provides a gathering space while allowing access to a number of buildings. Close BLOCK low to medium Low to High (varies) private private/possibly pUblic Minimize impervious surfaces. Where possible standardize site furnishings, hydrants, and fencing. Encourage long-lasting natural materials, None Grading to establish level Isome user operated plots for individuals and to lighting at common establish stormwater system structres oniy, will be necessary. Creative grading solutions could provide interesting options for play. Trees to be located with attention to solar orientation of production gardens, Framework of the community garden to be design up front to avoid the haphazard development of plots. Irrigation, perimeter fencing or hedging, shared tool storge etc should be determined through design, Trees shouid be located to provide shade for play and seating areas, Avoid lower plantings that reduce visibility. Water collection for use in gardens should be primary, Cisterns for collection and distribution of stormwater built as 'nfrastructure for the gardens A grouping of garden plots that allow for smail-scale cultivation, recreation, and community gathering for a neighborhood or block. Community Garden A small open space designed for small children. These areas should b1AJternative stormwater treatment interspersed within neighborhoods or blocks, a short walking distance fro should be explored where space residences. They are usually fenced areas with some type of shelter. allows. Playground trash pickup mowi ng, Medium to High: Encourage play equipment that ¡s¡private/ possibly public or school related wood and metal painted in subdued colors, User operated lighting for safety. Native plantings, mesic forest, and open meadow I Mlmimal grading to deai or fieids for passiveand active recreation. with stormwater and occupyable areas. Open swales and inflitration areas can process stormwate, from the pocket park and adjacent areas, Variable in size, pocket parks are usually associated with a neighborhood, May be largely structured recreation or be solely passive, These spaces may serve to mitigate stormwater runoff, They may often include access points to the greenway trail network, An area surrounding a building that is used for cultivation of plants. A garden could be public or private, utilitarian or ornamental. Pocket Park Medium Low to High (vaffes) Variable materials dependant on public/private use and terrain of park. Encourage natural materials where possible, private Full cut-off downlighting Discourage brightly colored encouraged. Avoid plastics and non recyclable where possible light materials, Encourage porous pOllution fro yard to walks and pavements where yard. possible. None As required by residential footprint Abrupt grade changes at property lines should be minimized and stormwater retention encouraged, Encourage planting of long-lived native hardwoods and conifers, as well as wildlife attracting native plants, Cisterns should be used to catch roof run-off where possbile for domestic irrigation. Yard! Garden . 5'j the development of The Crozet Master Plan, an adopted part of the Albemarle County Comprehensive Plan, is intended as a general guide for future development and systematic change in the Community of Crozet. The Comprehensive Plan is advisory in nature and, with its accompanying maps, charts and other supplementary informalion, it sets forth the County's long-range recommendatIons fo, and within its jurisdiction, The Comprehensive Plan also serves as a guide for the development and implementation of the Zoning Ordinance, Development guidelines contained in the maps, charts and other supplementary materials in the Comprehensive Plan are intended as targets rather than specific requirements, consistent with the advisory nature of the document. on a the in with and 64-68 18 - T2U in an is on-street ere na and 46 20 N na a na 5 na na na movem to 20 y oa na Aa ria na and is random and and - slow Under 3000 street is "shared -600', on of and the face of feet un _JI1..12 32 na na - - 18 na na €II Fi 2 ¡ 2 2 2 1 25 20 na 1 na III¡ .. · · · BOULEVARD A boulevard is a multi-lane thoroughfare that include a center median to create linear park pea ranee. Bike lanes are generally Parking lanes may be separated from lanes with medians on both sides DESIGN SPEED: 35·45 mph DRIVE A drive is a curvílínear thoroughfare that the edge between an urban area and an veloped as along a stream promontory. side of the drive has character of a boulevard with sidewalks, and street trees, while the other has the of a parkway. A pedestrian leis the undeveloped edge i not immediately adjacent to it. The urban side the drive has curb and gutter drainage. Typically, median divides the lanes. DESIGN SPEED: 25·35 mph NOTES: thoroughfares cross through occur within Minimum Right of Way vari"", and transect zones. Preserves. Revised March 5, 2004 . . Minimum Minimum ROW. 64' . 6& DESIGN SPEED: Minimum Right olwæ¡ 64' . 68' ... · ALLEY - Residential alleys are narrow accessways at the rear of residential iots to gar parking; "yield" movements or easement width reductions may be considered in accordance with Code 14-512F. The base-stone of the driving surface shall be extended at least 12" beyond edge of pavement to prevent edge faiJure; further extension to support the shouider areas is recommended. DESIGN SPEED: ¡ 5 mph Of below ALLEY - COMMERCIAL Commercial alleys are narrow acœssways at the rear of lots to service areas; 'yield" movements in- tended. Acœssways curbed unless pavement extends to the walls of structures. DESIGN SPEED: ¡ 5 mph or below · · ~M¡n.RO.W Revised March 5, 2004 COUNTY OF ALBEMARLE Department of Community Development Division of Planning 401 McIntire Road, Room 218 Charlottesville, Virginia 22902-4596 (804) 296 - 5823 Fax (804) 972 - 4012 MEMORANDUM TO: Albemarle County Board of Supervisors FROM: Elaine K. Echols, AICP, Principal Planner SUBJECT: ZMA 02-009: North Pointe Development SP 02-072: North Pointe Residential Uses DATE: March 31,2004 ***** On April 7, the Board will be receiving a presentation on CDA's, led by the County Attorney's office. Since the Board met on March 3, staff has been reviewing the Application Plan received March 9 in conjunction with proffers received March 18. Comments will be provided on April 1 to the applicant on both the plan and the proffers. Staffwill continue to work with the applicant on both the substance and form of the proffers as well as the application plan, in anticipation of a public hearing on May 12. 01-04-04PGS:23 RCVD HECEIVED AT 80S MEETING Albemarle Place, ZMA # 2001-07 Date: 't,7 "'rfI- Tax Map 61-W-3; Parcel Numbers 19A, 19B, 23, and 24; 64.705 Acres ~ - Approved October 22, 2003 Agenda Item #: /18 Approximately 58 acres commercial use subject to CDA participation. Clark's Initials:.... ~ Proffer #2. Community Development Authority Participation: Upon request by the C_ the Owner shall petition for and consent to all tax map parcels used for non-residential purposes participating in a Community Development Authority ("CDA") established pursuant to Section 15.2-5152, et seq. of the Code of Virginia ("Code") to be created for the purpose of implementing Route 29 regional transportation improvements, including but not limited to transportation improvements within the "Super Block" (the geographical area bounded by Route 29, Hydraulic Road, Commonwealth Drive, and Greenbriar Drive) and intersectional improvements associated therewith. Hollymead Town Center Area B, ZMA-OI-019 Tax Map Parcels 32-41D (part), 42B (part), 42C (part), 42D, 42E, 43, 43A (part) and 44 (part), 24.7 acres Approved July 16,2003 Approximately 24.7 acres commercial use subject to CDA participation. Proffer #6. Upon the request of the County, Owner shall petition for and consent to a Community Development Authority ("CDA It) established pursuant to Section 15.2-5152, et seq. of the Code of Virginia ("Code") to be created for the purpose of financing, funding, planning, establishing, constructing, reconstructing, enlarging, extending, or maintaining (except to the extent VDOT maintains any public improvements) Route 29, and roads and other improvements associated therewith, which shall include, but may not be limited to, improvements to Route 29 from the South Fork of the Rivanna River to Airport Road or the extension of Ridge Road as depicted on Exhibit A, to the south and across the Rivanna River to connect to Berkmar Drive. This proffer shall only apply if all of the owners of the lands subject to ZMA-OI-018, ZMA-01-19, ZMA-OI-020, and ZMA-02-002, as such applications exist on July 16, 2003, excluding residential property, have joined or been caused to join the same or a similar CDA for the purposes described herein. This proffer shall apply only if, at the time of the formation of the CDA, the rate of any special tax imposed shall be uniform and shall not exceed twenty-five cents ($.25) per $100 of the assessed value of any taxable real estate within the CDA, unless all the owners within the CDA subsequently consent to any proposed rate or level of assessment otherwise. Hollymead Town Center Area C, ZMA-01-20 Tax Map 32, Parcels 41D, 43A, 44, 45, 46; 37.1 Acres Approved August 6, 2003 Approximately 29 acres commercial use subject to CDA participation. Proffer #6. Upon the request of the County, for any parcel used for non-residential purposes in the portion that is currently zoned Light Industry that will be rezoned to PDMC the Owner shall petition for and consent to a Community Development Authority ("CDA") established pursuant to Section 15.2-5152, et seq. of the Code of Virginia ("Code") to be created for the purpose of financing, funding, planning, establishing, constructing, reconstructing, enlarging, extending or maintaining Route 29 and roads and other improvements associated therewith, which shall include, but may not be limited to improvements to Route 29 from the South Fork of the Rivanna River to Airport Road, the extension of Ridge Road as depicted on the Master Plan, to the South and across the Rivanna River to connect to Berkmar Drive. ' Hollymead Town Center Area D, ZMA-02-02 Tax Map 32, Parcels 46, 41D; 24.1 acres Approved August 6, 2003 Approximately 2 acres commercial use subject to CDA participation. Proffer #3. Upon the request of the County for any parcel used for non-residential purposes, the Owner shall petition for and consent to a Community Development Authority ("CD A") ~stablished pursuant to Section 15.2- 5152, et seq., of the Code of Virginia should such an authority be established for the purpose of funding transportation improvements relating to the Hollymead Town Center and the Route 29 North corridor, including but not limited to Route 29 North, roads within Hollymead Town Center, and roads and other improvem~nts associated therewith. " v HUNTON&! WJLLIAMS Privileged and Confidential Attorney Work Product l\1El\IORANDUM TO: Larry Davis, Albemarle County Attorney DATE: April 5,2004 FROM: John D. O'Neill, Jr. Christopher G. Kulp FILE: 26222.000032 Community Development Authorities You have requested our advice regarding community development authorities (a "CDA"), their utility and alternatives thereto for use in financing all or a portion of certain transportation improvements planned along Route 29. This memorandum addresses policy objectives of Albemarle County (the "County") and methods available to achieve those objectives. In addition, this memorandum addresses certain questions that have been raised in connection with the establishment of CDAs for each of three potential developments along Route 29: Hollymeade, Albemarle Place and North Pointe. For reference, attached hereto as exhibits are general descriptions of the statutory authority for a CDA and a service district (a "Service District"). I. Policy Objectives of the County . To provide transportation improvements to Route 29 in expectation of the development planned along the Route 29 corridor. . To provide alternative revenue sources to pay all or a portion of the costs of such transportation improvements. II. Methods Available to Meet the Objectives of the County Two financing methods available to the County with respect to Route 29 improvements are a CDA and a Service District. A. Community Development Authority . There have been at least ten CDAs created throughout Virginia to assist with the provision of public infrastructure improvements and services within each CDA district. Most CDAs have financed such improvements and services through assessments. . The process to create a CDA is commenced by a petition from at least 51 % of the landowners (measured by land area or assessed value) in the proposed CDA district. A CDA in the County must consist of a tract of at least 250 acres, unless the improvements to be financed exceed $3,000,000 (in which case the County may modify the rrùnimum district size). 1. Benefits of a CDA: a. Constitutes a separate political subdivision, capable of causing the generation of revenue to finance certain facilities and provide certain servIces. b. Authorized to request the County to levy and collect an annual special real estate tax on property within the CDA district to finance infrastructure improvements and services both within and outside the CDA district so long as those improvements located outside the CDA district are determined to "serve" the CDA district. c. Authorized to request the County to impose special assessments to finance infrastructure improvements and services to abutting property witlùn the CDA district. d. Asa separate political subdivision, CDA has power to finance infrastructure improvements and services by the issuance of revenue bonds that do not constitute indebtedness of the County. 2. Lirrùtations - special taxes: a. Collection of an annual special real estate tax is limited to a maximum of $0.25 per $100 unless all property owners within the CDA district request a greater amount. b. In order to determine that infrastructure and public improvements outside the CD A district "serve" the CDA district, studies of an acceptable consultant would be necessary. c. The lirrùt of $0.25 per $100 in special taxes may be insufficient to finance the full costs of the desired improvements. d. Because the special tax would be determined and collected on an annual basis, an investor in any revenue bonds may be wary of collection uncertainties arising primarily from (1) the failure of real estate values to meet expectations, (2) the dependence on the County Board of Supervisors to levy the annual tax and (3) the tax lien being lirrùted to the amount of the annual taxes then due. Such uncertainties may make the issuance of revenue bonds impracticable. -2- 3. Limitations - assessments: a. The amount of revenues is limited since assessments cannot be set at a level that exceeds the full cost of the improvements financed. (However, unlike special taxes which must be levied annually, assessments are determined at outset and, while payable in installments, create a lien on property subject to assessment equal to full amount of assessment). b. The CDA would be precluded from financing improvements outside the CDA district unless such improvements abut (i.e., physically touch) the CD A district. The Supreme Court of Virginia has interpreted "abut" to mean "land bordering upon, and not merely adjacent or in close proximity." Taylor v. Board of Supervisors of Northumberland County, 243 Va. 409 (1992). B. Service Districts . Service Districts may be created to provide additional, more complete or more timely services of government than are desired in the locality as a whole. A locality may pay, in whole or in part, for such services to a Service District through the levy and collection of an annual tax upon any property in the Service District that is subject to local taxation. . Service Districts have been created throughout Virginia, predominately by cities. 1. Benefits of a Service District: a. Unlike a CDA for which the County Board of Supervisors must adopt an ordinance not inconsistent with the petition to create the CDA, the County Board has complete discretion to determine a Service District's size and the scope of its services. b. Unlike a CDA, a Service District is not a separate political subdivision created by the County, eliminating the need to appoint a separate authority board (although a separate board answerable to the County Board may be appointed to oversee the improvements or services). c. Unlike a CDA where the tax is limited to $0.25 per $100 without the consent of all landowners in the CDA district, there is no express statutory limit as to the maximum rate of the tax that the County may collect from property within the Service District. 2. Limitations: a. A Service District does not constitute a separate political subdivision, and therefore there is no mechanism for the County to issue revenue bonds secured from the special tax revenues of the Service District. -3- b. Only special taxes are authorized and the County has no ability to impose special assessments. c. The Service District statute has been narrowly construed by at least one Virginia Circuit Court to authorize taxes to be levied only for those services and facilities expressly provided. Nageotte v. Board of Supervisors of Stafford County (Cir. Ct., Chancery No. 01-335, 11.23.01). The 2004 General Assembly adopted a bill (HB 1373) to specifically authorize "road construction" without a limit that it must not be under operation and jurisdiction of VDOT. The Governor has not yet signed this bill. III. Application to Hollymeade, Albemarle Place and North Pointe A. Generally · No legal impediment to the creation of a CDA to finance transportation improvements needed to accommodate increased traffic generated in part by each proposed development, provided that the petition is properly submitted and the requisite statutory procedures are followed to create a CDA district. · The CDA statute specifically provides that a CDA may provide roads, bridges, etc. (see Section II. B. in Exhibit B for a complete list) within or serving a CD A district. · It is theoretically possible to consolidate the three developments into one single CDA district but there are impediments to doing so. . The single most significant impediment is that a CDA district must consist of property in a single tract of land in which at least 51 % of the landowners join in the petition for its creation. . Other impediments include: . Requirement that all property (other than public property) in the CDA district be subject to tax or assessment; and . Difficulty in drawing the CDA district lines so as to exclude certain types or classes of property (e.g., residential) and still maintain contiguity inherent in a single tract of land. · Special tax and assessment are levied on only taxable property thereby excluding from taxation all public property within the district. · A petition to create a CDA must describe the services and facilities proposed to be undertaken which may include, for example, building a library or leasing land for school purposes. However, once a CDA is created, the CDA board, -4- as the governing body of a separate political subdivision, will have discretion to act within the powers granted in the enabling ordinance, and neither the County nor the developer can compel the CDA to act in any specific manner to carry out purposes of the CD A district. . A CDA may generate revenues from taxes and assessments simultaneously, but there are differences in the manner in which revenues derived from each source can be utilized. . Revenue from assessments may be applied only to improvements within or abutting the CDA district. . Revenues from taxes may be applied to certain improvements outside the CDA district. B. Other Considerations . For any CDA district consisting of less than 250 acres in the County, the proposed projects to be undertaken must be identified and their costs must be confmned to exceed $3,000,000. . Studies from recognized experts will be needed to demonstrate that improvements to be undertaken "serve" the CDA district, thereby enabling the County Board of Supervisors to make the legislative findings that the improvements are necessary to meet the increased demands on the County as a result of the improvements within the CDA district. · The County Board may wish to analyze the expected revenue to be derived from the CDA district compared to the overall costs of the improvements to determine practical viability of CDA. · The County Board and the CDA will likely need to enter into a contract by which the County will act as agent for the CDA to undertake the projects. · The CDA statute provides that the County Board will adopt an ordinance in response to the petition for the creation of a CDA that is not inconsistent with the petition. Nevertheless, the County, should consider what procedural prerequisites (e.g., require the CDA to obtain the consent of the County Board prior to the issuance of any debt) it may wish to impose on the CDA. -5- EXHIBIT A Community Development Authorities I. Creation of a CDA. A. A CDA is commenced by a petition from at least 51 % of the landowners (measured by land area or assessed value) of the land in the proposed CDA district. B. Minimum acreage requirements: 1. tract of any size in a city or town; 2. tract of at least 250 acres in a county with a population of at least 75,000; 3. tract of at least 250 acres, a portion of which lies within two miles of the center line of an interstate highway in any county with a population of less than 50,000; and 4. tract of at least 250 acres in any county with a population between 50,000 and 75,000 through which an interstate highway passes. C. A public hearing is required before adoption of the creating ordinance or resolution. Notice of public hearing is published once a week for three successive weeks with the hearing to be held not sooner than ten days after the last publication of notice. D. A petitioning landowner then has 30 days to withdraw his signature from the petition after the public hearing. The petitioning landowners may waive the right to withdraw their signatures. E. The ordinance creating the CDA is filed in the land records for each tax map parcel in the district. The CDA Articles of Incorporation are filed with the State Corporation CoIDITÚssion. II. Powers of a CDA. A. Expressly incorporates the powers of water and waste authorities under Article 3 of the Water and Waste Authorities Act (Sections 15.2-5110 - 15.2-5124); including, the power to issue revenue bonds, power of eminent domain, and the power to fix, charge and collect rates, fees and charges for services furnished by or for the benefit from any system operated by the CDA. B. Finance, fund, establish, acquire, construct. equip, operate and maintain infrastructure improvements enumerated in the ordinance or resolution establishing the district. as necessary to meet the increased demands placed upon the locality as a result of development within the district, including, but not limited to: 1. roads, bridges, parking facilities, curbs, gutters, sidewalks, traffic signals, storm water management and retention systems, gas and electric lines, A-I street lights within or serving the district which meet or exceed the specifications of the locality in which the roads are located; 2. parks and facilities for indoor and outdoor recreational, cultural and educational uses, entrance areas, security facilities, fencing and landscaping throughout the district; 3. fire prevention systems, rescue vehicles and other vehicles and equipment; 4. school buildings and related structures, when authorized by the locality and the school board; and 5. infrastructure and recreational facilities for age-restricted active adult communities with a minimum population of 1,000 residents. C. Issue revenue bonds, subject to such restrictions as may be established in the resolution or ordinance establishing the CDA, for all costs associated with the improvements described above. Bonds of the CDA are payable solely from revenues of the CDA. D. Request annually that the locality levy and collect a special tax on taxable real property within the district. The tax is limited to $0.25 per $100 of assessed value unless all the landowners in the district request a greater tax. E. Provide special services including, garbage and trash removal and disposal, street cleaning, snow removal, extra security personnel and equipment, recreational management and grounds keeping. F. Finance the services and facilities provided to abutting property within the district by special assessment thereon imposed by the local governing body. All assessments are subject to the laws pertaining to assessments under Article 2 (§ 15.2-2404 et seq.) of Chapter 24: 1. the taxes or assessments shall not exceed the full cost of the improvements, including without limitation the legal, financial and other directly attributable costs of creating the district and the planning, designing, operating and financing of the improvements which include administration of the collection and payment of the assessments and reserve funds permitted by applicable law; 2. the taxes or assessments may be imposed upon abutting land which is later subdivided in accordance with the terms of the ordinance forming the district, in amounts which do not exceed the peculiar benefits of the improvements to the abutting land as subdivided; and 3. the taxes or assessments may be made subject to installment payments for up to forty years in an amount calculated to cover principal, interest and A-2 administrative costs in connection with any financing by the authority, without a penalty for prepayment. G. Assessments may be made effective as a lien upon a specified date, by ordinance, but such assessments may not thereafter be modified in a manner inconsistent with the terms of the debt instruments financing the improvements. H. Assessments may be made subject to installment payments and other provisions allowed for local assessments under this section or under Article 2 of Chapter 24. All revenues received by the locality pursuant to any such special assessments which the locality elects to impose upon request of the development authority shall be paid over to the development authority for its use, subject to annual appropriation, and may be used for no other purposes. A-3 . EXHIBIT B Service Districts I. Creation of a Service District. A. Created by ordinance following a public hearing. B. Notice of the public hearing must be published once a week for three consecutive weeks (with the hearing occurring no sooner than ten days after the second notice). C. Ordinance creating a service district shall: 1. Set forth the name and describe the boundaries of the proposed district and specify any areas within the district that are to be excluded; 2. Describe the purposes of the district and the facilities and services proposed within the district; 3. Describe a proposed plan for providing such facilities and services within the district; and 4. Describe the benefits which can be expected from the provision of such facilities and services within the district. II. Powers of a Service District. A. To construct, maintain and operate such facilities and equipment as may be necessary or desirable to provide additional, more complete or more timely governmental services within a service district, including but not liooted to: . water supply, sewerage, garbage removal and disposal, heat, light, fITe-fighting equipment and power and gas systems and sidewalks; econoooc development services; promotion of business and retail development services; beautification and landscaping; beach and shoreline management and restoration; control of infestations of insects; public parking; extra security, street cleaning, snow removal and refuse collection services; sponsorship and promotion of recreational and cultural activities; upon petition of over 50 percent of the property owners who own not less than 50 percent of the property to be served, construction, maintenance and general upkeep of streets and roads that are not under the operation and jurisdiction of the Virginia Department of Transportation; and other services, events, or activities which will enhance the public use and enjoyment of and the public safety, public convenience, and public well-being within a service district. B-1 . Such services, events or activities shall not be undertaken for the sole or dominant benefit of any particular individual, business or other private entity. B. To provide, transportation and transportation services within a service district, including, but not limited to: public transportation systems serving the district; transportation management services; road construction1, rehabilitation and replacement of existing transportation facilities or systems; and sound walls or sound barriers. C. To levy and collect an annual tax upon any property in such service district subject to local taxation to pay, either in whole or in part, the expenses and charges for providing the governmental services and for constructing, maintaining and operating such facilities and equipment as may be necessary and desirable in connection therewith. · Such annual tax shall not be levied for or used to pay for schools, police or general government services not authorized by this section; · Proceeds from such annual tax shall be so segregated as to enable the same to be expended in the district in which raised; and · Any tax pursuant may base the tax on the full assessed value of the taxable property within the service district. 1 Proposed amendment in HB 1373. B-2 FY 04/05 Board of Beginning Board 3M,aOO 300,000 FY 03/04 Projected Fund tax rate) 2,435,000 Less FY04 Budgeted Fund (961,118) Ava!!able FY 03/04 Fund 1,413,882 30,230 30,844 933 933 3,728 3,728 21,231 21,231 2, 58, 59, 51,076 51,076 800,000 2,033,798 800,000 1,118,409 CommonweaJth's Attorney· mount needed to fully in FY 04/05 I Sheriff and Clerk of the CirC~it Court compensation Forgive additional debt at Eîst Rivanna VFD 100% operations for Volunterr Fire/Rescue Tax Relief for the Elderiy anq Disabled Albemarle County Fair I Regional Library : move to County scale 34,584 32,931 1,870 34,300 29,279 50,000 50,000 83,860 41,930 100,000 40,000 125,494 10,000 10,000 63,617 63,617 332,501 FY05 80S Budget Wor~sheet.FINAL.xls i Page 1 of 1 Printed 3/30/2004 10:00 AM 1 2 3 RI C ~,(Lr-d L nds4i 4 5 6 7 ,ä.,.. 9 .~ 19- 11 12 13 14 15 16 17 18 19 20 21 22 23 .. . PLEASE SIGN BELOW IF YOU WISH TO SPEAK ON Proposed FY 2004/2005 Operatina and capital Budaet. Proposed FY 2004 Tax Rates. The following guicjeJines wit! be,used for this public hearing: EACH SPEAKER IS ALLOTTED 3 MINUTES. INDIVIDUALS CANNOT RELINQUISH THEIR 3 MINUTES TO ANOTHER SPEAKER. INDIVIDUALS CAN ONLY SIGN UP ONE PERSON TO SPEAK. PLEASE GIVE ANY WRITTEN STATEMENTS TO THE CLERK. /~ /:J d-.-- C¡ ~ -- éf 7 C. ~ e - c:lFlc,- 'S-05 wG/'- FY2 Ian nga Vision Promoting Providing a Superior FY 04105 School Self- Sustaining 5% Revenue 5% Govemrœnt Operations 47% 3% ($ in millions) General Fund School Division School Self-Sustaining Capital Projects Debt Service Funds 102.0 11.0 22.9 12.5 GRAND TOTAL is 04105 Local Property Taxas 38% Other Local Revenues 21% 10.4% The Complete FY 04/05 County's funds, our 2008/09 expenditures, the 2004/05 - FY website at While our substantia! and we continue to face Growth According for Public the Area (MSA) has one of rates in Virginia which can be rates in Fluvanna and Albemarle's population has been annual growth rate during the period of 1990 to 2000. If our County continues.to grow at this rate, the could reach over 100,000 by 2010. Our population growth, while moderate compared to some us to find creative ways to maintain high standards in education, provide for capital infrastructure, and meet increasing demands for services in our growth areas, while we protect our rural character and natural resources. Continued em The State currently does the hotel and rely heavily on property County $0.76 per 1 to the ways cities can through counties must continue to account for 39% of our entire is sources in the Although local for 65% of our for any in $0.1 0 per $100 of between Last Year's Economic Downturn: Last year, the effects of the turbulent national economy and market downturns compounded by the state budget shortfalls, had a negative impact on consumer spending and on our local revenues. This time last year, the County's economy-driven revenues, such as sales, meals, transient, and utility taxes, were fairly flat. Personal property taxes, which reflect the value of new and used vehicles, as well as business equipment, were showing a marked decrease in rate of growth. In FY 03/04, lower revenues combined with the reduction in state and federal revenues, and additional obligations, resulted in a shortfall of $1.024 million in the FY 03/04 local government operations budget, which was addressed by reducing department baseline budgets, freezing some vacant positions, and postponing replacement capital equipment. This year, our challenge is to rebound from the lingering effects of last year's reduction and the on-going effects of the state's budgeting decisions that often fall short in meeting their local obligations. Our Strategic Response Covering FY 03/04's Reductions This budget provides revenue to fund eight reinstated positions frozen last year, purchase 31 overdue public safety replacement vehicles (police, sheriff, inspections, fire/rescue) and four replacement vehicles for other county departments, and makes up for some of last year's reductions in departmental operational budgets. Meeting Ongoing Commitments This budget targets available funds to meet ongoing commitments to our employees and agencies, including funding to pay for a 13.5% employer annual increase in health insurance, an additional $648 per employee. This does not increase benefits to employees but merely funds the rising medical costs. The regional jail costs are anticipated to increase by $567,000 in FY 04/05, which is primarily due to the jail having to use $500,000 of their carry-over this current year to fund the FY 03/04 budget. In addition, the state reimbursement for jails remains flat while costs continue to rise. In addition, $107,000 is budgeted to purchase mandated voting equipment for the disabled and $71,000 is targeted to provide for a cost-saving technology upgrade that will bring greater efficiency to our departments. Providing for $2.8 Million in Unexpected Virginia Retirement System (Vr{S) Contributions The most substantial impact to the FY 04/05 budget is the unexpected mandated increase in VRS contributions. The County was aware early in the budgeting process that the employer contributions to VRS might increase. However, it was not until recently, after we began to build this budget on a two cent decrease in real property taxes that we became aware of the impact this one item would have on the FY 04/05 budget. Due to the downturn in the market over the past several years, the County is required to provide an additional $2.4 million in VRS contributions. Of this, the local government budgeted an additional $820,000 to fund the employer contribution for local government employees and the schools budgeted an additional $1.6 million for school employees. Moving Forward on Cquntv Priorities This budget is designed to support the County's priorities within available resources and includes the following new and ongoing initiatives. " · Provides for Hiah Quality Education: The County will transfer $76.2 million to the School Fund for operations. This is an increase of $7.3 million, or 10.7% over last year. In addition, the school receives $11.2 million from local funds for capital projects and debt service. The school system shares in the growth of non-dedicated local tax revenues through our current formula, receiving 60% of such local tax revenue growth, in addition to other state, federal and miscellaneous income. Local funding covers 68% of total school revenues, with State aid, State sales tax, and Federal and other funds making up the remaining 32%. All non-local school revenue sources are projected to increase by $2.8 million this year. Additional details are provided in the School Budget, which is a separate document. The Piedmont Virginia Community College is constructing a Science and Technology building. Capital Improvement renovations will be made to the Albemarle and Murray High Schools. Other upcoming renovations funded in the FY 05/09 Capital Improvement Program include a new gym and restrooms at Hollymead, and initial funds for construction of the Southern Elementary school. Our IT Department plans to establish a free e-Iearning curriculum offered to all County employees and a pilot program for County citizens. · Provides funds to enhance Citizens' Quality of Life: This budget provides $19.5 million dollars for public safety. $4.9 million is targeted for libraries, parks, recreation, and cultural contributions. The County's Office of Housing, working with the Housing Committee and citizens and interest groups, will develop actions to implement the Affordable Housing Policy. These actions will include creating partnerships, identifying incentives, and increasing housing opportunities for homeowners and renters. The Comprehensive Plan's economic development policy will be updated. We will begin design work on the new Crozet Library. The SPCA will continue construction of its new state of the art animal shelter. The Parks and ReCreation Department will complete market analysis for indoor and outdoor recreation facilities and will establish a boat launch on the Rivanna Reservoir. In addition, the County will finalize the necessary easements to create a walkable public trail from Crozet Park to Lickinghole Creek Basin. Other initiatives will include the development of a fire/rescue training center and police firing range, as well as police technology upgrades. In addition, the Board of Supervisors proposes funding for the following initiatives: o Four additional police officers o Two Fire/Rescue positions for Northern Stations o EMS Instructor and EMS Supervisor positions o Public Safety Systems Analyst o Increased funding for the Drug Court o Child Protective Services Investigator o Mental Health/Substance Abuse worker o Additional funding for Jefferson Area United Transit Network OAUNn o Funding for the Family Support program o Increased funding for Tax Relief for the Elderly and Disabled o Inmate Community Workforce program o Athletic Field Maintenance Enhancement o Planner for Neighborhood Model Implementation o Additional support for the Jefferson-Madison Regional Library o Community Development Loan Fund . Protects the County's Natural. Scenic. and Historic Resources: The water crisis of 2002 demonstrated to us the critical importance of our region's natural resources. To ensure that a long range plan is in place to address our water needs, the County is continuing to work with the Rivanna Water and Sewer Authority to deyelop an integrated water resource plan that directs the County's efforts to address water quality and water supply. Other major staff efforts in FY 04/05 will include working to implement neighborhood master plans and actions needed to carry out the County's newly revised rural area policies. The County is continuing its Acquisition of Conservation Easement Program with additional funding of $1,000,000 in FY 04/05. The County will fund Ivy Landfill remediation efforts and begin implementing the County environmental management policy. In addition, the Board of Supervisors proposes funding for the following initiatives: o Zoning Ordinance Planner o TJ Soil and Water Conservation Stream Monitoring Program . Improves the Effectiveness and Efficiency of County Services: Currently, all County departments are revising, and implementing new standards for superior customer service. Resources will be directed to improve the County's business processes, such as the financial and human resource management systems, so that employees can locate data more easily and make better decisions. The County will continue deployment of its CityView program to streamline the Community Development Department's ability to receive and review new development and building permits and maintain critical data. The County plans to develop a Geographical Information System Web Module which will allow the public and other agencies ways to interact with the County's mapping systems. A five year forecasting model for long-range financial planning will be developed to better connect the strategic planning cycle to tñe operating budget and the capital budget. The County will provide a $2.0 million increase into the County's Capital Improvement Program based on the County's revenue growth and in accordance with our fiscal policies. COB South will house the Police Department, Fire/Rescue Department, Social Services Department, and the Housing Offices, as well as provide a new customer service booth to provide citizens who go there access to other county services. In addition, the Board of Supervisors proposed funding for the following initiatives: o Web Content Manager (from part-time to full-time) o Compensation Analyst o Loss Control Manager o Fire Station Computer Upgrades o Interpreter Services - Social Services o Employment Specialist - Social Services Career Center o Records Manager/Organizational Study . Supports our Hiqh Quality Workforce: This budget maintains the market competitive salaries identified in our market analysis, in addition to increasing the County's contributions to Health and Dental benefits of $648 per person, by providing a 3 percent merit pool for our local goyernment employees in FY 04/05. .. FY Capital and Debt 17% 23% Revenue 5% Local Property Taxes 38% School Sustaining 5% Operations 47% Other Local Revenues 21% Division School 1.0 13.6% 8.9% 11.7% Community Development 4% Capitai Projects 4% Debt Service 8% 8% 3% &, Human judicial Revenue Sharing 2% Administration Miscellaneous 5% 5% 1% ($ in millions) Local State Federal General $0.03 2.7 0.1 7.3 31.8 2.0 34.4 2.1 76.2 FY 04/05 Proposed School Division Revenue Other 1% FY 04/05 - 08/09 Improvement FY 04/05 ·08/09 CIP Revenues $126,993,000 Local Revenues. ~ Genera! Fund 21,0% SChODls 42% Stormwater 2% CIP Revenues ($ in thousands) Local Revenues General Fund Tourism Fund Revenues· ACE/Other Interest Earned Courthouse Maintenance Funds City Reimbursements Northside Library Lease State Construction Funding Borrowed Funds - General Gov VPSA Bonds - Schools State Technology Grant Use of Reserves FY 04/05 . 0lM09 Clf' Expenditures $126,993,000 Courts & Judicial Public Safety 2% 13% Libraries 12% Techno!ogy & GIS 3% Development Schools of Conservation Easements 3.418 Total C!P Revenues Total CIP Expenditures 4.4% 8.4% 3.9% 10.7% 9.7% 11% ~ 2,384 16,734 7,694 10,152 170 13.436 4,042 15,737 2,050 2,700 51,894 , II , 1 1 . 1 1 1 . .. .. I I , I I I I FY 04/05 Board of Supervisor's Budget REQUEST PROPOSED Board of Supervisors Resource Changes Two pennies on the tax rate Two ennies on the tax rate increase to FY04 one-time available funds Subtotal -- Add Recurring One-Time 300,000 2,435,000 (961,118) 1,473,882 30,230 933 3,728 21,231 2,449 58,571 51,076 800,000 1,000,000 800,000 1,000,000 Recurring One-Time County General Fund Beginning Board Reserves FY 03/04 Projected Fund Balance (assuming $0.74 real estate tax rate) Less FY04 Budgeted Fund Balance Available FY 03/04 Fund Balance 300,000 2,435,000 (961,118) 1,473,882 Less County Executive AQjustments 2% Adjustment to Salary Scale Juvenile Court Assessment Center CYFS (adjust to review team's recommendation) MACAA - CHP Program (adjust to review team's recommendation) Soil & Water Conservation: Additional 0 eratin Fundin Subtotal -- Subtract 30,844 933 3,728 21,231 2,449 59,185 Plus CounW Executive Resource Changes Reimbursement for Voting Machines 51,076 2,033,798 2,033,798 1,000,000 1,000,000 Less Increased Transfer to Schools 1,118,409 Recommended Unfunded High Prioriw New Initiatives Police Officers (4) 70,787 140,219 81,184 131,419 Fire/Rescue Positions· Northern Stations(2) 104,700 11,600 106,208 11,600 Interpreter Services 3,000 3,000 Parks - Inmate Community Workforce 39,001 53,000 40,375 50,900 EMS Instructor (6 mos, position) 28,953 22,950 33,463 26,150 EMS Supervisor (6 mos. position) 28,953 22,950 33,463 26,150 Zoning Ordinance Planner 52,445 3,115 52,654 3,115 Web Content Manager 17,680 18,212 Compensation Analyst 7,415 7,415 Family Support Program 11,000 11,000 Child Protective Services Investigator 23,907 21,845 2,920 Fire Station Computer Upgrades/Support 15,000 15,000 Loss Control Manager - HR 19,125 19,125 Public Safety Systems Analyst (6 mos, position) 31,553 4,200 31,624 4,200 Resources Manager/Organizational Study 35,000 35,000 Athletic Field Maintenance Enhancement 51,118 52,350 Mental Health - Substance Worker - DSS 23.755 24,659 Planner - Neighborhood Model Implementation 60.257 7,995 60,492 7.995 Employment Specialist - DSS Career Center Absentee Clerk - Satellite Absentee Voting 15,000 JAUNT - Ridership Increase 92,756 92,756 OAR - Drug Court 24,568 24,568 PHA - Community Development Loan Fund 50,000 150.000 50,000 150,000 Library - Crozet Branch Support 3,545 3,545 Library - Norths¡de Circulation Support 11,993 11,993 Library - Northside Reference Specialist 7,653 7,653 T J Soil & Water - Stream Monitorin 4,000 4,000 Subtotal - Subtract 768,164 481,029 791,584 464,449 Items from Board of Supervisors' Work Sessions Assistant Registrar/Contingency 34.584 32.931 1,870 Commonwealth's Attorney - amount needed to fully implement move to County scale 34.300 29.279 in FY 04/05 Sheriff and Clerk of the Circuit Court compensation 50.000 50.000 Forgive additional debt at East Rivanna VFD 83.860 41.930 100% operations for Volunteer Fire/Rescue 100.000 Tax Relief for the Elderly and Disabled 40.000 125,494 Albemarle County Fair 10,000 10,000 Regional Library 63,617 63,617 ACE 650.000 650.000 Subtotal Subtract 332,501 733,860 311,321 693,800 FY05 BOS Budget Worksheet-FINAL.xls Page 1 of 1 Printed 3/25/2004 12:04 PM APR-08-2004 01:02 AM P.01 Currituck Fann P. O. Box 207 Earlysville, VA 22936 AprilS, 2004 Members of the Board of Supervisors 401 McIntire Road Charlottesville, VA 22902 Dear Members of the Board, I was so happy to learn fi-om the County website that the updated budget dated today states that the tax rate will remain unchanged, and that the budget includes full budget for the ACE program for the upcoming fiscal year. Thank you for keeping the tax rate unchanged~ thus providing the needed funds for many parts of the budget. That took courage on your part. It was reassuring that seven speakers (second to the schools) at the last hearing recommended the continuation of the program. That shows its support ttom conservatives and liberals alike. Keeping viable agriculture will ensW'e attractive scenery and a pleasing quality of life for the county as a whole. The committee works hard to insure that the County's funds are well invested. The County will do well to protect our local food..producing land. People are beginning to appreciate having safer and fresher locally grown food on their tables. I know you have had a barrage of demands coming your way for programs all across the spectrum. But in many ways, solving part of the development problem through conservation easements will provide solutions simultaneously to problems of school crowding, transportation, water demand and quality, air quality, the preservation of views beds and tourism. Thank you again. I am unable to attend the Wednesday hearing, but I am counting on the Monday budget numbers being upheld. Have a wonderful spring. I am sure you are glad to have the budget process almost finished. Sincerely, ~ Ann H. Mallek