HomeMy WebLinkAboutSUB201600094 Correspondence 2016-08-08 Now
COUNTY OF ALBEMARLE
ov"iDepartment Community Development
$J . Planning Services Division
vi ,►; 401 McIntire Road North Wing•Charlottesville,Virginia 22902-4596
Phone: (434)296-5823 • Fax: (434)972-4035
Transmittal
From: Christopher Perez Date: 08/08/16
To: 0 /a/.0( /I' orr.s`-- — ACS A OAndrew Slack- E911
OJay Schlothauer- Inspections OMax Greene- CD Engineer
ORobbie Gilmer-Fire and Rescue ' 0
°Alex Morrison-ACSA 0
JOB#/FILE NAME:S g_01 - ,04.4- IA, s 4 C - P"'/
We are sending you the following items: ® Attached or ❑ Under separate cover
❑ Copy of Letter ❑ Prints ❑ Plans
❑ Plats ❑ Specifications El Other
# of Copies Date Description
1 8/4/16 final plat
These are transmitted as checked below:
For review and comments ® For approval ❑ Other
Remarks: Please review the revised plat(the applicant took off the dedication of the road in phase 4,
now all lots are served by previously approved roads). Also,the open space behind the 4 lots in phase 6
is residue.
Comments are due in City View or email by: 8/22/16 Signature: Christopher Perez
N ck c.c-k w2 ik)( Co-rictiemu
4
tot,�5 L. kz Za to,
} ( crux v o-j a1.,l. /4.1 ,
Christopher Perez
From: Nena Harrell <ulcwww@embarqmail.com>
Sent: Friday, August 05, 2016 1:24 PM
To: Christopher Perez
Subject: FW: Briarwood FifthSupplemental Declaration
Attachments: Briarwood FifthSupplemental Declaration.docx
Chris,
Please find attached supplement. I have not reviewed but should be OK.
Thanks,
Nena
From: United Land Corp [mailto:ulcwww2@embarqmail.com]
Sent: Friday, August 05, 2016 1:21 PM
To: Nena Harrell
Subject: Briarwood FifthSupplemental Declaration
Christopher Perez
From: Nena Harrell <ulcwww@embarqmail.com>
Sent: Friday, August 05, 2016 10:26 AM
To: 'Scott Collins'; 'Joe Keller; Christopher Perez; 'Deel, Justin (VDOT)'; 'Moore, Adam PE
(VDOT)'
Cc: 'Chris Kean'; 'Jenni Pack'
Subject: RE: 8 Lot Briarwood Plat
Chris,
I will have supplement to you today. I waited until we got this plat so I can reference correct one.
Thanks,
Nena
From: Scott Collins [mailto:scott@collins-engineering.com]
Sent: Friday, August 05, 2016 10:06 AM
To: Joe Keller; Christopher Perez; Nena Harrell; Deel, Justin (VDOT); Moore, Adam PE (VDOT)
Cc: Chris Kean; Jenni Pack
Subject: RE: 8 Lot Briarwood Plat
Chris-
We met with Adam and Justin on Wednesday afternoon after meeting with you, and they are acceptable to allowing us
to swap out the old plat for this new plat and they will complete their review on the project with the new plat. We will
drop off 2 copies of the plat to VDOT this morning, and 5 copies for you. Adam would like you to confirm that you are
acceptable for VDOT to review the new plat, so if you can a chance, can you send him an email letting him know to
review this plat and not the old plat.
Thanks Chris, and let me know if you need any additional copies or anything else for the review and approval of the
plat.
Thanks.
Scott
From:Joe Keller [mailto:ioe.keller@lincolnsurveying.com]
Sent: Friday, August 05, 2016 9:04 AM
To:Christopher Perez; Nena Harrell; Scott Collins
Cc:Chris Kean;Tom Lincoln
Subject: 8 Lot Briarwood Plat
Mr. Perez,
Attached is an update to the 9 Lot Plat I sent you last Saturday July 30th. Now the plat is for 8 Lots in
Briarwood.
Thank you
1
Noe
Christopher Perez
From: Scott Collins <scott@collins-engineering.com>
Sent: Friday, August 05, 2016 10:06 AM
To: Joe Keller; Christopher Perez; Nena Harrell; Deel, Justin (VDOT); Moore, Adam PE (VDOT)
Cc: Chris Kean;Jenni Pack
Subject: RE: 8 Lot Briarwood Plat
Attachments: 110006801_SP_PH6_16217B.PDF
Chris-
We met with Adam and Justin on Wednesday afternoon after meeting with you, and they are acceptable to allowing us
to swap out the old plat for this new plat and they will complete their review on the project with the new plat. We will
drop off 2 copies of the plat to VDOT this morning, and 5 copies for you. Adam would like you to confirm that you are
acceptable for VDOT to review the new plat, so if you can a chance, can you send him an email letting him know to
review this plat and not the old plat.
Thanks Chris, and let me know if you need any additional copies or anything else for the review and approval of the
plat.
Thanks.
Scott
From:Joe Keller [mailto:joe.keller@lincolnsurveying.com]
Sent: Friday,August 05, 2016 9:04 AM
To:Christopher Perez; Nena Harrell; Scott Collins
Cc: Chris Kean;Tom Lincoln
Subject: 8 Lot Briarwood Plat
Mr. Perez,
Attached is an update to the 9 Lot Plat I sent you last Saturday July 30th. Now the plat is for 8 Lots in
Briarwood.
Thank you
Joe Keller
Certified Survey Technician II
Lincoln Surveying
632 Berkmar Circle
Charlottesville,Va.22901
Office: 434-974-1417
Cell: 540-223-0545
Fax: 434-974-1776
1
Now ,4000,
Christopher Perez
From: Joe Keller <joe.keller@lincolnsurveying.com>
Sent: Friday, August 05, 2016 9:04 AM
To: Christopher Perez; Nena Harrell; Scott Collins
Cc: Chris Kean;Tom Lincoln
Subject: 8 Lot Briarwood Plat
Attachments: 110006801_SP_PH6_16217B.pdf
Mr. Perez,
Attached is an update to the 9 Lot Plat I sent you last Saturday July 30th. Now the plat is for 8 Lots in
Briarwood.
Thank you
Joe Keller
Certified Survey Technician II
Lincoln Surveying
632 Berkmar Circle
Charlottesville,Va.22901
Office: 434-974-1417
Cell: 540-223-0545
Fax: 434-974-1776
1