HomeMy WebLinkAboutSDP201500026 Review Comments Minor Amendment 2015-12-29Short Review Comments Report for: SDP201500026 SubApplication Type: Avinity I Phase IV - Minor Minor Amendment Date Completed:07/01/2015 Reviewer:Johnathan Newberry Planning Review Status:Requested Changes Reviews Comments: Division: Date Completed:06/12/2015 Reviewer:Margaret Maliszewski ARB Review Status:Requested Changes Reviews Comments: Division: Date Completed:06/09/2015 Reviewer:John Anderson Engineering Review Status:Requested Changes Reviews Comments: Division: Date Completed:05/29/2015 Reviewer:Jay Schlothauer Inspections Review Status:No Objection Reviews Comments:Based on plans dated May 26, 2015. No comments or conditions. Division: Date Completed:06/06/2015 Reviewer:Robbie Gilmer Fire Rescue Review Status:Requested Changes Reviews Comments:Based on plans dated 5/8/15 1. Radii on North East corner of Avinity Loop shall be minimum of 25'. Currently showing 13' radii at this intersection. Division: Date Completed:06/15/2015 Reviewer:Alexander Morrison ACSA Review Status:See Recommendations Reviews Comments:The applicant let me know that they are working directly with the ACSA on this application. Division: Date Completed:08/01/2015 Reviewer:John Anderson Engineering Review Status:Requested Changes Reviews Comments: Division: Date Completed:08/05/2015 Reviewer:Margaret Maliszewski ARB Review Status:Approved Reviews Comments: Division: Date Completed:08/01/2015 Reviewer:Robbie Gilmer Fire Rescue Review Status:Requested Changes Division: Page:1 of 3 County of Albemarle Printed On:November 17, 2016 Review Status:Requested Changes Reviews Comments:Based on plans dated 7/8/15. 1. Radii on North East corner of Avinity Loop shall be minimum of 25', currently showing 13' radii at this intersection. The radii in question is located at lot 101. Date Completed:12/09/2015 Reviewer:Johnathan Newberry Planning Review Status:No Objection Reviews Comments:I notified applicant on 12/17 that the County could now approve the minor amendment. Division: Date Completed:08/31/2015 Reviewer:John Anderson Engineering Review Status:See Recommendations Reviews Comments:If Applicant has responded to comment, response was overlooked: “Approved preliminary plat for Avinity II shows identical portions of Avinity Loop addressed under this (Avinity I) MIA. There is uncertainty whether features considered under this MIA that appear on Avinity II plat will continue to be carried under Avinity I bond. Please notify County of preference: whether to amend Avinity I subdivision bond, or to simply double-bond roadway/drainage features that appear on both Avinity I site plan and Avinity II plat. Revising existing Avinity I subdivision bond would require calculating the difference between initial Avinity I site plan design for just that portion affected by the MIA, and change proposed for this portion (Avinity Loop).” (31-Jul 2015; review comment #1) Recent evaluation of bonds at a separate subdivision shows that with respect to bonds, amended site plans pose complexity and confusion. This comment should be addressed –it is possible response indicating preference has been overlooked. J. Anderson: 434.296-5832 –x3069. (All other engineering review comments addressed with this, or prior, revision –thank you) janderson2 8/31/2015 8:37 AM Division: Date Completed:08/25/2015 Reviewer:Robbie Gilmer Fire Rescue Review Status:Requested Changes Reviews Comments:Based onplans dated 8/11/15. 1. Radii on North East corner of Avinity Loop shall be minimum of 25', currently showing 13' radii at this intersection. The radii in question is located at lot 101. Division: Date Completed:08/31/2015 Reviewer:Alexander Morrison ACSA Review Status:Approved Reviews Comments: Division: Date Completed:12/12/2015 Reviewer:Robbie Gilmer Fire Rescue Review Status:No Objection Reviews Comments: Division: Date Completed:12/16/2015 Reviewer:John Anderson Engineering Review Status:No Objection Reviews Comments:Text of Kaitlyn Kostelec Walthall email, 12/9/2015 3:11 PM "John – re: bonding The Avinity Minor Site plan amendment bond estimate I sent previously (attached) covered all the work associated with this amendment. The new Avinity II plans remove all of the Minor Site Plan information from the proposed plans and show it as existing (these were submitted yesterday). Is it possible to bond the amount of the Avinity Minor Site plan work ($257,494.16). This wouldn’t involve double bonding any features in Avinity II. Please advise. " Note -$257,494.16 was a Collins Engineering estimate of Minor Site Plan Amendment #2 road/utility design items [ref EMAIL Attachment, KKW/CE to JEA/CD -Fri 7/17/2015 3:35 PM]. Expense of road/utility items associated with Avinity Final Site Plan Phase IV that are replaced with Phase IV, Minor Site Plan Amendment #2 design features will not exist, will not be bonded, and will have no effect on Engineering recommendation of No objection to SDP20150026. Phase IV is not yet bonded. When it is, Amendment and not initial FSP design features will be bonded. In other words, discussion concerning effect of bonds was misplaced since at present no Phase IV bonds have been posted. Avinity I Minor Amendment #2 and Avinity II will be bonded in phases, separately and consistent with approved or amended design. I sincerely regret the unnecessary delay and effort (Ref. CV/RMS Document). janderson2 12/16/2015 5:46 PM Division: Page:2 of 3 County of Albemarle Printed On:November 17, 2016 The Avinity Minor Site plan amendment bond estimate I sent previously (attached) covered all the work associated with this amendment. The new Avinity II plans remove all of the Minor Site Plan information from the proposed plans and show it as existing (these were submitted yesterday). Is it possible to bond the amount of the Avinity Minor Site plan work ($257,494.16). This wouldn’t involve double bonding any features in Avinity II. Please advise. " Note -$257,494.16 was a Collins Engineering estimate of Minor Site Plan Amendment #2 road/utility design items [ref EMAIL Attachment, KKW/CE to JEA/CD -Fri 7/17/2015 3:35 PM]. Expense of road/utility items associated with Avinity Final Site Plan Phase IV that are replaced with Phase IV, Minor Site Plan Amendment #2 design features will not exist, will not be bonded, and will have no effect on Engineering recommendation of No objection to SDP20150026. Phase IV is not yet bonded. When it is, Amendment and not initial FSP design features will be bonded. In other words, discussion concerning effect of bonds was misplaced since at present no Phase IV bonds have been posted. Avinity I Minor Amendment #2 and Avinity II will be bonded in phases, separately and consistent with approved or amended design. I sincerely regret the unnecessary delay and effort (Ref. CV/RMS Document). janderson2 12/16/2015 5:46 PM Date Completed:12/29/2015 Reviewer:Johnathan Newberry Planning Review Status:Approved Reviews Comments: Division: Page:3 of 3 County of Albemarle Printed On:November 17, 2016