HomeMy WebLinkAboutZMA201600016 Correspondence 2016-12-13County of Albemarle
Department of Community Development
Memorandum
To:
Frank Pohl
From:
Bill Fritz
Date:
December 13, 2016
Subject:
SP2016-28 Woolen Mills
Attached is all of the information submitted by the applicant in support of their request for the construction of
flood control measures in the floodplain. We have discussed this project previously and it is my understanding
that you will contact the applicant directly to get additional information. If I need to contact the applicant, please
let me know.
SP 2016 -
WOOLEN MILLS — Activity in the Flood Plain
PROJECT PROPOSAL
This application is submitted in conjunction with the pending ZMA application no. 2016-16 for a mixed-
use redevelopment of the old Woolen Mills property. An important step in the redevelopment process
was obtaining a Letter of Map Revision from FEMA regarding the flood plain which impacts the property.
That successful effort allowed for the possibility that the existing mill buildings could be removed from
the flood plain, and hence restored and put to new use, provided that a flood wall running along the
existing basement wall of the buildings could be constructed. This application seeks approval to
construct that flood wall within the flood plain to allow the redevelopment of this valuable historic site.
Attached are Engineering Solutions plans showing the proposed flood wall location and sections, which
have been shared with and reviewed by the County Engineer. Also enclosed is a sample elevation of the
site showing the proposed wail as it relates to the existing structures. Without this approval, possible
uses of the existing buildings would be substantially limited such that redevelopment of the site would
not be a practical possibility.
CONSISTENCY WITH COMPREHENSIVE PLAN
In 2015, the Board of Supervisors approved an amendment to the Comprehensive Plan as a precursor to
this rezoning application. The same proposal was presented to the Board at that time and was very well
received. Attached hereto as Exhibit D is the result of that Comprehensive Plan amendment which
specifically provides for Office/R&D/Flex/Light Industrial use on the Property. If further specifically
provides that "Residential use of a portion of the historic former mill buildings as part of a mixed-use
development may be appropriate if the buildings are removed from the floodplain and provided that at
least 45% of the total built square footage and leased outdoor area of the mill property is used non -
residentially in employment -generating and commercial uses." Applicant has been working diligently
since that Comprehensive Plan amendment was adopted to have the floodplain revised by FEMA to
allow for such residential development which is necessary to the feasibility of this mixed-use project,
and now that such floodplain amendment is expected in the short term, has filed this rezoning
application to keep the Project moving forward.
It is a stated objective within the Comprehensive Plan to "Pursue additional protection measures and
incentives to preserve Albemarle's historic and archaeological resources in order to foster pride in the
County and maintain the County's character." This proposed amendment will do that by providing the
flexibility necessary to preserve and reuse the existing historic buildings, while opening up the Property
to be more welcoming to the community as a whole. The Woolen Mills story is one that should not be
lost, and should not only be known to the community, but should be a source of pride. Sadly, many
County residents have not seen this beautiful Property because there is nothing drawing them there.
Connecting the Rivanna Trails through this Property and having some mixed uses there that provide
work, home and entertainment possibilities will help to preserve this piece of history. As the
Comprehensive Plan states, "choices about growth and change should include the preservation of
historic buildings and structures. Adaptive reuse may be a practical approach to preserving these
important historic resources."
Needless to say, with the Comprehensive Plan having been amended to specifically allow for this
Project, including the residential use proposed hereby, the proposed project and this request are very
consistent with the Comprehensive Plan.
IMPACTS ON PUBLIC FACILITIES & PUBLIC INFRASTRUCTURE
The Project will be served by public roads, water and sewer. The main entrance to the Project will be
from Broadway St., which is presently capable of handling the traffic needs of this Project. The traffic
study prepared in connection with this project concluded that "[t]he traffic associated with the Woolen
Mills project will have a minimal impact on the surrounding transportation network. The ... analyses
indicate that the Woolen Mills site traffic can be accommodated with no improvements to the study
area intersections."
IMPACTS ON ENVIRONMENTAL FEATURES
This Project will have no adverse impacts on environmental features. On the contrary, the Project will
facilitate improved and adapted use of green spaces, create more green spaces accessible to the public
and preserve the historic beauty of the area through the renovation and preservation of the existing mill
buildings. New walking trails will welcome the public to view a beautiful part of the County that may
otherwise be lost to history.
From: Pete Caramanis [mailto:pcaramanis@rcmplc.com]
Sent: Tuesday, November 01, 2016 4:09 PM
To: Bill Fritz <BFRITZ@albemarle.org>; Brian Roy <brianhroy@gmail.com>
Subject: Re: ZMA 2016-16 Woolen Mills
Per our discussions, we would like to defer action on the pending rezoning so that it may be
heard with the other associated zoning applications we will be filing shortly. Thank you.
Pete
FtROYER
__
CARR AMIE &
McDO,.UG,
Peter J. Caramanis
Attorney at Law
pcaramanis@rcmplc.com
Royer, Caramanis & McDonough, PLC
200-C Garrett St.
Charlottesville, VA 22902
(434)260-8767
(434) 710-4061 Fax
NOTICE: This electronic mail transmission may constitute an attorney-client communication that is privileged at law. It is not
intended for transmission to, or receipt by, any unauthorized persons. If you have received this electronic mail transmission in
error, please delete it from your system without copying it, and notify the sender by reply e-mail, so that our address records can
be corrected. Thank you.
IRS Circular 230 Notice: Unless specifically stated otherwise, any tax advice contained in this communication (including
any attachments) is not intended or written to be used, and cannot be used, for the purpose of (i) avoiding penalties under
the Internal Revenue Code or (ii) promoting, marketing or recommending to another party any transaction or matter
addressed herein.
From: Bill Fritz <BFRITZ@albemarle.org>
Sent: Tuesday, November 1, 2016 11:46:45 AM
To: Pete Caramanis; Brian Roy
Subject: ZMA 2016-16 Woolen Mills
I wanted to follow up on our conversations before the Planning Commission meeting of last
week. It is my understanding that you want to defer action on this rezoning application so that
it may be heard with the other associated rezoning and special use permits. Please confirm that
is correct so that I have it for the record. If you do not want to defer the project it will be
scheduled for a public hearing. If I do not hear back from you by the end of the week I will start
the process of scheduling.
The next submittal date for rezoning and special use permit applications is December 5,
2o16. Based on our conversations about those submittals the "mandatory" preapplication
requirement has been satisfied. If you want to have a mandatory preapplication meeting let me
know and I will schedule it.
If you have any questions please let me know.
William D. Fritz, AICP
434-296-5823 extension 3242
County of Albemarle
Department of Community Development
Memorandum
To: Peter J. Caramanis and Brian Roy
From: Bill Fritz, AICP
Date: August 29, 2016
Subject: ZMA 2016-16 Woolen Mills
I have been able to conduct an initial review of this application and develop some comments.
Below is a list of the major issues that have been identified:
- Special Use Permit application is required for residential use.
- Special Use Permit application is required for activity in the floodplain. This will need
to include the information necessary to address the provisions of the flood hazard
overlay district. Without a design for the flood control devices and information on any
fill it will not be possible to make the necessary findings for approval.
The submitted plan shows disturbance of preserved slopes for the construction of a
new building and parking. Preserved slopes may not be disturbed as you have
proposed. In order for the development you propose to occur, the steep slopes overlay
district would have to be amended. Amendment of the district may only occur thru a
rezoning. Without amending the steep slopes overlay district, the development shown
on the plan will not be approvable even if the rezoning to C-1 and the special use
permits are approved.
- A traffic study is required pursuant to the State Code and Virginia Administrative Code
015.2-2222.1 and 24 VAC 30-155-40 )
- The proposal is critically under parked. Without waivers for parking and loading
spaces the project could not be approved for construction even if the rezonings and
special use permits are granted. A reduction may be requested as provided in
Albemarle County Code Chapter 18, Section 4.12.2(c) (See below for detailed
parking/loading comments.)
Provision of fire access to the existing buildings will be difficult. I have met with
Robbie Gilmer with Albemarle County Fire Rescue. I recommend you consult with
him prior to submitting the special use permit for activity in the floodplain or rezoning
for steep slopes as some solutions may potentially require development in the
floodplain or disturbance of steep slopes. Disturbance of the Water Protection Area
buffers may also be required.
Other issues have also been identified. At this time I am not sure if they are major issues but
they are issues that will need to be addressed:
- The property is in the Dam Break Inundation Zone (both State and Federal). This will
require additional evaluation to determine the full impact of this designation. This
information is being provided so that you are aware of the issue. At this time the
impact of the Inundation Zone requirements is not known.
The residential development requires that recreation areas be provided. (Reference
Albemarle County Code Chapter 18, Section 4.16) These facilities will need to be
provided or a modification requested. The provision of the facilities or the
modification request does not need to be addressed with the rezoning. It is provided
for your information in the event that you intend to request a modification. If that is
your intent, the modification may be processed with the rezoning.
- Industrial use is proposed for the new building. If it is truly intended for industrial use
it may be appropriate to amend the rezoning application to leave that area as industrial
and only rezone the existing building area. (Please note that as proposed the new
building and associated parking would disturb preserved slopes, see comments above.)
The above are those issues that have been identified at this time. I have received no
comments from any other agencies and my review continues. Additional comments may be
developed. Without a traffic study neither I nor VDOT will not be able to conduct a complete
review.
A community meeting will be required for this project. I will be working with the City to
develop a list of those to be notified. I don't know when you want to hold the community
meeting. I recommend that it be held as soon as feasible.
Turning to the next steps in the process; the necessary Special Use Permits, Rezoning and
modification applications should be submitted as soon as possible. I anticipate receiving
comments from other agencies for ZMA 2016-16 during September. A consolidated set of
comments will be prepared by me by September 30. The schedule for receiving comments
from other agencies on the additional applications will depend upon the submittal dates of
those applications.
After the traffic study is submitted, and when comments from VDOT are received, I
recommend that this project be scheduled for a work session with the Planning Commission.
I have not spoken with the Chair of the Commission yet about this project. However, based
on the past history of interest in this site and another rezoning in the Woolen Mills area I
believe that the Commission will likely want to hold a joint work session with the City
Planning Commission. As you may imagine scheduling a joint session can be complicated so
that sooner we start planning for it the better. You do have the right to request that this item
proceed directly to public hearing after you receive the comments on September 30.
However, based on where the review currently stands, and will likely stand at the end of
September I do not recommend that this project proceed directly to public hearing. I believe
a work session will be most appropriate to allow the other applications (rezoning special use
permits, modifications) to catch up. It will also allow a full vetting of the issues so that the
necessary information can be provided to the Planning Commission to allow them to make an
informed recommendation to the Board of Supervisors.
Please feel free to contact me to discuss any of these issues.
NVId NoLLv.3vI
7TVAA 000-1A
p1i�112i33�11 tJ
ooz-ss
SNO110'28
IIVMCIOOIZI
0
0
r,
m
Z
-n
I-
0
0
0
rvmec
RWW SH -L 093 IM
StMV70YOtl n[
JxmY
q
�.L-:RL
8n1Yd
HLODLMVB "DrMILL
NDU=TIVNKK)OU
ITA---
IINLLWMIIIII03
30VMIIIH8*-3dLIL
3
39 TIVIAS NOLL36 SUL
NJ a3g0 31MONDO 3FLL
lGdOWP - -Y F- ELOWN03
ONLLVWGdMOD
30'-34NrdH$ >MdA.J.
397WHONOM03S SIRL
NJ men 3LMMO7@Kl
- -- — - — - — - — - —
T"T
�.L-:RL
8n1Yd
HLODLMVB "DrMILL
NDU=TIVNKK)OU
ITA---
IINLLWMIIIII03
30VMIIIH8*-3dLIL
3
39 TIVIAS NOLL36 SUL
NJ a3g0 31MONDO 3FLL
IsdODD
_.JFAaL3HDNM
113NNILLN3
.0. 8
,,7TVHS NOLMSE
NI
"HONOO III
9
Mh=
IdItJrtlYtnJOJoI
PdOOaV--JYA3.L31J3N
EINLLVSN3dY403
30WNH49X�3dkL
tax ao:inrimm
39-nVHBNOLL03SEIRL
Ni o38n MMIONM MWI
KxnL=TryAwoD'U
IsdODD
_.JFAaL3HDNM
113NNILLN3
.0. 8
,,7TVHS NOLMSE
NI
"HONOO III
9
r
J-�
la
V00 0'08�i LIZ -..d a04
k
Woolen Mills Reclevelooment
Flood Wall Axonmetric