Loading...
HomeMy WebLinkAboutWPO201600034 Approval - County 2016-12-01COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902-4596 Phone (434) 296-5832 Fax (434) 972-4126 VSMP Permit plan review Project title: Greenloft Farm Project file number: WP0201600034 Plan preparer: Collins Engineering [scott@collins-engineering.com] Owner or rep.: Wright 104, LLC Date Received: 4 May 2016 (Rev. 1) 24 October 2016 (Rev. 2) 7 November 2016 Date of comments: 25 May 2016 (Rev. 1) 31 October 2016 (Rev. 2) 1 December 2016 Reviewer: Matt Wentland County Code section 17-410 and Virginia Code §62.1-44.15:34 requires the VSMP authority to act on any VSMP permit by issuing a project approval or denial. This project is approved. The rationale is given in the comments below. The application may be resubmitted for approval if all of the items below are satisfactorily addressed. The VSMP application content requirements can be found in County Code section 17-401. A. Stormwater Pollution Prevention Plan (SWPPP) The SWPPP content requirements can be found in County Code section 17-405. A SWPPP must contain (1) a PPP, (2) an ESOP, (3) a SWMP, and (4) any TMDL measures necessary. 1. Please include signatures on all documents in the SWPPP where required. The Articles of Incorporation for Wright 104 LLC, along with the consent form that was provided, will need to be reviewed by legal before non -owner signatures will be allowed on the SWPPP documents and bonds. Please provide a copy of the Articles for review. (Rev. 1) Partially Addressed. The certification will need to be signed. (Rev. 2) Comment addressed B. Pollution Prevention Plan (PPP) The PPP content requirements can be found in County Code section 17-404. 1. This requirement appears adequately addressed at this time. C. Stormwater Management Plan (SWMP) VSMP Regulation 9VAC25-870-108 requires the VSMP authority to approve or disapprove a SWMP. This plan is approved, and the reasons are provided in the comments below. The stormwater management plan content requirements can be found in County Code section 17-403. The area used for Forested/Open space in the VRRM calculations will need to be recorded before approval of the VSMP plan. The plat/deed will have to be reviewed and approved by the County Attorney's Office before recordation. (Rev. 1) Comment not addressed. The forested/open space can also be bonded by bonding the number of pollutant credits associated with this space. Engineering Review Comments Page 2 of 3 Please contact John Blair in the County Attorney's Office for further guidance on the deed language. (Rev. 2) Comment addressed. The forested/open space will be bonded with the VSMP bond. 2. Swales (including their design and calculations) outside of the road easement should be shown on the VSMP plan. The swale on Lot 16 appears to outlet to a natural channel that crosses onto TMP 89-22B and then disappears on the next property before crossing over that neighbor's driveway. This swale will need to address the channel and flood protection in 9VAC25-870-66, converted to sheet flow with a level spreader, or be redirected to the basin or an adequate channel. (Rev. 1) Comment addressed. 3. Show easements on proposed stormwater measures. (Rev. 1) Comment addressed. D. Erosion and Sediment Control Plan (ESOP) Virginia Code §62.1-44.15:55 requires the VESCP authority to approve or disapprove an ESOP. This plan is approved, and the reasons are provided in the comments below. The erosion control plan content requirements can be found in County Code section 17-402. 1. Provide inlet protection on the new inlet at the entrance. (Rev. 2) Comment addressed. The VSMP permit application and all plans may be resubmitted for approval when all comments have been satisfactorily addressed. For re -submittals please provide 2 copies of the complete permit package with a completed application form. Engineering plan review staff are available from 2-4 PM on Thursdays, should you require a meeting to discuss this review. Process; After approval, plans will need to be bonded. The bonding process is begun by submitting a bond estimate request form and fee to the Department of Community Development. One of the plan reviewers will prepare estimates and check parcel and easement information based on the approved plans. The County's Management Analyst will prepare bond agreement forms, which will need to be completed by the owner and submitted along with cash, certificates or sureties for the amounts specified. The agreements will need to be approved and signed by the County Attorney and County Engineer. This may take 2-4 weeks to obtain all the correct signatures and forms. Stormwater Management Facilities Maintenance agreements will also need to be completed and recorded. The County's Management Analyst or other staff will prepare the forms and check for ownership and signature information. The completed forms will need to be submitted along with court recording fees. After bonding and agreements are complete, county staff will need to enter project information in a DEQ database for state application processing. DEQ will review the application information based on local VSMP authority approval. At this time, the DEQ portion of the application fees will need to be paid directly to the state. For fastest processing, this is done electronically with the emails provided on the application. DEQ should notify applicants with instructions on how to pay fees. When DEQ approves the application, they will issue a permit coverage letter. This should be copied to the county. After DEQ coverage is issued, via the coverage letter, the County can hold a pre -construction conference. Applicants will need to complete the request for a pre -construction conference form, and pay the remainder of the application fee. The form identifies the contractor and responsible land disturber, and the fee remaining to Engineering Review Comments Page 3 of 3 be paid. This will be checked by county staff, and upon approval, a pre -construction conference will be scheduled with the County inspector. At the pre -construction conference, should everything proceed satisfactorily, a joint VSMP and grading permit will be issued by the County so that work may begin. County forms can be found on the county website forms center under engineering; http://www.albemarle.org/deptforms.asp?department=cden.gwpo File: WPO201600034 Greenloft Farm approval rev2 12-01-16.doc