HomeMy WebLinkAboutSDP200100055 Plan - Revision 2002-05-31GOLF"HORT'
D I R T
PRACr_'t"ICE Alv
WIF 40"114
,ASTE AREAS
19:11,101111 to] LNIEZ NOW&= all "a-011
Prior to commencement of any construction within any existing
public right-of-way, including connection to any existing road,
a permit shall be obtained from the Virginia Department of
Transportation ( V.D.O.T.). This plan as drawn may not accurately
reflect the requirements of the permit. Where any discrepancies
occur the requirements of the permit shall govern.
All paving, drainage related materials and construction methods
shall conform to current specifications and standards of V.D.O.T.
unless otherwise noted.
3. Erosion and siltation control measures shall be provided in accordance
with the approved erosion control plan and shall be installed
prior to any clearing, grading or other construction.
4. All slopes and disturbed areas are to be fertilized, seeded and
mulched. The maximium allowable slope is 2: 1 (horizontal: vertical)
Where reasonably obtainable, lesser slopes of 4: 1 or better are
to be achieved.
5. Paved, rip -rap or stabzation mat lined ditch may be_requir
when in the opinion of the Albemarle County DirectDr OT
Engineering, or the Director's designee, it is deened necessa
in order to stabilize a drainage channel.
6. All traffic control signs shall conform with the
Manual for Uniform Traffic Control Devices.
7. Unless otherwise noted all concrete pipe shall be reinforced
concrete pipe - Class III,
8. All excavation for underground pipe installation must comply with
OSHA Standards for the Construction Industry (29 CFR Part 1926) .
51 TE DATA:
LEGAL REFERENCE
TM. 60 E (2) PARCEL I (PART OF)
SOURCE OF TITLE
Dp. 668
OWNER
FARMINGTON COUNTRY CLUB
I COUNTRY CLUB CIRCLE
CHARLOTTESVILLE, VIRGINIA 22901
ZONING
RA , ENTRANCE CORRIDOR OVERLAY DISTRICT
MAGISTERIAL DISTRICT
SAMUEL MILLER
SOURCE OF TOPO & BOUNDARY SURVEY
LOUISA,AERIAL SURVEYS INC,
JAMES H. BELL SURVEYOR
THOMAS B, LINCOLN, LANO SURVEYOR,
DATUM
ASSUMED
BENCHMARK
BM I IS A CHISLEO SQUARE AT STEPS NEXT TO SOUTHEAST CORNER
OF TENNIS COURTS. ELEVATION 649.13
BM 2 IS A CHISLED SQUARE AT THE TOP REAR OF THE CURB
AT THE SOUTHEAST CORNER OF THE PRACTICE TEE PARKING LOT.
ELEVATION 624.09
SETBACKS
THERE ARE NO PROPOSED BUILDINGS OR PARKING IN THIS PROJECT.
r,
THE SHORT 'GAME PRACTICE AREA CONSISTS OF THE FOLLOWING:
• THE CONSTAVUbON OF A NEW GREEN WHICH WILL SHORTEN FAIRWAY NUMBER 9 EAST.
• THE CONSTRUCTION OF THREE REPLACEMENT TEES FOR NUMBER I EAST FAIRWAY.
• THE CONSTRUCTION OF TWO NEW GREENS FOR THE SHORT � GAME - PRACTICE AREA WITHIN
THE EXISTING NUMBER 9 EAST FAIRWAY.
• THE CONVERSION OF THE ORIGINAL GREEN 9 EAST INTO A CHIPPING/ PUTTING GREEN.
• THIS WILL PROVIDE FOR THE TEACHING AND PRACTICE OF BUNKER SHOTS,.PITCH SHOTS,
OF UP TOW YARDS, PUTTING SHORT SHOTS, AND CHIP SHOTS AROUND THE GREENS.
GRADING NECESSARY TO ACCOMPLISH THIS WILL RESULT IN EXCESS SOIL.
THIS EXCESS SOIL WILL BE UTILIZED TO FILL A SMALL, SHALLOW POND NEAR THE RAILROAD
TRACKS AND TO WIDEN FAIRWAY NUMBER I EAST. AN EROSION CONTROL PLAN (COUNTYNUMBER
1763) HAS BEEN APPROVED TO ACCOMPLISH THIS.
rr.F-T TX-. r#T.
.�illilill�llililil�ill'l!l�llill'! IT1111 ITIM III
WARKING SCHEDULE
THERE ARE NO CHANGES BEING MADE TO THIS SITE THAT WOULD
1EQUIRE ADDITIONAL PARKING SPACES
71ii
nil 1=11_xra I
�1101=11=&-SNAMJI
APPROVAL
Mma-IMI&TUNITim M.1-
VIRGINIA DEPT. OF HEALTH
MAY 31, 2002
SEE SHEET 5/8 FOR
REVISION TO THIS PLAN
TABLE
OF CONTENTS
C0
IN
SHEET 1/8 ---
COVER SHEET
CU
SHEET 2/8 ---
OVERVIEW SHEET
SHEET 318 ---
SHORT GAME PRACTICE AREA
Z
4_l
SHEET 4/8 ---
CART PATH PLAN
Ir
SHEET 5/8 ---
CART PATH PLAN
SHEET 6/8 ---
SHORT GAME CONSTRUCTION PLAN
U
-
SHEET 7/8 ---
WASTE AREA PLANS
�!
SHEET 8/8 ---
LANDSCAPE PLAN
LU
ZF-
0
F-
Uj
CC
> cc
J
CD
Cc
0
u1i
F --i
>
M
cn
Eli
cr
Z'
Z
't
D
"JI
M
LFIELU
)NTV U
Z
ED
Z
Cr
Z
<
itKKtLL
t0l. TI 10P
OLD
SALEM
cc
glbe?
-7
SITES
SEE SHE
FOR EXACT
2/8
LO
TIO
S
FARMINGTOM!
3V
J)
(�)CA
Pl'
4TERB
ILLS
6-A r, NT
y 1�
Barr I
Loy
`FIS nti,;VICINITY
SCALE
MARMFR J,
.,,----7/
i�
7
Ypo
R
I
\
_e7l
1 = 2,00
TL
IVY
10
R N
WARKING SCHEDULE
THERE ARE NO CHANGES BEING MADE TO THIS SITE THAT WOULD
1EQUIRE ADDITIONAL PARKING SPACES
71ii
nil 1=11_xra I
�1101=11=&-SNAMJI
APPROVAL
Mma-IMI&TUNITim M.1-
VIRGINIA DEPT. OF HEALTH
MAY 31, 2002
SEE SHEET 5/8 FOR
REVISION TO THIS PLAN
REVISIONS
AUGUST 10, 1998
SEPT. 17, 1998
MAY 25,2000
OCTOBER 11, 2000
(SHEET NUMBERING
CHANGED, TABLE OF
CONTENTS REVISED)
FEBRUARY 28, 2001
(SHEET NUMBERING
CHANGED)
IMAY 31, -2002
PROP. RIP RAP
EXTENSION & 6" DRAIN
DATE
JULY 13, 1998
TABLE
OF CONTENTS
C0
IN
SHEET 1/8 ---
COVER SHEET
CU
SHEET 2/8 ---
OVERVIEW SHEET
SHEET 318 ---
SHORT GAME PRACTICE AREA
Z
4_l
SHEET 4/8 ---
CART PATH PLAN
Ir
SHEET 5/8 ---
CART PATH PLAN
SHEET 6/8 ---
SHORT GAME CONSTRUCTION PLAN
U
-
SHEET 7/8 ---
WASTE AREA PLANS
�!
SHEET 8/8 ---
LANDSCAPE PLAN
LU
ZF-
0
F-
REVISIONS
AUGUST 10, 1998
SEPT. 17, 1998
MAY 25,2000
OCTOBER 11, 2000
(SHEET NUMBERING
CHANGED, TABLE OF
CONTENTS REVISED)
FEBRUARY 28, 2001
(SHEET NUMBERING
CHANGED)
IMAY 31, -2002
PROP. RIP RAP
EXTENSION & 6" DRAIN
DATE
JULY 13, 1998
C0
IN
CU
Z
4_l
0
Ir
0
M
U)
0
U
-
_j
Wj
�!
CZ
LU
ZF-
0
F-
Uj
CC
> cc
J
CD
Cc
0
u1i
F --i
>
M
cn
Eli
cr
Z'
Z
't
D
LLJ
0
Z
ED
Z
Cr
Z
<
REVISIONS
AUGUST 10, 1998
SEPT. 17, 1998
MAY 25,2000
OCTOBER 11, 2000
(SHEET NUMBERING
CHANGED, TABLE OF
CONTENTS REVISED)
FEBRUARY 28, 2001
(SHEET NUMBERING
CHANGED)
IMAY 31, -2002
PROP. RIP RAP
EXTENSION & 6" DRAIN
DATE
JULY 13, 1998
SHEET
1/8
UjC9 I
Uj
U)
C)
C
Cr -3
0
WUj
> cc
J
CD
F --i
SHEET
1/8
yy A
c ra �'� h}. �„ �:G .�