HomeMy WebLinkAboutWPO201200039 Inspection 2013-03-13 Interim Use 4 ^)
Date Received: 3 Fee Paid: / j OAF ALp„
Received by: - i ' �i'1 i 1,_11..•
•
(Make: Forwar• ,Management Analyst r I I 1.®
144Wir .
INSPECTION REQUEST
PROJECT NAME: OtskrickA*tei,ve. %)4d Eli it \4r. (1 i%-Z0►Z-0003(0
(as on bond estimate request form and approved plan)
An.eiutsiltA r ioSnecclt� —ro ovt 6rAN•er f,....4.‘ Si-4c. -'O'P�3 Zott-Goo 54
This is to request that an inspection be performed by the County. Where fees are assessed,a fee is required for
each inspection. Please check the inspections requested.
S , q2£lig/S,/
Erosion&Sediment Control per Water Protection Ordinance section 17-207
❑ Stormwater Management per Water Protection Ordinance section 17-306 $60
O Subdivision(roads,drainage,etc.)per Subdivision Ordinance section 14-435 and 14-438; $250
❑ Water&Sewer per Subdivision Ordinance section 14-435 $250
O Site Development Performance bond(Incomplete Site Work&Landscape Maintenance) $280
Inspections for the purposes of bond reduction or release will require a separate fee for each bond.
Submit requests to: Department of Community Development,401 McIntire Road,North Wing,Charlottesville,
VA 22902,Attention: Management Analyst-Phone 434-296-5832;Fax 434-972-4126. The County will try to
make inspections within thirty days of receipt of this request and the required fee. Bonds will not be reduced
below 20%of the original amount. This amount is held until acceptance of the bonded improvements.
If this inspection is for a public or private street which is not bonded,the S250 fee applies and it will be
processed as an inspection per the Subdivision Ordinance.
For Site Development Performance bonds, if landscape installation is part of the bonded incomplete site work,a
request for reduction should only be made once all site work is complete and the project is ready to start the
one-year landscape maintenance period. Bonds for landscape maintenance are 33.3%of the total landscaping
value and are maintained at that amount for the one-year maintenance period.
The revised estimate should be sent to;
EMAIL: 'IVA1aghcr 64 edef5.Core)
R- C-IGll4k9hct-
OR REGULAR MAIL ADDRESS: G __ESIENS- A 0e./N,ark. p1 act _-
12..0 Wi`c4:1iV;tn Ave. S.31-kt. 400
Betlnes.bq ► NO zo is O.
Signature ofeloper5°: ; IC:lieu..rg.._—_
IIVANIOS W Cha _ ulnar. . - . faik_ FLI of - 3/r 113
PAlbe_Marr� 1�1,Le-€tameEAAe� L-LC. Date
RECEIVED
MAR 1 3 2013
COMMUNITY
Rs% 7_ =;I 2 nc\,=!OPMENT