HomeMy WebLinkAboutWPO201500021 Plan - Stormwater Stormwater Management Plan 2016-03-23 I STORM WATER POLLUTION PREVENTION PLAN (Pursuant to Virginia Regulation 9 VAC 25-880-10) For Li Crozet Avenue North Sidewalk Improvements 3 1400 Crozet Avenue gi Crozet, Virginia 22932 y K N Prepared by: .1-,' L ' Kimley-Horn and Associates, Inc. vii 1700 Willow Lawn Drive,Suite 200 Richmond, Virginia 23230 804-673-3882 i June 2014 1 5 , L 14 (Operator's Signature) Date - Lv i s a p jSection 9. Signed Certification j (Pro\ide certification according to 9V \C25-870-370., For purposes of plan review and a royals, this certification should he the owner ()i'tile property,the same signature'as appears on the bonds and A applications Another operator can e designated on the delegation of authority form to follow.) F: CERTIFICATION "I certify under penalty of law that I have read and d tmeat th were prepacwis digned to understanassurehis thatdocuqualifientd and persothnnel properlyisdocument gatheredandall andattachments evaluated the informationred sinubmittaceordanced. Basedith ona msystem inqeuiryesof the person or persons who manage the system, or those persons directly 1 responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations." li 1 PA 141/1.14 Owner/Operator Name: V' l'Z^. Company: A -t--� � -z.t /1///3"—' /� • �� Title: 'Signature: G�, Date: 1 ,3/Z3//Z, I A I 1 1 1 A 1 . i • 1 i Issued— 10/2014 Stormwater Pollution Prevention Plan(SWPPP)Albemarle County LL POLICY AND GENERAL PROCEDURES This SWPPP has been developed in accordance with the requirements contained in the Virginia storm watergeneral permit for discharges from t., Pollution Discharge Elimination System(VPDES) 1111 construction activities(9 VAC 25-880).It is the responsibility of the Operator involved with grading,drainage,utilities or who implement a pollutant control measure identified in the Storm ) Water Pollution Prevention Plan(SWPPP)to secure authority to discharge stormwater from land disturbing activates of one acre or greater in full conformance with the stormwater regulations of the Virginia Department of Environmental Quality(VDEQ)as contained in 9 VAC 25-880. The 0 Operator and all subcontractors must comply with the requirements of the VSMP as contained in i=� the VDEQ VPDES storm water general permit and implementing regulations (9 VAC 25-880)and the erosion and sediment control requirements of the VDEQ as published in the Virginia Erosion ttt_ and Sediment Control Handbook(current edition). These requirements are as follows: A. The Operator will file a complete Registration Statement for coverage under a VPDES L. General Permit for storm water discharges from construction activities with the Virginia 4 Department of Environmental Quality at least 15 days prior to commencement of construction. Verification of coverage received from the Department of Environmental Quality prior to the commencement of land disturbing activities exceeding the thresholds ' L noted above. The appropriate filing fee(as outlined in local ordinance in VSMP localities or as outlined below for non-VSMP localities)in check form made out to "Treasurer of the locality in which the project is occurring except for localities not Lt; collecting permit fees(by ordinance or those choosing not to be VSMP Authorities)," (for non-VSMP Authority localities, make checks payable to "Treasurer of Virginia') must be submitted to the locality or DEQ for non-VSMP Authority localities before the general permit will be issued. The fees,payable by the Operator, are as follows: ' L''; • Less than 1 acre(only areas within 1. common plans of development or sale): $290 • Between 1 and 5 acres: $2,700 • Between 5 and 10 acres: $3,400 ' L, 4 • Between 10 and 50 acres: $4,500 L • Between 50 and 100 acres: $6,100 • Greater than 100 acres: $9,600 ' L Send the Permit Fee form and check for the appropriate fee amount to the following address: Department of Environmental Quality Receipts Control P.O.Box 1104 -- L Richmond,Virginia 23218 „,: Send the General Permit Registration Statement for Discharges from Construction Activities with a copy of fi the Fee Form and a copy of the fee check to the following address: Department of Environmental ItQuality Office of Stormwater Management ' L 10th Floor,P.O. Box 1105 1 ' Crozet Avenue North Sidewalk Improvements June 2014 Storm Water Pollution Prevention Plan K11,4 Job#113038016 Richmond,Virginia 23218 B. A copy of the Registration Statement for coverage under the general permit for storm water 1 discharges from construction activities as well as the actual general permit when issued by the VDEQ shall be maintained by the Operator for inspection at the construction site. Li Land disturbing activities cannot commence until verification of coverage is received by the Operator from VDEQ. ki C. A complete copy of the SWPPP, including copies of all inspection reports,plan revisions, etc.,must be retained by the Operator at the project site at all times during working hours and kept in the Operator's permanent project records for at least three years following submission of the Notice of Termination(NOT). D. The Operator must provide names and addresses of all subcontractors working on this project who will be involved with all construction activities that disturb site soil. This information must be kept with this SWPPP. E. The Operator and all subcontractors involved with land disturbing for this project must sign a copy of the appropriate certification statement included in Appendix C which will be incorporated into the construction contract. k- F. As described below,the Operator shall conduct regular inspections to determine effectiveness of the SWPPP. The SWPPP shall be modified by the Operator as needed to prevent pollutants from discharging from the site. The Operator's inspector must be both a person familiar with the site and the nature of the major construction activities and be 4 qualified to evaluate both overall system performance and individual component performance. Additionally,the Operator's inspector must either be someone empowered to implement modifications to this SWPPP and the pollutant control devices,if needed, in order to increase effectiveness to an acceptable level,or someone with the authority to ) cause such things to happen. This authority should be delegated to the inspector by using tA the enclosed Letter of Delegation of Authority(Appendix A)signed by the Operator naming the person or position responsible for undertaking these tasks on behalf of the Operator. G. This SWPPP shall be updated each time there are modifications to the pollutant prevention system or a change of Operators working on the project that disturbs site soil. The Operator shall notify the governing reviewing agency before these modifications are implemented,unless immediate Operator action is necessary to prevent unauthorized j discharges. If immediate Operator action is needed,then the Operator shall notify the governing reviewing agency of the action as soon as practicable. H. Discharge of oil or other hazardous substances into the storm water is subject to reporting and cleanup requirements. Refer to Part III.G of the VPDES General Permit for additional information. Copies of the VPDES General Permit and the Registration Statement forms are available on the Department of Environmental Quality web site (http://www.deq.virginia.gov/Programs/Water/StormwaterManagement/VSMPPermits.asp x). Crozet Avenue North Sidewalk Improvements June 2014 U. Storm Water Pollution Prevention Plan KHA Job#113038016 s A 1 tilA , i• i• i I. Once the site reaches final stabilization,the Operator shall complete and submit two copies of the NOT form for activities on site. This form is included as Appendix E. If a section ",,,i• ' of or phase of the project reaches final stabilization prior to the entire project reaching final s stabilization,then" that section may be clearly marked on the site plans and the date of fmal stabilization recorded in the SWPPP. Areas so marked are no longer required to be rj inspected as a part of permit compliance. J. This SWPPP is intended to control water-borne and liquid pollutant discharges by some I combination of interception, filtration, and containment. The Operator and all 3 tiii subcontractors implementing this SWPPP.shall remain alert to the need to periodically refine and update the SWPPP in order to accomplish the intended goals. K. This SWPPP shall be amended as necessary during the course of construction in order to keep it current with the pollutant control measures utilized at the site. Amending the SWPPP does not mean that it has to be reprinted. It is acceptable to handwrite revisions, ' L- -, add addenda, sketches,new sections, and/or revised drawings. 11 — H L. A record of the dates when land disturbing activities occur,when construction activities ' Ltemporarily or permanently cease on a portion of the site,and when stabilization measures are'initiated shall be maintained by the Operator until the NOT is filed. A log for keeping F such records is included in the Appendices. A different form for the log may be substituted if it found to be more useful. iM.9 Annual permit maintenance fees are required. Maintenance fees are as follows: ;y • Less than 1 acre(only areas within 7 common plans of development or sale): $50 • Between 1 and 5 acres: $400 • Between 5 and 10 acres: $500 • Between 10 and 50 acres: $650 l' • Between 50 and 100 acres: $900 Greater than 100 acres: $1,400 i ki II. INTRODUCTION This SWPPP has been prepared for land disturbing activities associated with the construction of 1 Crozet Avenue North,Sidewalk Improvements in Crozet,Virginia. This SWPPP includes the elements necessary to comply with the Storm Water General Permit issued by the VDEQ under the VPDES and local governing agency requirements. This SWPPP shall be implemented at the start 1 of construction. a : , LT' Construction phase pollutant sources anticipated at the site are: ® Disturbed(bare)soil, Z Vehicle fuels and lubricants, ® Chemicals associated with building construction, and building materials, s : ii Crozet Avenue North Sidewalk Improvements June 2014 Storm Water Pollution Prevention Plan i KHA Job#113038016 v � : ,.,4_, g 4, Li 4 1 4E- -4.4l ®Asphalt and asphalt pavement waste; chlorine for water line flushing, El Other pollutants Without adequate control there is the potential for each type of pollutant to be transported by , Lti, stormwater. I The project will consist of the following basic activities: (mark appropriate activities) , L ® Site grading, u ® Paving work, Installation tallation of stormwater management and drainage systems, ® Installation of utilities, ''' L''' ❑ Other activities -", k---. Purpose ' ' A major goal of pollution prevention efforts during project construction is to control soil 14 and pollutants that originate on the site and prevent them from flowing to surface waters of the Commonwealth. The purpose of this SWPPP is to provide requirements for achieving 11, that goal. A successful pollution prevention program also relies upon careful inspection and adjustments during the construction process in order to enhance its effectiveness. III1 Scope This SWPPP must be implemented when land disturbing activities begin on the site. This 1 SWPPP will be made available for public inspection upon public request on site during I-e_. normal business hours for the term of the permit authorization for the site. The SWPPP t ' Construction Site Notice as well as a copy of the DEQ Coverage Letter must be posted conspicuously and readable from a public right of way at the job site. 1 ,_ This SWPPP primarily addresses the impact of storm rainfall and runoff on areas of the ground surface disturbed during the construction process. In addition, there are recommendations for controlling other sources of pollution that could accompany the major construction activities. Permit coverage is terminated as of the date the lot is transferred to a new owner,coverage under a new VPDES permit is obtained,or as of the : date another Operator assumes control over portions of the site not stabilized. In these situations, coverage under the permit terminates at midnight the date the Notice of Termination(NOT)is filed. Where the Operator seeks to terminate coverage because the site has reached fmal stabilization,termination will become effective upon concurrence by , LIIII:./ the VSMP Authority, or after 60 days from the submittal of the NOT,whichever occurs first. i ` - Forms required to implementthe SWPPP are included in the Appendices to this document. Ly *; Crozet Avenue North Sidewalk Improvements June 2014 Li Storm Water Pollution Prevention Plan KHA Job#113038016 0 Nialillillailliiiiiiiiiiiillifilli „A- The VPDES General Permit for Storm Water Discharges from Construction Activities prohibits most non-storm water discharges during the construction phase. Allowable non- 1,' LA storm water discharges that may occur during construction on this project,which would therefore be covered by the General Permit,include: 1. Discharges from firefighting activities; .41 3 2. Fire hydrant flushing; il L3 3. Water used to wash vehicles or control dust where detergents are not used; i 4. Water flowing from potable sources and water line flushing; , L3 5. Water used to control dust; -' L 4 6. External building wash down which does not use detergents; 7. Runoff from pavement wash down where spills or leaks of toxic or hazardous materials have not occurred(unless all spilled material has been ,, L removed)and where detergents have not been used; s 13117 8. Uncontaminated air conditioning or compressor condensate; ,,., gi i 9. Springs and uncontaminated groundwater; ,-' TI- 10. Foundation or footing drains where flows are not contaminated with process materials such as solvents; �111. Uncontaminated excavation dewatering; and v 12. ; Landscape irrigation. The techniques described in this SWPPP focus on providing control of pollutant p g discharges with practical approaches that utilize readily available expertise,materials,and x equipment. The Operator referred to in this SWPPP is the entity noted on the VSMP registration statement. The Operator and their subcontractor(s) will construct the site development ii improvements in accordance with the approved plans and this SWPPP. 1 III. PROJECT DESCRIPTION i Described below are the land disturbing construction activities that are the subject of this SWPPP. p T. They are presented in the order(or sequence)they are expected to begin,but each activity will not necessarily be completed before the next begins. Also,these activities could occur in a different ' L order if necessary to maintain adequate erosion and sedimentation control• 1 ' ii1 A. The proposed project will include sidewalk construction on Crozet Avenue in Crozet, i y Crozet Avenue North Sidewalk Improvements June 2014 Storm Water Pollution Prevention Plan KHA Job#113038016 ` ` N , LI 4 k,.. Virginia. The proposed site is approximately 1.13 acres with an estimated disturbed area of.5 acres. 1 II B. Sequence of Construction i1 k Phase One li 1. Contact the county erosion control inspector to schedule a pre-construction P' meeting in the office of community development at the Albemarle county office 11 building for the issuance of a land disturbance permit. 48-hour notification is required. 2. The certified responsible land disturber(CRLD)must attend the pre- construction meeting. 3. After land disturbance permit is issued,install construction entrance at }£ i locations identified on plans. 4. Install perimeter erosion controls identified on phase 1 erosion control plans ' L (silt fence,drop inlet protection, and culvert inlet protection). `' 5. All disturbed areas are to drain to approved sediment control measures at all t times during land disturbing activities and during site development until final stabilization is achieved. ,,' P-'-'i 6. Installation,maintenance, and removal erosion and sediment items shall be per the VA Erosion and Sediment Control Handbook(VESCH). itli 1 i Phase Two , ki i , ,„ ' L' , i d i i L i'''''. r' Crozet Avenue North Sidewalk Improvements June 2014 Storm Water Pollution Prevention Plan KHA Job#113038016 1 1. Clear and grub site. Strip topsoil from the site and place in soil stockpile areas identified on the plans. I 2. Install major drainage pipes and inlets along crozet avenue. 3. Rough grade roads, excess soil shall be placed in the areas identified on the plans. Placement and compaction of the soil shall meet the requirements of the geotechnical engineer. 4. Immediately following rough grading,provide temporary seeding/mulch for all unpaved areas per temporary seeding schedule. 5. Install remaining underground utilities, drainage pipe, drop inlets, and inlet/outlet r protection. 6. Place base stone. 7. Pour curb and sidewalk 4 I 8. Place asphalt 9. Finish all pavement markings and signage. 10. Temporary erosion and sediment control measures can only beremoved with the approval of the erosion control inspector once the contributing drainage areas have been stabilized. 11. The contractor shall keep the roadway(s)adjacent to the construction entrance(s)free of dirt and debris at all times. C. The project site consists of 1.13 acres with a disturbed area of.5 acres. D. The pre-development runoff coefficient of the site is .45.The runoff coefficient will remain at .6 under post-development conditions. E. Other potential sources of pollution-Vehicle fuels and lubricants. F. The ultimate downstream receiving water body for stormwater runoff from within the limits of disturbance is the Mechums River-Beaver Creek G. Selected Erosion and Sediment Control and/or Grading and Drainage drawings illustrating the following are included in Appendix G: a 1. Drainage patterns and approximate slopes or contours anticipated after grading activities 2. Areas of soil disturbance and areas of the site which are not to be disturbed. Crozet Avenue North Sidewalk Improvements June 2014 k. Storm Water Pollution Prevention Plan KI-IA Job#113038016 I 3. Location of major structural and non-structural controls. ra 4. Location of areas where stabilization practices are expected to occur including types of vegetative cover 5. Surface waters including wetlands } 6. Locations where stormwater is discharged to a surface water with an outline of the drainage area for each discharge point. 7. Existing and planned paved areas and buildings 8. Location of permanent stormwater management practices to be used to control pollutants in stormwater after construction activities have been completed 9. Location of all off-site materials,waste,borrow or equipment storage areas covered by the plan,and 10. Location of other potential sources of pollution The actual schedule for implementing pollutant control measures will be determined by project construction progress. Down slope protective measures must always be in place before soil is disturbed. , IV. SITE DESCRIPTION Included as part of this SWPPP in Appendix G are selected project construction drawings. Please refer to them for detailed site information. A. Site Location—The Crozet Avenue North Sidewalk Improvements will be located at 1400 : Crozet Avenue in Crozet Virginia just north of Three Notch'd Road. B. Site Topography and Coverage—The site is located just west of the Crozet Elementary School. Elevations range from approximately 670 feet to 700 feet above sea level.Existing 4 on-site vegetation consist of trees and grass. The site consists of mostly impervious cover due to existing buildings,parking areas, and driveways. L-4 C. Rainfall Information—The average annual rainfall for Crozet,Virginia is 46.78 inches.A rain gauge shall be installed on site to determine if an inspection triggering rainfall event a has occurred.An inspection"triggering rainfall event"is rainfall that equals or exceeds one ' quarter inch'(0.25")in a 24-hour period at the construction site. 11, D. Site Soils—The following soils are present on-site according to a web soil survey generated from the United States Department of Agriculture(USDA)and Nautral Conservation Service(NRCS)online database. Soil Type 5B Belvoir loam, 2 to 7 percent slopes Crozet Avenue North Sidewalk Improvements June 2014 Storm Water Pollution Prevention Plan L' KHA Job#113038016 The Belvoir component makes up 80 percent of the map unit. Slopes are 2 to 7 percent. This component is on swales. The parent material consists of residuum weathered from granite and gneiss.The natural drainage class is somewhat poorly drained. The soil is not flooded and is not ponded. i Soil Type 7B Braddock loam,2 to 7 percent slopes The Braddock component makes up 80 percent of the map unit. Slopes are 2 to 7 percent. max_ This component is on fans. The parent material consists of alluvium and colluvium'derived r- from acid crystalline rocks. The natural drainage class is well drained. The soil is not id flooded and is not ponded. 16 Soil Type 8C3 Braddock clay loam, 7 to 15 percent slopes >., The Braddock component makes up 80 percent of the map unit.Slopes are 7 to 15 percent. This component is on fans. The parent material consists of alluvium and colluvium derived from acid crystalline rocks. The natural drainage class is well drained. The soil is not flooded and is not ponded. Soil Type 37C3 Ha esville clayloam,7 to 15percent slopes Y � P The Hayesville component makes up 80 percent of the map unit. Slopes are 7 to 15 percent. This component is on hillslopes. The parent material consists of residuum weathered from granite and gneiss. The natural drainage class is well drained. The soil is not flooded and is not ponded. E. Total Area and Disturbed Area—The project site consists of 1.13 acres with a disturbed area of.5 acres. F. Quality of Receiving Surface Water and/or Wetlands. -The proposed drainage of the Crozet North Sidewalk will ultimately drain in to the Mechums River-Beaver Creek. The Mechums River-Beaver Creek is classified as Waters of the United States. Beaver Creek is included on the Virginia Department of Environmental Quality 2012 305(b)/303(d) Water Quality Assessment Integrated Report as impaired for Recreation Use.Recreation Use is impaired due to the exceedance of the instantaneous criteria for Escherichia coli. To offset these impairments during construction portable sanitary facilities will be utilized on site and regularly serviced by contractor following competition of construction wastewater will be direct to existing public sanitary sewer system 6 G. Threatened or Endangered Species or their Critical Habitat—The Virginia Department of Game and Inland Fisheries' Virginia Fish and Wildlife Information Service was reviewed I for the presence of threatened or endangered species on the site. Zero species were identified as threatened or endangered within three miles of the project area. Other potential ti endangered species within three miles of the project site are displayed in the chart below. Crozet Avenue North Sidewalk Improvements June 2014 Storm Water Pollution Prevention Plan KHA Job#113038016 { Coordination with the proper federal, state,and local agencies should occur if these species are observed during construction or if impacts to these specieshabitats will occur. H. Erosion Control Plan—The Erosion and Sediment Control facilities shown on the approved - , E&S Plans (Appendix G)included a silt fence, drop inlet protection, culvert inlet protection, and a stone construction entrance, as shown on sheet CE-102 M1� I. Permanent Stormwater Controls—Runoff from the developed portions of the study area will,where practical,be directed to the existing stormwater system. Stormwater quality and quantity calculations proving the adequacy of this best management practice for meeting regulatory requirements are provided in Appendix I. if V. STORM WATER POLLUTION PREVENTION MEASURES AND CONTROLS A variety of storm water pollutant controls(Best Management Practices)are recommended for this project. These controls are reflected in the Erosion and Sediment Control Plans enclosed herein as Appendix G. Some controls are intended to function temporarily and will be used as needed for 1 pollutant control during the construction period. These include temporary sediment barriers such as silt fencing, a rock construction entrance,and inlet protection measures. For most disturbed areas,permanent stabilization will be accomplished by covering the soil with pavement,buildings, other improvements, and/or vegetation. i1„ A. Erosion and Sediment Controls 1. Short and Long Term Goals—All erosion and sediment control measures have been selected, designed and are to be installed in accordance with the A Virginia Erosion and Sediment Control Law and Regulations. The short term goal of construction phase stabilization is to minimize the loss of sediment to adjacent waters during construction. The long term goal is to minimize the loss of sediment from the project once constructed by permanent soil stabilization. 2. Soil Stabilization-The purpose of soil stabilization is to prevent soil from leaving the site. In the natural condition, soil is stabilized by existing vegetation. The primary technique to be used at this project for stabilizing site soil will be to provide a protective cover of turf grass,pavement, other improvements, or building over disturbed soil. (a) Temporary Seeding—Stabilization for all areas to remain denuded for a 1 Mai period of fourteen(14)days or longer(for disturbed area draining to impaired waters, Tier III waters or to waters with a TMDL established prior to the issuance of the Construction General Permit), or;thirty(30) days or longer(for all other disturbed areas)shall be initiated within twenty-four(24)hours after construction activity ceases in these areas. The methods for establishing stabilization shall be applied within seven w Crozet Avenue North Sidewalk Improvements June 2014 ' Storm Water Pollution Prevention Plan KHA Job#113038016 1 1 (7)days of initiation. Temporary seeding shall be in conformance with the project plans and/or erosion and sediment control narrative. (b) Permanent Seeding or Sodding-Stabilization for all areas at final grade shall be initiated within twenty-fours (24)hours of completion of the land disturbing activity.The methods for establishing final stabilization shall be applied within seven(7)days of initiation. Except for small level h spots, seeded areas shall be protected with mulch. Permanent seeding or 1 Sodding shall be in conformance with the project plans and/or erosion and sediment control narrative. r (c) Structural Controls—Storm water runoff is to be structurally controlled as depicted on the plan sheets and/or project narrative. Structural controls shall be keyed to land disturbing activities especially on sites with significant topography and shall be completely installed prior to commencement of such land disturbing activities. (d) Final Stabilization—Final stabilization is not considered established until a ground cover is achieved that is uniform,mature enough to survive and j3 will inhibit erosion. The Operator shall stabilize all exposed earth areas with permanent vegetation as described in the project plans and/or erosion and sediment control narrative. B. Stormwater Management Controls 1. The following stormwater management controls have been utilized on this project(mark appropriate activities and provide a brief explanation of each. plans project f Reer toas appropriate): Dry ponds ❑ Stormwater retention/detention structures ❑ Flow attenuation from swales and natural depressions ❑ Infiltration of site runoff ❑ Bio-retention systems I ❑ Stormwater wetlands ❑ Water quality structures ❑ Other measures(Specify) C. Construction Phase"Best Management Practices" Control of sediments has been described previously. Other aspects of this SWPPP are listed below: Crozet Avenue North Sidewalk Improvements June 2014 Storm Water Pollution Prevention Plan KHA Job#113038016 1. Dust Control-Construction traffic must enter and exit the site at the stabilized construction entrance. The purpose is to trap dust and mud that would otherwise be carried off-site by construction traffic. Dust control shall be provided by the Operator in compliance with applicable local and state dust control regulations. After construction,the site will be stabilized(as 1 described elsewhere),which will reduce the potential for dust generation. a 2. Effluent from de-watering activities must be filtered or passed through an approved sediment trapping device, or both,before being discharged from the site.No contaminated effluent or groundwater may be discharged with stormwater without a separate VPDES discharge permit from the VDEQ. Such permit shall be obtained by the Operator,prior to discharge. 3. Solid Waste Disposal-No solid materials, including building materials, are allowed to 1 be discharged from the site with storm water. All solid waste, including disposable materials incidental to the major construction activities,must be collected,removed I from the site and disposed of in a legal manner. The locations of solid waste I containers must be shown on the site maps. Substances that have the potential for polluting surface water and/or groundwater 1 must be controlled by whatever means necessary in order to ensure that they are not Idischarged from the site. As an example, special care must be exercised during t equipment fueling and servicing operations. If a spill occurs,it must be contained and „ 3; disposed of so that it will not flow from the site or enter groundwater, even if this requires removal,treatment,and disposal of soil. In this regard,potentially polluting substances should be handled in a manner consistent with the impact they represent. 1 4. Sanitary Facilities-All personnel involved with construction activities must comply with state and local sanitary or septic system regulations. Temporary sanitary facilities where provided at the site throughout the construction phase must be utilized J, by all construction personnel and shall be serviced by a commercial operator when provided. Their location must be shown on the project site maps if installed on site. ,0, 1 5. Water Source-Non-storm water components of site discharge must be clean water. Water used for construction, which discharges from the site,must originate from a 14 public water supply or private well approved by the Virginia Department of Health. Water used for construction that does not originate from an approved public supply must not discharge from the site. It is to be retained in ponds until it infiltrates and it evaporates. D. Construction Phase"Best Management Practices" During the construction phase,the Operator shall implement the following measures where appropriate: Crozet Avenue North Sidewalk Improvements June 2014 Storm Water Pollution Prevention Plan KHA Job#113038016 j ry,. i L▪ , 1. Material resulting from clearing and grubbing shall be stockpiled up slope from n adequate sedimentation controls or hauled off-site.All soil stockpile areas shall i g be annotated on the project plans in Appendix G. 2. All soil stockpile areas shall be maintained sufficiently far from water bodies 5 or wetlands and shall be adequately protected from erosion to preclude 3 migration of sediments into the water bodies or wetlands. 4 3. The Operator shall designate areas for equipment cleaning,maintenance,and i IN repair. The Operator and subcontractor(s)shall utilize those areas. The areas 4 shall be protected by a temporary perimeter berm or silt fencing. -i,.. i 4. Use of detergents for large scale washing is prohibited(i.e.,vehicles,buildings, 1 pavement surfaces, etc.) 33 .,..: L--- 5. Chemicals,paints, solvents, fertilizers,and other toxic material must be stored in waterproof containers. Except during application,the contents must be kept locked in trucks or within locked storage facilities. Runoff containing such- L material must be collected,removed from the site,treated, and disposed at an approved solid waste or chemical disposal facility. 6. All materials used for concrete mixing shall be washed down in a designated area where the corresponding runoff is directed into a leak-proof container or 3341 leak-proof settling basin. This concrete wash water shall be properly disposed of off--site. I VI. LOCAL PLANS '1 i In addition to this SWPPP, construction activities associated with this project must comply with all 3 additional requirements set forth by the Town of Crozet. , VII. INSPECTIONS AND SYSTEM MAINTENANCE A The purpose of site inspections is to assess performance of pollutant controls. The inspections A Li shall be conducted by the Operator's designated E&S inspector. If deficiencies in the erosion and sediment control measures are determined,they shall be recorded on the inspection form by the 4Operator and corrective action shall be initiated by the Operator within the time frame specified -..'.• L▪ ; below. i I Between the time this SWPPP is implemented and final site stabilization is achieved, all disturbed 311 areas and pollutant controls must be inspected at one of the two frequencies below: (Operator shall mark chosen inspection frequency) J (1 At least once every four business days or, 11 Bli ;j Crozet Avenue North Sidewalk Improvements June 2014 iStorm Water Pollution Prevention Plan KHA Job#113038016 j V =,14, a , c,, 1 ti ❑ At least once every five business days and no later than 48 hours following a measurable storm event. In the event that a measurable storm event occurs when there are more than 48 hours , k between business days,the inspection shall be conducted on the next business day. Based on these inspections,the Operator shall decide whether it is necessary to modify this ,, ,, SWPPP,add or relocate sediment barriers, or institute other actions required in order to prevent pollutants from leaving the site via storm water runoff. The Operator has the duty to repair, 1 modify,maintain,or supplement pollutant control measures and take other actions necessary to ',., L achieve effective pollutant control The Operator may install a rain gauge at the site to determine site specific rainfall conditions or must provide estimates of rainfall at the project site and provide information as to how the estimates were generated. For purposes of permit compliance,it is strongly recommended that 1• L 4 the Operator install a rain gauge at the project site. Li Examples of particular items to be evaluated during site inspections are listed below. This list is not intended to be comprehensive. During each inspection, the Operator's inspectors must evaluate f overall pollutant control system performance, as well as the effectiveness of system components. Additional factors should be considered as appropriate to the circumstances. 1 A. Locations where vehicles enter and exit the site must be inspected for evidence of off-site sediment tracking. A stabilized construction entrance will be constructed where vehicles 4 enter and exit. This entrance will be maintained or supplemented as necessary'to prevent i sediment from leaving the site on vehicles. Sediment tracked onto public roadways must be shoveled or swept from the roadway and re-deposited on site in a manner that minimizes its offsite release potential. --..,-,i LB. Sediment barriers must be inspected and, if necessary,they must be enlarged or cleaned in order to provide additional capacity. All material excavated from behind sediment barriers el shall be stockpiled on the up slope side of the barrier. Additional sediment barriers must be constructed as needed. Sediment must be removed from sediment traps and sediment iL-. basins when the design capacity has been reduced by 50%. u C. Inspections will evaluate disturbed areas and areas used for storing materials that are ' I exposed to rainfall for evidence of, or the potential for,pollutants entering the drainage i system. If necessary, the materials must be covered or original covers must be repaired or 1 supplemented. Also,protective berms must be constructed,if needed,in order to contain runoff from material storage areas. O• 001/4- 31 Grassed areas will be inspected to confirm that a healthy stand of grass is maintained. The site has achieved final stabilization when turf grass cover provides permanent stabilization --1, g of the soil surface exclusive of areas that have been paved or covered by building(s). Permanent stabilization is not considered established until a ground cover is achieved that 33, L0, is uniform,mature enough to survive and will inhibit erosion. D. All discharge points must be inspected to determine whether erosion control measures are effective in preventing impacts to receiving waters. : L 1 Crozet Avenue North Sidewalk Improvements June 2014 Storm Water Pollution Prevention Plan KHAJob#113038016 A II v Based on inspection results,any modification necessary to increase effectiveness of this'SWPPP to an acceptable level shall be made by the Operator within seven calendar days of the inspection. All modifications to the SWPPP document and approved plan will be noted on the construction plans. The inspection reports must be completed entirely and additional remarks shall be included if needed to fully describe a situation. An important aspect of the inspection report is the description of additional measures that need to be taken to enhance plan effectiveness. The inspection report must identify whether the site was in compliance with the SWPPP at the time of inspection and specifically identify all incidents of non-compliance. Inspection reports will be kept on file by the Operator as an integral part of this SWPPP for at least thirty six months following the month the Notice of Termination is filed with the VDEQ. It is the responsibility of the Operator to ensure the adequacy of site storm water pollutant discharge controls. Physical site conditions,weather conditions or Operator practices may make it necessary to install more structural controls than are shown on the plans. (For example,localized concentrations of runoff could make it necessary to install additional sediment barriers.) Assessing the need for additional controls and implementing them or adjusting existing controls are key aspects of the effectiveness of this SWPPP until the site achieves final stabilization. Should a control fail,be bypassed or otherwise be ineffective in maintaining sediments onsite and releasing jIII sediment offsite the Operator will provide notification to the VDEQ in accordance with Part III. G. of the VPDES Storm Water General Permit, as necessary. If it is determined by the Operator's Inspector that there has been an upset or bypass of the control A measures resulting in a release of sediment to State waters,the Operator's Inspector shall report the bypass or upset to the Valley Regional Office of the Virginia Department of Environmental j Quality(VDEQ)at 540-5747800 within 24 hours of discovery of the unanticipated bypass or upset. Within five days of making the verbal report to VDEQ,a written report shall be submitted by the Operator containing: • A description of the nature and location of the discharge; • The cause of the discharge; • The date on which the discharge occurred; • The length of time that the discharge continued; • The volume of the discharge; • If the discharge is continuing,how long it is expected to continue; g A r. • If the discharge is continuing,what the expected total volume of the discharge will be; and Any steps planned or taken to reduce,eliminate and prevent a recurrence of the present • discharge or any future discharges not authorized by this general permit. A A NI A ? Crozet Avenue North Sidewalk Improvements June 2014 Storm Water Pollution Prevention Plan KHA Job#113038016 w s N APPENDICES APPENDIX A —AUTHORITY LETTER APPENDIX B— GENERAL PERMIT FOR STORMWATER DISCHARGES FROM 1 i CONSTRUCTION ACTIVITIES (VAR 10)—REGISTRATION STATEMENT DEPARTMENT OF ENVIRONMENTAL QUALITY CONSTRUCTION ACTIVITY OPERATOR PERMIT FEE FORM ii'l L LSTORM WATER GENERAL PERMIT FOR CONSTRUCTION ACTIVITIES (VAR10) 'i.::, Li'' GENERAL VPDES PERMIT FOR DISCHARGED OF STORMWATER FROM CONSTRUCTION ACTIVITES (9VAC25-880) APPENDIX C OPERATOR CERTIFICATION FORMS '_:,,,- i APPENDIX D —INSPECTION REPORTS 3 n APPENDIX E -NOTICE OF TERMINATION(NOT) FORM '' LAPPENDIX F RECORD OF STABILIZATION AND CONSTRUCTION ACTIVITY DATES ", APPENDIX G — SELECTED EROSION AND SEDIMENT CONTROL SITE PLAN SHEETS - APPENDIX H - SWPPP CONSTRUCTION SITE NOTICE APPENDIX I STORMWATER CALCULATIONS i L Crozet Avenue North Sidewalk Improvements June 2014 Storm Water Pollution Prevention Plan KHA Job#113038016 p 15-4 • 6 •r1.7„;y gL1,!4' „ -• - -• . . . - - APPENDIX A AUTHORITY LETTER s Crozet Avenue North Sidewalk Improvements - June 2014 - - Storm Water Pollution Prevention Plan - • - KHA Job#113038016 i ' L 4:if, L , , DELEGATION OF AUTHORITY TO SIGN STORMWATER INSPECTION AND OTHER REPORTS - ..L. Project Title City State I I, (Owner contact—this person must be classified as an officer of the company), -,- L officer of (insert organization or company name here) t and its entities,with the authority over stormwater compliance of all Owner construction related ---, ki activities,do hereby delegate 7 ° (insert the name of the delegated individual(s)), of the below listed General Contractor the authority to sign/ certify any and all stormwater inspection reports and/or related documents. LThis authorization includes the authority to sign/certify any and all inspection forms and or ;, associated reports in accordance with the Virginia Pollutant Discharge Elimination System(VPDES) { general permit for stormwater discharges from construction activities. )., L fr Sincerely, 2 L (Owner signature) (Date) t 1 r t (Print Name) L (Title) 1 General Contractor .,: i_:, ,, - -11' Company Name Company Contact 1 Business Address .; L , ' '4 L n Business Phone Number b 2 L s Crozet Avenue North Sidewalk Improvements June 2014 Storm Water Pollution Prevention Plan 4 KHA Job#113038016 3 u - L i -: i GENERAL CONTRACTOR , _i SIGNATURE DELEGATION FOR REPORTS L GENERAL PERMIT FOR STORIVIWATER DISCHARGES FROM CONSTRUCTION ACTIVITIES 11 g y I,the undersigned,hereby delegate the Project Superintendent(s)'or Compliance Officer(s)of ,,, 4 ,,,,,_,, (Company Name ) P Y as the authorized signatory for all reports required by this permit and other information requested by the Owner or authorized representative of the Owner in accordance with the provisions of the General Permit. I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage this system,or those persons directly responsible for gathering the information,the information submitted is,to the best of my knowledge and belief,true ' Li -' accurate and complete. I am.aware that there are significant penalties for submitting false information, including the 1 possibility of fine and imprisonment for knowing violations. Sincerely, Principal or Officer of the General Contractor Ia (Principal or Officer of the General Contractor signature) (Date) , (Print Name) - LI} ,1 _ (Title) (Company) i' Lz 4 ' L4 -:: '. Crozet Avenue North Sidewalk Improvements June 2014 Storm Water Pollution Prevention Plan ' L KHA Job#113038016 a'€a s ,1' L-. -:)„ ,i L ',-;.,, ,,,,,,,,de,,___, ::, ,„, -'--- L ,,,.,, ,,' ''-' 1i''''''' .55i1''55 APPENDIX B VSMP GENERAL PERMIT FOR STORMWATER DISCHARGES FROM 4. CONSTRUCTION ACTIVITIES (VAR 10) - REGISTRATION STATEMENT DEPARTMENT OF ENVIRONMENTAL QUALITY CONSTRUCTION ACTIVITY OPERATOR PERMIT FEE FORM 15 55:5 i STORM WATER GENERAL PERMIT FOR CONSTRUCTION ACTIVITIES (VAR10) COVERAGE LETTER(WHEN RECEIVED FROM5:'1 L'5' DEQ) GENERAL VPDES PERMIT FOR'DISCHARGES OF STORMWATER FROM CONSTRUCTION ACTIVITIES (9VAC25-880) 51 I'5554 (IF THIS IS A SWPPP THAT WILL BE USED FOR CONSTRUCTION BEGINNING OR ONGOING PRIOR'TO JULY 1, 2014, THE AUTHOR NEEDS TO ALSO INCLUDE THE 2009 GENERAL PERMIT VAR10 IN THIS APPENDIX. IF THIS IS THE CASE,' ADD THE HEADING v "GENERAL PERMIT FOR DISCHARGES OF_STORMWATER FROM CONSTRUCTION ACTIVITIES(VAR10)" TO THIS PAGE, AND THE SAME HEADING TO THE TABLE OF CONTENTS. DELETE ALL OF h THIS HIGHLIGHTED TEXT ONCE YOU'RE FINISHED READING IT.) i 45i1 s ,:: '-':,,,,,,,,,:, i xr� Crozet Avenue North Sidewalk Improvements June 2014 Storm Water Pollution Prevention Plan KHA Job#113038016 f ,t Registration Statement General VPDES Permit for Discharges of Stormwater from Construction Activities (VAR10) 12-; La (Please Type or Print All Information) 1. Construction Activity Operator: (General permit coverage will be issued to this operator.`The Certification in Item#12 must be ' L'''- signed by the appropriate person associated with this operator.) Name: Albemarle County-Office of Facilities Development Contact: Frank Pohl .,,-;,-- `.:_ Mailing Address: 401 McIntire Road Room 228 City: Charlottesville State: VA Zip: 22902 Phone: 434-872-4501 Email address(if available): fpohl@albemarle.org l' i It Indicate if DEQ may transmit general permit correspondence electronically: Yes Q No❑ a 2. Existing General Permit Registration Number(for renewals only): 3. Name and Location of the Construction Activity: Name: Crozet Avenue North Sidewalk Improvements Address(if available): 1400 Crozet Avenue j, City: Crozet State: VA Zip: 22932 County(if not located within a City): Albemarle Latitude(decimal degrees): 38°4'24.32 Longitude(decimal degrees): 78°41'53.6" Name and Location of all Off-site Support Activities to be covered under the general permit: L Name: Address(if available): City: ` State: Zip: , ii County(if not located within a City): Latitude(decimal degrees): Longitude(decimal degrees): w 4. Status of the Construction Activity(check only one): Federal❑ State Public E <Private❑ 5. Nature of the Construction Activity(e.g.,commercial, industrial,residential,agricultural,oil and gas,etc.): sidewalk construction 6. Name of the Receiving Water(s)and Hydrologic Unit Code(HUC): Name: Rivanna/ Mechums` River-Beaver Creek Name: HUC: 020802040102/JR02 HUC: 7. If the discharge is through a Municipal Separate Storm Sewer System(MS4),the name of the MS4 operator: 4 8. Estimated Project Start and Completion Date: Start Date mm/dd/ Completion Date(mm/dd/yyyy): ( yyYY): Q �lO ' 11. 9.' Total Land Area of Development(to the nearest one-hundredth acre): 1.13 Estimated Area to be Disturbed(to the nearest one-hundredth acre): 0.50 4,`= 10. Is the area to be disturbed part of a larger common plan of development or sale? Yes❑ No E 11. A stormwater pollution prevention plan (SWPPP) must be prepared in accordance with the requirements of the General 1 VPDES Permit for Discharges of Stormwater from Construction Activities prior to submitting this Registration Statement. f By signing this Registration Statement the operator is certifying that the SWPPP has been prepared. 12. Certification:"I certify under penalty of law that I have read and understand this Registration Statement and that this document t and all attachments were prepared in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system or those persons directly responsible for gathering the information, the information submitted is to the best of my knowledge and belief true, accurate, and complete. I am aware that there are significant penalties for submitting false information including the possibility of fine and imprisonment for knowing violations." Printed Name: I4A'N' PO L.- Title: - �, f/ Signature: ..77 t"tiliVe...,V Date: 3 z 3 1‘ (Please sign in NK. This Certification must be signed by the appropriate person associated with the operator identified in i Item#1.) i � i 01/2014 Page 1 of 1 1 Instructions for Completing the Registration Statement General VPDES Permit for Discharges of Stormwater from Construction Activities (VAR10) GENERAL stormwater pollution prevention plan or comply with other permit conditions). A A.Coverage Under this General Permit. The entities that are considered operators will commonly consist of the Any operator applying for coverage under this general permit who is owner or developer of a project(the party with control of project plans required to submit a Registration Statement (see Section B below) and specifications)or the general contractor(the party with day to day q must submit a complete Registration Statement to the Department. operational control of the activities at the project site which are i N- .3 LThe Registration Statement serves as a Notice of Intent for coverage necessary to ensure compliance with the general permit). under the General VPDES Permit for Discharges of Stormwater from Construction Activities(VAR10). Provide the legal name(do not use a colloquial name),contact,mailing address, telephone number, and email address(if available) of the B.Single-family Residences. construction activity operator;general permit coverage will be issued to this operator. Indicate if the Department may transmit general permit Operators with an existing stormwater discharge or proposing a new correspondence electronically. stormwater discharge associated with the construction of a single- family residence separately built,disturbing less than one acre and Item 2:Existing General Permit Registration Number. part of a larger common plan of development or sale is not required to submit a Registration Statement, provided that the stormwater For reapplications only, provide the existing general permit registration management plan for the larger common plan of development provides number for the construction activity. This item does not need to be 4 permanent control measures (i.e., stormwater management facilities) completed for new construction activities applying for general`permit encompassing the single family residence. coverage. 4} L Operators of these types of discharges are authorized to discharge Item 3: Name> and Location of the Construction Activity 4, L 4under this general permit immediately upon' the general permit's Information. effective date of July 1,2014. Provide the official name,street address(if available),city or county(if C.To Apply for Permit Coverage. not located within a City)of the construction activity. Also, provide the latitude and longitude in decimal degrees of the approximate center of 1. New Construction Activities. Any operator proposing a new the construction activity(e.g.,N 37.5000,W 77.5000). stormwater discharge from construction activities shallsubmit a ''''. i complete Registration Statement to the Department prior to the Name and Location of Off-site Support Activity Information. commencement of land disturbance, unless exempted by Section B Iabove. Any operator proposing a new stormwater discharge from This general permit also authorizes stormwater discharges from construction activities in response to a public emergency where the support activities (e.g., concrete or asphalt batch plants, equipment # related work requires immediate authorization to avoid imminent staging g g yards, material storage areas, excavated material disposal endangerment to human health or the environment is immediately areas, borrow areas) located on-site or off-site provided that (i) the t authorized to discharge under this general permit and must submit a support activity is directly related to a construction activity that is complete Registration Statement to the Department no later than 30 required to have general permit coverage;(ii)the support activity is not ..,u days after commencing land disturbance; documentation to a commercial operation, nor does it serve multiple unrelated substantiate the occurrence of the public emergency must construction activities by different operators; (iii) the support activity ki accompany the Registration Statement. does not operate beyond the completion of the construction activity it supports; (iv) the support activity is identified in the registration 2. Existing Construction Activities. Any operator that was statement at the time of general permit coverage; (v) appropriate authorized to discharge under the general permit issued in 2009, control measures are identified in a SWPPP and implemented to and who intends to continue coverage under this general permit, address the discharges from the support activity areas; and (vi) all shall submit a complete Registration Statement to the Department applicable state, federal, and local approvals are obtained for the 1 on or before June 1,2014,unless exempted by Section B above. support activity. _= D.Where to Submit Registration Statements. Provide the official name,street address(if available), City and County (if not located within a City) of all off-site support activities to be 1 All Registration Statements should be submitted to: covered under this general permit. Also, provide the latitude and longitude in decimal degrees of the approximate center of the off-site -z Department of Environmental Quality support activities (e.g., N 37.5000, W 77.5000). Also, if an off-site "' Office of Stormwater Management,10th Floor support activity is going to be covered under this general permit the P.O.Box 1105 total land area of the off-site support activity and the estimated area to 1 Richmond,VA 23218 be disturbed by the off-site support activity need to be included in Item #9. ` LINE-BY-LINE INSTRUCTIONS Item 4:Status of the Construction Activity. Item 1:Construction Activity Operator Information. I Indicate the appropriate status (Federal, State, Public, or Private) of "Operator" means the owner or operator of any facility or activity the construction activity. subject to the Stormwater Management Act and regulations. In the context of stormwater associated with a large or small construction Item 5:Nature of the Construction Activity. activity, operator means any person associated with a construction project that meets either of the following two criteria:(i)the person has Provide a brief description of the'construction activity, such as 3 4 44 direct operational control over construction plans and specifications, commercial, residential, agricultural, oil and gas, etc.This list is not all -' including the ability to make modifications to those plans and inclusive. r specifications or (ii) the person has day-to-day operational control of those activities at a project that are necessary to ensure compliance Item 6:Receiving Waters(s)and HUC Information. with a stormwater pollution prevention plan for the site or other state permit or VSMP authority permit conditions(i.e.,they are authorized to Provide the name of the receiving water(s)and corresponding HUC for direct workers at a site to carry out activities required by the all stormwater discharges including any stormwater discharges from off-site support activities to be covered under this general permit. 01/2014 Page 1 of 2 k Hydrologic Unit Code or HUC is a watershed unit established in the gather complete and accurate information for permit application ALA most recent version of Virginia's 6th order national watershed boundary requirements; and where authority to sign documents has been dataset. assigned or delegated to the manager in accordance with corporate procedures. Item 7:MS4 Information. b. For a partnership or sole proprietorship: by a general partner or If stormwater is discharged through a municipal separate storm sewer the proprietor,respectively. system(MS4),provide the name of the MS4 operator.The name of the MS4 operator is generally the Town, City, County, Institute or Federal c. For a municipality,state,federal, or other public agency: by either facility where the construction activity is located. a principal executive officer or ranking elected official. For purposes of this part,a principal executive officer of a public agency includes: Item 8: ,Construction Activity Start and Completion Date Information. (i)The chief executive officer of the agency,or Provide the estimated start date month/da / ear of the construction (ii)A senior executive officer havingresponsibility for the overall ( Y y ) p tY activity. Provide the estimated completion date (month/day/year) of operations of a principal geographic unit of the agency. the construction activity. ,44 Item 9:Construction Activity Area Information. L Provide the total area (to the nearest one-hundredth acre) of the development (i.e.., the total acreage of the larger common plan of a development or sale). Include the total acreage of any off-site support 444 activity to be covered under this general permit. Provide the estimated area (to the nearest one-hundredth acre)to be disturbed by the construction activity. Include the estimated area of r1 land disturbance that will occur at any off-site support activity to be covered under this general permit. 44 Item 10:Common Plan of Development or Sale Information. Indicate if the area to be disturbed by the construction activity is part of a larger common plan of development or sale. Larger common plan of development or sale is defined as a contiguous area where separate and distinct construction may be taking place at different times on different schedules. Plan`is broadly defined as any announcement or documentation, including a sign,public notice or hearing, sales pitch, advertisement, drawing, permit application, zoning request, etc., or physical demarcation such as boundary signs,lot stakes, or surveyor markings indicating that construction activities may occur. Item 11:Stormwater Pollution Prevention Plan(SWPPP). AStormwater Pollution Prevention Plan(SWPPP)must be prepared in accordance with the requirements of the General VPDES Permit for 141. Discharges of Stormwater from Construction Activities(VAR10)prior to submitting this Registration Statement. By signing this Registration Statement the operator is certifying that the SWPPP has been prepared. Item 12:Certification. A properly authorized individual associated with the operator identified in Item 1 of the Registration Statement is responsible for certifying and signing the Registration Statement. Please sign the Registration Statement in INK. jai ja State statutes provide for severe penalties for submitting false f information on the Registration Statement. State regulations require that the Registration Statement be signed as follows: a. For a corporation: by a responsible corporate officer. For the i� purpose of this part,a responsible corporate officer means: (i) A president, secretary, treasurer, or vice-president of the corporation in charge of a principal business function,or any other person who performs similar policy-making or decision-making functions for the corporation,or (ii) the manager of one or more manufacturing, production, or s ; operating facilities, provided the manager is authorized to make management decisions that govern the operation of the regulated .l facility including having the explicit or implicit duty of making major capital investment recommendations, and initiating and directing other comprehensive measures to assure long-term compliance with environmental laws and regulations;the manager can ensure that the necessary systems are established or actions taken to 01/2014 Page2of2 ,.., Lii, DEPARTMENT OF ENVIRONMENTAL QUALITY CONSTRUCTION ACTIVITY OPERATOR PERMIT FEE FORM '4• -6 (Please Type or Print All Information) Instructions: Applicants for a'Construction Activity Individual Permit are required to pay permit application fees. Fees are r also required for registration for coverage under a Construction Activity General Permit. Fees must be paid when 1 applications for state permit issuance, reissuance, modification or transfer are submitted. Applications will be considered incomplete if the proper fee isnot paid and will not be processed until the fee is received. -..,,' L''• ''' The fee schedule for state permits is included with this form. Fees for state permit issuance, reissuance, maintenance, modification and transfer are included. Once you have determined the fee for the type of application you are submitting, complete this form. The original copy of the form and your check or money order payable to "Treasurer of Virginia" should be mailed to: Department of Environmental Quality Receipts Control P.O.Box 1104 ' I Richmond,VA 23218 A copy of this form and a copy of your check or money order should accompany the permit application (or registration statement). You should retain a copy for your records. N Construction Activity Operator: Name: Albemarle County--Office of Facilities Development i rill Contact Frank Pohl '° Mailing Address: 401 McIntire Rd Room 228 1 City: Charlottesville State: VA Zip: 22902 Phone: 434-872-4501 Email address(if available): fpohl@albemarle.org Name and Location of the Construction Activity: Name: Crozet Avenue North Sidewalk Improvements P City: Crozet State: VA Zip: 22932 t• i County: Albemarle Type of State Permit: 1-_—_1Construction Activity Individual Permit 0 Construction Activity General Permit K (from Fee Schedule) i Type of Action: � New Issuance ❑ Reissuance ❑ Maintenance 111 Modification [' Transfer Amount of Fee Submitted (from Fee Schedule): :,:- 1 Existing General Permit Registration Number(if applicable): FOR DEQ USE ONLY I Date: DC#: i 01/2014 Page 1 of 1 , , , ,,, ,--,, L CONSTRUCTION ACTIVITY PERMIT FEE SCHEDULE -,,: i'-' A. Individual Permits.The fee for filing a state permit application for a Construction Activity Individual Permit issued by the Board is as i follows: (NOTE: Individual permittees pay an annual permit maintenance fee instead of a reapplication fee. The permittee is billed I separately by DEQ for the annual permit maintenance fee.) ' TYPE OF STATE PERMIT ISSUANCE i-,- s Individual Permit for Discharges'from Construction Activities $15,000 4 B. Registration Statements. The fee for filing a state permit application (registration statement) for coverage under a Construction Activity General Permit issued by the Board, including a state or federal agency that does not administer a project in accordance with approved annual standards and specifications, is as follows: ' L h TYPE OF STATE PERMIT ISSUANCE ,.,--. L General/Stormwater Management-Small Construction Activity/Land Clearing(Areas within common plans of development or sale with land-disturbance acreage less than one acre) $290 General/Stormwater Management-Small Construction Activity/Land Clearing(Sites or areas within common plans of development or sale with land-disturbance acreage equal to or greater than one acre and $2,700 ' L less than five acres) �$ General/Stormwater Management-Large Construction Activity/Land Clearing (Sites or areas within common plans of development or sale with land-disturbance acreage equal to or greater than five acres and $3,400 less than 10 acres) General/Stormwater Management-Large Construction Activity/Land Clearing(Sites or areas within common plans of development or sale with land-disturbance acreage equal to or greater than 10 acres and $4,500 less than 50 acres) General/Stormwater Management-Large Construction Activity/Land Clearing (Sites or areas within common plans of development or sale with land-disturbance acreage equal to or greater than 50 acres and $6,100 1 less than 100 acres) General/Stormwater Management-Large Construction Activity/Land Clearing(Sites or areas within $9 600 ' common plans of development or sale with land-disturbance acreage equal to or greater than 100 acres) ' ' The •fee for filing a state permit application (registration statement)for coverage under a Construction Activity General Permit issued by the Board for a state or federal agency that administers a project in accordance with approved annual standards and specifications is as follows: TYPE OF STATE PERMIT ISSUANCE Construction General/Stormwater Management—Phase I Land Clearing("Large"Construction Activity- $750 r Sites or common plans of development or sale equal to or greater than 5 acres) 0, , iiiiiConstruction General/Stormwater Management`—Phase II Land Clearing("Small"Construction Activity $450 Sites or common plans of development or sale equal to or greater than 1 acre and less than 5 acres) e,:,--;,,_--1' e , i i i 01/2014 Page 1 of 2 1 C. State Permit Modification or Transfer Fees. The following fees apply to the modification or transfer of a Construction Activity e Individual Permit or a Construction Activity General Permit issued by the Board. The fee assessed shall be based on the total disturbed L acreage of the construction activity. In addition to the state permit modification fee, modifications resulting in an increase in total 1 disturbed acreage shall pay the difference in the initial Construction Activity General Permit fee paid and the Construction Activity General Permit fee that would have applied for the total disturbed acreage in Section B above. ,,,--' L TYPE OF STATE PERMIT MODIFICATION -; :-.L General/Stormwater Management—Small Construction Activity/Land Clearing (Areas within common $20 iplans of development or sale with land disturbance acreage less than one acre) General/Stormwater Management-Small Construction Activity/Land Clearing(Sites or areas within common plans of development or sale with land-disturbance acreage equal to or greater than one and less $200 1 A than five acres) 1 _ General/Stormwater Management-Large Construction Activity/Land Clearing(Sites or areas within ' L common plans of development or sale with land-disturbance acreage equal to or greater than five acres and $250 less than 10 acres) 1 General/Stormwater Management-Large Construction Activity/Land Clearing(Sites or areas within common plans of development or sale with land-disturbance acreage equal to or greater than 10 acres and $300 less than 50 acres) i rig General/Stormwater Management—Large Construction Activity/Land Clearing(Sites or areas within common plans of development or sale with land-disturbance acreage equal to or greater than 50 acres and $450 1-':' i less than 100 acres) 1. 3 General/Stormwater Management—Large Construction Activity/Land Clearing(Sites or areas within $700 ' L common plans of development or sale with land-disturbance acreage equal to or greater than 100 acres) Individual Permit for Discharges from Construction Activities $5,000 y� D. State Permit Maintenance Fees. The following annual state permit maintenance fees apply to each state permit identified below, j including expired permits that have been administratively continued. No annual state permit maintenance fee is required for coverage under a Construction Activity General Permit for a state or federal agency that administers a project in accordance with approved annual .... Li standards and specifications. ;1 TYPE OF STATE PERMIT MAINTENANCE ii L General/Stormwater Management—Small Construction Activity/Land Clearing(Areas within common 1 plans of development or sale with land disturbance acreage less than one acre) $50 i,,,. iiiil General/Stormwater Management—Small Construction Activity/Land Clearing(Sites or areas within common plans of development or sale with land-disturbance acreage equal to or greater than one and less $400 than five acres) ".,,,-, L. General/Stormwater Management—Lar9e Construction Activity/Land Clearing(Sites or areas within common plans of development or sale with land-disturbance acreage equal to or greater than five acres and $500 1 less than 10 acres) ' L" General/Stormwater Management-Large Construction Activity/Land Clearing(Sites or areas within common plans of development or sale with land-disturbance acreage equal to or greater than 10 acres and $650 1 less than 50 acres) "i,, i General/Stormwater Management—Large Construction Activity/Land Clearing(Sites or areas within common plans of development or sale with land-disturbance acreage equal to or greater than 50 acres and $900 i less than 100 acres) i 1 F.-ii General/Stormwater Management—Large Construction Activity/Land Clearing(Sites or areas within $1400 3 common plans of development or sale with land-disturbance acreage equal to or greater than 100 acres) , yl Individual Permit for Discharges from Construction Activities $3,000 ' Li ' L 01/2014 Page 2 of 2 I CHAPTER 880 GENERAL VPDES PERMIT FOR DISCHARGES OF STORMWATER FROM CONSTRUCTION ACTIVITIES - 9VAC25-880-1. Definitions. The words and terms used in this chapter shall have the meanings defined in the Virginia Stormwater Management Act (Article 2.3 (§ 62.1-44.15:24 et seq.) of Chapter 3.1 of Title 62.1 of s ,the Code of Virginia), this chapter, and .9VAC25-870 unless the context clearly indicates L. otherwise, except as otherwise specified in this section. Terms not defined in the Act, this chapter, or 9VAC25-870 shall have the meaning attributed to them in the federal Clean Water Act(33 USC § 1251 et' seq.) (CWA). For the purposes of this chapter: L "Business day" means Monday through Friday excluding state holidays. "Commencement of land disturbance" means the initial disturbance of soils associated with m x clearing, grading, or excavating activities or other construction activities (e.g., stockpiling of fill material). "Construction site" means the land where any land-disturbing activity is physically located or conducted, including any adjacent land used or preserved in connection with the land-disturbing activity. "Final stabilization" means that one of the following situations has occurred: 1. All soil disturbing activities at the site have been completed and a permanent L vegetative cover has been established on denuded areas not otherwise permanently 4 stabilized. Permanent vegetation shall not be considered established until a ground cover is achieved that is uniform (e.g., evenly distributed), mature enough to survive, and will inhibit erosion. 2. For individual lots in residential construction, final stabilization can occur by either: a a: The homebuilder completing final stabilization as specified in subdivision 1 of this definition, or j b. The homebuilder establishing temporary soil stabilization, including perimeter controls for an individual lot prior to occupation of the home by the homeowner, and M1 informing the homeowner of the need for, and benefits of, final stabilization. 3. For construction projects on land`used for agricultural purposes , final stabilization may be accomplished by returning the disturbed land to its preconstruction agricultural g use. Areas disturbed that were not previously used for agricultural activities, such as buffer strips immediately adjacent to surface waters, and areas that are not being returned to their preconstruction agricultural use must meet the final stabilization criteria = specified in subdivision 1 or 2 of this definition. "Immediately" means as soon as practicable, but no later than the end of the next business -1 day, following the day when the land-disturbing activities have temporarily or permanently ceased. In the context of this general permit, "immediately" is used to define the deadline for initiating stabilization measures. ) "Impaired waters" means surface waters identified as impaired on the 2012 § 305(b)/303(d) Water Quality Assessment Integrated Report. "Infeasible" means not technologically possible or not economically practicable and achievable in light of best industry practices. "Initiation of stabilization activities" means: 1 1. Prepping the soil for vegetative or nonvegetative stabilization; Page 1 of 29 9VAC25-880 (adopted 12/17/2013 - published 2/24/2014 - effective 7/1/2014) ' L 2. Applying mulch or other nonvegetative product to the exposed area; 3. Seeding or planting the exposed area; 4. Starting any of the above activities on a portion of the area to be stabilized, but not on =1 the entire area; or 5. Finalizing arrangements to have the stabilization product fully installed in compliance 1 L1--- with the applicable deadline for completing stabilization. This list is not exhaustive. "Measurable storm event" means a rainfall event producing 0.25 inches of rain or greater over 24 hours. 4 "Stabilized" means land that has been treated to withstand normal exposure to natural forces without incurring erosion damage. -L1 9VAC25-880-10. Purpose. This general permit regulation governs stormwater discharges from regulated construction # activities. For the purposes of this chapter, these discharges are defined as stormwater 1 discharges associated with large construction activity, and stormwater discharges associated with small construction activity. Stormwater discharges associated with other types of industrial activity shall not have coverage under this general permit. This general permit covers only discharges through a point source to surface waters or through a municipal or nonmunicipal separate storm sewer system to surface waters. Stormwater discharges associated with 1 1;F-111-11 industrial activity that originate from construction activities that have been completed and the site has undergone final stabilization are not authorized by this general permit. 9VAC25-880-15. Applicability of incorporated references based on the dates that they became effective. 11' LExcept as noted, when a regulation of the United States set forth in the Code of Federal Regulations is referenced and incorporated herein, that regulation, shall be as it exists and has been published in the July 1, 2013, update. trii''''- 9VAC25-880-20. Effective date of general permit. 111'1 This general permit is effective on July 1, 2014. The general permit will expire on June 30, 2019. This general permit is effective for any covered operator upon compliance with all --, L provisions of 9VAC25-880-30. 9VAC25-880-30. Authorization to discharge. A. Any operator governed by this general permit is authorized to discharge to surface waters of the Commonwealth of Virginia provided that: 1. The operator submits a complete and accurate registration statement, if required to do so, in accordance with 9VAC25-880-50 and receives acceptance of the registration by the board; 1 Li 2. The operator submits'any permit fees, if required to do so, in accordance with s 9VAC25-870-700 et seq.; 3. The operator complies with the applicable requirements of 9VAC25-880-70; ' L 4. The operator obtains approval of: i A -< Page 2 of 29 4 9VAC25-880 (adopted 12/17/2013 - published 2/24/2014 - effective 7/1/2014) ,, , ,., tii, , , il a. An erosion and sediment control plan from the appropriate VESCP authority as • Ell authorized under the Erosion and Sediment Control Regulations (9VAC25-840), unless the operator receives from the VESCP an "agreement in lieu of a plan" as defined in 9VAC25-840-10 or prepares the erosion and sediment control plan in accordance with annual standards and specifications approved by the department. ":!: L The operator of any land-disturbing activity that is not required to obtain erosion and sediment control plan approval from a VESCP authority or is not required to adopt department-approved annual standards and specifications shall submit the erosion • r-'• ,'and sediment control plan to the department for review and approval; and b. A stormwater management plan from the appropriate VSMP authority as authorized under the Virginia Stormwater Management Program (VSMP) Regulation ' 6 (9VAC25-870), unless the operator prepares the stormwater management plan in _ kill accordance with annual standards and specifications approved by the department. The operator of any land-disturbing activity that is not required to obtain stormwater • z management plan approval from a VSMP authority or is not required to adopt department-approved annual standards and specifications shall submit the stormwater management plan to the department for review and approval; and s 5. The board has not notified the operator that the discharge is not eligible for coverage in accordance with subsection B of this section. i B. The board will notify an operator that the discharge is not eligible for coverage under this y general permit in the event of any of the following: 1. The operator is required to obtain an individual permit in accordance with 9VAC25- i 870-410 B, F. 2. The operator is proposing discharges to surface waters specifically named in other board regulations that prohibit such discharges; 3 3. The discharge causes, may reasonably be expected to cause, or contributes to a s violation'of water quality standards (9VAC25-260); 2 4. The discharge violates or would violate the antidegradation policy in the Water Quality 4 Standards (9VAC25-260-30) ; or 5. The discharge is not consistent with the assumptions and requirements of an applicable TMDL approved prior to the term of this general permit. ' La' i, C. This general permit also authorizes stormwater discharges from support activities (e.g., , concrete or asphalt batch plants, equipment staging yards, material storage areas, excavated material disposal areas, borrow areas) located on-site or off-site provided that: 1 l▪ iu 1. The support activity is directly related to a construction activity that is required to have H general permit coverage for dischargesof stormwater from construction activities; i i41 2. The support activity is not a commercial operation nor does it serve multiple unrelated construction activities by different operators; 3. The support activity does not operate beyond the completion of the last construction activity it supports; i 4. The support activity is identified in the registration statement at the time of general ,�, permit coverage; 5. Appropriate control measures are identified in a stormwater pollution prevention plan 1 and implemented to address the discharges from the support activity areas;and 6. All applicable,state, federal, and local approvals are obtained for the support activity. DSupport activities located off-site are not required to be covered under this general permit. Discharges of stormwater from off-site support activities may be authorized under Page 3 of 29 :i 9VAC25-880 (adopted 12/17/2013 - published 2/24/2014 - effective 7/1/2014) I x Id another state or VPDES permit. Where stormwater discharges from off-site support activities are not authorized under this general permit, the land area of the off-site support activity need not be included in determining the total land disturbance acreage of the construction activity seeking general permit coverage. E. Discharges authorized by this general permit may be commingled with other sources of stormwater that are not required to be covered under a state permit, so long as the commingled discharge is in compliance with this general permit. Discharges authorized by a separate state or VPDES permit may be commingled with discharges authorized by this general permit so long as all such discharges comply with all applicable state and VPDES permit requirements. F. Authorized nonstormwater discharges. The following nonstormwater discharges from construction activities are authorized by this general permit: 1. Discharges from firefighting activities; 2. Fire hydrant flushings; 3. Water used to wash vehicles or equipment where soaps, solvents, or detergents have not been used and the wash water has been filtered, settled, or similarly treated prior to discharge; 4 4. Water used to control dust that has been filtered, settled, or similarly treated prior to discharge; 5. Potable water source, including uncontaminated waterline flushings; 6. Routine external building wash down where soaps, solvents, or detergents have not Lbeen used and the wash water has been filtered, settled, or similarly treated prior to discharge; 1 7. Pavement wash water where spills or leaks of toxic or hazardous materials have not occurred (or where all spilled or leaked material has been removed prior to washing); where soaps, solvents, or detergents have not been used; and where the wash water has been filtered,settled, or similarly treated prior to discharge; LI 8. Uncontaminated air conditioning or compressor condensate; 9. Uncontaminated groundwater or spring water; 10. Foundation or footing drains where flows are not contaminated with process materials such as solvents; 11. 'Uncontaminated, excavation dewatering, including dewatering of trenches and } excavations that have been filtered, settled, or similarly treated prior to discharge; and 12. Landscape irrigations. G. Approval for coverage under this general permit does not relieve any operator of the responsibility to comply with any other applicable federal, state or local statute, ordinance or regulation. H. Continuation of general permit coverage. 1. Any operator that was authorized to discharge under the general permit issued in 2009 and that submits a complete and accurate registration statement on or before June 30, 2014, is authorized to continue to discharge under the terms of the 2009 general permit until such time as the board either: La.Issues coverage to the operator under this general permit or b. Notifies the operator that the discharge is not eligible for coverage under this general permit. i 4L2. When the operator is not in •compliance with the conditions of the expiring or expired general permit the board may choose to do any or all of the following: I Page 4 of 29 9VAC25-880 (adopted 12/17/2013 published 2/24/2014 - effective 7/1/2014) ;.r -;3_, L a. Initiate enforcement action based upon the 2009 general permit; b. Issue a notice of intent to deny the new general permit. If the general permit is ' L denied, the owner or operator would then be required to cease the activities authorized by the continued general permit or be subject to enforcement action for operating without a state permit; c. Issue a new state permit with appropriate conditions; or d. Take other actions authorized by the VSMP Regulation (9VAC25-870). 9VAC25-880-40. Delegation of authorities to state and local programs. A board-approved VSMP authority is authorized to administer requirements of this general permit, including but not limited to.: (i) registration statement acceptance; (ii) fee collection; (iii) stormwater management plan review and approval; and (iv)permit compliance and enforcement dependent upon conditions established as part of the board approval. ' L9VAC25-880-50. General permit application (registration statement). A. Deadlines for submitting registration statement. Any operator seeking coverage under this general permit, and that is required to submit a registration statement, shall submit a complete and accurate general VPDES permit registration statement in accordance with this 4 section, which shall serve as a notice of intent for coverage under the general VPDES permit for discharges of stormwater from construction activities. 1. New construction activities. a. Any operator proposing a new stormwater discharge from construction activities shall submit a complete and accurate registration statement to the VSMP authority ,' prior to the commencement of land disturbance. b. Any operator proposing a new stormwater discharge from construction activities in response to a public emergency where the related work requires immediate zE authorization to avoid imminent endangerment to human health or the environment is 4 authorized to discharge under this general permit, provided that: ry _ (1) The operator submits a complete and accurate registration statement to the VSMP authority no later than 30 days after commencing land disturbance; and (2) Documentation to substantiate the occurrence of the public emergency is provided with the registration statement. Lc. 'Any operator proposing a new stormwater discharge associated with the construction of a single-family residence separately built, disturbing less than one - L acre and part of a larger common plan of development or sale, is authorized to discharge under this general permit and is not required to submit a registration statement or the department portion of the permit fee,provided that the stormwater 1management plan for the larger common plan of development or sale provides permanent control measures (i.e., stormwater management facilities) encompassing , L the single family residence. 2. Existing construction activities. a. Any operator that was authorized to discharge under the general permit issued in 2009 and'that intends to continue coverage under this general permit shall: I (1) Submit a complete and accurate registration statement to the VSMP authority on or before June 1, 2014; and ., L ' L Page 5 of 29 9VAC25-880 (adopted 12/17/2013 published 2/24/2014 -effective 7/1/2014) 3 (2) Update its stormwater pollution prevention plan to comply with the requirements of this general permit no later than 60 days after the date of coverage under this general permit. b. Any operator with an existing stormwater discharge associated with the 1 construction of a single-family residence separately built, disturbing less than one acre and part of a larger common plan of development or sale, and that intends to continue coverage under this general permit, is authorized to discharge under this general permit and is not required to submit a registration statement or the department portion of the permit fee, provided that: (1) The stormwater management plan for the larger common plan of development or sale provides permanent control measures(i.e., stormwater management facilities) ig encompassing the single-family residence; and lh (2) The operator updates its stormwater pollution prevention plan to comply with the requirements of this general permit no later than 60 days after the date of coverage under this general permit. 3. For stormwater discharges from construction activities where the operator changes, the new operator must submit a complete and accurate registration statement or transfer Loo agreement form to the VSMP authority prior to assuming operational control over site specifications or commencing work on-site. I 4. Late notifications. Operators are not prohibited from submitting registration statements I after commencing land disturbance. When a late registration statement is submitted, authorization for discharges shall not occur until coverage under the general permit is issued. The VSMP authority, department, board, and the EPA reserve the right to take k enforcement action for any unpermitted discharges that occur between the commencement of land disturbance and discharge authorization. B. Registration statement. The operator shall submit a registration statement to the VSMP I authority that shall contain the following information: 1. Name, contact, mailing address, telephone number, and email address if available of the construction activity operator. No more than one operator may receive coverage under each registration statement. NOTE: General permit coverage will be issued to this operator, and the certification in subdivision 11 of this subsection must be signed by the appropriate person associated with this operator; 2. Name and location if available of the construction activity and all off-site support activities to be covered under this general permit, including city or county, and latitude and longitude in decimal degrees; 3 Status of the construction activity. federal state public, or private; 4. Nature of the construction activity (e.g., commercial, industrial, residential, agricultural, oil and gas, etc.); 5. Name of the receiving water(s) and HUC al 6. If the discharge is through a municipal separate storm sewer system (MS4), the name of the municipal separate storm sewer system operator; 7. Estimated project start date and completion date; I 8. Total land area of development and estimated area to be disturbed by the construction activity (to the nearest one-hundredth of an acre); 9. Whether the area to be disturbed by the construction activity is part of a larger 1 common plan of development or sale; Page 6 of 29 9VAC25-880 (adopted 12/17/2013 published 2/24/2014 - effective 7/1/2014) A 3 r� t 10. A stormwater'pollution prevention plan (SWPPP) must be prepared in accordance with the requirements of the General VPDES Permit for Stormwater Discharges from Construction Activities prior to submitting the registration statement.' By signing the registration statement the operator certifies that the SWPPP has been prepared and 11. The following certification: "I certify under penalty of law that I have read and L., understand this registration statement and that this document and all attachments were prepared in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system or those persons directly responsible for gathering the information, the information submitted is to the best of my knowledge and 1 belief true, accurate, and complete. I am aware that there are-significant penalties for submitting false information including the possibility of fine and imprisonment for knowing violations." C.The registration statement shall be signed in accordance with 9VAC25-880-70, Part til K. 9VAC25-880-60. Termination of general permit coverage. A. Requirements. The operator of the construction activity shall submit a notice of termination to the VSMP authority after one or more of the following conditions have been met: 1. Necessary permanent control measures included in the SWPPP for the site are in place and functioning effectively and final stabilization has been achieved on all portions of the site for which the operator is responsible. When applicable, long-term responsibility and maintenance requirements for permanent control measures shall be recorded in the local land records prior to the submission of a notice of termination; 2. Another operator has assumed control over all areas of the site that have not been finally stabilized and obtained coverage for the ongoing discharge; 3. Coverage under an alternative VPDES or state permit has been obtained; or 4. For'residential construction only, temporary soil stabilization has been completed and ; theresidence has been transferred to the homeowner. The notice of termination should be submitted no later than 30 days after one of the above conditions being met. Authorization to discharge terminates at midnight on the date that the ,a notice of termination is submitted for the conditions set forth in subdivisions 2 through 4 of this subsection unless otherwise notified by the VSMP authority or the department. Termination of authorizations to discharge for the conditions set forth in subdivision 1 of this subsection shall be effective upon notification from the department that the provisions of subdivision 1 of this subsection have been met or 60 days after submittal of the notice of terminations, whichever occurs first. B.Notice of termination. The notice of termination shall contain the following information: 5 1. Name, contact, mailing address,telephone number, and email address if available of the construction activity operator. 2. Name and location if available of the construction activity covered under this general permit, including city or county, and latitude and longitude in decimal degrees. 3. The general permit registration number. L. 4. The basis for submission of the notice of termination, pursuant to subsection A of this I section. fi 5. Where applicable, a list of the on-site and off-site permanent control measures (both structural and nonstructural)' that were installed to comply with the stormwater Page 7 of 29 9VAC25-880 (adopted 12/17/2013 published 2/24/2014 - effective 7/1/2014) management technical criteria. For each permanent control measure that was installed, the following information shall be included: ▪ 1 a. The type of permanent control measure installed and the date that it became ▪ ti A functional as a permanent control measure; b. The location if available of the permanent control measure, including city or county, and latitude and longitude in decimal degrees; c. The receiving water of the permanent control measures; and ' 3 d. The number- of total and impervious`acres treated by the permanent control measure (to the nearest one-tenth of an acre). 6. Where applicable, the following information related to participation in a regional stormwater management plan. For each regional stormwater management facility, the following information shall be included: a.The type of regional facility to which the site contributes; b. The location if available of the regional facility, including city or county, and latitude and longitude in decimal degrees; and c.The number of total and impervious site acres treated by the regional facility (to L; the nearest one-tenth of an acre). 7. Where applicable, the following information related to perpetual nutrient credits that were acquired in accordance with§ 62.1-44.15:35 of the Code of Virginia: a. The name of the nonpoint nutrient credit generating entity from which perpetual 4. nutrient credits were acquired; and b.The number of perpetual nutrient credits acquired (lbs. per acre per year). 8. The following certification: "I certify under penalty of law that I have read and II understand this notice of termination and that this document and all attachments were prepared in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system or those persons directly responsible for gathering the information, the information submitted is to the best of my knowledge and belief true, accurate, and complete. I am aware that there are significant penalties for submitting false information including the possibility of fine and imprisonment for knowing violations." C. The notice of termination shall be signed in accordance with 9VAC25-880-70 Part III K. D. Termination by the board. The board may terminate coverage under this general permit during its term and require application for an individual permit or deny a general permit renewal application on its own initiative`in accordance with the Act, this chapter, -and the VSMP ; L;„ Regulation 9VAC25-870. 1 9VAC25-880-70. General permit. Le, Any operator whose registration statement is accepted by the board will receive the following general permit and shall comply with the requirements contained therein and be subject to all requirements of 9VAC25-870. 1 1 L „. Page 8 of 29 9VAC25-880 (adopted 12/17/2013 - published 2/24/2014 - effective 7/1/2014) i 3, L General Permit No.: VAR10 Effective Date: July 1, 2014 : L--; Expiration Date: June 30,2019 . GENERAL VPDES PERMIT FOR DISCHARGES OF STORMWATER FROM CONSTRUCTION L ACTIVITIES AUTHORIZATION TO DISCHARGE UNDER THE VIRGINIA STORMWATER MANAGEMENT PROGRAM AND THE VIRGINIA STORMWATER MANAGEMENT ACT In compliance with the provisions of the Clean Water Act, as amended, and pursuant to the Virginia Stormwater Management Act and regulations adopted pursuant thereto, operators of construction activities are authorized to discharge to surface waters within the boundaries of the Commonwealth of Virginia, except those specifically named in State Water Control Board --', L 1 regulations that prohibit such discharges. ' = The authorized discharge shall be in accordance with this cover page, Part I - Discharge Authorization and Special Conditions, Part II -Stormwater Pollution Prevention Plan, and Part III - Conditions Applicable to All VPDES Permits as set forth herein. A PART I 1 DISCHARGE AUTHORIZATION AND SPECIAL CONDITIONS .411 A. Coverage under this general permit. 1. During the' period beginning with the date'of coverage under this general permit and 5 lasting until the general permit's expiration date, the operator is authorized to discharge stormwater from construction activities. 2. This general permit also authorizes stormwater discharges from support activities (e.g., concrete or asphalt batch plants, equipment staging yards, material storage areas, ' excavated material disposal areas, borrow areas) located on-site or off-site provided that: L. a. The support activity is directly related to the construction activity that is required to x have general permit coverage for discharges of stormwater from construction activities; 6, b. The support activity is not a commercial operation, nor does it serve multiple # unrelated construction activities by different operators ; ' c. The support activity does not' operate beyond the completion of the last 1 L construction activity it supports; d. The support activity is identified in the registration statement at the time of general 1 permit coverage; e. Appropriate control measures are identified in a stormwater pollution prevention Ili plan and implemented to address the discharges from the support activity areas; and f. All applicable state, federal, and local approvals are obtained for the support 1activity. B. Limitations on coverage. 1. Post-construction discharges. This general permit does not authorize stormwater discharges that originate from the site after construction activities have been completed and the site, including any support activity sites covered under the general permit i Page 9 of 29 LA 9VAC25-880 (adopted 12/17/2013 -published 2/24/2014 -effective 7/1/2014) I registration, has undergone final stabilization. Post-construction industrial stormwater discharges may need to be covered by a separate VPDES permit. 2. Discharges mixed with nonstormwater. This general permit does not authorize discharges that are mixed with sources of nonstormwater, other than those discharges that are identified in Part I E (Authorized nonstormwater discharges) and are in L: compliance with this general permit. 1 3. Discharges covered by another state permit. This general permit does not authorize 9 discharges of stormwater from construction activities that have been covered under an , k, individual permit or required to obtain coverage under an alternative general permit. 4. Impaired waters and TMDL limitation. Discharges of stormwater from construction activities to surface waters identified as impaired in the 2012 §305(b)/303(d) Water L. Quality Assessment Integrated Report or for which a TMDL wasteloadallocation has been established and approved prior to the term of this general permit for(i) sediment or a sediment-related parameter (i.e., total suspended solids or turbidity) or (ii) nutrients (i.e., nitrogen or phosphorus) are not eligible for coverage under this general permit unless the operator develops, implements, and maintains a SWPPP that minimizes the pollutants of concern and, when applicable, is consistent with the assumptions and requirements of the approved TMDL wasteload allocations. In addition, the operator shall implement the following items: - a. The impaired water(s), approved TMDL(s), and pollutant(s) of concern, when applicable, shall be identified in the SWPPP; b. Permanent or temporary soil stabilization shall be applied to denuded areas within seven days after final grade is reached on any portion of the site; c. Nutrients shall be applied in accordance with manufacturer's recommendations or L an approved nutrient management plan and shall not be applied during rainfall events; and d. The applicable SWPPP inspection requirements specified in Part II F 2 shall be amended as follows: 1 (1) Inspections shall be conducted at a frequency of (i) at least once every four jury business days or (ii) at least once every five business days and no later than 48 s hours following a measurable storm event. In the event that a measurable storm event occurs when there are more than 48 hours between business days, the inspection shall be conducted on the next business day; and (2) Representative inspections used by utility line installation, pipeline construction, or other similar linear construction activities shall inspect all outfalls discharging to surface waters identified as impaired or for which a TMDL wasteload allocation has 1 been established and approved prior to the term of this general permit. t 5. Exceptional waters limitation. Discharges of stormwater from construction activities 1 not previously covered under the general permit issued in 2009 to exceptional waters 1 LII identified in 9VAC25-260-30.A 3c are not eligible for coverage under this general permit unless the operator implements the following: 1 a. The exceptional water(s) shall be identified in the SWPPP; b. Permanent or temporary soil stabilization shall be applied to denuded areas within seven days after final grade is reached on any portion of the site; c. Nutrients shall be applied in accordance with manufacturer's recommendations or an approved nutrient management plan and shall not be applied during rainfall 1N1 events; and Page 10 of 29 9VAC25-880 (adopted 12/17/2013 - published 2/24/2014 - effective 7/1/2014) d. The applicable SWPPP inspection requirements specified in Part II F 2 shall be amended as follows: (1) Inspections shall be conducted at a frequency of (i) at least once every four business days or (ii) at least once every five business days and no later than 48 hours following a measurable storm event. In the event that a measurable storm event occurs when there are more than 48 hours between business days, the 1 inspection shall be conducted on the next business day; and (2) Representative inspections used by utility line installation, pipeline construction, or other similar linear construction activities shall inspect all outfalls discharging to exceptional waters. 1111 6. There shall be no discharge of floating solids or visible foam in other than trace 17iamounts. C. Commingled discharges. Discharges authorized by this general permit` may be 1 commingled with other sources of stormwater that are not required to be covered under a state permit, so long as the commingled discharge is in compliance with this general permit. } Si Discharges authorized by a separate state or VPDES permit may be commingled with discharges authorized by this general permit so long as all such discharges comply with all applicable state and VPDES permit requirements. D. Prohibition of nonstormwater discharges. Except as provided in Parts I A 2, I C and I E, all discharges covered by this general permit shall be composed entirely of stormwater associated with construction activities. All other discharges including the following are prohibited: 1. Wastewater from washout of concrete; 2. Wastewater from the washout and cleanout of stucco, paint, form release oils, curing compounds, and other construction materials; 1 3. Fuels, oils, or other pollutants used in vehicle and equipment operation and 4 maintenance; 4. Oils,toxic substances, or hazardous substances from spills or other releases; and 5. Soaps, solvents , or detergents used in equipment and vehicle washing. E. Authorized nonstormwater discharges. The following nonstormwater discharges from construction activities are authorized by this general permit when discharged in compliance with this general permit: ;1 1. Discharges from firefighting activities; ti 2. Fire hydrant flushings; Y 9 I 3. Waters used to wash vehicles or equipment where soaps, solvents, or detergents have not been used and the wash water has been filtered, settled, or similarly treated 1 prior to discharge; 4. Water used to control dust that has been filtered, settled, or similarly treated prior 1 to discharge; 5. Potable water sources, including uncontaminated waterline flushings; 16. Routine external building wash down where soaps, solvents or detergents have not been used and the wash water has been filtered, settled, or similarly treated prior to discharge; 1 7. Pavement wash waters where spills or leaks of toxic or hazardous materials have not occurred (or where all spilled or leaked material has been removed prior to 1 Page 11 of 29 9VAC25-880 (adopted 12/17/2013 - published 2/24/2014 - effective 7/1/2014) hi i --' L: 1 washing);where soaps, solvents, or detergents have not been used ; and where the wash water has been filtered, settled,or similarly treated prior to discharge; 8. Uncontaminated air conditioning or compressor condensate; 9. Uncontaminated ground water or spring water; L„11 10. Foundation or footing drains where flows are not contaminated with process materials such as solvents; '` 1 11. Uncontaminated excavation dewatering, including dewatering of trenches and excavations that have been filtered, settled, or similarly treated prior to discharge; and ; LI 12. Landscape irrigation. s F. Termination of general permit coverage. , . 1 1. The operator of the construction activity shall submit a notice of termination in accordance with 9VAC25-880-60 to the VSMP authority after one or more of the following conditions have been met: a. Necessary permanent control measures included in the SWPPP for the site are in place and functioning effectively and final stabilization has been achieved on all portions of the site for which the operator is responsible. When applicable, long term responsibility and maintenance requirements shall be recorded `In the local land records prior to the submission of a notice of termination; .7! L b. Another operator has assumed control over all areas of the site that have not been finally stabilized and obtained coverage for the ongoing discharge; 51 c. Coverage under an alternative VPDES or state permit has been obtained; or d. For residential construction only, temporary soil stabilization has been completed .,,i: L and the residence has been transferred to the homeowner. 2. The notice of termination should be submitted no later than 30 days after one of the :. above conditions in subdivision 1 of this subsection are met. Authorization to`discharge terminates at midnight on the date that the notice of termination is submitted for'the conditions set forth in subdivisions 1 b through 1 d of this subsection. Termination of authorizations to discharge for the conditions set forth in subdivision 1 `a of this subsection shall be effective upon notification from the department that the provisions of subdivision 1 a of this subsection have been met or 60 days after submittal of the notice of termination, whichever occurs first. ', L• . 3. The notice of termination shall be signed in accordance with Part III K of this general 1 permit. G. Water quality protection. L-9• , 1. The operator must select, install, implement and maintain control measures as ) identified in the SWPPP at the construction site that minimize pollutants in the discharge as necessary to ensure that the operator's discharge does not cause or contribute to an 1• 1 excursion above any applicable water quality standard. 2. If it is determined by the department that the operator's discharges are causing, have A 1 reasonable potential to cause, or are contributing to an excursion above any applicable 1 xb water quality standard, the department, in consultation with the VSMP authority, may take appropriate enforcement action and require the operator to: a. Modify or implement additional control measures in accordance with Part II B to adequately address the identified water quality concerns; Page 12 of 29 9VAC25-880 (adopted 12/17/2013 - published 2/24/2014 -effective 7/1/2014) b. Submit valid and verifiable data and information that are representative of ambient conditions and indicate that the receiving water is attaining water quality standards; or c. Submit an individual permit application in accordance with 9VAC25-870-410 B 3. 1All written responses required under this chapter must include a signed certification consistent with Part Ill K. PART II STORMWATER POLLUTION PREVENTION PLAN A stormwater pollution prevention plan (SWPPP) shall be developed prior to the submission kV of a registration statement and implemented for the construction activity, including any support activity, covered by this general permit. SWPPPs shall be prepared in accordance with good engineering practices. Construction activities that are part of a larger common plan of development or sale and disturb less than one acre may utilize a SWPPP template provided by the department and need not provide'a separate stormwater management plan if one has been prepared and implemented for the larger common plan of development or sale. The SWPPP requirements of this general permit may be fulfilled by incorporating by reference other plans such as a spill prevention control and countermeasure (SPCC) plan developed for the site under § 311 of the federal Clean Water Act or best management practices (BMP) programs otherwise required for the facility provided that the incorporated plan meets or exceeds the SWPPP requirements of Part II A. All plans incorporated by reference into the SWPPP become enforceable under this general permit. If a plan incorporated by reference does not contain all of the required elements of the SWPPP, the operator must develop the missing elements and include them in the SWPPP. 1 Any operator that was authorized to discharge under the general permit issued in 2009, and that intends to continue coverage under this general permit, shall update its stormwater pollution prevention plan to comply with the requirements of this general permit no later than 60 days after the date of coverage under this general permit. - Lg. A. Stormwater pollution prevention plan contents. The SWPPP shall include the following items. 1. General information. a. A signed copy of the registration statement for coverage under the general VPDES permit for discharges of stormwater from construction activities; b. Upon receipt, a copy of the notice of coverage under the general VPDES permit for discharges of stormwater from construction activities (i.e., notice of coverage letter); c. Upon receipt, a copy of the general VPDES permit for discharges of stormwater from construction activities; d. A narrative description of the nature of the construction activity, including the function of the project(e.g., low density residential, shopping mall, highway, etc.); e. A legible site plan identifying: (1) Directions of stormwater flow and approximate slopes anticipated after major grading activities; (2) Limits of land disturbance including steep slopes and natural buffers around surface waters that will not be disturbed; Page 13 of 29 9VAC25-880 (adopted 12/17/2013 -published 2/24/2014 -effective 7/1/2014) (3) Locations of major structural and nonstructural control measures, including sediment basins and traps, perimeter dikes, sediment barriers, and other measures intended to filter, settle, or similarly treat sediment, that will be installed between I disturbed areas and the undisturbed vegetated areas in order to increase sediment removal and maximize stormwater infiltration; (4) Locations of surface waters; (5) Locations where concentrated stormwater is discharged; �; (6) Locations of support activities, when applicable and when required by the VSMP authority, including but not limited to(i) areas where equipment and vehicle washing, wheel wash water, and other wash water is to occur; (ii) storage areas for chemicals I such as acids, fuels, fertilizers, and other lawn care chemicals; (iii) concrete wash out areas; (iv) vehicle fueling and maintenance areas; (v) sanitary waste facilities, including those temporarily placed on the construction site; and (vi) construction waste storage; and ; L (7) When applicable, the location of the on-site rain gauge or the methodology established in consultation with the VSMP authority used to identify measurable 1 storm events for inspection purposes. 2. Erosion and sediment control plan. a. An erosion and sediment control plan approved by the VESCP authority as authorized under the Erosion and Sediment Control Regulations(9VAC25-840), an "agreement in lieu of a plan" as defined in 9VAC25-840-10 from the VESCP authority, or an erosion and sediment control plan prepared in accordance with annual standards and specifications approved by the department. Any operator proposing a new stormwater discharge from construction activities that is not required to obtain erosion and sediment control plan approval from a VESCP authority or does not adopt department-approved annual standards and specifications shall submit the erosion and sediment control plan to the department m for review and approval. b. All erosion and sediment control plans shall include a statement describing the maintenance responsibilities required for the erosion and sediment controls used. c. A properly implemented approved erosion and sediment control plan, "agreement in lieu of a plan," or erosion and sediment control plan prepared in accordance with department-approved annual standards and specifications,that adequately: L.-- (1) Controls the volume and velocity of stormwater runoff within the site to minimize I soil erosion; I (2) Controls stormwater discharges, including peak flow rates and total stormwater volume, to minimize erosion at outlets and to minimize downstream channel and stream bank erosion; 1 (3) Minimizes the amount of soil exposed during the construction activity; (4) Minimizes the disturbance of steep slopes; (5) Minimizes sediment discharges from the site in a manner that addresses (i) the amount, frequency, intensity, and duration of precipitation; (ii) the nature of resulting stormwater runoff; and (iii) soil characteristics, including the range of soil particle sizes present on the site; (6) Provides and maintains natural buffers around surface waters, directs stormwater to vegetated areas to increase sediment removal, and maximizes stormwater infiltration, unless infeasible; Page 14 of 29 9VAC25-880 (adopted 12/17/2013 —published 2/24/2014 - effective 7/1/2014) L 1 L (7) Minimizes soil compaction and,unless infeasible, preserves topsoil; (8) Ensures that stabilization of disturbed areas will be initiated immediately whenever any clearing, grading, excavating, or other land-disturbing activities°'have I permanently ceased on any portion of the site, or temporarily ceased on any portion of the site and will not resume foraperiod exceeding14 days; and y (9) Utilizes outlet structures that withdraw stormwater from the surface (i.e., above 1 the permanent pool or wet storage water surface elevation), unless infeasible, when discharging from sediment basins or sediment traps. L3. Stormwater management plan. a. New construction activities. A stormwater management plan approved by the VSMP authority as authorized under the Virginia Stormwater Management Program (VSMP) Regulation (9VAC25-870), or a stormwater management plan prepared in accordance with annual standards and specifications approved by the department. Any operator proposing a stormwater discharge from construction activities that is not required to obtain stormwater management plan approval from a VSMP authority or does not adopt department-approved annual standards and specifications shall submit the stormwater management plan to the department for review and approval. b. Existing construction activities. Any operator that was authorized to discharge under the general permit issued in 2009, and that intends to continue coverage under this general permit, shall ensure compliance with the requirements of 9VAC25- 870-93 through 9VAC25-870-99 of the VSMP Regulation,including but not limited to 1 the water quality and quantity requirements. The SWPPP shall include a description of, and all necessary calculations supporting, all post-construction stormwater management measures that will be installed prior to the completion of the x construction process to control pollutants in stormwater discharges after construction operations have been completed.Structural measures should be placed on upland soils to the degree possible. Such measures must be designed and installed in I accordance with applicable VESCP authority, VSMP authority, state, and federal requirements, and any necessary permits must be obtained. 4. Pollution prevention plan. A pollution prevention plan that addresses potential pollutant-generating activities that may reasonably be expected to affect the quality of stormwater discharges from the construction activity, including any support activity. The pollution prevention plan shall: a. Identify the potential pollutant-generating activities and the pollutant that is expected to be exposed to stormwater; b. Describe the location where the potential pollutant-generating activities will occur, or if identified on the site plan, reference the site plan; c. Identify all nonstormwater discharges, as authorized in Part I E of this general permit, that are or will be commingled with stormwater discharges from the 3 LA construction activity, including any applicable support activity; d. Identify the person responsible for implementing the pollution prevention practice or practices for each pollutant-generating activity (if other than the person listed as ,71 the qualified personnel); e. Describe the pollution prevention practices and procedures that will be implemented to: (1) Prevent and respond to leaks, spills, and other releases including (i) procedures for expeditiously stopping, containing, and cleaning up spills, leaks, and other Page 15 of 29 9VAC25-880 (adopted 12/17/2013 published 2/24/2014 - effective 7/1/2014) 4 j releases; and (ii)" procedures for reporting leaks, spills, and other releases in accordance with Part III G; (2) Prevent the discharge of spilled and leaked fuels and chemicals from vehicle fueling and maintenance activities (e.g., providing secondary containment such as 1 spill berms, decks,spill containment pallets, providing cover where appropriate, and having •spill •kits readily available); 41 (3) Prevent the discharge of soaps, solvents, detergents, and wash water from 1construction materials, including the clean-up of stucco, paint, form release oils, and Lcuring compounds (e.g., providing (i) cover(e.g., plastic sheeting ortemporary roofs) ) to prevent contact with stormwater; (ii) collection and proper disposal in a manner to prevent contact with stormwater; and (iii) a similarly effective means designed to ' L' prevent discharge of these pollutants); (4) Minimize the discharge of pollutants from vehicle and equipment washing, wheel wash water, and other types of washing (e.g., locating activities away from surface waters and stormwater inlets or conveyance and directing wash waters to sediment ,J Y basins or traps, using filtration devices such as filter bags or sand filters, or using similarly effective controls); (5) Direct concrete wash water into a leak-proof container or leak-proof settling j; kti basin. The container or basin shall be designed so that no overflows can occur due to inadequate sizing or precipitation. Hardened concrete wastes shall be removed and disposed of in a manner consistent with the handling of other construction ,-, L wastes. Liquid concrete wastes shall be removed and disposed of in a manner consistent with the handling of other construction wash waters and shall not be I discharged to surface waters;: L'----', (6) Minimize the discharge of pollutants from storage, handling, and disposal of construction products, materials, and wastes including (i) building products such as asphalt sealants, copper flashing, roofing materials, adhesives, and concrete admixtures; (ii) pesticides, herbicides, insecticides, fertilizers, and landscape ' L materials; and (iii) construction and' domestic wastes such as packaging materials, t scrap construction materials, masonry products, timber, pipe and electrical cuttings, plastics, styrofoam, concrete,and other trash or building materials; (7) Prevent the discharge of fuels, oils, and other petroleum products, hazardous or 1 toxic wastes, and sanitary wastes; and b (8) Address any other discharge from the potential pollutant-generating activities not addressed above; and 1 f. Describe procedures for providing pollution prevention awareness`of all applicable = wastes, including' any wash water, disposal practices, and applicable' disposal locations of such wastes, to`personnel in order to comply with the conditions of this general permit. The operator shall implement the procedures described in the ' L SWPPP. 5. SWPPP requirements for discharges to impaired waters, surface waters with an 1 applicable TMDL wasteload allocation established and approved prior to the term of this general permit, and exceptional waters. The SWPPP shall: ,] La. Identify the impaired water(s), approved TMDL(s), pollutant(s) of concern, and 1 exceptional waters identified in 9VAC25-260-30 A 3 c, when applicable; b. Provide clear direction that: IN (1) Permanent or temporary soil stabilization shall be applied to denuded areas i within seven days after final grade is reached on any portion of the site; Page 16 of 29 9VAC25-880 (adopted 12/17/2013 - published 2/24/2014 effective 7/1/2014) -y z 1 1 4 (2) Nutrients shall be applied in accordance with manufacturer's recommendations or an approved nutrient management plan and shall not be applied during rainfall :,- L events; and (3)A modified inspection schedule shall be implemented in accordance with Part I B a 4 or Part I B 5.,: L3, 6. Qualified personnel. The name, phone number, and qualifications of the qualified personnel conducting inspections required by this general permit. a 7. Delegation of authority. The individuals or positions with delegated authority, in ,- accordance with Part ill K, to sign inspection reports or modify the SWPPP. 8. SWPPP signature. The SWPPP shall be signed and dated in accordance with Part III K. : L: B. SWPPP amendments, modification, and updates. 1. The operator shall amend the SWPPP whenever there is a change in the design, 4 i; construction,-operation, or maintenance that has a significant effect on the'discharge of pollutants to surface waters and that has not been previously addressed in the SWPPP. 2. The SWPPP must be amended if, during inspections or investigations by the operator's qualified personnel, or by local, state, or federal officials, it is determined that : L the existing control measures are ineffective in minimizing pollutants in discharges from 1 the construction activity. Revisions to the SWPPP shall include additional or modified control measures designed and implemented to correct problems identified. If approval ' L by the VESCP authority, VSMP authority, or department is necessary for the control measure, revisions to the SWPPP shall be completed no later than seven calendar days 1 following approval. Implementation of these additional or modified control measures must be accomplished as described in Part II G. A 3. The SWPPP must clearly identify the contractor(s) that will implement and maintain ,t each control measure identified in the SWPPP. The SWPPP shall be amended to identify any new contractor that will implement and maintain a control measure. 4. The operator shall update the SWPPP no later than seven days following any modification to its implementation. All modifications or updates to the'SWPPP shall be noted and shall include the following items: L a. A record of dates when: 1 (1) Major grading activities occur; 4 (2) Construction activities temporarily or permanently cease on a portion of the site; and (3) Stabilization'measures are initiated; b. Documentation of replaced or modified controls where periodic inspections or other information have indicated that the controls have been used inappropriately or I incorrectly and where modified as soon as possible; c. Areas that have reached final stabilization and where no further SWPPP or s inspection requirements apply; 1 d. All properties that are no longer under the legal control of the operator and the dates on which the operator no longer had legal control over each property; 4 e. The date of any prohibited discharges, the discharge volume released, and what actions were taken to minimize the impact of the release; f. Measures taken to prevent the reoccurrence of any prohibited discharge; and i 1 Page 17 of 29 ,' ki 9VAC25-880 (adopted 12/17/2013 - published 2/24/2014 effective 7/1/2014) i g.'Measures taken to address any evidence identified as a result of an inspection required under Part II F. 5. Amendments, modifications, or updates to the SWPPP shall be signed in accordance with Part III K. C. Public Notification. Upon commencement of land disturbance, the operator shall post conspicuously a copy of the notice of coverage letter near the main entrance of the construction activity. For linear projects, the operator shall post the notice of coverage letter at a publicly accessible location near an active part of the construction project (e.g., where a pipeline crosses a public road). The operator shall maintain the posted information until termination of general permit coverage as specified in Part I F. D. SWPPP availability. 1. Operators with day-to-day operational control over SWPPP implementation shall have a copy of the SWPPP available at a central location on-site for use by those identified as having responsibilities under the SWPPP whenever they are on the construction site. 2. The operator shall make the SWPPP and all amendments, modifications, and updates i available upon request to the department, the VSMP authority, the EPA, the VESCP authority, local government officials, or the operator of a municipal separate storm sewer system receiving discharges from the construction activity. If an on-site location is LI unavailable to store the SWPPP when no personnel are present, notice of the SWPPP's 3 location must be posted near the main entrance of the construction site. Li 3. The operator shall make the SWPPP available for public review in an electronic format or in hard copy. Information for public access to the SWPPP shall be posted and maintained in accordance with Part II C. If not provided electronically, public access to the SWPPP may be arranged upon request at a time and at a publicly accessible location convenient to the operator or his designee but shall be no less than once per month and shall be during normal business hours. Information not required to be err contained within the SWPPP by this general permit is not required to be released. E. SWPPP implementation. The operator shall implement the SWPPP and subsequent amendments, modifications, and updates from commencement of land disturbance until termination of general permit coverage as specified in Part I F. 1. All control measures must be properly maintained in effective operating condition in accordance with good engineering practices and, where applicable, manufacturer specifications. If a site inspection required by Part II F identifies a control measure that is } not operating effectively, corrective action(s) shall be completed as soon as practicable, but no later than seven days after discovery or a longer period as established by the VSMP authority, to maintain the continued effectiveness of the control measures. 2. If site inspections required by Part II F identify an existing control measure that needs to be modified or if an additional control measure is necessary for any reason, implementation shall be completed prior to the next anticipated measurable storm event. If implementation prior to the next anticipated measurable storm event is impracticable, then alternative control measures shall be implemented as soon as practicable, but no later than seven days after discovery or a longer period as established by the VSMP authority. 7, # F. SWPPP Inspections. 1. Personnel responsible for on-site and off-site inspections. Inspections required by this general permit shall be conducted by the qualified personnel identified by the operator in the SWPPP. The operator is responsible for insuring that the qualified personnel conduct the inspection. Page 18 of 29 9VAC25-880 (adopted 12/17/2013-published 2/24/2014 - effective 7/1/2014) LA 2. Inspection schedule. : 'L a. Inspections shall be conducted at a frequency of: (1)At least once every five business days; or (2) At least once every 10 business days and no later than 48 hours following a measurable storm event. In the event that a measurable storm event occurs when -, L there are more than 48 hours between business days, the inspection shall be conducted no later than the next business day. t b. Where areas have been temporarily stabilized or land-disturbing activities will be suspended due to continuous frozen ground conditions and stormwater discharges are unlikely, the inspection frequency may be reduced to once per month. If weather conditions (such as above freezing temperatures or rain or snow events) make 1, L--- discharges likely, the operator shall immediately resume the regular inspection frequency. ' L c. Representative inspections may be utilized`for utility line installation, pipeline construction,or other similar linear construction activities provided that: (1) Temporary or permanent soil stabilization has been installed and vehicle access may compromise the temporary or permanent soil stabilization and potentially cause additional land disturbance increasing the potential for erosion; (2) Inspections occur on the same frequency as other construction activities; (3) Control measures are inspected along the construction site 0.25 miles above and ' L below each access point (i.e., where a roadway, undisturbed right-of-way, or other similar feature intersects the construction activity and access does not compromise temporary or permanent soil stabilization); and ' L (4) Inspection locations are provided in the report required by Part II F. 1 3. Inspection requirements. i a. As part of the inspection,the qualified personnel shall: i'. L (1) Record the date and time of the inspection and when applicable the date and rainfall amount of the last measurable storm event; (2) Record the information and a description of any discharges occurring at the time I L of the inspection; (3) Record any land-disturbing activities that have occurred outside of the approved erosion and sediment control plan; „,„, L (4) Inspect the following for installation in accordance with the approved erosion and 1 sediment control plan, identification of any maintenance needs, and evaluation of L effectiveness in minimizing sediment discharge, including whether the control has been inappropriately or incorrectly used: (a)All perimeter erosion and sediment controls, such as silt fence; Iz (b) Soil stockpiles, when applicable, and borrow areas for stabilization or sediment trapping measures; I (c) Completed earthen structures, 'such as dams, dikes, ditches, and diversions for --, ki.-" stabilization; (d) Cut and fill slopes; (e) Sediment basins and traps, sediment barriers, and other measures installed to I control sediment discharge from stormwater; i # (f) Temporary or permanent channel, flume, or other slope drain structures installed l , to convey concentrated runoff down cut and fill slopes; Page 19 of 29 i 9VAC25-880 (adopted 12/17/2013 -published 2/24/2014 - effective 7/1/2014) 1 (g) Storm inlets that have been made operational to ensure that sediment laden stormwater does not enter without first being filtered or similarly treated; and (h) Construction vehicle access routes that intersect or access paved roads for minimizing sediment tracking; L (5) Inspect areas that have reached final grade or that will remain dormant for more than 14 days for initiation of stabilization activities; (6) Inspect areas that have reached final grade or that will remain dormant for more than 14 days for completion of stabilization activities within seven days of reaching grade or stopping work; (7) Inspect for evidence that the approved erosion and sediment control plan, "agreement in lieu of a plan," or erosion and sediment control plan prepared in accordance with department-approved annual standards and specifications has not been properly implemented. This includes but is not limited to: (a) Concentrated flows of stormwater in conveyances such as rills, rivulets or Lg channels that have not been filtered, settled, or similarly treated prior to discharge , or evidence thereof; (b) Sediment laden or turbid flows of stormwater that have not been filtered or settled to remove sediments prior to discharge; 4 (c) Sediment deposition in areas that drain to unprotected stormwater inlets or catch basins that discharge to surface waters. Inlets and catch basins with failing sediments controls due to improper installation, lack of maintenance, or inadequate design are considered unprotected; (d Sediment deposition on any property (including public and private streets) outside of the construction activity covered by this general permit; (e) Required stabilization has not been initiated or completed on portions of the site; (f) Sediment basins without adequate wet or dry storage volume or sediment basins that allow the discharge of stormwater from below the surface of the wet storage :44 ki portion of the basin; (g) Sediment traps without adequate wet or dry storage or sediment traps that allow the discharge of stormwater from below the surface of the wet storage portion of the trap; and (h) Land disturbance outside of the approved area to be disturbed; (8) Inspect pollutant generating activities identified in the pollution prevention plan for the proper implementation, maintenance and effectiveness of the procedures and practices; (9) Identify any pollutant generating activities not identified in the pollution prevention 4', Li plan; and (10) Identify and document the` presence of any evidence of the discharge of pollutants prohibited by this general permit. 4. Inspection report. Each inspection report shall include the following items: a: The date and time of the inspection and when applicable, the date and rainfall amount of the last measurable storm event; b. Summarized findings of the inspection; c. The location(s) of prohibited discharges; d. The location(s) of control measures that require maintenance; Page 20 of 29 9VAC25-880 (adopted 12/17/2013 published 2/24/2014 -effective 7/1/2014) 1 j L 4 e. The location(s)of control measures that failed to operate as designed or proved inadequate or inappropriate for a particular location; - Liif.The location(s) where any evidence identified under Part II F 3 a (7) exists; g. The location(s) where any additional control measure is needed that did not exist at the time of inspection; h. A list of corrective actions required (including any changes to the`SWPPP that are j necessary ) as a result of the inspection or to maintain permit compliance; 3, LfI. Documentation of any corrective actions required from a previous inspection that have not been implemented; and j. The date and signature of the qualified personnel and the operator or its duly 3 authorized representative. The inspection report and any actions taken in accordance with Part II must be retained by the operator as part of the SWPPP for at least three years from the date that general permit coverage expires or is terminated. The inspection report shall identify any i'L--4 incidents of noncompliance. Where an inspection report does not identify any incidents of noncompliance, the report shall contain a certification that the construction activity is 1 in compliance with the SWPPP and this general permit. The report shall be signed in '''''''' accordance with Part III K of this general permit. 1 G. Corrective actions. 1. The operator shall implement the corrective action(s) identified as a result of an inspection as soon as practicable but no later than seven days after discovery or a longer period as approved by the VSMP authority. If approval of a corrective action by a regulatory authority (e.g.,- VSMP authority,: VESCP' authority, or the department) is 3' i necessary, additional control measures shall be implemented to minimize pollutants in stormwater discharges until such approvals can be obtained. 1 2. The operator may be required to remove accumulated sediment deposits located i outside of the construction activity covered by this general permit as soon as practicable in order to minimize environmental impacts.The operator shall notify the VSMP authority and the department as well as obtain all applicable federal, state, and local authorizations, approvals, and permits prior to the removal of sediments accumulated in :i surface waters including wetlands. PART III CONDITIONS APPLICABLE TO ALL VPDES PERMITS NOTE: Discharge monitoring is not required for this general permit.` If the operator chooses to monitor stormwater discharges or control measures, the operator must comply with the requirements of subsections A, B, and C,as appropriate. 3 i A. Monitoring. 1. Samples and measurements taken for the purpose of monitoring shall be 1 representative of the monitoring activity. =' 2. Monitoring shall be conducted according to procedures approved under 40 CFR Part J i136 or alternative methods approved by the U.S. Environmental Protection Agency, 1 unless other procedures have been specified in this general permit. Analyses performed �_ according to test procedures approved under 40 CFR Part 136 shall be performed by an L environmental laboratory certified under regulations adopted by the Department of General Services (1 VAC30-45 or 1 VAC30-46). Page 21 of 29 ' I 9VAC25-880 (adopted 12/17/2013 - published 2/24/2014 - effective 7/1/2014) 4 SII <:; 3. The operator shall periodically calibrate and perform maintenance procedures on all monitoring and analytical instrumentation at intervals that will ensure accuracy of measurements. 4 B. Records. 1. Monitoring records and reports shall include: a.The date, exact place, and time of sampling or measurements; b. The individual(s) who performed the sampling or measurements; c. The date(s) and time(s) analyses were performed; I d. The individual(s) who performed the analyses; e. The analytical techniques or methods used; and f. The results of such analyses. 2. The operator shall retain records of all monitoring information, including all calibration 7 and maintenance records and all original strip chart recordings for continuous monitoring Li instrumentation, copies of all reports required by this general permit, and records of all data used to complete the registration statement for this general permit, for a period of at least three years from the date of the sample, measurement, report or request for coverage. This period of retention shall be extended automatically during the course of any unresolved litigation regarding the regulated activity or regarding control standards applicable to the operator, or as requested by the board. C. Reporting monitoring results. L'• 1. The operator shall update the SWPPP to include the results of the monitoring as may 4 be performed in accordance with this general permit, unless another reporting schedule is specified elsewhere in this general permit. Li2. Monitoring results shall be reported on a discharge monitoring report(DMR); on forms provided, approved or specified by the department; or in any format provided that the 5 date, location, parameter, method, and result of the monitoring activity are included. 3. If the operator monitors any pollutant specifically addressed by this general permit I more frequently than required by this general permit using test procedures approved -L-• under 40 CFR Part 136 or using other test procedures approved by the U.S. Environmental Protection Agency or using procedures specified in this general permit, the results of this monitoring shall be included in the calculation and reporting of the data submitted in the DMR or reporting form specified by the department. 4. Calculations for all limitations which require averaging of measurements shall utilize an arithmetic mean unless otherwise specified in this general permit. D. Duty to provide information. The operator shall furnish, within a reasonable time, any information which the board may request to determine whether cause exists for modifying, revoking and reissuing, or terminating this general permit or to determine compliance with this general permit. The board, department, EPA, or VSMP authority may require the operator to vi furnish, upon request, such plans, specifications, and other pertinent information as may be necessary to determine the effect of the wastes from his discharge on the quality of surface waters, or such other information as may be necessary to accomplish the purposes of the CWA and the Virginia Stormwater Management Act. The operator shall also furnish to the board, department, EPA, or VSMP authority, upon request, copies of records required to be kept by this general permit. E. Compliance schedule reports. Reports of compliance or noncompliance with, or any I 4 progress reports on, interim and final requirements contained in any compliance schedule of this general permit shall be submitted no later than 14 days following each schedule date. I' Page 22 of 29 9VAC25-880 (adopted 12/17/2013 - published 2/24/2014 - effective 7/1/2014) 3 3 3 l A Ifs 1 iii F. Unauthorized stormwater discharges. Pursuant to § 62.1-44.5 of the Code of Virginia, _r except in compliance with a state permit issued by the department, it shall be unlawful to cause a stormwater discharge from a construction activity. G. Reports of unauthorized discharges.Any operator who discharges or causes or allows a t. d discharge of sewage, industrial waste, other wastes or any noxious or deleterious substance or 4 a hazardous substance or oil in an amount equal to or in excess of a reportable quantity established under either 40 CFR Part 110, 40 CFR Part 117, 40 CFR Part 302, or § 62.1- 44.34:19 of the Code of Virginia that occurs during a 24-hour period into or upon surface waters or who discharges or causes or allows a discharge that may reasonably be expected to enter ' till surface waters, shall notify the Department of Environmental Quality of the discharge immediately upon discovery of the discharge, but in no case later than within 24 hours after said discovery. A written report of the unauthorized discharge shall be submitted to the department F4 and the VSMP authority within five days of discovery of the discharge. The written report shall contain: 1. A description of the nature and location of the discharge; 2. The cause of the discharge; 3. The date on which the discharge occurred; 4. The length of time that the discharge continued; Ifii 5. The volume of the discharge; , 6. If the discharge is continuing, how long it is'expected to continue; 7. If the discharge is continuing, what the expected total volume of the discharge will be; 1 all and 8. Any steps planned or taken to reduce, eliminate and prevent a recurrence of the L present discharge or any future discharges not authorized by this general permit. i a• l a Discharges reportable to the department and the VSMP authority under the immediate reporting requirements of other regulations are exempted from this requirement. H. Reports of unusual or extraordinary discharges. If any unusual or extraordinary discharge including a"bypass" or"upset", as defined herein,should occur from a facility and the discharge enters or could be expected to enter surface waters, the operator shall promptly notify, in no case later than within 24 hours, the department and the VSMP authority by telephone after the discovery of the discharge. This notification shall provide all available details of the incident, _i including any adverse effects on aquatic life and the known number of fish killed. The operator shall reduce the report to writing and shall submit it to the department and the VSMP authority within five days of discovery of the discharge in accordance with Part III 12. Unusual and extraordinary discharges include but are not limited to any discharge resulting from: • , 1. Unusual spillage of materials resulting directly or indirectly from processing &• 11operations; 2. Breakdown of processing or accessory equipment; 3. Failure or taking out of service of some or all of the facilities; and U• r 4. Flooding or other acts of nature. I. Reports of noncompliance. The operator shall report any noncompliance which may adversely affect surface waters or may endanger public health. ,, 1. An oral report to the department and the VSMP authority shall be provided within 24 1 hours from the time the operator becomes aware of the circumstances. The following shall be included as information that shall be reported within 24 hours under this ' L subdivision: Page 23 of 29 9VAC25-880 (adopted 12/17/2013 - published 2/24/2014 - effective 7/1/2014) 1 F¢ 6 a cl a.Any unanticipated bypass; and b. Any upset that causes a discharge to surface waters. 2. A written report shall be submitted within five days and shall contain: a. A description of the noncompliance and its cause; 2 b. The period of noncompliance, including exact dates and times, and if the fe noncompliance has not been corrected, the anticipated time it is expected to continue; and c. Steps taken or planned to reduce, eliminate, and prevent reoccurrence of the noncompliance. The department may waive the written report on a case-by-case basis for reports of noncompliance under Part III I if the oral report has been received within 24 hours and no adverse impact on surface waters has been reported. fi 3. The operator shall report all instances of noncompliance not reported under Part ICI 11 or 2 in writing as part of the SWPPP. The reports shall contain the information listed in Part III 12. NOTE: The reports required in Part III G, H and I shall be made to the department and the VSMP authority. Reports may be made by telephone, email, or by fax. For reports Li outside normal working hours, leaving a recorded message shall fulfill the immediate reporting requirement. For emergencies, the Virginia Department of Emergency Management maintains a 24-hour telephone service at 1-800-468-8892. 4. Where the operator becomes aware of a failure to submit any relevant facts, or 1 submittal of incorrect information in any report, including a registration statement, to the department or the VSMP authority, the operator shall promptly submit such facts or correct information. J. Notice of planned changes. 1. The operator shall give notice to the department and the VSMP authority as soon as possible of any planned physical alterations or additions to the permitted facility or activity. Notice is required only when: a. The operator plans an alteration or addition to any building, structure, facility, or installation that may meet one of the criteria for determining whether a facility is a new source in 9VAC25-870-420; b. The operator plans an alteration or addition that would significantly change the nature or increase the quantity of pollutants discharged. This notification applies to 2 pollutants that are not subject to effluent limitations in this general permit; or 2. The operator shall give advance notice to the department and VSMP authority of any planned changes in the permitted facility or activity, which may result in noncompliance with state permit requirements. K. Signatory requirements. !, L. 1. Registration statement.All registration statements shall be signed as follows: a. For a corporation: by a responsible corporate officer. For the purpose of this I k 2 chapter, a responsible corporate officer means: (i) a president,secretary, treasurer, or vice-president of the corporation in charge of a principal business function, or any A other person who performs similar policy-making or decision-making functions for the corporation; or (ii) the manager of one or more manufacturing, production, or operating facilities, provided the manager is authorized to make management fri decisions that govern the operation of the regulated facility including having the Page 24 of 29 9VAC25-880 (adopted 12/17/2013 published 2/24/2014 - effective 7/1/2014) explicit or implicit duty of making major capital investment recommendations, and 1 initiating and directing other comprehensive measures to assure long-term compliance with environmental laws and regulations; the manager can ensure that the necessary systems are established or actions taken to gather complete and 1 accurate information for state permit application requirements; and where authority to ' L sign documents has been assigned or delegated to the manager in accordance with i corporate procedures; 1 b. For a partnership or sole proprietorship: by a general partner or the proprietor, ' L respectively; or 1 c. For a municipality, state, federal, or other public agency: by either a principal executive officer or ranking elected official. For purposes of this chapter, a principal executive officer of a public agency includes: (i) the chief executive officer of the agency or (ii) a senior executive officer having responsibility for the overall operations of a principal geographic unit of the agency. 2. Reports, etc. All reports required by this general permit, including SWPPPs, and other information requested by the board or the department shall be signed by a person described in Part III K 1 or by a duly authorized representative of that person. A person ; is a duly authorized representative only if: ij a. The authorization is made in writing by a person described in Part Ill K 1 1 b. The authorization specifies either an individual or a position having responsibility for the overall operation of the regulated facility or activity such as the position of plant manager, operator of a well or a well field, superintendent, position of Li equivalent responsibility, or an individual or position having overall responsibility for environmental matters for the operator. (A duly authorized representative may thus ' '' be either a named individual or any individual occupying a named position); and c. The signed and dated written authorization is included in the SWPPP. A copy must be provided to the department and VSMP authority, if requested. 3. Changes to authorization. If an authorization under Part III K 2 is no longer accurate because a different individual or position has responsibility for the overall operation of the construction activity, a new authorization satisfying the requirements of Part Ill 'K 2 ,; 4 shall be submitted to the VSMP authority as the administering entity for the board prior to or together with any reports or information to be signed by an `authorized representative. 1. 1 4. Certification. Any person signing a document under Part III K 1 or 2 shall make the following certification: "I certify under penalty of law that I have read and understand this document and that - L this document and all attachments were prepared in accordance with a system designed ito assure that qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system, or ' L those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting falseinformation, including the 4 possibility of fine and imprisonment for knowing violations." L. Duty to comply. The operator shall comply with all conditions of this general permit. Any state permit noncompliance constitutes a violation of the Virginia Stormwater Management Act and the Clean Water Act, except that noncompliance with certain provisions of this general # permit may constitute a violation of the Virginia Stormwater Management Act but not the Clean Water Act. Permit noncompliance is p grounds for enforcement action; for state permit � I,a Page 25 of 29 9VAC25-880 (adopted 12/17/2013 - published 2/24/2014 - effective 7/1/2014) t i termination, revocation and reissuance, or modification; or denial of a state permit renewal application. The operator shall comply with effluent standards or prohibitions established under § 307(a) of the Clean Water Act for toxic pollutants within the time provided in the regulations that establish these standards or prohibitions or standards for sewage sludge use or disposal, even L. if this general permit has not yet been modified to incorporate the requirement. M. Duty to reapply. If the operator wishes to continue an activity regulated by this general permit after the expiration date of this general permit, the operator shall submit a new registration statement at least 90 days before the expiration date of the existing general permit, unless permission for a later date has been granted by the board. The board shall not grant permission for registration statements to be submitted later than the expiration date of the 171 existing general permit. N. Effect of a state permit. This general permit does not convey any property rights in either fi real or personal property or any exclusive privileges, nor does it authorize any injury to private I property or invasion of personal rights, or any infringement of federal, state or local law or regulations. j O. State law. Nothing in this general permit shall be construed to preclude the institution of any legal action under, or relieve the operator from any responsibilities, liabilities, or penalties established pursuant to any other state law or regulation or under authority preserved by § 510 of the Clean Water Act. Except as provided in general permit conditions on "bypassing" (Part III U) and "upset" (Part III V), nothing in this general permit shall be construed to relieve°the operator from civil and criminal penalties for noncompliance. P.Oil and hazardous substance liability. Nothing in this general permit shall be construed to preclude the institution of any legal action or relieve the operator from any responsibilities, liabilities, or penalties to which the operator is or may be subject under §§ 62.1-44.34:14 through 62.1-44.34:23 of the State Water Control Law or§ 311 of the Clean Water Act. Q. Proper operation and maintenance. The operator shall at all times properly operate and maintain all facilities and systems of treatment and control (and related appurtenances), which are installed or used by the operator to achieve compliance with the conditions of this general permit. Proper operation and maintenance also includes effective plant performance, adequate funding, adequate staffing, and adequate laboratory and process controls, including appropriate quality assurance procedures. This provision requires the operation of back-up or auxiliary facilities or similar systems, which are installed by the operator only when the operation is necessary to achieve compliance with the conditions of this general permit. R. Disposal of solids or sludges. Solids, sludges or other pollutants removed in the course of treatment or management of pollutants shall be disposed of in a manner so as to prevent any pollutant from such materials from entering surface waters and in compliance with all applicable state and federal laws and regulations. S. Duty to mitigate. The operator shall take all steps to minimize or prevent any discharge in violation of this general permit that has a reasonable likelihood of adversely affecting human health or the environment. T. Need to halt or reduce activity not a defense. It shall not be a defense for an operator in an enforcement action that it would have been necessary to halt or reduce the permitted activity in order to maintain compliance with the conditions of this general permit. g U. Bypass. 1. "Bypass," as defined in 9VAC25-870-10, means the intentional diversion of waste streams from any portion of a treatment facility. The operator may allow any bypass to occur that does not cause effluent limitations to be exceeded, but only if it also is for Page 26 of 29 9VAC25-880 (adopted 12/17/2013 published 2/24/2014 - effective 7/1/2014) I AAA, I.J A 1 essential maintenance to ensure efficient operation. These bypasses are not subject to the provisions of Part III U 2 and 3. 2. Notice. a. Anticipated bypass. If the operator knows in advance of the need for a bypass, the operator shall submit prior notice to the department, if possible at least 10 days i before the date of the bypass. b. Unanticipated bypass. The operator shall submit notice of an unanticipated bypass 4as required in Part III I. c 3. Prohibition of bypass. ,41 a. Except as provided in Part III U 1, bypass is prohibited, and the board or department may take enforcement action against an operator for bypass unless: (1) Bypass was unavoidable to prevent loss of life, personal injury, or severe property damage. Severe property damage means substantial physical damage to 1 .--,-iproperty, damage to the treatment facilities that causes them to become inoperable, ' L. or substantial and permanent loss of natural resources that can reasonably be expected to occur in the absence of a bypass. Severe property damage does not 1 mean economic loss caused by delays in production; L'i (2) There were no feasible alternatives to the bypass, such as the use of auxiliary l treatment facilities, retention of untreated wastes, or maintenance during normal periods of equipment downtime. This condition is not satisfied if adequate back-up ' L equipment should have been installed in the exercise of reasonable engineering judgment to prevent a bypass that occurred during normal periods of equipment downtime or preventive maintenance; and (3) The operator submitted notices as required under Part III U 2. ' L ,-!.. I b. The department may approve an anticipated bypass, after considering its adverse } effects, if the department determines that it will meet the three conditions listed in Part III U3a. V. Upset. 3 1. An "upset," as defined in 9VAC25-870-10, means an exceptional incident in which i' ti4 there is unintentional and temporary noncompliance with technology-based state permit effluent limitations because of factors beyond the reasonable control of the operator.An upset does not include noncompliance to the extent caused by operational error, improperly designed treatment facilities, inadequate treatment facilities, lack of E preventive maintenance, or careless or improper operation. 2. An upset constitutes an affirmative defense town action brought for noncompliance with technology-based state permit effluent limitations if the requirements of Part III V 4 are met. A determination made during administrative review of claims that 1 noncompliance was caused by upset, and before an action for noncompliance, is not' a L. final administrative action subject to judicial review. 3. An upset does not include noncompliance to the extent caused by operational error, 1 improperly designed treatment facilities, inadequate treatment facilities, lack of preventative maintenance, or careless or improper operation. ,,,-, .,,, 4. An operator who wishes to establish the affirmative defense of upset shall demonstrate, through properly signed, contemporaneous operating logs or oth1L er v relevant evidence that: a. An upset occurred and that the operator can identify the cause(s) of the upset; I b. The permitted facility was at the time being properly operated; Page 27 of 29 9VAC25-880 (adopted 12/17/2013 -published 2/24/2014 - effective 7/1/2014) I ' Ld 1 c. The operator submitted notice of the upset as required in Part III I; and d.The operator complied with any remedial measures required under Part III S. 5. In any enforcement proceeding, the operator seeking to establish the occurrence of an upset has the burden of proof. W. Inspection and entry. The operator shall allow the department as the board's designee, the VSMP authority, EPA, or an authorized representative of either entity (including an authorized contractor), upon presentation of credentials and other documents as may be required by law to: 1. Enter upon the operator's premises where a regulated facility or activity is located or ; conducted,or where records must be kept under the conditions of this general permit; 2. Have access to and copy, at reasonable times, any records that must be kept under the conditions of this general permit;ti 3. Inspect and photograph at reasonable times any facilities, equipment (including z monitoring and control equipment), practices, or operations regulated or required under thisgeneral permit; and I 4. Sample or monitor at reasonable times, for the purposes of ensuring state permit compliance or as otherwise authorized by the Clean Water Act or the Virginia Stormwater Management Act, any substances or parameters at any location. For purposes of this section, the time for inspection shall be deemed reasonable during - regular business hours, and whenever the facility is discharging. Nothing contained herein shall make an inspection'unreasonable during an emergency. 3 X. State permit actions. State permits may be modified, revoked and reissued, or terminated 1 for cause. The filing of a request by the operator for a state permit modification, revocation and reissuance, or termination, or a notification of planned changes or anticipated noncompliance does not stay any state permit condition. Y. Transfer of state permits. - Li1. State permits are not transferable to any person except after notice to the department. Except as provided in Part III Y 2, a state permit may be transferred by the operator to a new operator only if the state permit has been modified or revoked and reissued, or a minor modification made, to identify the new operator and incorporate such other requirements as may be necessary under the Virginia Stormwater Management Act and the Clean Water Act. 1,05 2. As an alternative to transfers under Part III Y 1, this state permit may be automatically transferred to a new operator if: a. The current operator notifies the department at least 30 days in advance of the proposed transfer of the title to the facility or property; b.The notice includes a written agreement between the existing and new operators containing a specific date for transfer of state permit responsibility, coverage, and k.,.-, liability between them; and c. The department does not notify the existing operator and the proposed new operator of its intent to modify or revoke and reissue the state permit. If this notice is not received, the transfer is effective on the date specified in the agreement :: .---.L mentioned in Part III Y 2 b. 3. For ongoing construction activity involving a change of operator, the new operator shall accept and maintain the existing SWPPP,' or: prepare and implement a new SWPPP prior to taking over operations at the site. I . " Page 28 of 29 9VAC25-880 (adopted 12/17/2013 -published 2/24/2014 - effective 7/1/2014) 1 1 , Liii.'': 1 ' 6-; Z. Severability. The provisions of this general permit are severable,and if any provision of this general permit or the application of any provision of this state permit to any circumstance, is - kg held invalid, the application of such provision to other circumstances and the remainder of this general permit shall not be affected thereby. ''':' i 9VAC25-880-80. (Repealed.) 1 � 9VAC25-880-82. (Repealed.) .,,i'''' i'i:, 9VAC25-880-84. (Repealed.) i L 9VAC25-880-86.(Repealed.) 9VAC25-880-88. (Repealed.) r-n, 9VAC25-880-90. (Repealed.) 9VAC25-880-100. Delegation of authority. -'!, .L., The director, or his designee, may perform any act of the board provided under this chapter, except as limited by§ 62.1-44.14 of the Code of Virginia. o FORMS (9VAC25-880)iti vgDepartment of Environmental Quality Construction Activity Operator Permit Fee Form (rev. .i01/2014)=y Notice of Termination - General VPDES Permit for Discharges of Stormwater from i Ill Construction Activities (VAR10) (rev. 01/2014) l Registration Statement - General VPDES Permit for Discharges of Stormwater from Construction Activities (VAR10) (rev. 01/2014)i-' L' Transfer Agreement - General VPDES Permit for Discharges of Stormwater from Construction Activities (VAR10) (rev. 01/2014) _, ,, ,,_,_ ::,,,, j isp 3 Page 29 of 29'-',',, L-,,,'. 9VAC25-880 (adopted 12/17/2013 published 2/24/2014 - effective 7/1/2014)`` 1 n 3 a + L-''': i '1.1 v ,2,--'--,,,,,.,,,,,,,, --,; , n L ,','," APPENDIX C _. L a CERTIFICATION FORMS ,1 11:,,.,.,,, EL:,..,,,,,,,__,,, --,1„.,,_,,T L._,_,,,,,.__, , ,i, k_-,..;?: '-'''-',.,..!,,, ,_,,,,,,, i x Crozet Avenue North Sidewalk Improvements June 2014 Storm Water Pollution Prevention Plan KHA Job#113038016 1 -I' i 3 OPERATOR CERTIFICATIONS Project Name: /- e ��/ ok' % Project Location: .�� e /v. /A/ .e% 'T The contractor and subcontractor(s)that will implement the pollutant control measures described in the SWPPP must be - iiiidentified below. Each must sign a statement certifying that they understand the VPDES general permit authorizing storm l water discharges during construction. These statements must be maintained in the SWPPP file on site. 1 I Operator or subcontractor implementing the SWPPP: Business Name //' -1 I -V"- X&c,-/., -3_,, i, Business Ad ss ,,e7.e.. 1 li ,---.. V --- .9 ", —e957--e:, Business Telephone Number Fj Activities operator op-strbca t responsible for: '-i k i AzA '27j . II k. CERTIFICATION: 1 "I certify under penalty of law that I understand the terms and conditions of the VPDES General Permit for 1 kDischarges of Stormwater from Construction Activities(VAR 10)and the SWPP.P that authorizes storm water 1 discharges associated with land disturbing activities from the construction site identified as part of this certification." , , l'rzi...,elidit,k_..y t Signature Date 1-'-' _ , , i 1 pi„.4,:fit/A v i:iffz., ,. ,,, 1 i Printed Name .,7`.„,.:,, k Crozet Avenue North Sidewalk Improvements June 2014 Storm Water Pollution Prevention Plan KHA Job#113038016 ,s 1 1 j n: , L'I ,,,,-, L.,-,-,-.. 1 k'--: m ,,, ,,,; t..,„ '-' n''' ki I APPENDIX D INSPECTION REPORT i d 1 ;Ai, 1' i -,i. 1 I I i E imi 1 I n 1 k Crozet Avenue North Sidewalk Improvements June 2014 Storm Water Pollution Prevention Plan KHA Job#113038016 7,1 STORM WATER POLLUTION PREVENTION PLAN INSPECTION REPORT i i Project Name: Location: 1'1 } Contractor: Anticipated Completion Date: -.4- L Inspection Date: a ' :Inspector: InspectorsQualifications SITE CONDITIONS: -J Li- - POLLUTANT CONTROL IN EFFECTIVE LOCATION OF Non Conformance 1 CONFORMANCE .,,,,;- L Construction Entrance YES/NO/NA YES/NO/NA Sediment Barriers YES/NO/NA YES/NO/NA Storage/Disposal Areas YES/NO/NA YES/NO/NA Sediment Traps YES/NO/NA YES/NO/NA i Check Dams YES/NO/NA YES/NO/NA Inlet Protection YES/NO/NA YES/NO/NA VIOLATIONS NOTED: (Explain each"NO"circled above) i A 1 II1 REMEDIAL ACTIONS TO BE TAKEN: ,; wii , I COMMENTS: 4 Based on the results of the inspection,necessary control modifications shall be implemented within 7 calendar days. This report shall be kept on file by the General u Contractor as part of the Storm Water Pollution Prevention Plan for at least 3 years from the date of completion and submission of the Notice of Termination. - 1 Certification Statement :1 L "I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to Aassure that qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system,or those persons directly responsible for gathering the information,the information submitted is,to the best of my knowledge and belief,true,accurate,and complete. I am aware that there are significant penalties for submitting false information,including the possibility of fine and imprisonment for knowing violations. , L Name: Address: I Phone: Date: , L (Authorized Signature) 1 li i Crozet Avenue North Sidewalk Improvements June 2014 Storm Water Pollution Prevention Plan 1 KHA Job#113038016 ii i ' L.' ': APPENDIX E v�''' L''''''' NOTICE OF TERMINATION Two copies of the Notice of Termination shall be completed by the Operator when construction activities that disturb site soil have been completed and the'site has achieved final stabili7ation. :In'addition, a list of permanent stormwater Best Management'Practices(BMPs)installed on site must be prepared. For each permanent BMP, the'following information must be submitted: name of the BMP (i.e. Permanent Wet Pond 1;Hydrodynamic Separator 1;Oil Water Separator 1; Permanent Seeded Area,etc.), the site acreage ri treated by the BMP, the name of the water body receiving runoff treated by the BMP and the 8-digit Hydrologic Unit Code (HUC) of the receiving water body receiving runoff treated by the BMP. i One NOT shall be forwarded to the Project Owner. The other NOT shall be sent via registered or certified mail,with return receipt requested, to the following address: Department of Environmental Quality Office of Stormwater Permits, 10th Floor P.O. Box 1105 Richmond, VA 23218 Permit coverage is terminated as of the date the lot is transferred to a new owner, coverage under a new VPDES Li, permit is obtained,or as of the date another Operator assumes control over portions of the site not stabilized. In these situations, coverage'under the permit terminated at midnight the date the Notice of Termination(NOT)is filed. Where the Operator'seeks to terminate coverage because the site has reached final stabilization,termination will become effective upon concurrence by the VSMP Authority, or after 60 days from the submittal of the NOT have ' i' passes,whichever occurs first. --/ L -,::1 , -.,,,: !, Li 'il � Crozet Avenue North Sidewalk Improvements June 2014 Storm Water Pollution Prevention Plan i KHA Job#113038016 k -1 - L' Notice of Termination Lt,,--_. General VPDES Permit for Discharges of Stormwater from Construction Activities (VAR10) i (Please Type of Print All Information) 1. Construction Activity Operator: , LName: Contact: f Mailing Address: lA City: State: Zip: Phone: 3 L Email address(if available): ' 2. Name and Location of the Construction Activity:(As listed on the Registration Statement.) 9 It':. Name: Address(if available): A i City: State: Zip; :-:, L County(if not located within a City): Latitude(decimal degrees): Longitude(decimal degrees); 3. General Permit Registration Number: „,..4 i 4. Reason for Terminating Coverage Under the General Permit: (The operator shall submit a Notice of Termination after one or more of the following conditions have been met.) ' L ❑ A. Necessary permanent control measures included in the SWPPP for the site are in place and functioning effectively and final 1 stabilization has been achieved on all portions of the site for which the operator is responsible.When applicable, long-term 1 responsibility and maintenance requirements for permanent control measures shall be recorded in the local land records prior to the submission of a notice of termination; ❑ B. Another operator has assumed control over all areas of the site that have not been finally stabilized and obtained coverage for the ongoing discharge; -:! wr . Li ❑ C. Coverage under an alternative VPDES or state permit has been obtained; or 3 ❑ D. For residential construction only,temporary soil stabilization has been completed and the residence has been transferred to the homeowner. The notice of termination should be submitted no later than 30 days after one of the above conditions being met. Authorization to 1 discharge terminates at midnight on the date that the notice of termination is submitted for the conditions set forth in subsections B through D above, unless otherwise notified by the VSMP authority or the Department. Termination of authorizations to discharge for the conditions set forth in subsection A above shall be effective upon notification from the Department that the provisions of subsection A have been met or 60 days after submittal of the notice of terminations, whichever occurs first. 15. Permanent Control Measures Installed: (When applicable, a list of the on-site and off-site permanent control measures (both Li. structural and nonstructural)that were installed to comply with the stormwater management technical criteria.Attach a separate list if additional space is needed.) 1 Permanent Control Measure#1 Type of Permanent Control Measure: Date Functional i L-,--; Address(if available): City: State: Zip: i 1 County(if not located within a City): I Di 4 Latitude(decimal degrees): Longitude(decimal degrees): Receiving Water: ' LiTotal Acres Treated: Impervious Acres Treated: 01/2014 Page 1 of 2 ) i Permanent Control.Measure#2 Type of Permanent Control Measure: Date Functional: Address(if available): City: State: Zip: County(if not located within a City): Latitude(decimal degrees): Longitude(decimal degrees): ., Receiving Water: ig Total Acres Treated: Impervious Acres Treated: Permanent Control Measure#3 Type of Permanent Control Measure: Date Functional: Address(if available): till City: State: Zip: County(if not located within a City): Latitude(decimal degrees): Longitude(decimal degrees): .; Receiving Water. r Total Acres Treated:` Impervious Acres Treated: 6. Participation in a Regional Stormwater Management Plan: (When applicable, information related to the participation in a regional stormwater management plan.Attach a separate list if additional space is needed.) ail Regional Stormwater Management Facility Type of Regional Stormwater Management Facility: Address(if available): 1 City: State: Zip: i4 County(if not located within a City): Latitude(decimal degrees): Longitude(decimal degrees): Total Site Acres Treated: Impervious Site Acres Treated: 7. Perpetual Nutrient Credits: (When applicable,information related to perpetual nutrient credits that were acquired in accordance with§62.1-44.15:35 of the Code of Virginia.Attach a separate list if additional space is needed.) Nonpoint Nutrient Credit Generating Entity A Name: Perpetual Nutrient Credits Acquired(lbs/acre/year): ri 8. Certification:"I certify under penalty of law that I have read and understand this Notice of Termination and that this document and all attachments were prepared in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system or those persons -13 directly responsible for gathering the information, the information submitted is to the best of my knowledge and belief true, accurate, and complete. I am aware that there are significant penalties for submitting false information including the possibility of fine and imprisonment for knowing violations." Printed Name: Title: Signature: Date: (Please sign in INK. This Certification must be signed by the appropriate person associated with the operator identified in Item#1.) 01/2014 Page2of2 4 L A i L Instructions for Completing the Notice of Termination General VDPES Permit for Discharges of Stormwater from Construction Activities (VAR10) I I ,,_., GENERAL b. The date that the permanent control measure became functional A Notice of Termination must be submitted when an operator no longer as a post-development stormwater management control; wishes to be covered under the General VPDES Permit for Discharges of Stormwater from Construction Activities(VAR10). c. The street address (if available), City or County (if not located within a City)of the permanent control measure; All Notice of Terminations should be submitted to: I. d.The latitude and longitude in decimal degrees of the approximate Department of Environmental Quality center of the permanent control measure; t Office of Stormwater Management,10th Floor P.O.Box 1105 e.The receiving water of the permanent control measure;and Richmond,VA 23218 f. The number of total and impervious acres treated by the 34 LINE-BY-LINE INSTRUCTIONSpermanent control measure(to the nearest one-tenth of an acre). 3 i ''--.---i L Item 1: Construction Activity Operator Information. Attach a separate list if additional space is needed. 11, Provide the legal name(do not use a colloquial name),contact,mailing Item 6: Participation in a Regional Stormwater Management Plan address, telephone number, and email address (if available) of the (when applicable). construction activity operator that was issued general permit coverage. 11 For each Regional Stormwater Management Facility provide the 1 L Item 2: Name and Location of the Construction Activity following information: r Information. a. •The type of regional facility to which the site contributes; 1 Provide the official name,street address(if available),city or county(if 1 not located within a City)of the construction activity. Also, provide the b. The street address (if available), City or County (if not located latitude and longitude in decimal degrees of the approximate center of within a City)of the regional facility; 1 the construction activity (e.g., N 37.5000, W 77,5000). NOTE: This "-.$ information. can be obtained from the previously submitted Registration c.The latitude and longitude in decimal degrees of the approximate Statement. center of the regional facility;and L Item 3:General Permit Registration Number. d. The number of total and impervious site acres treated by the L , regional facility(to the nearest one-tenth of an acre). Provide the existing general permit registration number for the construction activity identified in Item 2. Attach a separate list if additional space is needed. 1 Item 4:Reason for Termination. Item 7:Perpetual Nutrient Credits(when applicable). Indicate the appropriate reason for submitting this Notice of Provide the following information related to perpetual nutrient credits Termination. The Notice of Termination may only be submitted after that were acquired in accordance with §62.1-44.15:35 of the Code of I one or more of the following conditions have been met: Virginia: 1 r" a. Necessary permanent control measures included in the SWPPP a. The name of the nonpoint nutrient credit generating entity from 1.1 y for the site are in place and functioning effectively and final which perpetual nutrient credits were acquired;and stabilization has been achieved on all portions of the site for which the operator is responsible.When applicable,long-term responsibility b. The number of perpetual nutrient credits acquired (lbs. per acre t, and maintenance requirements for permanent control measures shall per year). 1 be recorded in the local land records prior to the submission of a notice of termination; Attach a separate list if additional space is needed. b. Another operator has assumed control over all areas of the site Item 8:Certification. L14. that have not been finally stabilized and obtained coverage for the 4 ongoing discharge; Aproperly authorized individual associated with the operator identified in Item 1 of the Registration Statement is responsible for certifying and 1 c. Coverage under an alternative VPDES or state permit has been signing the Registration Statement. Please sign the Registration obtained;or Statement in INK. d. For residential •construction •only, temporary soil stabilization •has State statutes provide •for severe penalties •for submitting false been completed'and the residence has been transferred to the information on the Registration Statement. State regulations require homeowner, that the Registration Statement be signed as follows: The Notice of Termination should be submitted no later than 30 days a. For a corporation: by a responsible corporate officer. For the after one of the above conditions being met. purpose of this part,a responsible corporate officer means: 1 Item 5:Permanent Control Measures(when applicable). Apresident, secreta treasurer, or vice-president of the i k (i) secretary, p corporation in charge of a principal business function,or any other For each on-site and off-site permanent control measure (both person who performs similar policy-making or decision-making structural and non-structural) that was installed to comply with the functions for the corporation,or stormwater management technical criteria provide the following information: (ii) the manager of one or more manufacturing, production, or operating facilities, provided the manager is authorized to make a.The type of permanent control measure; management decisions that govern the operation of the regulated 01/2014 - Page 1 of 2 9' 3 facility including having the explicit or implicit duty of making major capital investment recommendations, and initiating and directing other comprehensive measures to assure long-term compliance with environmental laws and regulations;the manager can ensure that the necessary systems are established or actions taken to gather complete and accurate information for permit application requirements; and where authority to sign documents has been ) assigned or delegated to the manager in accordance with corporate procedures. b. For a partnership or sole proprietorship: by a general partner or the proprietor,respectively. c. For a municipality,state,federal,or other public agency: by either a principal executive officer or ranking elected official. For purposes of this part,a principal executive officer of a public agency includes: (i)The chief executive officer of the agency,or (ii) A senior executive officer having responsibility for the overall im operations of a principal geographic unit of the agency. tii AALA gi 01/2014 Page 2 of 2 ,,',,,.,,,,,,f,,,--,,, _.,,,,,‘.._ , , , , ,:,,, L.,,, 1 k i rit ,.,i':,,,,,,, i I I a APPENDIX F RECORD OF STABILIZATION AND CONSTRUCTION ACTNITY DATES --"-:„.t.. i ii ,,,..:, .,_,, _ ,_::,., '', L -.1',''''-',:'' L-----'' 4, _4, ,,.; LCrozet Avenue North Sidewalk Improvements June 2014 Storm Water Pollution Prevention Plan KHAJob#113038016 L ,-. ' L 1 L: { SITE STABILIZATION and CONSTRUCTION ., L ACTIVITY DATES A •record of dates when land disturbing activities occur,when construction activities temporarily or permanently V's— cease on a portion of the site, and when stabilization measures are initiated shall be maintained by the Operator until final site stabilization is achieved and the Notice of Termination is filed. The dates can be entered in the following a form, or on a different form. LAND DISTURBING ACTIVITIES ; L ,'.. L-;• ,,, Description of Activity: Begin(date): Site Contractor: Location: , t. End(date): .-- L,• ,,, Description of Activity: I Begin(date): Site Contractor: Location: End(date):ii- -,'," tkir'ii"''' Description of Activity: 1-1 Begin(date): Site Contractor: Location: _= End(date): v i: Description of Activity: Begin'(date): Site Contractor: i4 i Location: End(date): Description of Activity: Begin(date)- L. : g Site Contractor: 4 -L. Location: 1 End(date): 1 _" L• , a ' L Crozet Avenue North Sidewalk Improvements June 2014 Storm Water Pollution Prevention Plan KHA Job#113038016 I L4 i 1 ti i APPENDIX G SELECTED EROSION AND SEDIMENT CONTROL SITE PLAN SHEETS OR EROSION AND SEDIMENT CONTROL NARRATIVE ::-', 'z (CHOOSE WHICHEVER APPLIES TO YOUR PROJECT AND DELETE 1 THE OTHER HEADING. MAKE SURE TO UPDATE THE TABLE OF ' L CONTENTS. THE TEMPLATE EROSION AND SEDIMENT CONTROL NARRATIVE CAN BE FOUND HERE: K \VAB_Civil\SWPPP\SWPPP Templates\Appenix G - E&S Narrative.doc) ai , Note to SWPPP Preparer: ,' i ii Plans need to indicate, 1.Direction of final storm flows &slopes 2. Areas of disturbed&undisturbed sites 3.Location of controls i 4. Location of stabilization practices 5. Location of surface water including wetlands k 6.Location of stormwater discharges i it 7. Location of any off-site,waste, storage, and borrow areas 8. Location of potential pollutant sources `t' 9. Areas of final stabilization ` Crozet Avenue North Sidewalk Improvements June 2014 k Storm Water Pollution Prevention Plan KHA Job#113038016 i 4 6mP•OLOSCOSti tOS-3U a L°N al!3 A9 31tl0 SIN�151�3a °N {aTST m Sll`d134 �eorace(/er) 4'oase'zce(6E4) ua , oast£L9(406)%q! ZB6f TL9(406)3NOHd n /� �,/ CI m BZZ£Z qA ONOWHUIN 5LL 3tIflS'3ON3Aq 153301 005L YVVB A9 03NO3HJ 969KOM YA'filliAse31oNe4� ',../ �) • Z 3,Q^ 3 'UNI 53LY00SSV ONq N0OH-A310IN SLOZ U t ¢.r.:;, W Z u', - aul'saaer>4ssypue -0 ea0 ABNAtltl0 NVld 102�1N00 peoae�A�I�W 60Y # Fit. o o LU `I wo -Raw ❑ 2 2 0 "ci3N'3Is3o 1N2WIa3S OMd NOIS02j3 3'1aW1991V O J.Nf10O ar,i,lin); M � H I Di 0310N SV3VVOS E v V G 1A 111 g a4-' 1. .1 c , M1 1 i'w , ! 1''1 . fiZ 3.. `'l N O C W w m Zub O .. , 0tA : 11, -. 'c o . . , a I .. - s O� a _o-°o I 3a,°. a ti vmo E v°yav 0 • o_ _. c ' 'e,•';0' mi co... at •.. ° c 6�w no ° � ., E$m 0 °'m O C m° 2.:`;', '6= 1'° E-,'5`2.5-:. °3° G 'O O d T.9- g3 ° O m O V 0 N` �O U O 3 - mmcn oc me mo g" ET;-.'T; Amo w v cm 1,'L' o - ° -5 moo° 'c` w o -:a�E 'u w m _ °•- a ° m».3 ,7)'--2- ,:2:, n c� m aEc ,no o. .. oN v cc E >.°' i .0 mo� .-. m°p CE -Ntm. Lm O° 00 °. U° :U mm °Tm6 0 d°. mw Oy ^.Qv N O . UO : I -,‘,,...,g..}1,_ Q'o'Y ma: and 5°2• 7-,°,,,-O .wNv m° t",;'.' :;'''' 00 0_ " n m oDc oo 'E 2G 'a vo o N°o.:. _o, .°c 'o c�o� m ,.-° `o > o l'' ''.1.;•'5,:, .moo 'N �, ,�E 'EL,„ a �° i o °m a 'g,,,°- .Lf' g '-,',E o m'- m mon ,.. � coo . 3omE oOm•- ao° E ao am.- �;� v°;cE �'m In 5°m ,. E :g.-°,3a7,2-.E r w amu 9 �', E cw� E v cc o `;',5 v 1 '-i.,:',..,-,,,.',-_,' .,.a,_0 um '" vc rn'm c_ 9. i'-.., 00 um o mom° E'NFo:' mmu o..r•- &',..!,°,.; m ° co �• .o oc � otn_v_ o o z o .,`,?,,=---,'; �� a �>. I m ...o p -.N O W O'; E,g_)'.&', n U> 7' O O "0,m•2 O T•> :O H O T O.O O EO N 1] 0 0 .-O I VE 5ON r >.NG•w� °N.i.U. 2 °2 2 0M-E : Ce.'=--5.7.2 ma OQ0 .0.t:2 C.. ON O > OIr OO'NL " -5)'-' 0 °0 I )&'- .%OC v w'o mam°0�' >ac ,mac°vr �vc "5 5 .foo'-a .0wo °--i':8-‘°a','„"-F,,, S'°aw"E ''p,_ ,- 0E ova a-.5_7‘;'5, U,W 0 0; O E y. O N y. O"L C v' '2'=t5 °'° E Q,/m' O:, O d� �v i N� ..-'...'.i .5_cOO UE u00> OoEE -•,5-`_'‘,,,;_', - N „;„'---;_2UU° m't''°.] c°gyp -c NgcV Ec Savn yVO S i VI ;O .+.0 202. 0 0 N'.�O N 0 E m ,'-' -:''''7°)...;v 0 O -(31''.°''''''''`.v `o v a t a r _.-0 0 -,0-F,"2 °o o. N` >n e -,s'... .1," 9 F c o-O w o .• 34 -m n 3 E'5 E o '1'-'2 '° e-52 er c00 2 co vv'O-o c °• oo mQEC `N E•m m p;a ooE bhw ° 7 o�°>,52e Ea �w ommc `.rn; mrn vlovo '-,---'5'a@m4, m-uac ;`� '- 'z' c n° �occ E�yoo am v3:_= a"'1 >t-.'-F o T mot 0,5-'' 0'3 m E °' 'v cm a 0 L_ �+ , -2.9 o�',T m a m O V -.,.‘--30 a e m`m .ted U ; a >' ,`oO m O a_oE mo° o'� e=oW my .°s ' [ 'E'003-2,' o a m m .m� m o. c c o ,„ E . v t o m d � ac o�,u°Eo E'..co>oE'm` 3 m°„',4-, �o .v.. 5moo 00 .-N .. o m° .oc a a;',.2Es ...., �- °cow uwa� c6o°E °,00nw Eo coo «" o c u ; our, • E ,s»- ❑° E a m O-°O N. -04-,.."6-.L1,&.' L m m O T,--,--,; .0 O.U T� m 0 C.° VI� d 0 _ ------ o a„ E m,.c c ,•,,, Ornr 0, ;,_,02,_ c c '2,.° .'° mv u E o )0•- o° „ n¢ co'J %mU,m °,i -O t.+`l0 ..Cmc oL OcmD2 '-0 '. c0 T°0 A a Uc 0iy CC o0 •; 02'''7 n--',?,'‘2,20 '..as.u«m°� m v mE o o° ° .5_mo ac>v o vv.:..om :0o :,,7•, ,,,g m•g,K N m._c O Nj 3_2 5 n.m+O ; m tU °3 u E, c m O.3..- > m y 'm a • o r- °o Q.o o+ . o'Ovo av a mo a _ s,,,22 Env o ° m uOEm av . E o'mm Z�o E _t3, 11:'e; u,m "o•Q�5 00§. °:ov`vEOaa ti 2 ''<i'5 2,2• ' . V =+LN3:N d O .FWN aNV°IE F�U� Q�00N1 2 �aI [V NLLmL F N 0 . W o! En .0 v .0 c I En N 3 .0 O 'O.a m 0 7 E 0 5 m 3 0,N E '_ 0 o m'o oL. = o m °amu, v . Q �o c ° q °, o r n ° E . ° vt n ov °mE° <-°,0,) 0)i 5 °o0 -' o a .8o ° c N D 9 N 0 E y m a,L C O E V o ami W .'..g c ,, CCW --t,. 0 °I E i», „'rnT 'o v _o, -0 °l'o o'rm ° wmaaia (n o o� 'Pow �•o v -g_'-`6.-25-g2 o 5 G .a -O So S o.y 0.° ` m ? m e °mo a F m 0 a ;0 c0,,,-.- .-.T m ,' +' v -. U U 0 0 .'C. c L W .•E• j. d 0. ° °t.,:,°.2.-'0 o o- ° 0 m d. o 0 ,. 0-.'O: 5 0 C N 8 ° U i'',.'4': . 3 °m V E O'O O U0 0 J ,:P0-`.'' a'u u °3 . `8•,,,E 0 o Sm -2 moN dE ocmom- o0) ,L0`� o ‘].7; = o E vY. TMo o m Q 0 YO -0 N N 0 z ..L- °y 4, O W O 's .0 0 o L c w 3.N.r ''o O O,. :c 4,.•- '0 p a w N .� = N °, c..,: .0 9 ''''''°) : E °� W 0. .r0 E �., ‘E,_,.,,.-,‘:), • d•- °UNS]�O0 ❑ '' ,`1‘,'....,;. Om �° m T °Y.04- F...',' O'. s- =�'_ - L'O =_ J' .+... c,3_.O O 0 2-,;-',•,.9''',3-1 �E�n,t,.�U T � u�� O O OW m m 0 O 0 O N O O.�O+t.O� `'-,,,-).,,_.0 ..; 3 0. U c �'c 0 C3' c 0 H E 'C'13,.° 0.°- N a 0 0 UO O N : -a 0 U y w_a d ._ 0' U c 9!0 0 L D v 1- N O O >: N T_ -:,,,,_`-o!, , _ W U y - O a 0 .m+ O O c 'o 0 C O TF C a m --1, z EOo :o, __ �.Os o -c v c (n (n E o0 0 -F•;.-50. 0 ., > e? v>.mEmo- 22`,`,,,,' `m_'. o -.÷.. ° - ,� :m 0 0 m Ci . O W So.- v y c m A° a > L•-i a 0 t;,-,,°_,''-.2-2 m 4�--~ U°' ° °, d 'o 'm a O f C) Q u"5-2 °6,-‘7,',,-,5.,° o v w y m N E o'0° 3� o -F,°;,0 ' 5 -E.c o s. o A,_,,5 -,-,,f_-g- ; m o o y 4'2.'L'.2 -6 N D m .1;'. 0 O 0 D ° O N ,O•l a n y'o m_ t'',..-,)-. + . -.°,--.<7,20, 0-.0 0 p `S •_,?, - O Z o'+' :Y c6 0 °� ; ac6• Q D oo„F o3n mcMln° uat °o?-c,2 '-=p-s' c"m,5 'E3= °O Ln v m vdoa U) p N m ° E (S''-• 0 U- Q ° -.628 °O. N-.L 3`,1.,,..'' _,v; °O O 0�, YO O`o O m N..0.c ..,,,„=„.•-s,0 0 0 :.N 0 .O .w f 0,,,,,,,.2. 4E r -0 0 0 0 0 0 3 0 m T O,° D 0) 0 N O (n W '0 3..0 8 o 0'0 ° m c m .'4' U'''.O u m i v L c. n E-. -EO `O_D o O c_• - 2 0 O a Tw N E �) -',•.:'_ v 0. 0..- Nv W _ O�m V 0 O"'m 0° .c Eo m�0 ' vC :m '0 o2.2°E C n 0 t2N C._.• U N U ° :CD 2.9 s : c 0 c c L L c._..a+O E h m .+0, 0,.1._,'`,:g ... U O W ;3 T� _.0 - � 00 0 vQ o'a 'W meoJ= o> o55 > c °`aPE vt °� E .°° >. -. O3'.�E.moo o m o m mi y^ -`1-,' ? m _ L v F- O u ° o ° 'u auo; E � am$ °�N 3 V m m = > GO y.0 0 2'� U_ 0'>E5,'-,,.,08.",'<7,f,2 .0 r-wY ° O VI O E ' ' aL Ll. -2--t-, 'L> ._ N , cora, cLv :Q w..0 `;oov •°o'vc.o. o >_ : i" . $o No m ,_v 0.. ° o w c � � -,°,- ..`E'.' °"'- H E •`- ,no ° > uayo _ � ,in..o -•ornno v ,„2 u ° TN DE 0 01'-?, Q u ; 3 0 L ix 3 .-0 0 O c N c 0 ° 0• w aa,0 y Cy n -f,„, , 0 ,_'50'497-4".:,() 0 0 0 o c :.� o o ''.c 0 o 3 a •No. ,E ° V, c o-.0 I- z ..�c, UU u, uo "^-1Zu. "01'7,°''±'':','°-'",;',f oo how�y0 ca � 2u2-.2,°°. oy .nor rn oDc mya a c � O 0 N•p L ° (n Q W oo'o n� Sao ° m N o° � v v m ° m m42. ,„',u E cmorn 3m mm o,00 1 :.',-,;3= T- w 2•,3 N•C U N c T 3 (, '-.,,,.„.',-:)- 5,5, 5 2;4 r, u c u O'o C U C rif' O 0•E. O 'E.'(-) i v a O,O r _ O O 'g.>7 0 Z O ff«N% Vg Z ° E . �� .,.E 6 E '6'.6c z z ' j N E E °o'' ',-, '1,,-,;,E2 '.m u N E,-E a, E�o.5 2°E N m°�°E 553 O•.9 a c v o o v t=v°O o Vg Q ca E E-: a.`,� v. i, O W ,g,' 'v•v y.. _m m y, mw ° >, 2 r I _.oc c� we . °' :.ago O m .o to In 0° E 22v :-.S e3t33v c ° m om°uE OEo �i.c t EoP°oNvo�o Z o . ° v ° Ivo ccv 3._ ' N^ (n ;cc o'-._ v° vlv 3°-- nm°�� o m> c6°o Eo`o ov°" Lo irn vva W -L-o 0c m9l ooE x05 0)0- W 0 -.00-av cvo F .0'00...• m `,,', .-E c c m° a I- OUm° 0 U3 'N 3 NOO C7 0°0 iO °CC aC� tOU. ° vv mv� o"2 o - m :-'2'.2o < W °21'.3 a o we000 • o0 zn a� vc z :cvs u g mV1 w w ' C''' c 3 N Z W m ::oro« 5 a 0 rvuuu ¢ u ,,,, U ,z ° Q 3i, u Q i "E22 moon"o '-'`E.,>,,.._• .' v O c m n o t.j ri v L. uS 4 4 i - ED2 [(--,---, ED ir 1 'L,,,, , .1., 1 0 1'.r b�I Z S ; .; ov. a 1 AI I�=�112 ��ilfyfr o,_ I :I i,,.!.1,,,, o(flrw \'p1V�' : I'- 1 b I�� Z Ld a J '*,h'Sa a s o �� ¢ ?, I . I 11:1i 1 $ s 4 §§ p ! a'E lo\v$ Ets ds \ a y a 'r; a e m. u o � ,.i w Q ` \l\ , v U3 lil \. i\\ °\ ... \\U VI 11 ^�-� N e° m € € 11X _ • , w 5 a` CD O o a$ ti § j,IU6S 1) It y �; J ( ^ Il `±',•,-,,' \\\11i1 J'a�'6 \\ 71� €N6'6e ,,,C .Rb 1-Pt' ° S6 " `SII 1 z,_, �= 4� p m I Z, a IN 1 Lu,-1 -,,,,/,.,_,._ a \ . h, "�a °g iFa gB>I ori a2 ,i1. -41 I) e z z r. -1:,1-4:; 1� . g i\\'\I g 50 B v ,JJI o '1)(7): / t\ ` '''.:',.4. �U 3 g g aw : 1 4Nia� ES at IIII€aa A A€ t I a sil a Q i >z fI Ly 0, a i ilia))) € I g8LA s < zg ul d 1%;112 ' E:;g $ 1,11 E, t, E' O- m E£ f� sid • 1 �� ' '�� tl�'�_.I �. � _. � �� Ill lm¢� I$ zb ti.,!:i � �'� o IIW?4v f ,I 1 tll. o o � 3C $f 1` €1;,q E I-. € a1g8 � ��� � I � � � Z \\\ill \\\ V � ull cjrc �.S° 5'L °Ek ��€ w�uw r� /��� 1 0 ,12.°( 'u 1 e o� n 4A1 � ga g a6 b ti' ' l' x - -5 I % 5°i �ti f .K S °Srt j YN {{� (;,.•?y4 1 '‘11f1,_1,---1, fmt' i "i-,o E �o \\ @ � 1,i . / ri 6 'all! i 21,-;1-!, �t a €`N9 ,,.3-) I &i^' � s j1il s �., r �� = i \y� � I �9.. � / g��4 &a=E s��°�E ��d ( i 1'IV tee a t 3 �1��h 1' e _4i c ge,- tt° a c°i ti W- Mr g ,i (,)`, ._-17- V 1rP�'` tl' i\\ ��. _ teHl €8&r y� � ' 4. 0 a gam 4g e 3 U Saba a 40 1,1Sg4bg .€ ;x6 .'2 fM a€g 4SA ° .pp P C - g I; 11.‘'.g! , a _ o° ; 8 N;..,,' '''''4,y,..�, Y ' i I .14 **, J #i $III a II I_ 6 3' Q3': l 1 1 r °+ i �1= e�• i�' el u j 868 Ee▪ a 4 'd .r.a i r i ,_;!k`8‹ g :S E 1 .i jR ,S a "7,-,•,-'' ',1 ,r.f r... °n ,,-•, , �;" $s'm�.T `°a� 815 I r 16B''''§ >', ! 1. . 1,,, tg ,�.Tue °w N , ,.404 a auM as a°u° ,w .a o�° w� a ° w'°vw, , „., .° -1}I v v -�v°�.,.A �... v as ,. °�..,u u° a a�rv•.w awll�a �G°d.nc�il:.au°W3. R,uo wr+aiw FI. 11.as aux v .ivu.urz a i .y 0ai . uara 4 sl ar v v•cara7uo�aNt uaw laria5o, I.a+,r.�a0 a rt atad.u'�y. Fa F• •Sx -OtONfOf 4104 X:5,304 i o .�.• °o � w o .nu-A'o I „as °, v ,� a wr a �a w m nor n �e v u a , �^+ 1 4 St01,'LZ NI Unn 3,nor�I P"O tO6t0tLt,o5-3J\i S laa4S\!7QV0\0000IS 4}icN arwnq;aza�a 0�0\II03 4(4 0)3 a,zm++84(0-00044(\A 3 Ulb\•N j 'ti M l' 1 o 31'11, WI 4 1 .a �I i ,moi `a �� , , ' 6".010EISOE:L-Z0V3D s 1 1 ),XO 'itIIII,Z1,9(1,fit):OuoLld IS''''''''..14.ti, •. EL'l CNI _ '-' N Z 3SVHd ''''''''w(`'Et nnpurt e, '''14 0 2- g 0 '4".-4 4,4 31Va SN°ISIA38 ''• 0E76E-E49(V0E1)XV.I LBLIC-£49(1,0S) 3NONd NV0 Ae a3,. 96t'- O6 ZZ VA'eliiASOV-,r--iv 1 VIA'S'3CIINV°11111CS'IV t'linSk‘21'4'../1‘1V>1 IQ'''''Z°g°'' 88a AB wyHa NVid 10:11-N00 PeoldeiPu101,110t, '4,,,,','„,',Ii''''11-,i•g,,f,.:,,,) .'„, `,44,',9, LLI-.j-Llj 4- ---- wc,.1-1..3ullseleP°9-4991114uPue111 U11•111111. 1N3VNICI3S CINV NOIS013 31NYVil2Ell'ild0AiNnoo ---i . . _ _ 0310 N SV,yos A ,-; , iL) -, 1 t• it: k" .17s;,-' g— . „E 6 .' : z . 1 16 a 'in 6 Ll 8 6 ,s4.4 .4e< -.',' 4e° z v) 4.) 4,,4,,, c_ 4,-,) m 44 0 L....1 < >_ ce I- 4, ,...4, u) I-4 < z 0 H z < co 0 L'-' ''•,.. t u..,CC 2 . Z CO 0 z ,t Z 0 L.-I C, •.... '''' Z C.) __, C0 -. 0 ","",1 - =, M R. CL LsJ R' (-J z .... •s:C z z 8_ Le,j 0 6 o u.. 5 H - , c, 0004, z , i_ 44.4 z < n 4L-1 Er 1_ Lii 2 (4,f, - • 0- . 4 0 Cl)- 0 — 0 I= OZI— _, 8 8—, Zi— < — Z 0 c-D 2 I '''' z (?) LU 0 `8 cc) Ix _J (J) L.) If) — 8 6 = (±, ,,.„ °6 Cjt,'0 C) C) q.)' 0 *a 2 _,z '149 tli' cl a' 5 I I I I I z ,.. L,- 42 ',J (.7, 2'' 49 0 E, I ,› ><./0 0 4 0 9 — g - c :-•L s ? '20 ,,L°,;', - , I .*'.1 Fi (k) . .,-.-t;- • 6g 0 4Jz2,' i . -ii al I 1 171 1 2,, ,,, 44)6 r, .R. ‘e, E,0,.,-• ,,_ , , 44 ...J -1— ..., ,±1:L ' '• -' /' ps p;- ,g 1— .. _. -'-1 "4\ ''''''•., 4 ,,• ,i ,4 Z R'-' a B ,_9_< ..'' I7, 0 0L- 0 L-I .8 a §. Lu . = . >_ .ie, g4,4 4.) c,z g L0 L, 4,-c- =', > Z (5,,,,,j , ,,- \ \t`,,/ .. =,..,= 0 D i ,,,,,, ,,N.., ',, • A ,v,s406/,-- S' '— V_, igg A _ ''' ` ', 0 r,') d w 2 R''6 ?.. K 8 ii. 2 a Li i—03 i-ti 1 - -- ' 4,i,\.,,.,„,\.,; ‘,'\ LT., ,T_ , , 45 44 4) 0) od 4r, — '4 • '4\\'''''•'''4444,,,:.\‘''.,,,, 4' ,; \ \;;''''''s,s`N,..,,,‘,„, ' , ,,.• 1i \ / ;, / , 4 -A -._,,,,,, 4 \'''*Cr4 `‘ ' •404.3.',,gt., \•, ,i'''''''' I `, ..„\'‘ , f•L 1 )\,,,'''.:0'',---- '' t,,,..-.1,\.,,,',1,i / '\. II., ,' .44 ***''‘'`,,'", '‘, \ l i ,, N14,,.*' '',. \ ' ., / / 1'.!. 'i iil I y/11/'Eli.!•i.#1,* 1,,,/i 1/1 1 '. ' ....-'‘-' '`,. 4:1 'N.''',, ' ,\, - / ' / 6' /11/1/ iii'll/1/1 4'''';' ''''''''."., '*''''''"4%''''''''',\\ .. \,, ' ' 1 11'11.'1 fill/111i/i''''11111 , , / /, \ ,/, , ti,//////,'/ if, /,// '0 ,,,, \\ 4k,•:'''''':,.''s \‘‘ 1 /,////,// ' 'III ' ‘,, \ , / / i \ //://, il ' \, 4,.„)9-.:,,,,, \ , , ,,,, , / ille‘k , .N.,,,,,,,_,....,,,,,,NvN," ;„,‘ , ,'‘,,', / / / 4,1® / / \\*;N4,1',44.,," '''C4,4,,'N'I'`;4?., '''''1$Cs° --4 .•-• ' ' 1 v ' ‘\\'‘‘4'N„,„/'''S'''‘.‘,,,,, 4 4 ,,;‘,, ' ' — - ' 4s \‘',•. Ni,,71' 4''''t\ -'.';--,-__ ,- i 1 t ,' ' ' '/- ,\,,,,., , I ---- ' \\\t,,)i\4 1 -/ \44.4i's ,\I4 4 / ------ \ _ ..,....., 1 \ .....,.._ , 41 ‘,‘k,i\ill`lit'-'4' ..,1 \ \ \ _ -- 1 \\ 1 41 _. , ',,, '\ ' , -------- 1 1 ------- - 44 \k , 1 ) f 1 A \ 4i14 i • , P IIti ' ' I .4 -' \\ \ '' 1 '—'- \4 \ i 4,11 I 11141 \„ 1 41. ,1 1111 i i'''''' , \\ i 411 1 t . ).; ,,,,),, _ 4 i All. I, i, 1- \ • .1 1 1,4,I 1 I /' \\,---14 4 • ''' , '1;'.1., ,1 1 [- ' •k• iii41 t '11 ' ' \ ,. —I / 76.11;44_ ' 1 I,,,-4-.4,14 --- i , — 7- ' : \ ,OZt as) ,,, 300 30003b IS 1:1 1 [ I 4 : ...,-Avull0 Pa(.P.1/P4d0P0 PlO li..ICY$ovir s 1.4.,,,sk snsu,,k 4sa,u0)op NP) ..,0)asoc,nd..,IN...^4ds sq;Jr...,410)PQp.la,tli,, aoin,.4o t+awr,-,ss).sa'4a,sy paisasd-d suD,s+p PUP 5440)0),UP)ullPs-..n6o3,1,..,,a,,,..gr,.......,.s..,41,,,, UPPA PLOP''''''-'1';',/;:,'''''-',‘,r'tC',,•`,"-r'',',-,f;"•-6"„,pcYc.,?,;`,',°.,;..`,T.2,;,3_...,-\°,Ts",°t,`,`,'\s,?j-,',`,r„t2,,UP,T„'.',.';'''.,°.S,','„".-...S'°..5'`,°,`\'..,A1'3--_'",,g"2,4o".'",','..''LL-4`,v°`_°gc.c.,,,, >, C F - 611111'1111 iiiiiiiillialii' 0 s A9 31V0 SNOISIA3E1 oN �,J J / ,.NmP-JtOa£9f14 104-30 ewoN.IIJ • oee££ca(ao9):xVd sea££ta(aoa)aNOHa 1, 3S Hd 1,604-LL9(46►):xed'1.0 ZL9(Pet):euo4d {,A `r BLL£Z VA'QNDWHOIN'S4t 31105'30N3AV 1S3H03 0051 NVB �� 'ONI'S31VIOOSSV ONV NUGH-1.311,11N SCOL O A9,N,i. A0 eaa 966b'Z06ZZ VA 1e1111As�oPe40 °'° Z out sa�el sypue ❑�❑ A9N9Vtl0 NV1d �0211N00' peou n ulon A g�L� _o woH,dalw� ", Aa�N6'S3a 1N2 a�S O W NOIS0�13 3lbMW39l`JO INnOJ 114°W:- °" =W . a310N SV 31V05 r 1u'7 Fz m. .. ac nc 33 aH m u � ��. 6 ,i oo .mn a Q OUN t.) aJ � O ��•T00 E.. �5ul `n zz w c.oz z (,, z0 _ o U n^�v^m Z w ,1-6J 0 ¢ F_ o . , .,z w o o v (p w ¢ z r >' F- NJ o L� us e °c-' . o 0: FO- Z a z O w a Z wO ,- in Z E N--N o N ~ --I Q Z U W z w W O a Q� H W - OO LU o o u > W < :. o -z. w t O I- f, o _ ¢w a z a o , gt.'= osmmv>'', O } T w w U 0 Z U 2 Y m LL _ ? F w `J`'' a O: �'aawmm O Z O g O lwi a W. .:� 4. -1 d W =Wm < 1-'2' -° m 3 of CO N2O Z ~ O Z H J Z J Z U U]~~ N QE ZW W I W U) o 1- O J J F- i z F- D z Z f z 3 'y 0 m K J ,n U fn — 0 0 0 U O W F°-QW § V 0..O :.WV ,-d � Z tV� VJ Z Q-- W I .. I I - .OWZ . FJQ- V F- OQ I z= I I ' I I O ® U ® • �s N�m w o z' a¢ w V zT''' ''')-- ti- fO W W Q 0 £:' 62 21°'i'-‘3'' M W I I 1 I I "1�4 g zEz o tLnn-- z='C'51 lEJ z -, J q ZQo k ,,44 '�M.y/ f�/l cr Z Q W J W Z 8 O 0 Z Z Y \.y '' '. / < E LU O J Z �d Z Z Z e) ¢p ��"y*"4'`\�`,'"'�0�` .., I#\ �, .+.,)J J y0 o z -2P, o o z 2-1' z Z� ,. -- wy hi ,,,,',\ } ,v)` 6 ' i' \ O <1,—,g ,p CC O O_ .`,'(2 F '`h� 1 H- o w 'w� o � Z c)wW Er)„, _ InZ �o d� � a� I q'� Q W'-H :W' OWQ Ea T§.Z 63 6Z j'''',',.''.4''''':,,,,,,,‘:.,.‘\'-‘,,,,,,,'' '.\‘,.,14,‘;'''' y,,„ ,,, z it,' �� gQ °-k-, oW �W ‘‘;''S.,',•:'''''',„''''',',"'',,,. X �.\ \ V� - O PJEi O' W W 8 1-)R a0 O W a a 0 -, ri1 h w ?o <cn ?� \\)\ p ��i� m\. W '''-'4' i ri v vi . , \ ...,: -‘,,`"\',:t,,,I,j,pw,., :, xr, , 2-,,, e • 1 '§� '''',:,.".‘,,..-‘'..4,',., k % J/*� ` o,''(".:;,,,,''‘,„, \ y ` . r r � x � \,j yam.\Agh 4fi / 01'1/i t„/ • Vit ; '�\ f\\' - • / .:,/d/,'/ i.'.#4,1,;,41.1#1,.;,,/- ,,. :,,,,,:,,,,,,‘,',,,,,,,,,.,,,,,„,,,,,. ,,,,,,,,,,.,.:,,,,,,\,,, ,,,,,f, 1 411,',/r r 1 r ! ,., \..\\ .y �\,, 19' ' �= 1 r 411.° 1 1 j`� 1 r' +,�, 4 � x % -w /rr///r ';, 'r,,rft,1/1, /7.-, t , - '//,',//,,', /ri ,v N,,,,,,,,:4,,,,,,„" / ,','::',,,,":,/ / ''''' 0 [ „` ® k, v1 . f pp �' t M1/ „\ \i „—t , ' tV ” 1 ) �. ,1 } i � ! \' 11 0 0 , l's, \ � AJ . A a va r" 1 v) '} ,I l i f' \ ,, � \ 1 Ii ),.e e 0 \\' ', ! ',l q 1 �� ; t _ ,i ,�' 1 x I ,- (zoo-6) V ,, 3AV 35N030:IS b F. t- u '"v'{% ^+stl Due u,vd-dat>•IN ay Fy 04%i:�+:411ro a9 Aon•oul acpolwscV o�-.carygy xa vo,yo�dnnc 0 ac.i°I$' �o wya,x ynewM xuawr%P.swa oo wuniw�,aa„e.��v ,� sma oa.oaia CCC 44 93(40 m):woa a,neoddnc 04 090 a,{i 04 940 000040 04•0300,,yo y mgbv.w;so , [-'.:,- � ',ka a4 patua of 6�ap pio s)Caauo.>ay}411 JI�:} }� p SeW-: a dow uc:� ''�icr61)10410944441 V,-x td 01(18£0£444')'.93:,',1' 93-x 44430 5X'3 0109404'4,39-/0499440444U 0406£0£4444. K ;9039:( er ye ,9 9tOZ'a IoW 39940 090-4 6oP 0,).;.3'Z''1•?:-1.)0C 4 01\445\034(9\!IOtlJ\><J�MaprS )+oN Drop\;00)4 o t0\11o0-o 440 00000949 8£'91.1\n�44 i\N i 1 ki 4..,41.,':i 4v;iiti;1 i L , , 't U. APPENDIX H i SWPPP CONSTRUCTION SITE NOTICE AND SITE 'SPECIFIC VPDES fePERMIT AUTHORIZATION FROM THE VIRGINIA DEQ - The SWPPP Construction Site Notice must be completed and be made -1' mil weather proof by lamination or other means by the Operator and prominently posted by the Operator in a manner sous to be readable i from a public right of way at the job site. The size of the SWPPP ' E: Construction Site Notice shall not be less than 8.5" x 11". The project-specific VSMP Permit Authorization for the construction site shall be made weather-proof by lamination or other means by the Operator and prominently posted by the Operator with the SWPPP Construction Site Notice. : 'i I Crozet Avenue North Sidewalk Improvements June 2014 Storm Water Pollution Prevention Plan KHA Job#113038016 4 r 1 ffi , L SWPPP CONSTRUCTION SITE NOTICE FOR THE ii VPDES GENERAL PERMIT ' -L--' Project Name: Crozet Avenue North Sidewalk Improvements ] L Site Operator Information: ',. i Name Office Phone Number 1 Cell Phone Number r VPDES General; i Permit Authorization Number and SWPPP Location u Include number obtained from DEQ Coverage Verification 3ii Note actual location of updated SWPPP book on site Project Description: The project site consists of 1 .13 acres with a disturbed area of 5 acres. The ultimate outfall is the Beaver Break. 1 4 iii Crozet Avenue North Sidewalk Improvements June 2014 , Li Storm Water Pollution Prevention Plan i KHA'Job#113038016 -1:--;4',-:-'!,- IL11-;.:'E. .r I L IL Y .,,,, , ,...,-.,:,..,,,, L-:_,_ ...: ,,,, , _,,,: ii„, ::=: t!,,,,i APPENDIX I STORMWATER'CALCULATIONS ,,,,,..1,:,-I:.,,i ,F --,-,.! 14', t 41 1, cel I Crozet Avenue North Sidewalk Improvements June 2014 ''::,,,,,i.''''' r--,,_,Aki'm Storm Water Pollution Prevention Plan j ki KIIA Job#113038016 A L Drainage and Erosion Control Narrative for: ,IL CROZET AVENUE NORTH SIDEWALK IMPROVEMENTS __.,_,, L,,,,,,:,_., PROJECT Crozet, Virginia ,,e.i.i,i LA--., ir.....••• A Q BRIAN A McPETERS Lie.No.041405 cliii i L t_i ‘4.).4,,,O w 1. ,,,, ,,,,o _ ,, . NAL, ,,,,,, Kimley-Horn and Associates,Inc. Richmond, VA :; LA Roadway Designer -4 L-- ,,, ,, -..-;-,, k Prepared for: s Albemarle County 1 KHA Project #.• 113038016 1 March 27, 2015 1 I '-', kil'A I LA r4 '' L s :,,,, L , L 1 a la -',„: L :., Fir...,,,1 ,, 1 i a L.,,,'0 :i ;, ; L 11 .;u 3 1 ik- i Li This document, together with the concepts and designs presented herein, as an instrument of service, is intended only for the specific purpose and client for which it was prepared.Reuse of and improper reliance on this document without written authorization and adaptation by Kimley -Horn 1 and Associates, Inc. shall be without liability to Kimley-Horn and Associates,Inc. '14, , L 3 , L ,, ._.,...,, , . 1 L TABLE OF CONTENTS :s ` DRAINAGE NARRATIVE 3 0 APPENDIX A: SITE INFORMATION USDA Soil Survey Map -,,'- i ,A FEMA Map h APPENDIX B: DRAINAGE MAPS 1: IIIPre-Development Drainage Area Map (Sheet CG-100) Post-Development Drainage Area Map(Sheet CG-101) f APPENDIX C: NOT USED '--, L APPENDIX D: WATER QUALITY CALCULATIONS APPENDIX E:EROSION AND SEDIMENT CONTROL E&S Phase 1 Plans(Sheet CE-101) E&S Phase 2 Plans(Sheet CE-102) '''' `' E&S Details(Sheet CE-501) APPENDIX F:STORM DRAINAGE SYSTEM CALCULATIONS Storm Sewer Computations 4 A ' L Hydraulic Grade Line Computations - -L, Spread Calculations APPENDIX G:MS-19 ANALYSIS Flowmaster Analysis 4 4 L1 1 .. L 1 .. --,, L A DRAINAGE Project Description The Crozet Avenue North Sidewalk Improvements Project consists of approximately 1100' of sidewalk and roadway improvements along Crozet Avenue (SR 810)between St.George Avenue and Crozet Elementary School. These improvements in Crozet will ' provide better pedestrian access and storm water infrastructure. Crozet, Virginia is `i located approximately 15 miles from Downtown Charlottesville,VA. Crozet's current surroundings are rural but the 2002 Crozet Master Plan and new Downtown Crozet al Zoning envision an urban downtown core by 2024. Description of Existing Drainage Conditions The section of Crozet Avenue between St. George Avenue and Ballard Drive is surrounded by grass, low lying brush and large canopy trees. This roadway also provides access to two single-family detached residences and the old and new Crozet Elementary School buildings. There are two high points along Crozet Avenue that impact this project, one is approximately 75' north of St. George Avenue and the 1 other is approximately 200' north of the elementary school entrance. The water that collects between these high points flows into roadside ditches and eventually joins the Parrot Branch flowing through a culvert beneath Crozet Avenue towards the east. I North of the sag existing cross drains(VDOT CD-1) drain the porous aggregate base-stone (21-B's) of the road and discharge into the ditches on either side. They do not convey stormwater underneath the road. I The site drains to one (1) main outfall point (Appendix B): • A culvert located approximately 600' north of the Crozet Avenue-St. George Avenue intersection. The culvert crosses beneath Crozet Avenue Li- directing the Parrot Branch towards the east. The culvert will be extended to accommodate the new sidewalk and landscape verge. Adjacent Areas The site is bordered by St. George Avenue to the south and Ballard Drive to the north. wry Soil Description According to the Natural Resource Conservation service map the soils on site are all L-; loam variations. Critical Areas ■ Parrot Branch. -▪ 1 • Construction slopes throughout the site. Adjacent Projects Contributing to SWM in Crozet Crozet Master Plan £1 The Crozet Master Plan was adopted in 2002 by the County Board of 1• 11 Supervisors. The master plan envisioned a thriving and accessible downtown Crozet environment supported by a main thoroughfare(Crozet Avenue)that =• r encourages economic vitality and healthy activity. The Master plan set forth I suggested patterns for private development and recommended necessary infrastructure. The plan had a downtown first priority with adjacent neighborhood centers of appropriate scale. The plan stressed the importance of 1 Ili interconnection of streets,alternatives to access, and an outline of infrastructure necessary to be constructed for the plan to be implemented. The plan also incorporated diversity in population with affordable housing and a welcoming climate. The plan is built upon a foundation of encouraging local small businesses; as well as, an innate value of Crozet's natural and historic resources • A that make the community of Crozet what it is today. 7 Downtown Crozet Rezoning Project Following adoption of the Crozet Master Plan in 2002, the County with the help of CP+D developed the first step towards implementing the recommendations of the plan by beginning to investigate a new zoning designation for portions of Crozet. In June 2008, the County Board of Supervisors approved the Downtown Crozet Rezoning that established zoning requirements within the Downtown Core to facilitate urban development with minimal or zero foot setbacks. The Downtown Crozet Rezoning made the ideal of the Master Plan of a thriving ,,. commercial urban mixed-use downtown a reality. 4' Safe Routes to School Sidewalk Improvements Project Vi The County has proposed a project to improve sidewalks in front of Crozet g Elementary School adjacent to the northern limits of this project. Improvements t include proposed curb and gutter,a storm sewer drainage system, and an improved curbed entrance to the school. A iii- i ' L.,-, .,., .„-1, „L_ EROSION CONTROL Erosion and Sediment Control Measures --'' k • Inlet protection will be used at all existing and proposed culverts and storm sewer K inlets to reduce the amount of sediment carried into the storm sewer systems. - L ■ Silt fence is used to reduce the sediment carried offsite by sheet flow. -. ■ Outlet protection is used to reduce erosion at pipe outlets. iiPermanent and temporary stabilization ` - The site will be stabilized by the ultimate development including paved areas, seeded areas and landscaped areas. - Temporary stabilization will be used in accordance with MS-1. ' L ■ Soil stockpiles and Borrow areas. - -' - Soil stock piles will be encircled with silt fence and temporary seeding will ',,, be perfoiuued if necessary. L---' Construction Schedule A sequence of construction is provided in the E&S Control plan sheets. L. Maintenance Schedule I Erosion control measures will be inspected and maintained in accordance with the Virginia Erosion and Sediment Control Handbook(VESCH). - L !' PROPOSED DRAINAGE IMPROVEMENTS , kOverview a The proposed onsite drainage design consists of a series of curb drop inlets and ' L .-.,-,. - reinforced concrete and HDPE pipes which collect runoff from the site. This'proposed pipe system routes stormwater runoff from the ground surface to the culvert that crosses beneath Crozet Avenue. See E&S'Narrative above for descriptions. The- drop-inlet a openings were sized in using VDOT Drainage Manual methods in Chapter 8 and sump : L inlet openings calculated using QHEC-12 design software. i Drain age'structure 101-7 was designed to match the proposed structure location of the future Safe Routes to School project( SRTS-002-834,M501, UPC 97189) adjacent to this project. Storm sewer proposed with that project was considered in design and will ' L tie in at proposed structure 101-7. The pre-development drainage area is shown on Plan Sheet CG-l00 the post- development drainage areas are shown on Plan Sheet CG-101 (both in Appendix B). 1 i Methodology 11,, illi The proposed drainage system was designed to collect and convey the storm water runoff for 2-year and 10-year storms. Existing and proposed topography are shown on the 3 proposed plan using 1' contours. Times of concentration for overland flow were 3 calculated using the Seelye chart. Times of concentration for channel flow were calculated using the Kirpich chart. The curb inlet throat lengths were analyzed using ng Haestad Methods Flowmaster software to check the depth and spread during the 2-year J storm. The following is a summary of the drainage design parameters for the proposed e• development. `4 Design Parameters Design Storms: 2-Year, 10-Year, 25-Year, and 100-Year Storms -51 rii Manning's "N" Value: 0.013 Reinforced Concrete Pipe Class: III Minimum Gutter Longitudinal Slope: 0.5% z Gutter Width: N/A Gutter Cross Slope: N/A Depth of Local Depression: 1" J 4i Rainfall intensity for inlet sizing: 4 in/hr Maximum inlet spread: 8' ' L Minimum Pipe Size: 15" Design Velocities: 3 to 20 fps 3 Max. Pipe Slope: 16% 3 ,• i. 1 MS-19 COMPLIANCE rz i Overview The point described above and shown on the pre and post-development drainage maps included in the Appendix were analyzed for compliance with the MS-19 Standards set forth by the Erosion and Sediment Control Regulations. A summary of compliance , ii calculations are included below. Analysis Point#1 .,- ,..tg,T,i 11-6 Analysis Point#1 is located at the existing sump in Crozet Avenue approximately 600' i north of the St. George Avenue intersection. The outfall is the Parrot Branch tributary. ..„,• LDrainage area E l in the existin condition(see Appendix g g pp B) drains to Analysis Point#1. In the pre and post-development condition all project area drains to Analysis Point#1. _g The combined pre and post development 2 year flows of these drainage areas area summarized below: " Total DA Area of Site 2-Year Description 2-Year Flow (Acres) (Acres) Velocity(fps) Pre-Development 116.32 1.13 81.86 7.53 Post-Development 116.32 1.13 81.87 7.53 The velocity produced by the 2 year storm under both pre-development and post- il development conditions is greater than the existing permissible velocity of 2.5 ft/s for Sandy Loam as specified by Table 3.18B of the Virginia Erosion and Sediment Control Handbook, 3rd Edition. The 6.2' deep channel that the culvert outfalls into is capable of accommodating the depth of flow of 1.85' produced by the 2 year storm. Further the improvements and construction of the storm sewer improvements do not alter the computed headwater of the existing culvert. WATER QUALITY This project is not located within the Chesapeake Bay Preservation Area(CBPA). The western limit of the CBPA is approximately Interstate 95. However, the project involves more than 10,000 square feet of land disturbance,so water quality requirements are applicable for coverage under a VSMP permit. Water Quality requirements are described in the Virginia Stormwater Management Handbook. This project utili7ed performance- based water quality calculations to'perfolni the water quality analysis. The Applicable Area within this project's right-of-way is 1.13 acres. The pre- development impervious area is 0.37 acres,meaning the pre-development impervious cover is 33.0%. This is greater than statewide average land cover condition of 16%, meaning this project falls under"Situation 3"and must reduce post-development pollutant runoff to 10% less than the pre-development pollutant runoff. The pre- development pollutant runoff load is 0.89 lb/yr,meaning post development pollutant runoff must be reduced to 0.80 lb/yr. With the post-development impervious area being 0.49 acres, the post development pollutant runoff would be 1.13 lb/yr if no BMP is utili7ed. To reduce the post-development pollutant load then, a BMP(s) must be able to remove 0.33 lb/yr. The pollutant removal requirement of 0.33 lb./year will be purchased Lfrom a nutrient bank. Water quality calculations are presented in Appendix D. TOTAL IMP. PERVIOU SCENARIO AREA(AC.) AREA S AREA IMP. P LOAD RR r., (A-SITE) (AC.) (AC.) COVER (LB/YR) (LB/YR) PRE- DEVELOPMEN 1.13 0.37 0.76 33.0% 0.89 0.33 T t .; POST- DEVELOPMEN 1.13 0.49 0.64 43.3% 1.13 T' i 1 ii 1 ''' r• ii w -„'„,,!„,-. Li., ,, 1 , ._, ._. ,,, '.-'-„?', . - L' - i q , 1 • L i LA,,o1 L '1 ',,,,-, kii, ., 1 .„ , ,;:e.,...„,.., ii„, , .1 aw-- • , .._, „,.... .••o.,,, ,o,.,,,, L • , o , o„,,, , „„ , 0 4 I 1 '• L, ,, ., _, ,,..., i 3 A ,,I.,-,,, L-,,, .,,,: ! .t.., ;, I iv APPENDIX A 4 5, Li 1 E a y:, ''''i L-1 : Li 03 , -'''' i:}. LI .__-.:-,,, k -j i i i 'r 'a r� v v '4' ro M -3 00991Zb 00L91Z4 00991Zb 0059424 004.124 00£9124 002'124 O w ..8£,14 Sio .6£,lbAL N O EL N N ccauwlsi s ... -,,,,a....,,. , _t .-t - Y eg , r-:' r;,'-44f: � ;rl",rt; - -s4sVSt,„+ .. ,.:s'3e rt F ; Y _ . O. ° - -, _ ' t t_ - � _ 'o rO cr-'-::::','::;;:,;:/.-,4 ,:=1...,,,,,.'.:'*,-:,',.,:,�K _ y 00 - 'te - .. + .4 S s`. S o j -,:-.', ...:.,-...,,,i':---.\--„,‘-':,...:-4::',„..--;.„- 1 o a a .i� fad",”a2, - S ti. 44.i'- {' r _¥ � c � "' 1 , {{ �µt !, 7 8 1 {4, sS N-meq,_, F.i", 1 '-',;'.#.4.1`-` ';' y_ �. O .-.i.,,..:.„..,.4,--- a''),..'..--. 1'.:".::::::-,:-.----;.:1-;.;;.,"..-':::' ; x _ ! x;t of } O n�' - 1 n `kie " ,j oo # /J eG" !;,',_..:.:::.,,,:y . - - ^ ()1/r fr r"v, , '.,4.' r .O i4^ 01M �5 :4": .t ,r '''''''-':-::1"-'::::'7:4 i O.Ysf4 O N o � �: _oa ' �� _ ,- ' 'i - „ _ L.LL 0cu= -- @'CYNJ, ....--.:-.-.'h Zdor N - - nm ^ ,-:,,..;#” g l g rM 7 O' 4,/ z aboa.B co # �' A��. - . • � FS ' . 9 m•0O 4 1 ' , f " .--,;;;Az.:-- t "�Q,, 3 ;',-i-.1:',.".7'.;;/'!-:'" ,s(n U :"r , #":&'. O2 .rr ryy 'v N. nN \ ` ' _ Sit .,_,Ma ± Ti_-,,i 'r _� € " ; sP/:: --!,';.:„-",-;;;i:!..:,,,!,..),- "�2 " _ ' xo�F - s :''' ..i.':0'.::::::. .11.1';':17 / uv� ;! , � `' ,,,,,O,"''�'` .r,spp k�.� ir �tr ' <, -/ 4.i-;., '"'-,c -''' ;';',*:'' ',-=', '' '''' '-',„,,:::''-:!-' ',..,-,*:::::,;2'..d7,---- .'7,::-.,,,%:, )41.,.0' e-.07',..-' - . _ • . < E _:', ii-. - � r � i.� s Ft: _` use , - 3•' 'N ::-..„,..--,0-e/. ... --.,...- ,' .,,-- jFr t '� 0 ,_ 0 csi a 8 hi t 4 ,� - - ,�" S ',' , `. ✓i` 5 sok ! /, _x M*g k Y .7c`r/i: Ii„,;_7 vim, co E ' � 8a) roof 1 :,34 a` o.4'' '”. / -} _ r, o o o O C �f , s �c :4 iii '. MA JGv ta' �s"s _ 'a - " en St 4 �. f0 O o F. �- '•.,0_,,,--,9-----„. ;v Z� ZU :, -. & _ � .. .. Pie,! . ,. "- ..ZZ.Z4 a91 0089124 00L91-Z4 0099124 0059124 OOb91Z4 00£9124 00Z9 24 m �+ v OD _'y r> L • s xY 4 C) 0 0 Ot. p_ O C N N ,-) g„, 7 2 z co cu U o .O a) C cO d) 7 1 Lc a' 8 C W O N 22 E O i X (D a) : TM (� Cp wt= E°— o �Q Z N a o `, QQCDD o gZ Q 1 '3` 'a c C N O E u) O 0 . -'r Cl �/ Z I JL y ¢ V 0dr 0 3 N E ° < :c3 0 Q o m o o m o0 rn as w m � a) U o m o y 3 0 - 3 .r- , . E�m ao) N E o L..„__ Z (i) .n m ce Lo 8 m o ,2 m a %) c›,3"' n- o. 0E uU, ....-00) y �> 3 : � .cE 1 QQ !,.- 3p J a7 ca Q N .L W C N a _ 4 E kg Z o5 2oN iia •< m . "Lc a- 3 m aEi o�io i o ZQ m s -o� z — m o 2 mm Baa y> o•ago ---_,,, L m o o — o E m E g H a E tp U IL— .Lo. co 1p 0 H v E p T t6.i....-') Z yN O T to Uu) .52,- ' cp = 0 `m o 3. 0 EZ a>)U o a) a) C O n C N a Q `>) al C N •O a ,,,,,,, L,,,, , „) „, , , L Q a �, U s co 2 U N >` ` a C I y 'a II a -'O o O D r N — w RO ec' Y C/) 0- c C 2 m o _ -. 0 ca 1 ,,,l't > O c 7 to O A u.m O 6 u)O c E D 2 J W+ y LL C a ,,,,,,i (5 g. It . 3 W a - o a w a o Q N 4 N w a) al 4 N !0 � N N d. 'O na 3 , ''o 2 °•U)) a m 0 U U (� C7 J J g • a in Cl) in U) Cl) Cl) <n v) C c - C' co 0 03 c ° C • >c 0 4 do @ Cn > + : III Ca 4 , OF 0' c a C - 0 rn d f a N 1_,,c� A 0 a ' Lg 4 z ISoil Map-Albemarle County,Virginia Crozet Avenue North Sidewalk Project Map Unit Legend Albemarle County,Virginia(VA003) Map Unit Symbol , ° Niap Unit Name Acres in"A01 .. Percent of AOl ;° 5B Belvoir loam,2 to 7 percent slopes 17.1 14.1% 7B Braddock loam,2 to 7 percent slopes 66.1 54.5% 8C3 Braddock clay loam,7 to 15 percent slopes, 13.0 10.7% severely eroded 25B Dyke silt loam,2 to 7 percent slopes 5.3 4.4% 26C3 Dyke clay loam,7 to 15 percent slopes, 6.0 4.9% severely eroded 37C3 Hayesville clay loam,7 to 15 percent slopes, 13.8 11.4% severely eroded I Totals for Area of Interest 121.3 100.0% A Ai A A A iii1 f 4 iii i 4 alb 1r A o a 1 _„.,__,,USDA Natural Resources Web Soil Survey 2.1 12/15/2008 Conservation Service National Cooperative Soil Survey Page3 of 3 i 1 I zi L; al 8 ', i U W l'd !7J .pcd OLL mmw-m x3 c_ ¢ e��ge d p-i W o 3 L W Qf .-0 U 00.-mi 13 m gd �0 a ¢Fp 1 0 Lg.,11 i z y o � S L A N O N � 1:,'m"o m 0 a 0 C ^.AAa a a $ 1 et"a _ fl -0.8 m 8- O = W W E :mE rg=ELL H M €-� 0, S d = �J'_ 2 IK; c c��W W < = W 0 W x o OE �Ib u p�1�a v' k 44 Q - �' co, O o as 80`=,2� U V7. h z 'g SEs el o 6 aHm°a -1--.. i Q +� 4 F'�.x N a¢` p' °,,, z W 'S L E�i t E 1M C W Q 0If i s3$ , �o-U d c- of z W m i5€E �n x� b ,m 3yLi Y. u. � � 0 d g oma w �'mge ovEag .2,SY 1m. c`d O_ mgE3>° s m 01 N `o«a .,51a w 1 4 =Z 1 1 � a if I V a) 4° 1 , i a) g 8 ,,,,, 4 M i� I/1 Q.v� FIREHOUSE LN 1l N0 Yd' a I ,, L o 0 A ( U } Q, �.1ccp,Ut_EY Z ►� 0 w - L z w oc i 1 /1 2I ,,,,- k ..,a - c } i 11w / Wo C7 / L it, oQ I cc -1 ../1„,.. / cn ��zo�� y f oz- , �` 3 6w ' � i �e. o i C o °v 2 o / o H 1 P rn 1 `�sk s,� Q o s _1:-',.-'-- ,,,E,,:z', 3 j ---g APPENDIX B -1,,1 ,,,,,, , , ,„ y J --.._,,ri, L,,,, s 1 71 N Mgrs A -! Li L aPP'DLCS£O£It 7nl-O„ aw°N aiH AB 31tl0 SN0151�3Li oN • oas£-ua(aoe)�xvd ZB9£-£G9(b0B)3NOHd 66D6•LL8I6eN�d'W96•ZL6(66')I 4d .i . ' Lr c) 6ZZ£Z VA'DNDWHJIH'ALL"'AA '3fN3AV 1S3UO DOAL rive A9 03NO3HJ QEED� ��++��7j�,/�E I� .Lj •wij m m O ,_ 'A3LVIDDASV ONV zRec CLL(ALDZ O 969v-zo6tZ Y/\ BI��S ov�B4JLu Z, I Q aaa Aa NflVND dbW VV 39VNIv a-� JdZ • u� saaei�sl Pue �❑ Ppb eLAul�w 60ti a,,,i,,,,,,,,,,4-,,t/111,1::.',,,,,,,),\o'..„.>.� o" w o C� . 8tla A8 43N'JI330 .tvI+�i -— W WOH-4OIWN 312 /W381d IOALNf10� U :� ,. 0310N SV 3lvDs �G1tilA.2C�,s_ g �� , -,':,1 ' ''f4,,, 11,,,,d, !,,,''',1 ''' ,, L''''''''''''-',,,,„ c>f-",),- ://`' \ \_‘ -- \‘‘ - - ' - --- \ / - , iz-. I { \ i 4 A;;;\ 7 \ ....; -; .i 1 . : , r r' ., „ J , ,.\'-, / { , \ j 1� r'....//i, � { { 7 '� / /; f 1 ', J 1 �\ �� t r 1 _? adv?' 1 \ l{ I f f {1 r r t � \ , a i! l 1 1 f I ` ; \ i l t \ \ ' \ / ` Z m , { i Lidz` , \ 1 aul aa.olaassp PPP u+eH.t a,aqN of Rt!IIGPII lne4)IM V pO4s.Du,`saigaosap pW,woy—FPIUX`/.F9 uo11a;daPo Dm volAPE,+CV ualil+M ine4ti/R luawn�o0 t14;ao ea IIa++PVC+tiv11 C,P Ao as•iPA pa+oda,d 6oM j 4a n x• Put, anC , 14 M.vall'+ d oU1C d a.{1/P1 Rluo D P 1W sl'Pq i ;Pewn+lvu,vn sv'ya+a4 P i 1 auEl F o s;tlaau iP ;1 'a41 brl 1 a.Un�DD sIW g... aludow ua„ Id'VIA 7AZVAD A P4 AVAIIP 6104£0£.AL%AIAA£DLLIA+DLOA£0£ILVII E :SJAAA & A 9LDZ'LZ 'V IyncVu7}r Ol'Amp O,ALD£IL f-p. V3\laa laa4S\0AVA\VVMap,S A N at.,a.,y;azO+A OIO\IVA V FIA=VewagIV 9£O£�.�AIA DIA/A i ' AB 31V4 SNOISIA321 oN F,mnotoB£osu to%-sa awoN api OB6C£L8(40B)Xtl3 ZBBF-£L9(408)3HOHd � 6ZZ£Z VA'ONOWHOIB'56t 311(15'317N3Atl 153H0�0054 L60FZL8(�i�7�'�yjAR�096'�L{LBa�6�A86):auald „,.......„0..1.11,.i2,:!1:4:1.,.. . 5 T 'I'S31VIANDIH ONV 1ins'3 N3AV St3ZO,o WV6 AB 03Y,03H0 969t-Z06ZZ YA'a11C`$"1/O E • O — aul salel�sypue BBB atl� dbW b3 :ib �JbNlb2la-1SOd Yf n w 4� ? i `' � PeOZIaJA�I�W 40ti AEI n wz i WoH-AslwN u �v3 F6 g3H'is- 3-INVIN381b'AO)J.Nf100 s'' l(1a''t1 ,,,<�, p.,” W 0 0310N SV3N�5 a a�GIN1k att.,. E` 5 "" Eli p=,/ \ + t ` o t \ \ f N CI) + o O \`:do • tQ �\ O ii \-11 r, ' 1 / �L I O r i � 1 i r , r / - r , ' r / � J r f c , t + 1 ' r7 ( -- P� ( r J jr , a • L 7 / [\ J : ( J � f r W w¢....= r r- J 'ca}alaassY p.%P urPH-Lv uflY p%x1i!!Crli l+xrJ!!m aN APus'p as}alac"s%Pw \ pu , ' uraH Faluq;l F9 ual%u}dapP puu ualicxlrP4}np ualll+m Incyl,m luvwt•/op 11/0 up aPlu>Ila}uptloAou�l Puo!a a 051';..45;:1/..,`',<;g%';'.1 01StlU6�sBgmLUSStO£Ol A:Puul01G0 pPlapcm/gltuads aA}apl R w Papua} a oras lu 1 w%u}bu:4P sa ulan4 Palua d OUP aa,+pup }uapup.,a4•u,}im ra41aM%'ivawnap t 21.-Y 0 Md 0.08/0£1+/0-a' P sl•tt ; valapw ucpq 5102'Li 420 tints no.(o 6m U4lus tMS x Ot08£0£1V p o coc£t so -oIoJ£ttp-x ni0tf£0.tttl0 9\ 3 V 040i0S11-40L 0.'J\lag}aa4S\'IgtlO\'lloma!5 4iwN anuany iazpr0-plq�l o0 u0 Riy a�c.ua91V°'`,',Z.'.-,',?t3-00,-',9',`, t,\ \. L 1::;;: APPENDIX D` i ttt rt I i ill ,:i..,,:,-:21 i'.1 W-,1 '';-, kili 0 :., ,.!il '-' ''''it: '. riii 1 .,j ,.1.--.;,,,1 1 i 3i 1 iii5 o's i ;., Li 4 i :."s c; i H I ',.:6'11 1 i Tc a O i.iiiiii cc a a O O v oirii y -i--e m ce m o Y fB Q CC 'J m O .-i d J O ce ( m2u, Nr. opL ` O ri N 7 NE amO M N 2 C U ,r `M Q v 4# l D _co .i O Qr.O o 11 0.F d ii.O mu, Q wvCtiflii Q U m Q Q Od E QS — )aW � m aQcMi e- IJ 3 J r' `1Yttt o� a E a 6 +• w H z p E w (O' W 4 Q 2 ii+ W W W gg i,A. �p H W O O W e 4 I i k ;.a f 1 r 31 1 i 1 APPENDIX E 3 iiii I, 1 i '.7N 1 aj .r L a -41 4-4 - - - - - - 5.P'01.0A5:0E11 104-3...a..N.1!J- A8 31V0 SNOISIA3a `.N �./ -- 4 -_ • 066E-£L9(409):XV3 Z69E-EL9(406)3NOHd - - - S V H d }'BQf (no A��Q 'Z/,0 ono:6004d }1�"'� F 6ZZ£Z VA'ONDNNOI6'ALL 311115'30N3AV 153103 0051 WV8 A6 03NO3HJ - .,4'./4x co m C_ '3NI'S3LV10055V(INV NNOH-A31NIN ALOO eaa 969ti-ZO6ZZ VA alllnse oPE43 '' �' Z 1 A9 NAtltlO NV-1 �02i1N0� eo 61 u a 1 n -41 �ui saaepossy pue P a A I w LOV r ,4 i" o "8z, I woH�(OW ❑�❑ "° AB03N01530 1N3WIa3S aNy NOISO 13 312i`dw381VAOUNnoo —'1.I"� � =w 031ON SH 33vOs 1 Y�,J`a� - 0 - - r a z" .( - a In In z o z z o a�s� o C) z W 6E6 W p.,- Z w o - r o E Cy? J z m o z - - - - C - o o - --. z -�: In g N N O T O T •Q W _r ? < 0 W Z ? 0 _ d Q Z = W o - v or�ra 5 0 Z E o °v W z o z _, w rill z0 F - m - U a w o o zo -a _ -Er O _W o - :tiN w rmn ❑ r- L ,_ c w U O Z U iX Y - _ LL < w - --I 0C2 03 - - - o o 'N y o 0 0 Lt z CC i_ D a aw O as K o .°- 0 : Z i I m O LL d E r rij J W =_ ¢ w w Fd m g's-8,=- -.",1 o z r r r w n z U N N z v OE mm`m y=m CO O C=7 2 6 p -, J _".1 -O h a s - Z o¢m o o o = - Z - O m L J V) U V) Z 0 '0 0 U �O : - W r H a J Z U Z N Wu„z wZ W- .-4 ao oz z mZ ti o ¢ L 44 aLm w w ¢= 0z w'.+ ❑ I ' I IO6oo ® W JvZZ ~, . g Ln- • �P zzz 0 1n f Z InmmmmU r7n W I I ' I '''171 ! - U 5 aa zo< O -J (r Vu h! fl : C No_w_ --4—",7::,,,,:','', ,,;k,„\...,,,,:-:.,,,, a y \... ,Y 444 oc8 66 II O = r ww—.m oR E mzz zo Uz � gz � o �t, 0nZ ,-z - 2' 1,7,8,5 �. , , ,4,.z, O = �= Wa @ , . aw 8`i-',TA'-',E' a 9 zo aFv zN Ki 4 vi cci} y `yi\ A m, „ 4. h a Ov '. 4J .,-)\`' t ',11/0/1"4'.f r, ,4 � / ! r1 > x r s - .� 111 `.�r"' / - :i 1 ! firr rrr _{ t �,. \ .'n \\F\�`\ '' - � r 1h r; f ! r � t -t' '7rtr t ( rl \ c , r t , 7 O 'r ,r r! r I ' f ! ;!? ij \ \F, a , t0 ' ~ I '' *---• 3 e „\,,,,,,,,\,7,,,i,,,„/„/ i , __ 1,. �\ \ / r , 7‘k./.7:,,,, a ! m I 1 _ • - 4 , If ,, ter, \ i , \ i' \ !,I j-” _ - _ to ( yjl ,-'rte^�\/ \\\\ - 1 j G : - II, \ i ii 7 /j I ! 1 14,1I I� faea4 ds1 ,-f- f jj k '3AV 398030 1S I I t f I 1,- 1 ac.'aa;gpvssb puo usvH—A a;ugyl<)F;1119v11)n<4))<a9 C<LV'a ba;ganasb pw umti—Fa!ugll Fq uplly;Aapc Vvp ucliu[xlt,)/v ual;NM.nvV;1M}uawroap 51 V;uo aawllei iativxsu LUJ Ju ac•w)J pa�vaaatl ewn,,ual4o-+vJ;Valy pw�vsadx�v='IJlaads aV;xii Rluv p Paa;ul sl hai, s'Jp 1iaWNlav M su'uia.+a4 pa)u,,,tl Fu69ao Pup s;vaaupa 54)Vilo-�aV{a5v} }wwnav�a.,{L - :m{ uPlc, 7,-,s-)5x0,0 X a>0409£D£11� !d-OIOA£O.tt4Sd-x PNA6a-AAA 0409£O4'14VH-P O.DA£OCIIA-x Od000A0)Vl-S &JABS) ...,.a- 9402'LZ AoV t)noSo)5550<1 Smp OIO9£0£Ll)Ot-3J\)<ss Iaa4S\00VJ\V)"UPS 4)nV anua<V;azo.J 0t0\IIoV-o0 A)')aloc.�,a91V A£OE))\AIS 0IA\N Lodi. iii itisrim rut. - rr._ O i....1 - - I E---, - r "`' '34 VOp•o104f0£4,ZO1."3J awop aid AB 31V0' SN0151�32J �N [� HL1 0esc £L9(009)xtle Lser-CZ9(409)3N0Hd �, g Jdfl d 680FW.8(/S4)xB�+W46^Z1d X664) Id ,,,,x0;11:1041'-';i-4,e°, „�,CV 8ZZ£Z tlA'O00 44010'014 311f15'000340 153004 0054 YVV6 AB 03NO3HJ 961A - O6 VA'8"4Asdltp14Q11h ?'! ,c n OZ O 01 ONI 5219100959 ONq NtlOH-A3lWIN 5402 eaa N`d-Id 1O I1NOJ ' a77VV77 Y{{//UU /1�1"v ■n"f1'�4P' 9yV. — '3U�'S BI3OSSd p1JB 0 NMtl 0 p a '7 VV ��Y ',v;:.',-'111''',4„,`;' 9 a 1,,,,,c.;-',o W BO 9JU� �V� A8 03''91530 Y Ij)I(^'' Nl O r7 woHa(alw� ILA—[::1 0310''Sd3lv0s 1N2WIo3S aNb' NOISOf2 311`dV 1VA0)11Nn0a U , .14. yt 4 m 6 iii) a9z AA € N . eaa Z rz •---.. _ &�"� =CO Lo O_ LL, 0 Y ' OW O Z ji W z 6 <? z OZ 0 s Q Z F Q } ') dam 9 ¢ 0 J J < O Z � Z O w p Z O ¢Z W 10014� W'm N 771 W = a O 0 -W U Z Z Z N :Q Z 1,J Wm Z Z .. t- p U w w = 8z z D W - o z w W r z o O u- m L ZW 040 o zo o W :W f � U ' U.. a z w W g > rg N o= ti O Z a o 0 o w a a a ¢ z o O ,w -� E ... o w w N w z c 1/1�J o R' c'4i P- l.i U w F- = F D: : Z 4 LJ J Z. J J V Q o O(n O a Z Cl) o C7 L. o o -' z O i o Z w 01 ow ag o_ wD 5 m 6 J U In U U O U (n 3 : g .o( wo ¢ v00 �� W I I 4 I 1 I f I P ( Lir,), z w 0404 z 2 y : a w� oc0 o w ! ina W I I I � � ®® ® Z mO �w W � oz �a W1 1 ' ;. I >Iz i' (-\ ; Z - } J (n .O'W O: ' O O ;/11 �. OO pOZ Ina QK 2 7p7 F-OJ .gym I I I /I•-/ I OVi .6-'e,,, UO z N _W>Z ro // Ow 0 U W C4 O (0 pOH ,d 0_ �pZ 8� Z WN W:¢ V J _ o X F-W W W z w W � :., 0 �z Ww¢ ga ¢ E, 0, 1 ¢w. � ,7,E, a oav 3 rn z ,i z z x04 .� '`'‘,;;.,:'\ 77 • / H mo o ocwii Jo zo z go- .mow. "ti�\ ts� ),./''''/ Z =W O W a-� D O _U a, !- ¢ id&J< � 1 \ \l''(,,/ ,''' oz aw� 'R' ctO w m = a t-oa ¢a n v , "' //‘•,/ zw = O't-04 -'Q �� Ld 6'i w p Z „ 0400 d d m ¢ ¢ ¢¢ __ "0y4. W d �i ri v vi c� r 046 ai a / *,1 n /\ 'i:_.,t.,*,,,,„ ,,,,,, r, ( 1 d > ��fr CI v a xaY' 3; � 01 '\0 'i '4 r j)) 1 7OiS �;'g / d ,,ti11 ' � v� r t/Jlr ! 1� ,‘\,,,,,,k '''nn/ \ it vjt(tX11l/ t � 4 � I��`� � iw`� ` S'>1.,,-."''''',,.„ ,‘"‘s,`,‘‘''\'',,\,..,,1 iifj rr; ' fr, .2'1 f'74 ( /II/)4 4 ) / 1 /® -I - '' ''1.4: NA\‘ /''''\''' ^ \��4449 /-/ /l- . _,/ _ __- .711141,,. i ''' ---411,,I. ,\‘1),',,,i,, ,,,„,[ -- ...„ ,— - s1 . ,,1 I',-L l a l` ,i ‘. ,,,,,, ,,„ , ,-- , \11111.0' ii,,, ,, , \ .,------ I ® 0 n , , .v i 4 i. lc �,;G \ \ fiadl, \ 1 it tip iilfig' , -- 4. r — e �. 11 ), Ai .n -I g I HO) !it ._._ 11 „� -<O vv 4 A' 'I 9xii � , Av i I � !'t 1 IiI f'1 , t 4$ lii),. lilt' aY i'1 (aoo o) v 1 a 'JAY 39ao3`J 1S 1 i'1. y pal as#+la.asq 000 u-r l-�0)U3)4 4)4)130)44044)0 3 N us Y040)00800 p'm+q4-FaIUAN Fq xa1;a}GupC pu'A 00440 4040(0 uelil+m Ana4)40;uawrtaoP Gli}ua 0000440)aa,la Jwl G da asnali p+Quad 10 .4 lox x ,ual a VUP apncmtl 04)44001 a41 44 1.uc pa ua..,q 0•aaln�10 40 Waui,ui ul +.an4.Palaasa+d vu6 sop pup 14004400 040 1.1,,N,+aV#a5n#luawn�up 0 04 m p o sp Id SLN';ozo�X+0Lt09f0C..A x 04494440140-0 Zd-01044(0£ll iS3-0 P Bel 433 0109£0£t.VH-x.0)00(0£i0M5-x G+a000w uo+ U(4400 0000£04'000-x OL00£0£llfl43 SS\-A ' A 19 S40Z !.Z�pW IinuFol'6mp O406EC£lt LOt-30\ia5 iapHS\OOVJ\ aP5 43+400 uanq}axa+0-Olfi�ImJ-40 F10 s,,iGwagly 9£0£04\A!J Jlb\N 33 1 1 6n4•0lG9£0SIt lDS-3J w°M1 alli -Ae 31Va SNOISI43a °N y A096f-0L9(40/3)•XVd 0000-fL9(400)3NOHd - S II V��O �'eo�t�e( )•��'W96'uB�666T 1d i a� w ` 60(00 VA'00064010'Sll 311N6'3NN3Atl 163Wy 0001 WVe 1 h `..`=',' ONI'S3LVIOOSStl(INV NNON-A31604 0000 O OLIO eel 03HD3FYJ 969V-ZOM VA eIIIAs 01JuLI/ t`„ \r W 3"/) ul'sasllPu� A9NAV00 NV-Id 1O11N00 peoaeJAulow�Oti o" wo ...OVO . Iiiip ' ,'o ma w W w0..-A P I_❑ a310NBs''"ml"' 1N WIaaS aNb' NOlSO 2 31aWfl 1Y AO AINnOJ L > a N U .4.4 ''Nis. t g ' ax tgS a w W tA g.1 x o-C°j. C«.."3N:.•aC�.•"—c_ -',13 1 '-LcYa>Cpu'•0-'.....�oC0p.'-�oao:=ENn 2 ;01 «sC ` .�.•9'.nv-. Q6 m0 V %°' rN_Om* Igy❑ v � c 'n' cU c °- .``31 /-++YO E. p c — E ° V I , _ °c o :o ° g a0m O ° - « U' yTDJ VDL0N_ 0 O O 'NN c-� c E ._ • •: nY N O U V°t a °V ° c EOLC ..'.'- n � m EQNym0 m N °- 0rN Pao0 aO °A 0Vo02 OOOm0 °b;E . .p! °Ev o A°'O, aoo3 mNco« O.oLNv °' 0E0- 0"0g °21.-6.-8' wEo Occ a'Ow Lvc - OoiO d. EN 2 0'''' EON- m0 :0 0--' 0"NTVp ',.,"'o-7^ .c3, 6- E .. E v.`' ,D°vmo � 2-',,''.a'OQ 0 -o ° v Om9O � -> m°- 0 cL00 0 E_ 3•^❑Em ,,NV. w o O•C U E CE vo°''" °'n�0 « p C_o n . 0 j °°2 op vC �d , p"Up0yp3 • t o° �'owE °o°� 0°°° "E onoE6 ;2 '°'=E , .. my- moEm�o�aUt 'v oC CrnN C °°a0V E cv- 'O' C NVv O 'O .0 E•- a°.�oc « ES>«m"-V = 0c ' Oo v TO N oV)^a� Sv = oOo ,oFuc_" oocE�n•o o E+am3 yv.c0 - -N'Lrni E,''m >, u°: v m._Vico 'o. a12 co5 oGo °°"° c • mF ,o,E- oca -F,,,.4,. mcmv o .- ° o .p.a. °. _ �w ' 2,L0E�E ou c°p:E ' o'm.Q, : - oe 0' 0uv'vD ° o mc ° o°oc m ; o bn"'0 v O'°= oa,: 0 Evn0 cvc- ° ro."c 00',_ ..1,°,. � 0at°'cA uooyt> ao o E -''' . °��o ve>' cvo cn. -d. ''''0 'd n � O.N1'° N .00L"'I°°° E -o'a0 C• - _m V..°, = aN';O ] L om : ' d d 90 ° c _C O3 ••1'4, .s'.▪.Q2 • a •' ..VNO ?, 7,.`12.,. . ❑ NO m',m; u°d °.ETQ -g•_g-.','- vOV 3.1,' To .„..,..51,-?, ..:° I N°o3 -6�2...:i..•-, - noro V-oYom UmEO Sm.v` oN noc `,C vO _ V >.o Ed 'OooLI',"<7',,'''''''C'.82-' tov OVo« °p'-,3° coonNOc "NE•U1—mO O N '°rnWN rOcvrowd70N f«N OT,. 1=!= ' _roo N`'❑cam2 >. `o 7,-0 3,2E E o ,'-=-6 a+?oD2o. O3L 3 '62 -0S�, --',,,_ `(:,' 0' ..E'°'`>'-0,0 C2 , _ °' 0 mCy. N.- O O ` OyQ O° « 2' CUE'° CVOD Es• "o4'�O2 3°A� « EO °, 0 0 -.O Cv DECQow ° aE` OV_ovEc -Oo° w330Lms - C•OoOdoNNcmvoD Q3-.DUQ° ° o1m°0o « 8-- . - 42COQ mO0o30' NLVI 0 «DCN°' Oo°O_L cW°]t•-p 225 OO ° CAE'° O `dCL- OoN00VL,N0o•chma._ nmOOO° • w'5 .� oNpEmO3u0E �°L-. EQ>"' C' 0 Zno cE2, ,Eo° < 222-E NnCO .-:,t-°2-° m°'''''nvam ° o ; a/ t YEo2iE0a >0 4Viac`d vN a° °Ipoo - v Ym:_nO N 0 'no+L 8 .° ° .. p R o . N 4 ° a,;cw;m` `i�m '«cmo' N'-m_O• N.5aIo°c3E'Oc y>jo� O-_"'c0UE0t52.�V 3 T A N ,C: y N u as .g-'1' W OM '''1.' 2 «NA- mO " a NE 2 m ° C° V 2 NVN N OOno(n mN OO 3I N L OE O O i .°mVO °pOOE« a0a oNv°NTC m ' O;TVH Q 2 'OdN N� _' ''' - ° N N °Copm O °O >.tW°10L'Wy.aT °N O Or PO a ,,O -pxQ°_" .rWO— ri,V y '— _O O E` ' dC . c' Q0w. >, 00n o o«o 'to °a°:v � °° ' oo5� ms W 0- '6„> 0 _t,-, ON '' omo v oo V c o cA02Om .N. ` o ' o Da -O U 0t ' L . maez-2 2op ° DoE r° a E n , a,'.voJ Ns 0 '00c .0u ° 0Nae5onZ OYSOm ° 0°o 13.3 .- 6....---=2. c arn 5a° « 0 A ,_ ,„32-,-0 °m 33 si .om0N o nopE n0 20 wW OL5mNo "; Snoagc- vo0 v"o0v0 Orn ° v mov0 0,.,T,2' 1...c.; QEayoo 0i'-0E p 'cv5 . E90= o'y 15'g',?; na�N -=a3 a ° ° gm~v'°�vvo5 Z ''''''',ti a 20 AU . a W mo° os= t° o' o�aiw6EEd`° o•am m"...o-o -Eo o° o 7 v0v=caoQEaoo' .s., .3, ‘„.,-_,,.800 o° Co n 'E000 u..� 0-'.. . 2.1), >>.'-_.‘1"...g. 6.. . >sxt• Q � v "..-p V°- °' O' N NCpL.nOi oE"' 0 oa v °n u"° o 1-`j a,-g-..- ON .Wt NE °nVpNp .OO'C • °ovm -.5 0 o' i Nn,- 'a 0) O N0 .7 5A O m V N > No _ V a 00 O 0 . n, qa � O .CoOn 22 --•. .,- « Z D VV m`a N ;_20,;200.-,E-: EN 0VN E w O Ln V ywCm° C OCN NOO' Q (n O-.•K OO C , O p °' 0 n V '_ °vO U ,2 OVEC= V52 ' ., ° V WvnonOr °LO VV2O ton !°1o COu = VO N m + Of',,'...6,°-:.' LO° L UN O U .18-73,Z')! › (n W C' A O VU= NOm u° ° C °V°'SV°CyES Oo.`O ° c vQ 0 QA°0ErO � � ° U ,5 OOo N °1 N'0OW OEV005o--§ ''Nom °seaC vc-o=.° E 'm°.� C ° mC `fvO £n �'a $, o -2 E v.o`•-213.•-213.E- =� 0 2a;'� oa2t '.o0 J i-,'5,-:..'-',2-.=`.,i tt' • 0�C °E °`u:0yrEc A2 '7o-2E c -v 0 0y�Wa0V -. • daam Dpp'.�` N Q. 2 • " Y• OO' .00' �.po; .,-',.°'' -3 oornVO• ;",,',-,,°ao V' vu pm -g' To.t0�LU 5O Cd u �m ' . t mE =o0O `h0. a0O5uo _ a E-°- E` O -° d 'a 3" -'°°m °4 0 ° 30a ° 3 0.2 . I Z °apUUouo0coa =mo r °a=v o O--E 'o-5 O y`O. st;N O ,Nrn °wCOE0--°W ,26g_ -� - O °).C'O v.0 N . 0c o � n ° ooE5 ''. ' ocoo 'Oo ° c2dHw °2 � 'C''5 -.C.° -oEE ' °ov0 5aE-2_ 2.Eu 8oOov SEa go E° s'-a° va z oo ai.o -o5ooa Z „,5,2-•,.3,E, ioco wE 0_ E ' 2 >° mw °tn o u25' ° v3 Q caEms : E.- °-25028oC '4'c'°tnn0 5 ° '` u +c ° ' ou°'oo E2- ° `o o .�oaiN �aoZo.2 ° '2o 5 5 ' ° Wv ° 0' otn ° . n '- )''- v '-''' aocm' , o ov� me ou ax W _Lt Scm1o3,E2-25 o. a0 ,. ,(3.== o555 ° a.S ,'=3- . o " N ° 0 5,1 ow 22 -..3-.',',.. < (C O o U r, NU°° Qu0 ,-2— Un ¢ 0 CN 5U5V"V) vN QNC Q Z °Coo OdT p 3. 33. cp 33, 0 . a - so� - N 46 <F u1 ° nuww �� Q - N r'i � 'ri tri ' 1 u 3 3 4 ci) ' a u, 1 gg 1 ``' e \ 4 ' \\l 1 z € U ,4 I- Il 1,�• e • \\r Z Z , . _ a d U ys1 tl@ , p� J ;:, {\\ ll \\ U p p k 1e :m I-� I E . E7S � II K " u k i U -LI(II 1/M •� •, ° °• s i . €3 2 pa e - II w f��" I J 2 ►b1y111 u F LI ,.,..:.,:-:.•.,,,,,:,,,)- :r .a i 01@4,4 , 1 zw �\_ ... x \�\ ill € —''---1 l Z o- (r,- –.;:•„1,,.,''.,:;f;:.:. i @ ig / a `"1 ct' j" ?ile3!I s Ute.gY. '1sl !' 1 III L , La Ill _ 1\‘\7',1--til6 W ,2 - Ig6¢,131 N p _ 1� J F J ° E E e� ® C) o IIgx ' Al II } Ld I `x� IL Z Yp4� \�\� �. fa \": 1�1 \' g Qua s wa'&/,�e, esaa; gT �a ¢ - II �r.fl: ; 1 IN a 4` <3 L1 t\1\\,"_F,1 \ 5 x e€5 x °a��aE o� 1 B4 '"b 1 W yt IA� g 1 1-(25g J2 1 O , \\ / .p 311 1y a WEo 1� (� i \\ 5 3a 3 JI' 1 / Ery"+`; e iI g at" / +\\ ` \� <f nu:,a 6 11$t E °Et Es" >'- ■ei'iv� d �IIIII � i� 4 l..w \i� ma+ :�Illl�e,°,� 3 a- a A� 6 €. a ,- , .!t,,1 j j f^3 $ W 2 E S w ,€°W&F fi°'°` lit E° 9t X5 W /E �� E E � � B MK Y�� gii g 11; U- o� .IIIII'I'ar- ,. E,3 .e ya4 cDo 1,,,ei, j7�, II n ._.� "'hl Ivl g IIr„...8 §`s'iegr9 € z 8E< . ,° �w I`,.'li Li'II 1 a of- 4 \"\ LIII �\ �I 11 #a;.EE0 E a.Ex ,„ gW�W . 1 3 W coo T,-- \ \ <zb.,1„1@� -b g ' ,Es I. K" N 3 g O ` ; }Rk E ',,Ir tt.; a i ,. d ,i ) ;; 1 //7 2 E`i 6.$yi s ; ./ .. as 8 9 III "Fc y' ' ~y " \V I � a^E �°8 F$ i J ) ( III E ti I r� �/// F iE`- E° E ,.E E $,t `a a -' 1 11 1I _63 . gl' s 0 ®./�I'1` g- : ,\\1`� �� � K6o`$kw Jf �E $$p 6 A I 5„a ' 6 o Et ylr \ qEe \\\ ,Q ENW. uI 86 Ef Y2 a It '1 I C) :-1.1 .4,i . _¢},tik •€ .g; Ike aY: e i E HE 4 d. y e; . !' Im'ar; F o a z 8 -1,.'.1,7.,_7 E ,1'', ,„ i. l!1t 1'6 iYli :5 x �§ its ,a'9 ±i$ .� gI E y y 11 • s " " i �>. ;',vv�,r iI.., .-1,= ,omEEa ,�� s, , E x b FP3p A g! g 4, L ,r,9"1 " F °Fy^ ,u ¢s a`'m Jq' ° 13" m$¢Bti 6 12, 1 i € E ° E� I E a .Ih rEl'�€¢�lfbl _t. la,'Y, y,I 11'd�� '"vR m E� @��g c°� 1 }gqa 'i a'.M;,'+s00 FIa <4 40/444 00 e'gall'nuy�,M v puya•a saaa,x804 pun u.o44-FSIWM Fa 40004&0P0 ouo .'z"ou'no 00)400.I°c)10 iucwn_uv GIA'00 s ur:llw�aacjrl„I v+°a>as ,uca�d so ua au u� maw M 4,u rc ,oe auan,vu<+asn."d,;'reads ay;,oA;;;ea wu,alu,el !-as'o uau.'4au un se wa,au v=Acasa,d a e a,puv sam-o'n>aw:uaru.:aaiar,oz iva.uraev s1'u yg a,e4edu(04-4 5400'LZ 106 .4 001:4,000}'6MP'Ot09fGfl!-;05-3)\los 40.45\040'3\510"'00!5 oro 000000 4.za. L Ol09fO C1.\A.0-011\:So\l-s I j iE I I 1 1 -::,,,.,,,I':.,.: s ''''E'4 Li -4:4,:,4 i 4,4 L.,, ,,,1 =.:,-;_l_, .._,,,,, ' L 1 z APPENDIX F ,.,_,,,,;.,,,-,,,, _-,-.,, , .,., ,, ...,...... ,_,..:. i..,,,„ , , , -'.-:'-'-,_.1_'-'-',:i,''''' rP k , L ,.,,,,,,, __, .7.,..; i 51 i ,,Ti. -.L_.„ I i i 1 i -L,,,,,,, VA .--00. 10.CO N ri of 0 m - - - G v .-I a O o0 m m m 0 - _ - - - ,� D a ry a .I!1,,• o 115,o o - - N:00 In - o m a m a ,Is+ - - - - N d m en to f� m m - - - o sq. D 00 co 0"2-"--P,- m m - N 10 ID 10 1Dt t0 tot l0 10 s - - w w .m m v. ..-1 NC vsi• o°to /��l - - • N 3f1 N in oo N' N N N 4 Z .0 l00 100 (00 1,0, l(0 (0 Lco LD KKKK - - - x I E O M a"N a N 3+f`t0 lit - - < 10 0 c6:0, 0$o o ri - m1,'°' om -o oi .-io .N ry - - - - 0 0 o'o a o a o e4 -IIVH r z N v4 ti rvrI .-i ti 1�`r. V, - - m N .o ti m re V-411al .- n v CV 0 O,o-O 0 0: O t.ttl • x N N . m "-I m m io...Co, - - o o a o a o o o .� 1 ,.z,, ,:,:::, i„:„.. Li - - 0 0 0 ID-m o-0 o o - - - -<, Ln 1° a 0 0.O a o 0 o a a --.,o o o:d a d ti o 0 - - - - - - - - • v • ¢ n m 'mmN oo o o p P a O m m Ta a-o. o a - - - - - - - r - z f d o o q. O•-a o 0 0-0 0 O 0,o C O o- O C - - - - - 4 O O itS.in 'a N'O O AO - - O O a 0 kd o o 0 0 > N O M Ca •O-I O`O - - d C O l+r' r a- m C'OvV O O tD N^1D co Cr 0 Y O N C N V' a..,In I. C O ---,-: L--, a O tO N fN O;O O _ N-deg n m .-I a O StO Ot0 C- aol al O O 'in OO` C O #f N {N a C O to - _ - _ p CD C IN - ` W N x Ol O .rvi at-i N en .ai ▪ t0 000 •zO tw 0 -0On•Oa Orip O r9 - - - 2 U O ti N N O tY l0 ai 00 n en a - - O M N.O 0) 1�1D > 00 00 Vl '0) O t0 O Dl - U=M Q �" o H in-/a of In a ui ti N �di�6o ,:_-:1, L d V !D N -o .-I O m-i0 N lw m e - - - - - O co re N co a .-1 m - •O d V ° x E.O N m,O m O N -n1 - - - - - ao J 000-00ID000 - O N N N VN mSl`1'0 E.0 0 ...• O O D" O C 0 0 .-I O - - N 0 vi0 0 C; 0 0 0 0 0 0 - - - - _ 0 o c o,0 0 0 o a % a t0+1 N d a• x0 Ol O 91 -01 of tfi O , '1 - - _ - • O p m N N_a In a▪ co ri LN N O m ,-e Ili ti "N"I T�•i 00 "V ti e - O - - ' - - in. z F- 00 0 0Y Ol`.-1 00 Zit'00 N E O La 0 Ls., ?!? o Ol 1�^Sn N N- N i, G N V] N ry,,iii-In N m a 1 N ! N.O r] _.„ ^ V o 0 0 3 c m rn.co AO CO'CO 0o m _ io a a100tgew ^ J = No j▪ F.. n`N -c1 m".��ii 00 c6 co an` a 37 Ol r1n N N N C m 'o F- -a, m `a N 14 N KV-N C A) c Q03 • � w az.--ria ,raa 00 coo z• 0 ",rri In -1 m:r'�i o.o .-i a o O m m rn co-.m 0o m- T--fg ■� V • m t9 t0_m tD aD t0 m z „ mY .-i a• N t{ 'A z-t,O ,, - __ a Y 0 0 0 0 0 I-' LQ o o b d o N„ 4 N N 'N N QQ QQ pp QQ T T T :,0 (ld)gvs @ ad321ds'1 .•.`'..., o` 4/p o3i s E ^ or (IA)4 0. '.'-' LN W i: . - (ld)P m _ . . , . m + (sdo)H3/\0,k 1 IVO'QO N m M M o :''''' 0 0 0 0 [-co-; t (Sdo)a3J.d3ON31N1"O N `v, o n m . o e n m m m 4 t 3 N 0 O O O 0 Jt.f.,'-3 Li V N -Li, N O O O O N e (Id) HION31 a31d133dS 1 N o o o e 1 2 s (id)'ll N N rn N rn N 'HION31 " LF (ld/ld)'(03)M S+XS=aS 'a 0cs, 0 0 0 0 0 0 0 0 c (MZ L)/e=M1S 0 0 0 0 O o 0 0 0 0 UOIsSBJdea — m °'i N 0 183011-(''S-MS)MZI.=e N 0 5 O m m m n 0 �3 N G O O G O x d ':...d XS/MS A O O O V 6 En n N- N- n :O (id/id)'MS • o =.• o o 0''''' -p in 0 0 0 0 `1. v '. N d 1/M r N N c',-, V V -1.''. O O O 0 O m' Z (i.'j)M N N N N N L„..,_ Oi N v %� K Q I v m (id)CV32ldS.1 '° M n a m , y, o (`I 0 0 ..,,r;-t. v ..0. 0 O. o o' o m m r a (idrld)3dolS ssoao'Xs ,..-..-,C'' o 0 o s s 0 0 0 0 0 opo (ld/ld)idols a3.uno's o o c S b 00000 Lii a (sdo)M01d 213i1no''O E ,c,,,,,'''. y ! � .= 0 v (SAO)213AOANaVo'9O o rn g m. o 00000 - L, ,,, (sdo)/JONI O O 'PIN ',L,': W A ... f c (H"oI �' a v. a v v �' ` m o M ^ m '' L yawns N 0 0 0 a ,,,,, ,,.,-,, E, ,,.._, A _ O m co.N0. v m . 0 0 0 (0V)8321,3OVNIVba rn O O O Cl n k O Y NOI1Hls ,.- ' , . ' Ni (Id)HION31 w o - m 2 F e o z 3dA1 N o ' ' m a vJ q W O a3awnN n " , s 3 m J O O O O . L ,, .,L., ,‘, 3t.... ',. -1. `,2,,,,4' -.1'; ,, o— . -- 0,-9 ,_ b v m °an N m' - O o a c ,'- . 16" . ° " �'�. oa h O ' ad,7, W r - c w- o i°-1 0 , L. m , , W W n -,.. -7,„ , a,, t, ,4_ ,:i ,., ,.. Ln. y g , _ .„.„,. z 2,, '6; W m X mo E41„,. .141,, _ m a a4 — F11 flu,°i ::, Liii .._ -. D 2t. N .'a ate'.`�� 'c,-i' + 10 - -:-.. ,. N „ ., i L-, m O * a Y1 0 O vi c-"r, 0 -?D k? ry , a vi O; i C9 x i`'Fl m N r a`'5' „ H, N, a 2 N n m d'g V a0; 3 4 14 SumpSpread_032715.txt PROJECT 113038016 HEC12 Version: v2.91 Run Date: 03-27-15 4 iiINLET NUMBER 101-5 LENGTH 4.0 STATION 16+00 DRAINAGE AREA = 0.040 ACRES C VALUE = .820 CA = 0.033 ,, DRAINAGE AREA = 0.040 'ACRES C VALUE = .820 CA = 0.033 1 ii FOR THE FIRST 'SIDE SUM CA= 0.033 INT= 4.00 CFS= 0.131 CO= 0.015 GUTTER FLOW= 0.146 FOR THE OTHER SIDE SUM CA= 0.033 INT= 4.00 CFS= 0.131 CO= 0.673 GUTTER FLOW= 0.804 B L, AT THE INLET SUM CA= 0.066 INT= 4.00 CFS= 0.262 CO 0.688 GUTTER FLOW= 0.950 i':-.;', ii GUTTER SLOPE = 0.0020 FT/FT PAVEMENT CROSS SLOPE = 0.0479 FT/FT 1 r- SPREAD AT A SLOPE OF .002 (ft./ft.) AND 0.80 (cfs) IS 4.83 (ft.) XXXXXXXXXX CURB INLET IN A SUMP XXXXXXXXXX P EFFEC. LENGTH (ft) = 5.80 H (ft) = 0.385 DEPTH OF WATER (ft) = 0.17 SPREAD (ft) = 3.58 i N ifcil , ii ''''li L'-' :I, .„. -1 1 ,,_:m.'.:,,.''..'-1 'il-1'.! --'''',._.'''.?3,1,''''4::.'r,,,,,1 L„;,. 4 T a i .__, ?..-i' .,,,., 1 Page 1 :,1-3. -• • . •. • ..„ . . APPENDIX G • • • E �-d • • • •• • • 1 Worksheet for Irregular Section - Point 1 - 2yr .. Li ,, Per.15_,), 3 e -,-,S--."-,,,,P,,,P ---E*-i,,,,Mi-i-:4:',Ni,c:f-,41 -2'A-A,:;,,At,-T,,tle-tfvk:',A•t_-Rftz',-,,r:*lltkW,K,,31 :f':t-5,:fr'fX,---,-"--,--------!-,,=j''',',','-- ',,v,3:Jn'=--- , Friction Method Manning Formula vs >y Solve For Normal Depth 471 44 Channel Slope 0.04500 ft/ft Discharge 81.87 ft3/s Section Definitions ,s-� {`.rix _ x> x .4 v Y� r. ,,_ 4,-1.;I,rl . <., .r :Y- . ..e a 10 � -,-- r, - -F.4 0+00 680.20 0+22 674.00 0+41 677.60 0+50 680.53 1 Li Roughness Segment Definitions 41 4,44,44444,A4-4,444-44,wq- 44-442,4 4-4 724444224,44-4-4-42-,4 ,2-4-.4,4444-444444444444,44442,4444-44"444444444-44v44444-444444444444424-4-444444444 ',,i Li, :..„ .,„ ,_,4,A,r: ver;,,. sir aux..s 44 4 r' a -aSia iii 444 a -- �vff 2 4:`vs.vvvrr.-,.C" 3444,444444444443374474-v'r` ...47 4.74 .7,a..4 . s ,...tr r-, r ' O g neS$ ,,,,,21it 8 - _ Lt (0+00,680.20) (0+50,680.53) 0.035 current Kougnness Weignted Pavlovskii's Method 4. Method Open Channel Weighting Method Pavlovskii's Method Closed Channel Weighting Method Pavlovskii's Method a � a--s Y � a te ` Y-',..." ' . '''PeS * ' 4. '� _ g" ' -A3 1- -1,V.:,0,,,,-,--4:1,,,,,,,.,!--, , Normal Depth 1.57 ft -:,1 L Elevation Range 674.00 to 680.53 ft 1 Flow Area 10.87 ft2 Wetted Perimeter 14.22 ft Hydraulic Radius 0.76 ft j Top Width 13.85 ft sl Normal Depth 1.57 ft 1 VI Critical Depth 1.85 ft I Critical Slope 0.01898 ft/ft 4 Bentley Systems,Inc. Haestad Methods So3thdte¢EidarMaster V8i(SELECTseries 1) [08.11.01.03] 3/27/2015 5:32:35 PM 27 Siemons Company Drive Suite 200 W Watertown,CT 06795 USA+1-203-755-1666 Page 1 of 2 --:,' L- ,1 p Worksheet for Ir e,, ar Section -Point 1 - 2yr + � € '&mss r r .a., -,, ",;fix.,. '; ;£ ..,..:,,,,,,,,,,,,,,,:::,::,,7,,,, ., ,::,, .=' t`3`.... fi- . _ i'" ,...4f,,,,",--' .�_'�,r"(': - --- r. 7 ;"„ , ,xt;, - Velocity 7.53 ft/s ,, L Velocity Head 0.88 ft Specific'Energy 2.45 ft Froude Number 1.50 a Flow Type Supercritical 1 € _ ,if,:_.,„,,,,,,,,', - 1 . &� ',- ,..,,......,,,._14_,. ....,r,,,.,.Y. :?,,.._ - ,�'" ,r , :-1:'' iDownstream Depth 0.00 ft Length 0.00 ft Number Of Steps 0 7 Utz �� ,_ h.._ ..� '"� r'�. �; , ''' _ 4�-� : I Upstream Depth 0.00 ft Profile Description ri,,,_-_-„ k Profile Headloss 0.00 ft Downstream Velocity Infinity ft/s m Velocity Infinity ft/s NormalUpstreaDepth 1.57 #t ,, L' Critical Depth 1.85 ft ,j Channel Slope 0.04500 ft/ft h Critical Slope 0.01898 ft/ft 1 1 i, ' L. : ' ,,,-, i hi 1 a - L --' ' Bentley Systems,Inc. Haestad Methods SoEirtn1 F86wMaster V8i(SELECTseries 1) [08.11.01.03] 3/27/2015 5:32:35 PM 27 Siemons Company Drive Suite 200 W Watertown,CT 06795 USA+1-203-755-1666 Page _2 of 2 I