Loading...
HomeMy WebLinkAboutWPO201500045 Bond Estimates 2016-11-18Berkeley Water Main Replacement Project WPO file number: WP0201500045 Erosion and Sediment Control Bond Estimate Item Item Number stablization (PS, TS) silt fence (SF) safety fence (SAF) diversion (DD, FD, RWD) temporary slope drain (TSD) earthwork for trap/basin structures for basin silt fence inlet protection (IP) stone inlet protection (IP) outlet protection (OP) channel (SCC, matted) check dam construction entrance (CE) wash rack paved construction entrance rip -rap, placed pipe length 0 ft height of dam at toe0 length of cut ft height of fill at face ft Oft length of dam (total width of cut) 0 ft top width ft (area above transition) 0 sf (total width of dam) 0 ft (height below transition) 0 ft (area below transition) 0 sf (total fill volume) 0.0 cy length spillway _ft width off spillway ft riser heightft riser diameterMin in barrel lengthft barrel diameter length Witftlength ft depth in channel depth _ft width survey and layout (price per 0.1 mi.) acres - mobilization stream crossing (computed independently) pipe diameter _ 0 in cut at high side 0 ft cut at face I 0 ft length of cut ft width of cut ft (area below transition) 0 sf (total width of cut) 0 ft (depth below transitior 0 ft (area above transition', 0 sf (total fill volume) 0.0 cy (TOAL CY estimate) 0 cy (spillway stone tons) 0 tons (riser unit price) $0.00 base plate orfdn - (barrel unit price) $0.00 barrel collars baffle length Mft width ft width ft channel width oft length -ft (tons) 0 tons traps and basins - No. Unit Unit Cost Cost (installed) acres $5,000.00 $1,650.00 ft $5.00 $2,750.00 ft $5.00 $0.00 ft $13.00 $0.00 $0.00 $0.00 $13.00 $0.00 $50.00 $0.00 $0.00 $200.00 $0 $0.00 $200.00 $0 $50.00 $0 ■ $100.00 $0.00 $200.00 $7,000.00 $0.00 $0.00 $0.00 $0.00 $0.00 $2,000.00 $4,000.00 $2,000.00 $4,000.00 $3,500.00 $0.00 $60.00 $0.00 $0.00 $500.00 $0.00 cost sum $19,900.00 contingency $1,990.00 Total $21,890 10/13/2016