Loading...
HomeMy WebLinkAboutWPO201600054 Bond Estimates 2016-11-18 (3)Project Name Briarwood Phase 6 Early Grading WPO file Number WPO 201600054 Erosion and Sediment Control Bond Estimate Item Item Number stabf tion (PS, TS) silt fence (SF) safety fence(SAF) diversion (DD, FD, RWD) temporary slope draln(TSD) pipe length -ft pipe diameter -in earthwork for trap/basin Basin i hallht of dam at tce ft cut at high side ft heiht of fill at face ft out at face ft length of dam ft length of out ft top width ft width of out ft (area above transition) 168 at (area below transition) 432 at (total width of dam) 22 ft (total width of cut) 76 ft (height below transition) 4ft (depth below tranabor 5ft (area below transition) 28 at (area above transition) 165 at (total fill voume) 1451.9 cy (total fill volume) 1990.0 cy length of spillway ft (TOAL CV estimate) 2474 cy width of spillway ft (spillway stone tons) 14.4 tons structures for basin Basin 1 riser height ft rise r diameter in (riser unit price) $65.00 barrel length ft base plate or fdn - barrel diameter (barrel unit priue) $35 00 barrel collars baffle length 67 fi earthwork for trap/basin Basin 1 heigght of dam at tceL height of fill al faceft ft cutathigh side ul at face2.5 fi Ion th of dam ft length of cut 700 ft top width ft width of cut ft (area above transition) 28 sf (area below transition) 250 sf (total width of dam) 6 ft (total width of cut) 108 ft (height below transition) 1 ft (depth below transtior 1.5 ft (area below transition) 2 at (area above transition) 78.75 at (total fill volume) 144.4 cy (total fill volume) 1217.6 cy length of spillway ft (TOAL CV estimate) 1266 cy width of spillway ft (spillway stone tons) 14.4 tons structures for basin Basin 2 riser height ft er diameter in (riser unit price) $65.00 barrel length ft base plate or fdn - barrel diamea in (barrel unit price) $35.00 barrel collars M. baffle length sill fence inlet protection (IP) stone inlet protection (IP) cutlet protection(OP) length ft width ft channel (SCC, matted) length ft width ft check dam depth in channel ft channel width ft construction entrance (CE) wash rack paved construction entrance fipaap, placed depth _ft length -ft width (tons) 33.12 tans umey and layout (price per 0.1 mi.) acres traps and basins - mobilization stream crossing (computed Independently) No. Unit Unit Cost Cost installed 3.1 acres $5,000,00 $19,600.00 1200.0 ft $5,00 $6,000.00 0.0 ft $5,00 $0.00 615 ft $13,00 $7,995.00 $0,00 $0.00 $13.00 $32,162.00 $50.00 $720.00 $357.50 $200.00 $200 $2,380.00 $200.00 $400 $50.00 $3,350 $13.00 $16,458.00 $50.00 $720.00 $260.00 $200.00 $200 $1,680.00 $200.00 $400 $50.00 $2,700 $00.00 $0.00 ■ $2200.00 $0.00 $324.00 $648.00 $0.00 $0.00 $0.00 $2,000.00 $0.00 $2,000.00 $0.00 $3.500.00 $3,500.00 $60.00 $1,987.20 $2,960.00 $5,000.00 $0.00 cost sum $109,677.70 contingency $10,967.77 Total $120,650 11/18/2016 Approximate Earthwork computations for sed Assumes all cut and fill slopes are 2.1 for simplicty Cut at High Side h2 Height of Fill at Face h1 %, w Width of Cut Fill area above transition = h1(2h1) + h1(w) Fill area below transition; total width of fill (dam) = 2h1 + w + 2h2 height below transition = h2-h1, area = (width*height)/2 - height x height Length of Cut Top I-w transitic h1 Cut at Fa liment traps and basins Width ►n point \ Height of Dam at Toe h2 ice Volume = Length of Fill x Fill Area Cut Areas and Volume is the same as fill but using the cut dimensions Fill for Dam (imately)