HomeMy WebLinkAboutARB201600135 Review Comments Architectural Review Board 2016-11-08APPLICATION REVIEW HISTORY
ARB #/Name__201600135, Sprint Sign
ACTION DATE NOTES
County received application
10/24/2016
Corresponding submittal
deadline/ARB meeting date
10/24/2016 deadline
12/05/2016 meeting
Transfer from intake to ARB Staff
10/25/2016
First ARB staff review
11/08/2016
Comments to applicant
11/08/2016 Email/mail
Resubmittal received by staff
11/23/16
Resubmittal reviewed by staff
12/02/16
Were all comments addressed?
Yes
Comments to applicant
Resubmittal received by staff
Resubmittal reviewed by staff
Were all comments addressed?
Comments to applicant
Resubmittal received
Resubmittal reviewed
Approval letter sent
Applicant Survey Included?
12/02/16 Email/mail
ARB meeting date
ARB action
0 ALg�
JRGNZP
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road, North Wing
Charlottesville, Virginia 22902-4596
Phone (434) 296-5832 Fax (434) 972-4126
November 8, 2016
Adria Sprouse
Hightech Signs
2165 Seminole Trail
Charlottesville, VA 22901
RE: ARB -2016-135: Sprint Sign
TMP 078000000073A1
1950 Abbey Road
Dear Ms. Sprouse,
I have reviewed the above -noted sign application. The following revisions are requested to make the
proposal consistent with the Entrance Corridor Sign Guidelines.
The proposed sign shown below (channel letters and graphic) appears to be too tall for the sign
band leading to an oversized appearance for the sign. ARB Sign Guidelines indicate that 18" is
considered an appropriate height for a sign (letters and graphic) in a 30" tall sign band. This
allows 6" of unoccupied space above and below the sign. Revise the sign drawing to address this
guideline.
2. Miscellaneous:
a. Include a latest revision date on the resubmitted sign drawing.
Please respond by email within 15 days of the date of this letter indicating whether you will or will not
proceed with these revisions. Your decision to make the revisions will suspend the 60 -day review period
associated with your original submittal. If you choose to complete the revisions, please email the revised
drawings to me. If you choose not to proceed with these revisions, staff will be unable to approve your
application. Failure to respond to this letter shall be presumed to be a request to proceed to action on
the application without further revisions.
If you have any questions about this action, please contact me as soon as possible. I look forward to
receiving your revisions and completing this review with an approval letter.
Sincerely,
Brent Nelson
Senior Planner
bnelson@albemarle.org
cc: ARB File