Loading...
HomeMy WebLinkAboutSDP200100055 Plan - Revision 2002-05-31GOLF"HORT' D I R T PRACr_'t"ICE Alv WIF 40"114 ,ASTE AREAS 19:11,101111 to] LNIEZ NOW&= all "a-011 Prior to commencement of any construction within any existing public right-of-way, including connection to any existing road, a permit shall be obtained from the Virginia Department of Transportation ( V.D.O.T.). This plan as drawn may not accurately reflect the requirements of the permit. Where any discrepancies occur the requirements of the permit shall govern. All paving, drainage related materials and construction methods shall conform to current specifications and standards of V.D.O.T. unless otherwise noted. 3. Erosion and siltation control measures shall be provided in accordance with the approved erosion control plan and shall be installed prior to any clearing, grading or other construction. 4. All slopes and disturbed areas are to be fertilized, seeded and mulched. The maximium allowable slope is 2: 1 (horizontal: vertical) Where reasonably obtainable, lesser slopes of 4: 1 or better are to be achieved. 5. Paved, rip -rap or stabzation mat lined ditch may be_requir when in the opinion of the Albemarle County DirectDr OT Engineering, or the Director's designee, it is deened necessa in order to stabilize a drainage channel. 6. All traffic control signs shall conform with the Manual for Uniform Traffic Control Devices. 7. Unless otherwise noted all concrete pipe shall be reinforced concrete pipe - Class III, 8. All excavation for underground pipe installation must comply with OSHA Standards for the Construction Industry (29 CFR Part 1926) . 51 TE DATA: LEGAL REFERENCE TM. 60 E (2) PARCEL I (PART OF) SOURCE OF TITLE Dp. 668 OWNER FARMINGTON COUNTRY CLUB I COUNTRY CLUB CIRCLE CHARLOTTESVILLE, VIRGINIA 22901 ZONING RA , ENTRANCE CORRIDOR OVERLAY DISTRICT MAGISTERIAL DISTRICT SAMUEL MILLER SOURCE OF TOPO & BOUNDARY SURVEY LOUISA,AERIAL SURVEYS INC, JAMES H. BELL SURVEYOR THOMAS B, LINCOLN, LANO SURVEYOR, DATUM ASSUMED BENCHMARK BM I IS A CHISLEO SQUARE AT STEPS NEXT TO SOUTHEAST CORNER OF TENNIS COURTS. ELEVATION 649.13 BM 2 IS A CHISLED SQUARE AT THE TOP REAR OF THE CURB AT THE SOUTHEAST CORNER OF THE PRACTICE TEE PARKING LOT. ELEVATION 624.09 SETBACKS THERE ARE NO PROPOSED BUILDINGS OR PARKING IN THIS PROJECT. r, THE SHORT 'GAME PRACTICE AREA CONSISTS OF THE FOLLOWING: • THE CONSTAVUbON OF A NEW GREEN WHICH WILL SHORTEN FAIRWAY NUMBER 9 EAST. • THE CONSTRUCTION OF THREE REPLACEMENT TEES FOR NUMBER I EAST FAIRWAY. • THE CONSTRUCTION OF TWO NEW GREENS FOR THE SHORT � GAME - PRACTICE AREA WITHIN THE EXISTING NUMBER 9 EAST FAIRWAY. • THE CONVERSION OF THE ORIGINAL GREEN 9 EAST INTO A CHIPPING/ PUTTING GREEN. • THIS WILL PROVIDE FOR THE TEACHING AND PRACTICE OF BUNKER SHOTS,.PITCH SHOTS, OF UP TOW YARDS, PUTTING SHORT SHOTS, AND CHIP SHOTS AROUND THE GREENS. GRADING NECESSARY TO ACCOMPLISH THIS WILL RESULT IN EXCESS SOIL. THIS EXCESS SOIL WILL BE UTILIZED TO FILL A SMALL, SHALLOW POND NEAR THE RAILROAD TRACKS AND TO WIDEN FAIRWAY NUMBER I EAST. AN EROSION CONTROL PLAN (COUNTYNUMBER 1763) HAS BEEN APPROVED TO ACCOMPLISH THIS. rr.F-T TX-. r#T. .�illilill�llililil�ill'l!l�llill'! IT1111 ITIM III WARKING SCHEDULE THERE ARE NO CHANGES BEING MADE TO THIS SITE THAT WOULD 1EQUIRE ADDITIONAL PARKING SPACES 71ii nil 1=11_xra I �1101=11=&-SNAMJI APPROVAL Mma-IMI&TUNITim M.1- VIRGINIA DEPT. OF HEALTH MAY 31, 2002 SEE SHEET 5/8 FOR REVISION TO THIS PLAN TABLE OF CONTENTS C0 IN SHEET 1/8 --- COVER SHEET CU SHEET 2/8 --- OVERVIEW SHEET SHEET 318 --- SHORT GAME PRACTICE AREA Z 4_l SHEET 4/8 --- CART PATH PLAN Ir SHEET 5/8 --- CART PATH PLAN SHEET 6/8 --- SHORT GAME CONSTRUCTION PLAN U - SHEET 7/8 --- WASTE AREA PLANS �! SHEET 8/8 --- LANDSCAPE PLAN LU ZF- 0 F- Uj CC > cc J CD Cc 0 u1i F --i > M cn Eli cr Z' Z 't D "JI M LFIELU )NTV U Z ED Z Cr Z < itKKtLL t0l. TI 10P OLD SALEM cc glbe? -7 SITES SEE SHE FOR EXACT 2/8 LO TIO S FARMINGTOM! 3V J) (�)CA Pl' 4TERB ILLS 6-A r, NT y 1� Barr I Loy `FIS nti,;VICINITY SCALE MARMFR J, .,,----7/ i� 7 Ypo R I \ _e7l 1 = 2,00 TL IVY 10 R N WARKING SCHEDULE THERE ARE NO CHANGES BEING MADE TO THIS SITE THAT WOULD 1EQUIRE ADDITIONAL PARKING SPACES 71ii nil 1=11_xra I �1101=11=&-SNAMJI APPROVAL Mma-IMI&TUNITim M.1- VIRGINIA DEPT. OF HEALTH MAY 31, 2002 SEE SHEET 5/8 FOR REVISION TO THIS PLAN REVISIONS AUGUST 10, 1998 SEPT. 17, 1998 MAY 25,2000 OCTOBER 11, 2000 (SHEET NUMBERING CHANGED, TABLE OF CONTENTS REVISED) FEBRUARY 28, 2001 (SHEET NUMBERING CHANGED) IMAY 31, -2002 PROP. RIP RAP EXTENSION & 6" DRAIN DATE JULY 13, 1998 TABLE OF CONTENTS C0 IN SHEET 1/8 --- COVER SHEET CU SHEET 2/8 --- OVERVIEW SHEET SHEET 318 --- SHORT GAME PRACTICE AREA Z 4_l SHEET 4/8 --- CART PATH PLAN Ir SHEET 5/8 --- CART PATH PLAN SHEET 6/8 --- SHORT GAME CONSTRUCTION PLAN U - SHEET 7/8 --- WASTE AREA PLANS �! SHEET 8/8 --- LANDSCAPE PLAN LU ZF- 0 F- REVISIONS AUGUST 10, 1998 SEPT. 17, 1998 MAY 25,2000 OCTOBER 11, 2000 (SHEET NUMBERING CHANGED, TABLE OF CONTENTS REVISED) FEBRUARY 28, 2001 (SHEET NUMBERING CHANGED) IMAY 31, -2002 PROP. RIP RAP EXTENSION & 6" DRAIN DATE JULY 13, 1998 C0 IN CU Z 4_l 0 Ir 0 M U) 0 U - _j Wj �! CZ LU ZF- 0 F- Uj CC > cc J CD Cc 0 u1i F --i > M cn Eli cr Z' Z 't D LLJ 0 Z ED Z Cr Z < REVISIONS AUGUST 10, 1998 SEPT. 17, 1998 MAY 25,2000 OCTOBER 11, 2000 (SHEET NUMBERING CHANGED, TABLE OF CONTENTS REVISED) FEBRUARY 28, 2001 (SHEET NUMBERING CHANGED) IMAY 31, -2002 PROP. RIP RAP EXTENSION & 6" DRAIN DATE JULY 13, 1998 SHEET 1/8 UjC9 I Uj U) C) C Cr -3 0 WUj > cc J CD F --i SHEET 1/8 yy A c ra �'� h}. �„ �:G .�