HomeMy WebLinkAboutWPO201400022 Review Comments 2014-12-17 Max Greene To: Cheryl Lynn Taylor Cc: Sarah Baldwin Subject: RE: CV327 Verulam Farm WPO WP0201400022 I did a quick review of the WPO submittal and found many items not adequately addressed by this submittal. 3. Date and source of topography is not stated on the plan. Where did the topo originate? When was the topo generated? Was it field verified and by whom? 4. Mitigation plan is required for the stream buffer disturbances. No mitigation plan was included in submittal. 10. Staging and parking areas not shown on plan. 11. silt fence and diversion are directing stormwater into stream and road without adequate protection.Sediment traps need to be shown to capture stormwater runoff. 12. Culvert areas do not have the proper symbols for work in a stream. Live streams will require a pump-around or other system proposed . NO WORK is allowed in a live stream. Replacement pipes will be designed for the drainage area to pipe. Please have all of these item addressed prior to resubmittal. From: Cheryl Lynn Taylor [mailto:C.Taylor@velocitel.com] Sent: Wednesday, December 17, 2014 3:36 PM To: Max Greene Cc: Sarah Baldwin Subject: RE: CV327 Verulam Farm WPO WP0201400022 Fantastic!! Any idea when the WPO may receive approval? I am pushing a dead line on this one especially since we submitted it in March. Any assistance would be greatly appreciated. Cheryl From: Max Greene [mailto:MGreene@albemarle.orq] Sent: Wednesday, December 17, 2014 3:34 PM To: Cheryl Lynn Taylor Cc: Sarah Baldwin Subject: RE: CV327 Verulam Farm WPO WP0201400022 Thank you, I've added this information to the review documents. From: Cheryl Lynn Taylor [mailto:C.TaylorOvelocitel.com] Sent: Wednesday, December 17, 2014 9:41 AM To: Max Greene Cc: Sarah Baldwin Subject: CV327 Verulam Farm WPO WP0201400022 Importance: High Mr. Greene, I at the County office yesterday and spoke to Sarah regarding the above WPO.As I am sure you are aware this has been lingering for a while and I need to get this completed today and get the bond calculation so I can get the bond issued and have the project closed out.Sarah made a copy of the last comment on the WPO we received from Glenn and the comments we had noted where we had addressed each of his issues except the Flood Plain Development permit which previously thought lost but is grirtroved. I also dropped off an updated WPCPettplication signed by the landowner and have attached to the email the USACE approval. Please let me know if you need any additional assistance from me as this has become a very time sensitive issue. Regards, Cheryl Lynn Taylor Cheryl Lynn Taylor Site Acquisition Specialist Velocitel, Inc. 4144 Innslake Drive, Suite B Glen Allen, VA 23060 (804)852-8275— Mobile (804)217-8665— Fax c.tavlor@velocitel.com www.velocitel.com The information contained in this message may be privileged and confidential and protected from disclosure.If the reader of this message is not the intended recipient,or an employee or agent responsible for delivering this message to the intended recipient,you are hereby notified that any dissemination,distribution or copying of this communication is strictly prohibited. If you have received this communication in error,please notify us immediately by replying to the message and deleting it from your computer. 2 � OF AL ,. vIRGI1`IZP COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 Project: CV327B Plan preparer: Painter -Lewis P.L.C, [office @painterlewis.com] Owner or rep.: Verulam Farm Limited Partnership [25 10 Pine Ln., Charlottesville VA 229011 Plan received date: 11 Mar 2014 Date of comments: 18 Mar 2014 Reviewer: Glenn Brooks, P.E. Erosion Control Plan (WP0201400022) 1. Provide copies of state and federal permits for stream disturbances. 2. Please remove all sheets that are not the erosion and sediment control plan, and title the document an erosion and sediment control plan. Please use plan size sheets for the road. This plan is too difficult to piece together at 11x17. 3. Provide source and date of topographic information 4. Show and label WPO buffer limits. This road appears to have buffer disturbances and will require a mitigation plan. 5. Show and label floodplain limits. This road appears to be crossing the floodplain and will require a Floodplain Development Permit. Any fill in the floodplain, or crossings affecting floodplain will require a special use permit. 6. Provide evidence of board approval for critical slopes disturbances or eliminate these disturbances. 7. Any proposed slopes steeper than 3:1 must have an alternative to grass as permanent stabilization. 8. The construction entrance must drain to a sediment trap. 9. Provide DC, TS and PS on the plans in disturbed areas. 10. Provide a staging /parking area and stockpile location. 11. Silt fence running down or up contours is not effective. Place silt fence at an angle and use diversions to direct flow and checkdams to control velocity. 12. Culvert areas must use USC or SC and CIP and OP. 13. MS -19 must be addressed in the narrative or on the plan. File: E 1 esc GEB CV327B.doc IV fritnstP. COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road,Room 227 Charlottesville,Virginia 22902-4596 Phone(434)296-5832 Fax(434)972-4126 Project: Verulam Farm Tower,CV327B Plan preparer: Painter-Lewis P.L.C, [office@ painterlewis.com] Owner or rep.: Verulam Farm Limited Partnership [2510 Pine Ln., Charlottesville VA 22901] Plan received date: 11 Mar 2014 Rev.1: 14 May 2014 Date of comments: 18 Mar 2014 Rev.1: 27 May 2014 Reviewer: Glenn Brooks,P.E. ISA.Erosion Control Plan(WPO201400022) 8#.1. Provide copies of state and federal permits for stream disturbances. Rev.1:none received. — .r y I (App -10 k2. Please remove all sheets that are not the erosion and sediment control pl ,and title the document an erosion and sediment contql plan. Please use plan size sheets for the road. This plan is too difficult to piece together at 11x17. O>v-). Rev.1:The cover sheet title should be for an erosion and sediment control plan. p ) X 3. Provide source and date of topographic information— la c a{,,,( .5LA5 as-2-) M s•er curs 1'd , Rev.1:not found.Please provide an original survey of the area of work. Data and source the tszpoeraphy k4. Show and label WPO buffer limits. This road appears to have buffer disturbances and will require a mitigation elan.jb tv Rev.1:The buffer encroachment is significant,and there appears to be room to move the access road out of the WPO buffer. Please move the work outside the buffer except where crossings are unavoidable. --KDA- Qoss;‘,1t - e t ..J, p(y q /_fig X45. Show and label floodplain limits. This road appears to be crossing the floodplain and will require a SDP Floodplain Development Permit. Any fill in the floodplain,or crossings affecting floodplain will require a special use permit. Rev.1:A floodplain development permitis required. It appears a special use permit is required per ikak- Zoning Ordinance section 18-30.3.11. Please consult this section of the ordinance. It might be easier 65rb1.. to relocate the access road so that a floodplain crossing is not necessary. �,/6. Provide evidence of board approval for critical slopes disturbances or eliminate these disturbances. 9 Rev.1:not addressed. . ( ..cy( `YID ®j(,-7. Any proposed slopes steeper than 3:1 must have an alternative to grass as permanent stabilization. Rev.1:addressed. T„.- 8. The construction entrance must drain to a sediment trap. Rev.1: addressed. 6,47.- 9. Provide DC,TS and PS on the plans in disturbed areas. Rev.1: addressed. 10. Provide a staging/parking area and stockpile location. Rev.!: The staging/parking and stockpile location provided on the plan is not useable until the project Engineering Review Comments Page 2 of 2 is finished. Provide a useable area before and during construction. i+r�pA-5 t"'c 11. Silt fence running down or up contours is not effective. Place silt fence at an angle and use diversions (tok 3 to direct flow and checkdams to control velocity. // ct,dd ( v^ sI Rev.1: There are no sediment control or protections along the roadway downhill sid'on sheet E&S-2, E S• 2 4 or at the culvert work proposed. Provide sediment trapping measures. - E t S_ 12. Culvert areas must use USC or SC and CIP and OP. Rev.1:not addressed. C d ©? n-trt.rtw4s tti,s.o a a.d.d< 4. E tiS-2 E $S -3 anck 13. MS-19 must be addressed in the narrative or on the plan. ol, .'lj cd -,l La £fit S-4f Revd:not addressed.-- w w E 14. Rev.1: The application requires an owner's signature. This is not yet a valid application or revision, but has been reviewed as a courtesy. There will be no more review without a valid signature of the property owner. - ()Wit ✓'15. Please provide an,origin seal appropriately sized on plans. ,Ovru, dhl to vn, 2+Y3(0 B.Mitigation Plan(WPO201400022) '(( �q�t Pl off - Ck53 se-net ItAino 0-4-ryi A mitigation plan has not been received.