Loading...
HomeMy WebLinkAboutSUB201600131 Bond Estimates 2016-12-05Avinity Phase IV Road and Infrastructure Construction Bond Estimate (roads, site work, storm sewer) Plan # SUB201600131 Item Road Name $35.00 $17,525.67 0% Begin station 10+00.00 $10.00 $0.00 End station 13+70.00 road length 370.0 ft aggregate base 8.0 in d 370.0 ft L 29.0 ft W blotted or prime&double seal $120.00 370.0 ft L 0.0 ft W asphalt base 3.0 in d 370.0 it L 29.0 ft W asphalt surface 2.0 in d 370.0 it L 29.0 ft W curb CG -2 0% $10,050.00 170.0 ft curb CG -6 $2,890.00 0% $2,890.00 sidewalk, concrete (6) $350.00 $1,750.00 0% ramp CG -12 2 each $200.00 $400.00 street name sign $400.00 5 each $200.00 traffic control sign 0% $1,000.00 13 each Street Landscape $3,575.00 P"- 13 Each $3,575.00 guardrail $17.00 0 ESC 3000 drop inlet or grate F 6 each $3,500.00 $21,000.00 standard manhole frame top (not inlet) $21,000.00 2 each $500.00 manhole structure (per ft. rise) 0% $1,000.00 55 ft pipe, rcp, cmp (15 to 48") ORR in d 0 ES -1,2 0 EC -1 pipe, rcp, cmp (15 to 48") 18.0 in d 0 ES -1,2 0 EC -1 pipe, rcp, cmp (15 to 48") 24.0 in d 0 1 ES -1,2 0 EC -1 pipe, rcp, cmp (15 to 48") 36.0 in d 0 ES -1,2 0 EC -1 pipe, rcp, cmp (15 to 48") 42.0 in d 0 ES -1,2 0 EC -1 pipe, rcp, cmp (60 to 108") 96.0 in d 0 ES -1,2 0 EC -1 rip -rap, placed 2.0 ft d 12.0 it L&:w matting, EC -2 or 3 $60.00 0.0 it Lclear $1,555.20 and grub (for wooded sites) $2.00 0.0 ft Lt W cut grading $24,000.00 $0.00 0% fill grading -ey $4.00 $0.00 as -built drawings (1k+price per 0.1 mi.) $0.00 370.0 ft L 0.0701 mi. survey and layout (price per 0.1 mi.) 0% 370.0 ft L 0.0701 mi. mobilization $3,000.00 0% $3,000.00 materials testing $2,000.00 370.0 ft L 0.74 inc of 500' compaction testing -Isum 370.0 ft L 0.74 inc of 500' CBR tests (1 every 0.1 mi. per road) $5,000.00 370.0 ft L 0.74 inc of 500' stone depth inspections 0% 370.0 ft L 0.74 inc of 500' pavement inspections $360.00 370.0 ft L 0.74 inc of 500' pipe and drainage video inspections $200.00 $360.00 0% VDOT surety (1 lane) 2 each 370.0 ft L 0.0701 mi. VDOT maintenance fee (1 In rd, 1 yr) $360.00 370.0 ft L 0.0701 mi. VDOT admin. Cost recovery fee(1 lane) 0% 370.0 ft L 0.0701 mi. No. Unit Unit Cost Cost installed % compete cost remaining 500.7 ton $35.00 $17,525.67 0% $17,525.67 0.0 sy $10.00 $0.00 0% $0.00 197.2 tons $100.00 $19,716.38 0% $19,716.38 131.4 tons $120.00 $15,773.10 0% $15,773.10 180.0 ft $13.00 $2,340.00 0% $2,340.00 670.0 ft $15.00 $10,050.00 0% $10,050.00 170.0 ft $17.00 $2,890.00 0% $2,890.00 5 ft $350.00 $1,750.00 0% $1,750.00 2 each $200.00 $400.00 0% $400.00 5 each $200.00 $1,000.00 0% $1,000.00 13 each $275.00 $3,575.00 0% $3,575.00 0.0 ft $17.00 $0.00 0% $0.00 F 6 each $3,500.00 $21,000.00 0% $21,000.00 2 each $500.00 $1,000.00 0% $1,000.00 55 ft $450.00 $24,750.00 0% $24,750.00 174.0 ft $35.00 $6,090.00 0% $6,090.00 F 170.0 ft $40.00 $6,800.00 0% $6,800.00 77.0 ft $50.00 $3,850.00 0% $3,850.00 219.0 ft $70.00 $15,330.00 0% $15,330.00 25.0 ft $75.00 $1,875.00 0% $1,875.00 ` 0.0 ft $320.00 $0.00 0% $0.00 25.9 ton $60.00 $1,555.20 0% $1,555.20 0.0 sy $2.00 $0.00 0% $0.00 0.0 acre $24,000.00 $0.00 0% $0.00 -ey $4.00 $0.00 0% $0.00 cy $9.00 $0.00 0% $0.00 1 Isum $2,000.00 $3,000.00 0% $3,000.00 1 Isum $2,000.00 $3,000.00 0% $3,000.00 -Isum $5,000.00 $5,000.00 0% $5,000.00 2 each $200.00 $360.00 0% $360.00 2 each $200.00 $360.00 0% $360.00 2 each $200.00 $360.00 0% $360.00 2 each $200.00 $360.00 0% $360.00 2 each $200.00 $360.00 0% $360.00 ---M ft $1.00 $665.00 0% $665.00 0 Lanes $2,000.00 $0.00 0% $0.00 0 Lanes $150.00 $0.00 0% $0.00 ,Lanes $100.00 $0.00 0% $0.00 cost sum $170,735.34 $170,735.34 contingency $17,073.53 $17,073.53 Total $187,810 $187,810 ars\mwentland\Documents\SUB201600131 Avinity Phase IV RP_bond _est _12-05-16.xis 12/5/2016