HomeMy WebLinkAboutWPO201600058 Bond Estimates 2016-12-14 (3)Dunlora Overlook VSMP Plan WPO file number: WPO-2016-00058 Stormwater Management Plan Bond Estimate Item Item No. Unit Unit Cost Cost Number installed permanent diversion or ditch 0 ft $13.00 $0.00 standard manhole frame top (not inlet) 0 ea $500.00 $0.00 drop inlet or grate 0 ea $3,500.00 $0.00 manhole structure (per ft. rise) 0 ft $450.00 $0.00 pipe, rcp, cmp (15 to 48") m d ES-1,2 0 EC-1 0.0 ft $0.00 $0.00 aggregate base or drainage stone in d ft L ft W 0.0 ton $35.00 $0.00 earthwork for trap/basin height of dam at toe 0 ft cut at high side 0 ft 'Volume analysis performed in Civil 3D height of fill at face 0 ft cut at face 0 ft 3,608 cy cut; 350 cy fill length of dam 0 ft length of cut 0 ft (additional earthwork required for top width 0 ft width of cut 0 ft SWIM conversion to biofilter) (area above transition, 0 sf (area below transition 0 sf (total width of dam) 0 ft (total width of cut) 0 ft (height below lransilio 0 ft (depth below transitio 0 ft (area below transition; 0 sf (area above transitior 0 sf (total fill volume) 0.0 cy (total fill volume) 0.0 cy length of spillway 0 ft (TOTAL CY estimate) 3724 cy $13.00 $48,412.00 width of spillway 0 ft (spillway stone tons) 0 tons $50.00 $0.00 structures for basin riser height flriserdiameter In JVO (riser unit price) $0.00 $0.00 barrel lengthfbaseplate or fdn $200.00 $0 barreldiameter In (barrel unit price) $0.00 $0.00 barrel collars Mfl $200.00 $0 baffle length $50.00 $0 trees 5 ea $275.00 $1,375.00 shrubs 8 ea $50.00 $400.00 seedlings 1210 SF coverage -ea $5.00 $0.00 underdrain (LF) 375 ft $5.00 $1,875.00 biofilter soil mix (CY) 850 cy $38.00 $32,300.00 trash rack/ anti vortex devices 3 ft $1,500.00 $4,500.00 maintenance access road (LF) 340 ft $50.00 $17,000.00 rip -rap, placed depth 1.5 ft length 43.0 ft width 10.0 (tons) 48.375 $60.00 $2,902.50 survey and layout (price per 0.1 mi.) acres basins $0.00 mobilization $500.00 as -built drawings (per facility) 1 ea $2,000.00 $2,000.00 materials testing (per facility) 1 ea $2,000.00 $2,000.00 compaction testing (per dam) 1 ea $5,000.00 $5,000.00 forest/open space bond amount (0.38 Ib/yr phosphorous removal at $15,000/pound per year) $5,700.00 cost sum $123,964.50 contingency $12,396.45 Total $136,370 12/14/2016