HomeMy WebLinkAboutWPO201600034 Bond Estimates 2016-12-01Greenloft Farm
WPO file number: WP0201600034
Stormwater Management Plan Bond Estimate
Item Item
Number
permanent diversion or ditch
standard manhole frame top (not inlet)
drop inlet or grate
manhole structure (per ft. rise)
pipe, rcp, cmp (15 to 48") 18.0 in d
aggregate base or drainage stone 2.0 in d
Remaining riprap included w/ E&S bond
Earthwork for Detention Basin A
Earthwork for Detention Basin C
height of dam at toe
height of fill at face
length of dam
*Volume anaylsis performed in Civil3D, top width
includes grading necessary to convert (area above transition)
sediment basin to SWM facility. (total width of dam)
0 cy cut, 751 cy fill (height below transitioi
(area below transition)
(total fill volume)
length of spillway
width of spillway
3 EW -1 0 ES -1
115.0ftL 6.0ftW
ft
height of dam at toe
ft
height of fill at face
cut at face
length of dam
*Volume anaylsis performed in Civil3D,
top width
includes grading necessary to convert
(area above transition)
sediment basin to SWM facility.
(total width of dam)
9 cy cut, 8,342 cy fill
(height below transitioi
0 sf
(area below transition)
(total width of cut)
(total fill volume)
0 ft
length of spillway
0 ft
width of spillway
Basin structure included w/ E&S bond
0 sf
0.0 cy
riser height
0.0 cy
riser diameter
JOAL CY estimate)
barrel length
ft
barrel diameter
Earthwork for Detention Basin C
height of dam at toe
height of fill at face
length of dam
*Volume anaylsis performed in Civil3D, top width
includes grading necessary to convert (area above transition)
sediment basin to SWM facility. (total width of dam)
0 cy cut, 751 cy fill (height below transitioi
(area below transition)
(total fill volume)
length of spillway
width of spillway
3 EW -1 0 ES -1
115.0ftL 6.0ftW
ft
cut at high side
ft
ft
cut at face
ft
ft
length of cut
ft
ft
width of cut
ft
0 sf
(area below transition
0 sf
0 ft
(total width of cut)
0 ft
0 ft
(depth below transitio
0 ft
0 sf
(area above transition
0 sf
0.0 cy
(total fill volume)
0.0 cy
ft
JOAL CY estimate)
8345 cy
ft
(spillway stone tons)
0 tons
ft
in
(riser unit price)
$0.00
ft
base plate or fdn
in
(barrel unit price)
$0.00
barrel collars
0
baffle length
0 ft
ft
cut at high side
ft
ft
cut at face
ft
ft
length of cut
ft
ft
width of cut
ft
0 sf
(area below transition
0 sf
0 ft
(total width of cut)
0 ft
0 ft
(depth below transitio
0 ft
0 sf
(area above transition
0 sf
0.0 cy
(total fill volume)
0.0 cy
ft
JOAL CY estimate)
751 cy
ft
(spillway stone tons)
0 tons
No. Unit
Unit Cost
Cost
installed
1500 ft
$13.00
$19,500.00
2 ea
$500.00
$1,000.00
1 ea
$3,500.00
$3,500.00
14 ft
$450.00
$6,300.00
344 ft
$40.00
$15,260.00
8.1 ton
$35.00
$281.75
$13.00 $108,484.61
$50.00 $0.00
$0.00
$200.00 $0
$0.00
$200.00 $0
$50.00 $0
$13.00 $9,763.00
$50.00 $0.00
12/1/2016
Greenloft Farm
WPO file number: WP0201600034
Stormwater Management Plan Bond Estimate
Item Item
Number
Basin structure included w/ E&S bond
riser height
riser diameter
barrel length
barrel diameter
Level Spreader Excavation, Lip & Stone
trash rack/ anti vortex devices
maintenance access road (LF)
rip -rap, placed depth
volume (cu. ft.)
survey and layout (price per 0.1 mi.) acres
mobilization
as -built drawings (per facility)
materials testing (per facility)
compaction testing (per dam)
Nutrient credits/Forested & Open Space Plat
ft
in (riser unit price) $0.00
ft base plate or fdn
in (barrel unit price) $0.00
barrel collars 0
baffle length 0 ft
ft length ft
(tons) 0
0.25 basins 2
No. Unit
Unit Cost
Cost
$37,046.44
installed
$407,520
$0.00
$200.00
$0
$0.00
$200.00
$0
$50.00
$0
1 ea
$750.00
$750.00
2 ea
$1,500.00
$3,000.00
840 ft
$50.00
$42,000.00
$30.00
$0.00
$1,125.00
$500.00
1 ea
$2,000.00
$2,000.00
1 ea
$2,000.00
$2,000.00
1 ea
$5,000.00
$5,000.00
10 lb/yr
$15,000.00
$150,000.00
cost sum
$370,464.36
contingency
$37,046.44
Total
$407,520
12/1/2016
Greenloft Farm
WPO file number: WP0201600034
Erosion and Sediment Control Bond Estimate
Item Item
No. Unit
Unit Cost
Cost
Number
installed
stablization (PS, TS)
11.8 acres
$5,000.00
$59,000.00
silt fence (SF)
7700.0 ft
$5.00
$38,500.00
safety fence (SAF)
2235.0 ft
$5.00
$11,175.00
diversion (DD, FD, RWD)
3315 ft
$13.00
$43,095.00
temporary slope drain (TSD)
pipe length
430 ft
pipe diameter
15 in
$35.00
$15,550.00
earthwork for Sediment Basin #A
height of dam at toe
ft
cut at high side
ft
height of fill at face
ft
cut at face
ft
length of dam
ft
length of cut
ft
top width
ft
width of cut
ft
'Volume analysis performed in Civil3d
(area above transition)
0 sf
(area below transitior
0 sf
2,810 cy cut, 435 cy fill
(total width of dam)
0 ft
(total width of cut)
0 ft
(height below transition)
0 ft
(depth below transitic
0 ft
(area below transition)
0 sf
(area above transitior
0 sf
(total fill volume)
0.0 cy
(total fill volume)
0.0 cy
length of spillway
ft
(TOAL CY estimate)
2954 cy
$13.00
$38,396.15
width of spillway
ft
(spillway stone tons)
0 tons
$30.00
$0.00
structures for Sediment Basin #A
riser height
10.5 ft
riser diameter
42 in
(riser unit price)
$75.00
$787.50
barrel length
88 ft
base plate or fdn
1
$200.00
$200
barrel diameter
18 in
(barrel unit price)
$40.00
$3,520.00
barrel collars
2
$200.00
$400
baffle length
56 ft
$40.00
$2,240
earthwork for Sediment Basin #C
height of dam at toe
ft
cut at high side
ft
height of fill at face
ft
cut at face
ft
length of dam
ft
length of cut
ft
top width
ft
width of cut
ft
'Volume analysis performed in Civil3d
(area above transition)
0 sf
(area below transitior
0 sf
430 cy cut, 370 cy fill
(total width of dam)
0 ft
(total width of cut)
0 ft
(height below transition)
0 ft
(depth below transitic
0 ft
(area below transition)
0 sf
(area above transitior
0 sf
(total fill volume)
0.0 cy
(total fill volume)
0.0 cy
length of spillway
ft
(TOAL CY estimate)
552 cy
$13.00
$7,177.30
width of spillway
ft
(spillway stone tons)
0 tons
$30.00
$0.00
structures for Sediment Basin #C
riser height
7.54 ft
riser diameter
36 in
(riser unit price)
$70.00
$527.80
barrel length
61.5 ft
base plate or fon
1
$200.00
$200
barrel diameter
18 in
(barrel unit price)
$40.00
$2,460.00
barrel collars
2
$200.00
$400
baffle length
0 ft
$40.00
$0
12/1/2016
Greenloft Farm
WPO file number: WP0201600034
Erosion and Sediment Control Bond Estimate
Item Item
Number
No. Unit Unit Cost Cost
(installed)
earthwork for Sediment Trap #1
height of dam at toe
ft
cut at high side
ft
height of fill at face
ft
cut at face
ft
length of dam
ft
length of cut
ft
top width
ft
width of cut
ft
*Volume analysis performed in Civil3d
(area above transition)
0 sf
(area below transitior
0 sf
1826 cy cut, 1 cy fill
(total width of dam)
0 ft
(total width of cut)
0 ft
(height below transition)
0 ft
(depth below transitic
0 ft
(area below transition)
0 sf
(area above transitior
0 sf
(total fill volume)
0.0 cy
(total fill volume)
0.0 cy
length of spillway
ft
(TOAL CY estimate)
1826 cy
$13.00
$23,742.29
width of spillway
ft
(spillway stone tons)
24 tons
$30.00
$720.00
earthwork for Sediment Trap #2
height of dam at toe
ft
cut at high side
ft
height of fill at face
ft
cut at face
ft
length of dam
ft
length of cut
ft
top width
ft
width of cut
ft
*Volume analysis performed in Civil3d
(area above transition)
0 sf
(area below transitior
0 sf
524 cy cut, 124 cy fill
(total width of dam)
0 ft
(total width of cut)
0 ft
(height below transition)
0 ft
(depth below transitic
0 ft
(area below transition)
0 sf
(area above transitior
0 sf
(total fill volume)
0.0 cy
(total fill volume)
0.0 cy
length of spillway
ft
(TOAL CY estimate)
565 cy
$13.00
$7,343.96
width of spillway
ft
(spillway stone tons)
15 tons
$30.00
$450.00
earthwork for Sediment Trap #3
height of dam at toe
ft
cut at high side
ft
height of fill at face
ft
cut at face
ft
length of dam
ft
length of cut
ft
top width
ft
width of cut
ft
*Volume analysis performed in Civil3d
(area above transition)
0 sf
(area below transitior
0 sf
1,107 cy cut, 23 cy fill
(total width of dam)
0 ft
(total width of cut)
0 ft
(height below transition)
0 ft
(depth below transitic
0 ft
(area below transition)
0 sf
(area above transitior
0 sf
(total fill volume)
0.0 cy
(total fill volume)
0.0 cy
length of spillway
ft
(TOAL CY estimate)
1115 cy
$13.00
$14,489.67
width of spillway
ft
(spillway stone tons)
7 tons
$30.00
$210.00
12/1/2016
Greenloft Farm
WPO file number: WP0201600034
Erosion and Sediment Control Bond Estimate
Item Item
Number
earthwork for Sediment Trap #4
height of dam at toe
ft
cut at high side
ft
height of fill at face
ft
cut at face
ft
length of dam
ft
length of cut
ft
top width
ft
width of cut
ft
*Volume analysis performed in Civil3d
(area above transition)
0 sf
(area below transitior
0 sf
965 cy cut, 12 cy fill
(total width of dam)
0 ft
(total width of cut)
0 ft
(height below transition)
0 ft
(depth below transitic
0 ft
(area below transition)
0 sf
(area above transitior
0 sf
(total fill volume)
0.0 cy
(total fill volume)
0.0 cy
length of spillway
ft
(TOAL CY estimate)
969 cy
width of spillway
ft
(spillway stone tons)
4 tons
silt fence inlet protection (IP)
stone inlet protection (IP)
outlet protection (OP) (9 total)
total area
600 sf
channel (SCC, matted)
length
ft
width
ft
check dam
depth in channel
ft
channel width
ft
construction entrance (CE)
wash rack
paved construction entrance
rip -rap, placed
depth
ft
length
1.0 ft
width
(tons)
0 tons
survey and layout (price per 0.1 mi.)
acres
49.23
traps and basins
6
mobilization
stream crossing (computed independently)
No. Unit Unit Cost Cost
(installed)
$13.00 $12,596.48
$30.00 $120.00
$100.00 $0.00
5 $200.00 $1,000.00
1 $2,700.00 $2,700.00
$0.00
$0.00 $0.00
$2,000.00 $0.00
1 $2,000.00 $2,000.00
1 $3,500.00 $3,500.00
$30.00 $0.00
$27,615.00
$500.00
$0.00
cost sum $320,616.15
contingency $32,061.62
Total $352,680
12/1/2016