Loading...
HomeMy WebLinkAboutSDP201600003 Correspondence Final Site Plan and Comps. 2016-11-17 ' r Lore' cow 'IS Christopher Perez From: Jeremy Lynn <jlynn@serviceauthority.org> Sent: Thursday, November 17, 2016 3:34 PM To: Christopher Perez Subject: RE:Wintergreen Sewer bond - Mosby Mtn to Sunset Overlook Attachments: DB3270Pages160-167.pdf; db 3190 pg 654-659.pdf Here is the off-site deed of easement and plat. Jeremy M. Lynn, P.E. Senior Civil Engineer Albemarle County Service Authority 168 Spotnap Road Charlottesville, Virginia 22911 (434)977-4511 From: Christopher Perez [mailto:cperez@albemarle.org] Sent:Thursday, November 17, 2016 3:30 PM To: Jeremy Lynn Subject: RE: Wintergreen Sewer bond - Mosby Mtn to Sunset Overlook Jeremy, Ok, I have my bearings now, see attached scanned plan. It appears Phase I of Wintergreen also has an offsite sewer connection near Turnstone Drive. Is this offsite easement platted?Also, is this off site portion near turner drive included in the bond for phase I of Wintergreen? Christopher P.Perez 1 Senior Planner Department of Community Development County of Albemarle,Virginia 401 McIntire Road I Charlottesville,VA 22902 434.296.5832 ext.3443 From:Christopher Perez Sent:Thursday, November 17,2016 2:35 PM To: 'Jeremy Lynn'<ilynn(a serviceauthority.org> Subject: RE:Wintergreen Sewer bond -Mosby Mtn to Sunset Overlook Jeremy, Has this offsite portion of the sewer connection been included in the bonding. Christopher P.Perez 1 Senior Planner Department of Community Development 1County of Albemarle,Virginia 401 McIntire Road l Charlottesville,VA 22902 434.296.5832 ext.3443 From:Jeremy Lynn [mailto:ilynn@serviceauthority.org] Sent:Thursday, November 10, 2016 9:50 AM To:Ana Kilmer<akilmer@albemarle.org> Cc:Jeremy W.Swink<SwinkJW@stanleymartin.com>;Scott Collins<scott@collins-engineering.com>; Frank Pohl <fpohl@albemarle.org>; Matthew Wentland<mwentland@albemarle.org>; Christopher Perez 1 411, .111101 4 <cperez@albemarle.org>;Andrew Baldwin<andrew@corecville.com> Subject: RE:Wintergreen Sewer bond -Mosby Mtn to Sunset Overlook Ana, 1, Jeremy Swink is correct. The Wintergreen Farm Phase 1 bond estimate of$620,000 included the off-site portion of the sanitary sewer. Jeremy M. Lynn, P.E. Senior Civil Engineer Albemarle County Service Authority 168 Spotnap Road Charlottesville, Virginia 22911 (434)977-4511 From: Ana Kilmer [mailto:akilmer@albemarle.orq] Sent: Thursday, November 10, 2016 9:37 AM To: Jeremy Lynn Cc: Jeremy W. Swink; Scott Collins; Frank Pohl; Matthew Wentland; Christopher Perez; Andrew Baldwin Subject: FW: Wintergreen Sewer bond - Mosby Mtn to Sunset Overlook Jeremy: I have received an e-mail from Jeremy Swink that says that the sunset overlook off-site sewer extension bond in the amount of$125,245 is not required because you have included these improvements in the Wintergreen Farm Phase 1 water and sewer bond in the amount of$620,000(attached). Please let me know if this is correct. Thank you Ana D. Kilmer Management Analyst Community Development Department 401 McIntire Road Charlottesville,VA 22902 434-296-5832 akilmer@albemarle.org From:Jeremy Lynn [mailto:ilynn@serviceauthority.org] Sent:Wednesday,August 31, 2016 4:23 PM To:Ana Kilmer<akilmer@albemarle.org> Cc:Alex Morrison<amorrison@serviceauthority.org> Subject: RE: Wintergreen Sewer bond - Mosby Mtn to Sunset Overlook Ana, The bond amount is correct. I would call this bond Sunset Overlook Off-Site Sewer Extension. Jeremy M. Lynn, P.E. Senior Civil Engineer Albemarle County Service Authority 168 Spotnap Road Charlottesville, Virginia 22911 (434)977-4511 2 Now From: Ana Kilmer [mailto:akilmerOalbemarle.orq] Sent: Wednesday, August 31, 2016 4:09 PM To: Jeremy Lynn Cc: Max Greene Subject: FW: Wintergreen Sewer bond - Mosby Mtn to Sunset Overlook Jeremy: I was not aware that this subdivision bond was needed. What is the name of the project and please confirm the amount of the bond. Thank you Ana D. Kilmer Management Analyst Community Development Department 401 McIntire Road Charlottesville,VA 22902 434-296-5832 akilmer@albemarle.org From:Scott Collins [mailto:scott@collins-engineering.com] Sent:Wednesday,August 31,2016 6:35 AM To:Ana Kilmer<akilmer@albemarle.org> Cc:Andrew Baldwin<andrew@corecville.com>; Christopher Perez<cperez@albemarle.org>;Jeremy Lynn <ilynn@serviceauthoritv.org> Subject: RE:Wintergreen Sewer bond -Mosby Mtn to Sunset Overlook Ana- I sent the wrong estimate,this is the bond amount to be used. ($125,245). Thx. Scott From:Scott Collins Sent:Wednesday,August 31, 2016 6:33 AM To: 'Ana Kilmer' Cc:'Andrew Baldwin'; 'Christopher Perez'; 'Jeremy Lynn' Subject: FW:Wintergreen Sewer bond -Mosby Mtn to Sunset Overlook Ana- Attached is a bond estimate for the offsite sanitary sewer that the developer needs to bond for the Sunset Overlook project. The bonding will be the same as the bonds that were just completed for the E&S and SWM. When you get a chance, can you prepare the paperwork for this bond. Thank you Ana. Scott Collins From:Jeremy Lynn [mailto:ilvnn@serviceauthority.org] Sent: Friday,August 26, 2016 1:51 PM To:Scott Collins 3 Cc:'Christopher Perez';Alexander Morrison Subject: RE: Wintergreen Sewer bond - Mosby Mtn to Sunset Overlook If that were the case, your initial amount would be accurate. I was just going by what was shown on the plans with the casing pipe. Jeremy M. Lynn, P.E. Senior Civil Engineer Albemarle County Service Authority 168 Spotnap Road Charlottesville, Virginia 22911 (434)977-4511 From: Scott Collins [mailto:scott@collins-engineering.com] Sent: Friday, August 26, 2016 1:50 PM To: Jeremy Lynn Cc: 'Christopher Perez'; Alexander Morrison Subject: RE: Wintergreen Sewer bond - Mosby Mtn to Sunset Overlook Thanks Jeremy. I believe the plan is to install the sewer with an open cut of Sunset avenue while the roadway is being improved. Would that help reduce the overall bond amount. From:Jeremy Lynn [mailto:ilynn@serviceauthority.org] Sent: Friday,August 26, 2016 1:46 PM To:Scott Collins Cc: 'Christopher Perez';Alexander Morrison Subject: RE: Wintergreen Sewer bond - Mosby Mtn to Sunset Overlook Scott, The only item missing is the Jack and Bore. That items is actually listed under the waterline, but would be the same in this case. If you add 108' to that line item, the bond amount increases to$180,000. Jeremy M. Lynn, P.E. Senior Civil Engineer. Albemarle County Service Authority 168 Spotnap Road Charlottesville, Virginia 22911 (434)977-4511 From: Scott Collins [mailto:scott@>collins-engineering.com] Sent: Friday, August 26, 2016 1:16 PM To: Jeremy Lynn Cc: 'Christopher Perez' Subject: FW: Wintergreen Sewer bond - Mosby Mtn to Sunset Overlook Jeremy- For the approval of the Sunset overlook site plan, the county wants the developer to bond the sanitary sewer from Mosby mountain up to the manhole that Sunset overlook is tying into. Attached is the bond spreadsheet for this run. Can you confirm for me if this looks acceptable,that way we can set the bond and move toward getting the site plan approved. Thx, Scott 4 • From:Adam Long Sent: Friday,August 26, 2016 10:49 AM To:Scott Collins Subject:Wintergreen Sewer bond - Mosby Mtn to Sunset Overlook $126,000 Adam Long,PE Project Manager Collins Engineering,L.L.C. 200 Garrett Street,Suite K Charlottesville,VA 22902 PH:434.293.3719 adam(a)collins-engineering.com 5 { Christopher Perez From: Christopher Perez Sent: Wednesday, October 05, 2016 9:19 AM To: 'Scott Collins' Cc: Andrew Baldwin;Adam Long; Patricia Saternye Subject: RE: SDP201600003 Sunset Overlook - Final Site Plan Scott, SDP201600003 Sunset Overlook-Final Site Plan Yes, please add the DB PG reference information to the site plan and submit a min of 4 signed copies of the plan for approval. Please assure the conservation checklist is also signed. Once the bonding for the sewer is completed the above site plan can be signed/approval. Christopher P.Perez 1 Senior Planner Department of Community Development County of Albemarle,Virginia 401 McIntire Road 1 Charlottesville,VA 22902 434.296.5832 ext.3443 From:Scott Collins [mailto:scott@collins-engineering.com] Sent:Tuesday,October 04,2016 10:53 AM To:Christopher Perez<cperez@albemarle.org> Cc:Andrew Baldwin<andrew@corecville.com>; Adam Long<adam@collins-engineering.com> Subject: RE: SDP201600003 Sunset Overlook- Final Site Plan Chris With the recordation of the dedication plat,we are going to add the Deed book and page info to the site plan. Can we go ahead and submit the (4)final site plan copies for signatures, knowing that you will not release/sign the final site plan until the bonds are posted. All the other items listed below have been completed. Thx. Scott From:Christopher Perez [mailto:cperez@albemarle.org] Sent:Wednesday,August 31,2016 7:52 AM To:Scott Collins Subject:SDP201600003 Sunset Overlook- Final Site Plan Scott, SDP201600003 Sunset Overlook-Final Site Plan Attached is my latest review of the final site plan. To sum it up for you, it seems we're almost at the end of this one, pending the following: 1)Have Roger Ray submit the Forge Farm BLA/right-of-way plat(SUB2016-108)for approval.Then record it in the clerk's office. Then revise the site plan to include that DB PG REF#. Completed—add this info to the site plan. 2)Contact Fire and Rescue-pay the remaining fees of theirs so they can release their comments to us. (Pending their 1 approval still)Completed—no obj. 3)Finish up w/Paty and receive ARB approval. Completed—ARB approved. 4)Offsite bonding of Wintergreen sewer connection.—pending. Christopher P.Perez I Senior Planner Department of Community Development 1County of Albemarle,Virginia 401 Mclntire Road l Charlottesville,VA 22902 434.296.5832 ext.3443 From:Scott Collins [mailto:scott@collins-engineering.com] Sent:Wednesday,August 31, 2016 6:35 AM To:Ana Kilmer<akilmer@albemarle.org> Cc:Andrew Baldwin<andrew@corecville.com>; Christopher Perez<cperez@albemarle.org>;Jeremy Lynn <ilynn@serviceauthority.org> Subject: RE:Wintergreen Sewer bond-Mosby Mtn to Sunset Overlook Ana- I sent the wrong estimate,this is the bond amount to be used. ($125,245). Thx. Scott From:Scott Collins Sent:Wednesday,August 31, 2016 6:33 AM To: 'Ana Kilmer' Cc: 'Andrew Baldwin'; 'Christopher Perez'; 'Jeremy Lynn' Subject: FW:Wintergreen Sewer bond- Mosby Mtn to Sunset Overlook Ana- Attached is a bond estimate for the offsite sanitary sewer that the developer needs to bond for the Sunset Overlook project. The bonding will be the same as the bonds that were just completed for the E&S and SWM. When you get a chance, can you prepare the paperwork for this bond. Thank you Ana. Scott Collins From:Jeremy Lynn [mailto:jlynn@serviceauthority.org] Sent: Friday,August 26, 2016 1:51 PM { To:Scott Collins Cc: 'Christopher Perez';Alexander Morrison Subject: RE:Wintergreen Sewer bond - Mosby Mtn to Sunset Overlook If that were the case, your initial amount would be accurate. I was just going by what was shown on the plans with the casing pipe. Jeremy M. Lynn, P.E. Senior Civil Engineer Albemarle County Service Authority 168 Spotnap Road Charlottesville, Virginia 22911 (434)977-4511 2 Cosi From: Scott Collins [mailto:scoff@collins-engineering.com] Sent: Friday, August 26, 2016 1:50 PM To: Jeremy Lynn Cc: 'Christopher Perez'; Alexander Morrison Subject: RE: Wintergreen Sewer bond - Mosby Mtn to Sunset Overlook Thanks Jeremy. I believe the plan is to install the sewer with an open cut of Sunset avenue while the roadway is being improved. Would that help reduce the overall bond amount. From:Jeremy Lynn [mailto:ilvnn@serviceauthoritv.org] Sent: Friday,August 26, 2016 1:46 PM To:Scott Collins Cc: 'Christopher Perez;Alexander Morrison Subject: RE:Wintergreen Sewer bond- Mosby Mtn to Sunset Overlook Scott, The only item missing is the Jack and Bore. That items is actually listed under the waterline, but would be the same in this case. If you add 108'to that line item, the bond amount increases to $180,000. Jeremy M. Lynn, P.E. Senior Civil Engineer Albemarle County Service Authority 168 Spotnap Road Charlottesville, Virginia 22911 (434)977-4511 From: Scott Collins [mailto:scott@collins-engineering.com] Sent: Friday, August 26, 2016 1:16 PM To: Jeremy Lynn Cc: 'Christopher Perez' Subject: FW: Wintergreen Sewer bond - Mosby Mtn to Sunset Overlook Jeremy For the approval of the Sunset overlook site plan,the county wants the developer to bond the sanitary sewer from Mosby mountain up to the manhole that Sunset overlook is tying into. Attached is the bond spreadsheet for this run. Can you confirm for me if this looks acceptable,that way we can set the bond and move toward getting the site plan approved. Thx, Scott From:Adam Long Sent:Friday,August 26, 2016 10:49 AM To:Scott Collins Subject:Wintergreen Sewer bond-Mosby Mtn to Sunset Overlook $126,000 Adam Long,PE Project Manager Collins Engineering,L.L.C. 200 Garrett Street,Suite K Charlottesville,VA 22902 PH:434.293.3719 3 v ik Li Cad Christopher Perez From: Andrew Baldwin <andrew@corecville.com> Sent: Tuesday, October 04, 2016 10:43 AM To: Christopher Perez Cc: Scott Collins;Ana Kilmer Subject: Fwd: Forge Farm-- dedication plat Attachments: Certificate of Plat.pdf Chris, please see the attached recorded dedication plat for sunset ave. Ana, Wagner is working on the bonds for the sewer now and we should have those set in the next few days. Andrew Baldwin Principal Broker: Core Real Estate and Development. 195 Riverbend Dr. Suite 1 Charlottesville, Va 22911 0: 434 979 8181 F: 434 296 3510 C: 434 466 6566 www.corecville.com Begin forwarded message: From: Roger Williams <RWilliams@mkpc.com> Subject: Forge Farm-- dedication plat Date: October 3, 2016 at 3:33:06 PM EDT To: "andrew baldwin(andrew@corecville.com)" <andrew@corecville.com> Andrew, The above dedication plat for Forge Farm was recorded today—see attached copy with recording receipt. Roger Roger D. Williams, Esq. McCallum &Kudravetz, P.C. 250 East High Street Charlottesville, VA 22902 Ph.(434)-293-8191 Fax (434)-296-9641 rwilliams@mkpc.com This email message,including attachments,if any,is intended as a confidential and/or privileged communication. If you are not the intended recipient,you should not copy,save,or reproduce in any manner or form,but should delete immediately and notify the sender. 1 t r i koff,i rstop her her Perez 1/40, 1/44001 From: Scott Collins <scott@collins-engineering.com> Sent: Tuesday, October 04, 2016 11:29 AM To: Ana Kilmer;Andrew Baldwin; Christopher Perez Cc: Max Greene; Frank Pohl Subject: RE: Forge Farm-- dedication plat Ana Thanks. We are only in the initial phases of the final subdivision plat(the plat will be submitted for review and approval at the county once the site plan has been signed). In order to get the site plan signed, we need to post the bond for the offsite sanitary sewer. This is the offsite bond cost that Jeremy Lynn has already approved. This should be the only bond that we need to post at this time. We will be posting the onsite road and utility bonds for the subdivision plat recordation within the next 60- 90 days, but can not start that process until the site plan is approved. Thx. Scott From:Ana Kilmer [mailto:akilmer@albemarle.org] Sent:Tuesday,October 04,2016 11:25 AM To:Andrew Baldwin; Christopher Perez Cc:Scott Collins; Max Greene; Frank Pohl Subject: RE: Forge Farm--dedication plat Mr. Baldwin: I have not formatted a subdivision/road performance bond agreement for this project. My records show that you have not submitted a request to calculate subdivision bonds for this project. I need to talk to Frank and Max to understand where we stand on this project. I will be in touch soon. Thank you Ana D. Kilmer Management Analyst Community Development Department 401 McIntire Road Charlottesville,VA 22902 434-296-5832 akilmer@albemarle.org From:Andrew Baldwin [mailto:andrew@corecville.com] Sent:Tuesday, October 04,2016 10:43 AM To:Christopher Perez<cperez@albemarle.org> Cc:Scott Collins<scott@collins-engineering.com>;Ana Kilmer<akilmer@albemarle.org> Subject: Fwd: Forge Farm--dedication plat Chris,please see the attached recorded dedication plat for sunset ave. Ana, Wagner is working on the bonds for the sewer now and we should have those set in the next few days. 1 3 Andrew Baldwin Principal Broker: Core Real Estate and Development. 195 Riverbend Dr. Suite 1 • Charlottesville, Va 22911 0: 4349798181 F: 434 296 3510 C: 434 466 6566 www.corecville.com Begin forwarded message: From: Roger Williams<RWilliams@mkpc.com> Subject: Forge Farm-- dedication plat Date: October 3, 2016 at 3:33:06 PM EDT To: "andrew baldwin(andrew@corecville.com)" <andrew@corecville.com> Andrew, The above dedication plat for Forge Farm was recorded today—see attached copy with recording receipt. Roger Roger D.Williams, Esq. McCallum&Kudravetz, P.C. 250 East High Street Charlottesville, VA 22902 Ph.(434)-293-8191 Fax(434)-296-9641 rwilliams@mkpc.com This email message,including attachments,if any,is intended as a confidential and/or privileged communication. If you are not the intended recipient,you should not copy,save,or reproduce in any manner or form,but should delete immediately and notify the sender. 2 Albemarle County, VA opJon R. Zug Circuit Clerk 501 East Jefferson St. VWCharlottesville, VA 22902 c. Phone Number: (434)972-4083 L Fax Number: (434)293-0298 L Official Receipt: 2016-00015433 C. • Printed on 10/03/2016 at 02:38:38 PM By: 16 on CIRCOURT 005490 •. & KUDRAVETZ Date iRecar -r: 10/03/2016 Instrument ID Recors-d Time Amount ., Bk 4822 Pg 344 :" :36:44 PM $62.00 File No : .-00011175 GRANTOR:FORGE FARM LLC EX:N GRANTEE:NA, NA NA EX:N Addressl:NA Address2:NA City/State/Zip:NA VA 22902 NEW SIGHT EASEMENT, DEDICATIONS TO... Consideration: Assumption: Locality:CO Percent:100.00% Pages:7 Names:2 Accounts Amount 301- DEEDS $44.50 145- VSLF $1.50 106- TECHNOLOGY TRUST FUND FEE $15.00 035 - OPEN SPACE PRESERVATION $1.00 Itemized Check Listing Check # 1351 $62.00 Total Due: $62.00 Paid By Check: $62.00 Change Tendered: $0.00 VISIT US ON THE WEB AT HTTP://COTTHOSTING.COM/VAALBEMARLEEXTERNAL I { Albemarle County 401 McIntire Road Charlottesville,VA 22902 434-296-5832 ext.3250 psaternye@albemarle.org www.albemarle.org From:Christopher Perez Sent:Wednesday,August 31,2016 3:27 PM To: Patricia Saternye<psaternve@albemarle.org> Subject: RE:ARB201600022 Sunset Overlook Comments Solid. Let me know when you are ready to approve it from an ARB perspective. Christopher P.Perez 1 Senior Planner Department of Community Development 1County of Albemarle,Virginia 401 McIntire Road 1 Charlottesville,VA 22902 434.296.5832 ext.3443 From: Patricia Saternye Sent:Wednesday,August 31, 2016 3:25 PM To:Christopher Perez<cperez@albemarle.org> Subject: FW:ARB201600022 Sunset Overlook Comments Chris, , Attached please find the PDF they sent me with the resubmission of the landscape plan sheets. I think this is a full set O. Thanks, Paty Saternye Senior Planner Community Development a Albemarle County 401 McIntire Road Charlottesville,VA 22902 434-296-5832 ext.3250 psaternye@albemarle.org www.albemarle.org From:Jenni Pack[mailto:jenni@collins-engineering.com] Sent:Wednesday,August 31, 2016 10:57 AM } 2 i To: Patricia Saternye<psaternve@albemarle.org> Subject: RE:ARB201600022 Sunset Overlook Comments Paty, I dropped off the copies of the Sunset Overlook plan to the county this morning.Attached is a pdf copy of the set. Let me know if you need anything else. Thanks, Jenni From: Scott Collins Sent:Tuesday, August 30, 2016 4:36 PM To: Patricia Saternye Cc: Jenni Pack Subject: RE: ARB201600022 Sunset Overlook Comments Will do. We will send them down to you and drop them off in the morning. Thx. From: Patricia Saternye [mailto:psaternye@albemarle.org] Sent:Tuesday,August 30,2016 4:32 PM To:Scott Collins Subject:RE:ARB201600022 Sunset Overlook Comments Scott, Is it correct that you would like to treat what you gave me today as a resubmission for ARB review? If so, could you provide me with versions of the two sheets with new revision dates added? Please include the ARB resubmission cover letter (that I sent you attached to a previous email) with them. Please include two hard copies (full size), one hard copy 11x17, and then email a PDF. Thanks, Paty Saternye Senior Planner Community Development + # Albemarle County 401 McIntire Road Charlottesville,VA 22902 434-296-5832 ext.3250 psaternye@albemarle.org www.albemarle.org From:Scott Collins [mailto:scott@collins-engineering.com] Sent: Monday,August 29, 2016 4:46 PM To: Patricia Saternye<psaternye@albemarle.org> Subject: RE:ARB201600022 Sunset Overlook Comments 3 Yes,that would be great. Thanks! From: Patricia Saternye [mailto:psaternye(Walbemarle.org] Sent: Monday,August 29, 2016 4:46 PM To:Scott Collins Subject: RE:ARB201600022 Sunset Overlook Comments Would 3PM tomorrow (Tuesday 8/30/16) afternoon work for you? Thanks, Paty Saternye Senior Planner Community Development Albemarle County 401 McIntire Road Charlottesville,VA 22902 434-296-5832 ext.3250 psaternye@albemarle.org www.albemarle.org From:Scott Collins [mailto:scott@collins-engineering.com] Sent: Monday,August 29, 2016 4:38 PM To: Patricia Saternye<psaternye@albemarle.org> Subject:RE:ARB201600022 Sunset Overlook Comments Paty- Thanks again for the help on this. Do you have any time tomorrow to sit down and review our final changes to the plan to see if they address the remaining comments. Thx. Scott From: Patricia Saternye [mailto:psaternye@albemarle.org] Sent:Tuesday,August 23,2016 11:05 AM To:Scott Collins Cc:Jenni Pack Subject: RE:ARB201600022 Sunset Overlook Comments Scott, Attached please find the 3' round comments on ARB201600022 Sunset Overlook. Please note comment# 1.a.. I would like to meet with you or someone from your office before any modifications are made to discuss comment#1 so that we can get this last comment fully addressed. Meeting in person, with the drawing in front of us, would help with that process. 4 Co, Thanks, Paty Saternye Senior Planner Community Development *44 Albemarle County 401 McIntire Road Charlottesville,VA 22902 434-296-5832 ext.3250 psaternye@albemarle.org www.albemarle.org From:Jenni Pack [mailto:ienni@collins-engineering.com] Sent: Friday,July 29, 2016 10:59 AM To: Patricia Saternye<psaternve@albemarle.org> Subject:ARB201600022 Sunset Overlook Comments Paty, I have updated the landscaping plan based on your latest comments. I have attached a pdf for you to review.The entrance corridor street tree calculations are under number 4 in the notes. Please let me know if there are any more changes you request and how many sets of plans you need me to submit to the county. Thanks, Jenni Pack From: Patricia Saternye [mailto:psaternye@albemarle.org] Sent:Thursday,July 14, 2016 3:12 PM To:Scott Collins Cc:Christopher Perez Subject: RE:ARB201600022 Sunset Overlook Comments Scott, Attached please find 2nd round of comments for Sunset Overlook ARB 2016-22 and the ARB comments for SDP 2016-3. Please let me know if you have any questions. Thanks, Paty Saternye Senior Planner Community Development 5 Albemarle County 401 McIntire Road Charlottesville,VA 22902 434-296-5832 ext.3250 psaternve@albemarle.org www.albemarle.org From: Patricia Saternye Sent:Tuesday, May 31, 2016 4:30 PM To:scott@collins-engineering.com Cc:Christopher Perez<cperez@albemarle.org> Subject:ARB201600022 Sunset Overlook Comments Scott, Attached please find comments for Sunset Overlook ARB 2016-22 and the ARB comments for SDP 2016-3. Please let me know if you have any questions. Thanks, Paty Saternye Senior Planner Community Development ry� Albemarle County 401 McIntire Road Charlottesville,VA 22902 434-296-5832 ext.3250 psaternye@albemarle.org www.albemarle.org ti 6 kohl? ,400 Christopher Perez From: Robbie Gilmer Sent: Monday, September 19, 2016 10:16 AM To: Christopher Perez Cc: Scott Collins Subject: FW: SDP-2016-00003 Sunset Overlook Final Site Plan Chris, Here is my comments for Sunset Overlook. Based on plans date 6/29/16. No comments or objections. 8/23/16- Paid with check#1076, receipt#68142. RM Sorry for the delay but I don't always know when they come in and pay. THANK YOU, ROBERT GILMER, CFEI CAPT/ASSIST FIRE MARSHAL ALBEMARLE COUNTY FIRE RESCUE 460 STAGECOACH ROAD CHARLOTTESVILLE, VA. 22902 OFFICE 434-296-5833 CELL 434-531-6606 From: Rebecca Morris- Fire Rescue Sent: Monday,September 19, 2016 8:27 AM To: Robbie Gilmer<rgilmer@albemarle.org> Subject: RE:SDP-2016-00003 Sunset Overlook Final Site Plan Yes, sunset overlook was paid in full on 8/23/16. FireRMS was updated w/payment info that day as well. Nothing outstanding for sunset overlook at this time. You put your comments in on 7/11/16, 6/7/16& 5/29/16. From: Robbie Gilmer Sent:Sunday,September 18, 2016 12:24 PM To: Rebecca Morris Fire Rescue<rmorris2@albemarle.org> Subject: FW:SDP-2016-00003 Sunset Overlook Final Site Plan Have they paid yet? 1 COIIleOF From:Christopher Perez Sent:Tuesday,August 30,2016 7:55 AM To: Robbie Gilmer<rgilmerCa1albemarle.org> Subject:SDP-2016-00003 Sunset Overlook Final Site Plan Robbie, SDP2016-00003 Sunset Overlook-Final Site Plan I am seeking a status update from you for the above ref plan.The last communication from you that I was CCed on for this project was the email below from 5-29-16 withholding comments from the applicant till they paid the account in total. Since then we also had another resubmittal of the plans from Scott which was distributed to you for review on 7-1-16. I have yet to receive anything from you on this one either.Please provide me a status update on this project.If the fees for you are still unpaid and you are withholding comments till its paid,let me know. Thanks Christopher P.Perez 1 Senior Planner Department of Community Development 1County of Albemarle,Virginia 401 McIntire Road Charlottesville,VA 22902 434.296.5 832 ext.3443 From: Robbie Gilmer Sent:Sunday, May 29, 2016 11:05 AM To:Scott Collins<scott@collins-engineering.com> Cc:Christopher Perez<cperez@albemarle.org> Subject:SDP-2016-00003 Sunset Overlook Final Site Plan Scott, I can't release my comments on the final site plan until the account is paid in full.Could you please have the owner contact our office and speak with Rebecca Morris about the amount owed on this account? Rebecca's number is 434- 296-5833 ext. 3101 THANK YOU, ROBERT GILMER, CFEI CAPT/ASSIST FIRE MARSHAL ALBEMARLE COUNTY FIRE RESCUE 460 STAGECOACH ROAD CHARLOTTESVILLE, VA. 22902 OFFICE 434-296-5833 CELL 434-531-6606 2 (44000 Christopher Perez From: Christopher Perez Sent: Wednesday, August 31, 2016 7:52 AM To: 'Scott Collins' Subject: SDP201600003 Sunset Overlook - Final Site Plan Attachments: CD4 SDP201600003 - Sunset Overlook-final_Site_Plan.pdf Scott, SDP201600003 Sunset Overlook-Final Site Plan Attached is my latest review of the final site plan.To sum it up for you, it seems we're almost at the end of this one, pending the following: Have Roger Ray submit the Forge Farm BLA/right-of-way plat(SUB2016-108) for approval.Then record it in the clerk's office.Then revise the site plan to include that DB PG REF#.17b1, 8,2_ . — 3 Le ontact Fire and Rescue-pay the remaining fees of theirs so they can release their comments to us. (Pending their approval still) yt 0 ,o1/4 inish up w/Paty and receive ARB approval. AiPP--rc/ 4)Offsite bonding of Wintergreen sewer connection. Christopher P.Perez 1 Senior Planner Department of Community Development 1County of Albemarle,Virginia 401 McIntire Road i Charlottesville,VA 22902 434.296.5832 ext.3443 From:Scott Collins [mailto:scott@collins-engineering.com] Sent:Wednesday,August 31, 2016 6:35 AM To:Ana Kilmer<akilmer@albemarle.org> Cc:Andrew Baldwin<andrew@corecville.com>; Christopher Perez<cperez@albemarle.org>;Jeremy Lynn <jlynn@serviceauthority.org> Subject: RE:Wintergreen Sewer bond- Mosby Mtn to Sunset Overlook Ana- I sent the wrong estimate,this is the bond amount to be used. ($125,245). Thx. Scott From:Scott Collins Sent:Wednesday,August 31,2016 6:33 AM To: 'Ana Kilmer' Cc: 'Andrew Baldwin'; 'Christopher Perez'; 'Jeremy Lynn' Subject: FW:Wintergreen Sewer bond - Mosby Mtn to Sunset Overlook Ana Attached is a bond estimate for the offsite sanitary sewer that the developer needs to bond for the Sunset Overlook project. The bonding will be the same as the bonds that were just completed for the E&S and SWM. When you get a chance, can you prepare the paperwork for this bond. Thank you Ana. 1 (ti;'° Scott Collins From:Jeremy Lynn [mailto:ilynn@serviceauthority.org] Sent: Friday,August 26, 2016 1:51 PM To:Scott Collins Cc: 'Christopher Perez';Alexander Morrison Subject: RE:Wintergreen Sewer bond- Mosby Mtn to Sunset Overlook If that were the case, your initial amount would be accurate. I was just going by what was shown on the plans with the casing pipe. Jeremy M. Lynn, P.E. Senior Civil Engineer Albemarle County Service Authority 168 Spotnap Road Charlottesville, Virginia 22911 (434)977-4511 From: Scott Collins [mailto:scott@collins-engineering.com] Sent: Friday, August 26, 2016 1:50 PM To: Jeremy Lynn Cc: 'Christopher Perez'; Alexander Morrison Subject: RE: Wintergreen Sewer bond - Mosby Mtn to Sunset Overlook Thanks Jeremy. I believe the plan is to install the sewer with an open cut of Sunset avenue while the roadway is being improved. Would that help reduce the overall bond amount. From:Jeremy Lynn [mailto:ilynn@serviceauthoritv.org] Sent: Friday,August 26, 2016 1:46 PM To:Scott Collins { Cc: 'Christopher Perez'; Alexander Morrison Subject: RE:Wintergreen Sewer bond- Mosby Mtn to Sunset Overlook Scott, The only item missing is the Jack and Bore. That items is actually listed under the waterline, but would be the same in this case. If you add 108'to that line item, the bond amount increases to$180,000. Jeremy M. Lynn, P.E. Senior Civil Engineer Albemarle County Service Authority 168 Spotnap Road Charlottesville, Virginia 22911 (434)977-4511 From: Scott Collins [mailto:scott@collins-engineering.com] Sent: Friday, August 26, 2016 1:16 PM To: Jeremy Lynn Cc: 'Christopher Perez' Subject: FW: Wintergreen Sewer bond - Mosby Mtn to Sunset Overlook Jeremy- For the approval of the Sunset overlook site plan,the county wants the developer to bond the sanitary sewer from Mosby mountain up to the manhole that Sunset overlook is tying into. Attached is the bond spreadsheet for this 2 II run. Can you confirm for me if this looks acceptable,that way we can set the bond and move toward getting the site plan approved. Thx, Scott From:Adam Long Sent: Friday,August 26, 2016 10:49 AM To:Scott Collins Subject:Wintergreen Sewer bond - Mosby Mtn to Sunset Overlook $126,000 Adam Long,PE Project Manager Collins Engineering,L.L.C. 200 Garrett Street,Suite K Charlottesville,VA 22902 PH:434.293.3719 adamPcollins-engineering.com 3 Christopher Perez From: Christopher Perez Sent: Monday, November 14, 2016 10:53 AM To: Ana Kilmer;Andrew Baldwin Cc: Frank Pohl Subject: RE: SDP2016-3 Sunset Overlook—final site plan Attachments: RE: Wintergreen Sewer bond - Mosby Mtn to Sunset Overlook; Re: Wintergreen Sewer bond - Mosby Mtn to Sunset Overlook; Re:Wintergreen Sewer bond - Mosby Mtn to Sunset Overlook; RE: Wintergreen Sewer bond - Mosby Mtn to Sunset Overlook; FW: Wintergreen Sewer bond - Mosby Mtn to Sunset Overlook Andrew, RE: SDP2016-3 Sunset Overlook—final site plan I have reviewed all the previous emails (attached) and just touched base with Ana to confirm my understanding of where everything is at. From all the information I have received the offsite sewer bond that covers sewer through Wintergreen Farm and connects to Sunset Overlook has not actually been posted. It appears it's been calculated and inserted into the amount for Wintergreen Farm but the bond itself has not been posted.The bond has to actually be posted before the final site plan for Sunset Overlook final site plan can be approved. Once this has occurred then the site plan can be approved. Christopher P. Perez I Senior Planner Department of Community Development 'County of Albemarle, Virginia 401 McIntire Road I Charlottesville, VA 22902 434.296.5832 ext. 3443 Original Message From: Ana Kilmer Sent: Monday, November 14, 2016 8:50 AM To: Andrew Baldwin <andrew@corecville.com> Cc: Christopher Perez<cperez@albemarle.org>; Frank Pohl <fpohl@albemarle.org> Subject: RE: Executed site plan sunset Chris Perez will need to respond. I do not review site plans. Thank you Ana D. Kilmer Management Analyst Community Development Department 401 McIntire Road Charlottesville, VA 22902 434-296-5832 akilmer@albemarle.org Original Message From: Andrew Baldwin [mailto:andrew@corecville.com] 1 Sent: Monday, November 14, 2016 8:43 AM To:Ana Kilmer<akilmer@albemarle.org> Subject: Executed site plan sunset Hey Ana.Just checking back on this for sunset. Let me know when you can. Thanks. Sent from my iPhone 2 Lid Christopher Perez From: Christopher Perez Sent: Monday, November 21, 2016 1:47 PM To: Frank Pohl; Moore,Adam PE (VDOT); Patricia Saternye; Margaret Maliszewski; Robbie Gilmer;Alex Morrison;vfort@rivanna.org;Jay Schlothauer;Andrew Slack Cc: Judy Martin - BC/ZS Subject: Final Site Plan Ready for Signatures Good afternoon. SDP201600003 Sunset Overlook- Final Site Plan The above site plan is ready for signatures, please have it signed no later than Thursday, December 1, 2016. Thank you. Christopher P.Perez 1 Senior Planner Department of Community Development 1County of Albemarle,Virginia 401 McIntire Road l Charlottesville,VA 22902 434.296.5832 ext.3443 1 —err Christopher Perez From: Christopher Perez Sent: Monday, November 21, 2016 1:48 PM To: 'Andrew Baldwin'; 'Scott Collins' Cc: Ana Kilmer Subject: SDP201600003 Sunset Overlook - Final Site Plan Andrew/Scott, SDP201600003 Sunset Overlook- Final Site Plan The required sewer bonds for Wintergreen have been posted.The notification for all SRC reviewers to sign the final site plan mentioned above has been sent out.Reviewers have 10 days to come into the office and sign the final plans. Once all reviewers have signed the plans I'll approve the plan and notify you that it's ready for pickup. Thanks Christopher P.Perez Senior Planner Department of Community Development'County of Albemarle,Virginia 401 McIntire Road Charlottesville,VA 22902 434.296.5832 ext.3443 From:Andrew Baldwin [mailto:andrew@corecville.com] Sent: Monday, November 21,2016 9:36 AM To:Ana Kilmer<akilmer@albemarle.org> Cc:Jeremy W.Swink<SwinkJW@stanleymartin.com>;Christopher Perez<cperez@albemarle.org>; Rachel Falkenstein <rfalkenstein@albemarle.org>;Todd Shifflett<tshifflett@albemarle.org>; Kenny Thacker<KTHACKER@albemarle.org>; Matthew Wentland<mwentland@albemarle.org>; Frank Pohl<fpohl@albemarle.org> Subject: Re: Wintergreen Farm Phase 1 only bonds Ana.Thanks so much for the update. Chris please give me an update when you can.Thanks Andrew Sent from my iPhone On Nov 21, 2016,at 9:32 AM,Ana Kilmer<akilmer@albemarle.org>wrote: The following bonds have been posted and approved: Water protection performance bond-$882,930(erosion and sediment control$717,750; stormwater management and water quality$165,180). Subdivision/road performance bond–Water and Sewer$620,000 Pending: Three stormwater management/bmp facilities maintenance agreements. Agreements are still in the process of being routed for approval. Subdivision/road performance bond has not been posted. Thank you 1 II