Loading...
HomeMy WebLinkAboutSUB201600094 Correspondence 2016-08-08 Now COUNTY OF ALBEMARLE ov"iDepartment Community Development $J . Planning Services Division vi ,►; 401 McIntire Road North Wing•Charlottesville,Virginia 22902-4596 Phone: (434)296-5823 • Fax: (434)972-4035 Transmittal From: Christopher Perez Date: 08/08/16 To: 0 /a/.0( /I' orr.s`-- — ACS A OAndrew Slack- E911 OJay Schlothauer- Inspections OMax Greene- CD Engineer ORobbie Gilmer-Fire and Rescue ' 0 °Alex Morrison-ACSA 0 JOB#/FILE NAME:S g_01 - ,04.4- IA, s 4 C - P"'/ We are sending you the following items: ® Attached or ❑ Under separate cover ❑ Copy of Letter ❑ Prints ❑ Plans ❑ Plats ❑ Specifications El Other # of Copies Date Description 1 8/4/16 final plat These are transmitted as checked below: For review and comments ® For approval ❑ Other Remarks: Please review the revised plat(the applicant took off the dedication of the road in phase 4, now all lots are served by previously approved roads). Also,the open space behind the 4 lots in phase 6 is residue. Comments are due in City View or email by: 8/22/16 Signature: Christopher Perez N ck c.c-k w2 ik)( Co-rictiemu 4 tot,�5 L. kz Za to, } ( crux v o-j a1.,l. /4.1 , Christopher Perez From: Nena Harrell <ulcwww@embarqmail.com> Sent: Friday, August 05, 2016 1:24 PM To: Christopher Perez Subject: FW: Briarwood FifthSupplemental Declaration Attachments: Briarwood FifthSupplemental Declaration.docx Chris, Please find attached supplement. I have not reviewed but should be OK. Thanks, Nena From: United Land Corp [mailto:ulcwww2@embarqmail.com] Sent: Friday, August 05, 2016 1:21 PM To: Nena Harrell Subject: Briarwood FifthSupplemental Declaration Christopher Perez From: Nena Harrell <ulcwww@embarqmail.com> Sent: Friday, August 05, 2016 10:26 AM To: 'Scott Collins'; 'Joe Keller; Christopher Perez; 'Deel, Justin (VDOT)'; 'Moore, Adam PE (VDOT)' Cc: 'Chris Kean'; 'Jenni Pack' Subject: RE: 8 Lot Briarwood Plat Chris, I will have supplement to you today. I waited until we got this plat so I can reference correct one. Thanks, Nena From: Scott Collins [mailto:scott@collins-engineering.com] Sent: Friday, August 05, 2016 10:06 AM To: Joe Keller; Christopher Perez; Nena Harrell; Deel, Justin (VDOT); Moore, Adam PE (VDOT) Cc: Chris Kean; Jenni Pack Subject: RE: 8 Lot Briarwood Plat Chris- We met with Adam and Justin on Wednesday afternoon after meeting with you, and they are acceptable to allowing us to swap out the old plat for this new plat and they will complete their review on the project with the new plat. We will drop off 2 copies of the plat to VDOT this morning, and 5 copies for you. Adam would like you to confirm that you are acceptable for VDOT to review the new plat, so if you can a chance, can you send him an email letting him know to review this plat and not the old plat. Thanks Chris, and let me know if you need any additional copies or anything else for the review and approval of the plat. Thanks. Scott From:Joe Keller [mailto:ioe.keller@lincolnsurveying.com] Sent: Friday, August 05, 2016 9:04 AM To:Christopher Perez; Nena Harrell; Scott Collins Cc:Chris Kean;Tom Lincoln Subject: 8 Lot Briarwood Plat Mr. Perez, Attached is an update to the 9 Lot Plat I sent you last Saturday July 30th. Now the plat is for 8 Lots in Briarwood. Thank you 1 Noe Christopher Perez From: Scott Collins <scott@collins-engineering.com> Sent: Friday, August 05, 2016 10:06 AM To: Joe Keller; Christopher Perez; Nena Harrell; Deel, Justin (VDOT); Moore, Adam PE (VDOT) Cc: Chris Kean;Jenni Pack Subject: RE: 8 Lot Briarwood Plat Attachments: 110006801_SP_PH6_16217B.PDF Chris- We met with Adam and Justin on Wednesday afternoon after meeting with you, and they are acceptable to allowing us to swap out the old plat for this new plat and they will complete their review on the project with the new plat. We will drop off 2 copies of the plat to VDOT this morning, and 5 copies for you. Adam would like you to confirm that you are acceptable for VDOT to review the new plat, so if you can a chance, can you send him an email letting him know to review this plat and not the old plat. Thanks Chris, and let me know if you need any additional copies or anything else for the review and approval of the plat. Thanks. Scott From:Joe Keller [mailto:joe.keller@lincolnsurveying.com] Sent: Friday,August 05, 2016 9:04 AM To:Christopher Perez; Nena Harrell; Scott Collins Cc: Chris Kean;Tom Lincoln Subject: 8 Lot Briarwood Plat Mr. Perez, Attached is an update to the 9 Lot Plat I sent you last Saturday July 30th. Now the plat is for 8 Lots in Briarwood. Thank you Joe Keller Certified Survey Technician II Lincoln Surveying 632 Berkmar Circle Charlottesville,Va.22901 Office: 434-974-1417 Cell: 540-223-0545 Fax: 434-974-1776 1 Now ,4000, Christopher Perez From: Joe Keller <joe.keller@lincolnsurveying.com> Sent: Friday, August 05, 2016 9:04 AM To: Christopher Perez; Nena Harrell; Scott Collins Cc: Chris Kean;Tom Lincoln Subject: 8 Lot Briarwood Plat Attachments: 110006801_SP_PH6_16217B.pdf Mr. Perez, Attached is an update to the 9 Lot Plat I sent you last Saturday July 30th. Now the plat is for 8 Lots in Briarwood. Thank you Joe Keller Certified Survey Technician II Lincoln Surveying 632 Berkmar Circle Charlottesville,Va.22901 Office: 434-974-1417 Cell: 540-223-0545 Fax: 434-974-1776 1