Transmittal
0i,From: r;';14)(11 � � Date: 02/01/12
To: OPhil Custer- CD Engineer 0
°Margaret Maliszewski - ARB 0
�
n
o Scv t,`L ;11,„,, 0
0 0
0 0
JOB #/FILE NAME: S 9(112--0 00)
We are sending you the following items: ® Attached or ❑ Under separate cover
❑ Copy of Letter 0 Prints ® Plans
O Plats 0 Specifications 0 Other
# of Copies Date Description
1 1/19/12 Stonefield - Town Center- Minor Site Plan Amendment
These are transmitted as checked below:
® For review and comments 0 For approval 0 Other
Remarks: The attached is being distributed to you for review. Revised Pages have been slip sheeted to
the previous version of the plan you already received/reviewed (These pages have been marked with
blue highlighter on the bottom right hand corner).
Please review and enter your comments into City View by the date below. I will distribute the
comments to the applicant and advise the applicant to work with each of you to address your comments.
If you need additional copies of the plat please contact me. % /
Comments are due in City View or email by: 2/15/12 Signature: ,/l �`��G `-----,
Cir
r)1.
r.r
vire
ENGINEERS
SURVEYORS
PLANNERS
ASSOCIATES
TRANSMITTAL
To: Bill Fritz, Chief of Current Date: January 23,2012
Development
Organization: County of Albemarle WWA Project 208026.45
Community Development No:
401 McIntire Road
Charlottesville, VA 22902
Project: Stonefield —Stonefield Town Center Final Site Plan
No. of
Copies Description
4 Stonefield Town Center Final Site Plan Amendment (Landscaping and
Photometric Sheets)
Attached are copies of the Stonefield Town Center Final Site Plan Amendment Landscaping
and Photometric sheets for review.
WW Ass ;ates, Inc.
WW Ai
ss
Rob Umberger
Project Manager
3040 Avemore Square Place■Charlottesville,VA 22911
Telephone(434)984-2700 •Fax(434)978-1444
Charlottesville •Lynchburg
w..
iv II. '*.r
Summary of Addendum #1 revisions:
1. Site re-graded. You may want to mention that we did not change
grades at Regal construction pad or at the intersection of Bond at
District to explain scope of areas changed
2. Retaining Walls on Sperry reduced
3. Storm Water: We added a large bio-swale NW of Sperry resulting in
the removal of numerous Filteras
4. Lighting photometric plan has been included
5. Landscape plans updated to minimize impervious areas: we enlarged
tree wells a bit, created additional planting strips.
6. Horizontal plan changes to District ave have been shown.
7. Throats connecting to District were modified, and parallel parking was
added where possible. Note to TRG: due to water line construction
under way, we were not able to change the throat of Bond street on
the west side of District ave. we did change the east side of this
intersection.
8. Crosswalk designs updated throughout the site.
9. One specific change I need you to show Bill Fritz is sidewalk on the
East Side of A3 (BRMS building). Former plan check comment
requested a sidewalk on the east façade of the building. Due to
grade changes at the NE corner of this building and our stone clad
entrance retaining walls, we have modified this as follows: The
sidewalk on the south side of A3 now connects to sidewalk on Rt. 29.