Loading...
HomeMy WebLinkAboutWPO201600070 Review Comments Appeal to BOS 2016-12-19COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902-4596 Phone (434) 296-5832 Fax (434) 972-4126 VSMP Permit plan review Project title: Belvedere Phase IV A Project file number: WP0201600070 Plan preparer: Collins Engineering [scott@collins-engineering.com] Owner or rep.: Belvedere Station Land Trust [rhauser@stonehaus.net] Plan received date: 14 Nov 2016 Date of comments: 19 Dec 2016 Reviewers: David James — VSMP Geoff Elsie - VESCP County Code section 17-410 and Virginia Code §62.1-44.15:34 requires the VSMP authority to act on any VSMP permit by issuing a project approval or denial. This project is denied. The rationale is given in the comments below. The application may be resubmitted for approval if all of the items below are satisfactorily addressed. The VSMP application content requirements can be found in County Code section 17-401. A. Stormwater Pollution Prevention Plan (SWPPP) The SWPPP content requirements can be found in County Code section 17-405. A SWPPP must contain (1) a PPP, (2) an ESCP, (3) a SWMP, and (4) any TMDL measures necessary. 1. Section 1 — A signed DEQ Registration Statement needed as part of SWPPP 2. Section 2 - Provide a copy of DEQ coverage letter when obtained 3. Section 10 — Complete/sign Delegation of Authority B. Pollution Prevention Plan (PPP) The PPP content requirements can be found in County Code section 17-404. 1. Show and label potential pollutant sources on the "exhibit sheet" that are on the list marked in Section 6 of SWPPP; Update your PPP "exhibit sheet" showing these sources. C. Stormwater Management Plan (SWMP) VSMP Regulation 9VAC25-870-108 requires the VSMP authority to approve or disapprove a SWMP. This plan is disapproved, and the reasons are provided in the comments below. The stormwater management plan content requirements can be found in County Code section 17-403. 1. Cover sheet: Sign and date engineering seal (Ref. 18-32.6.1). 2. Show callouts for any permanent ditches/channels. These should have typical sections, and design calcs on plans (designed to meet part II(B) requirements). 3. Proposed slopes greater than 3:1 to have low maintenance (not grass) ground cover specified on plan (Design Manual, sect. 8A). 4. Confirm depth to seasonal high groundwater table and bedrock (minimum 2 ft. below the design bottom of the facility). Engineering Review Comments Page 2 of 3 5. Show area of Forest/Open Space to be protected for phase IVA. 6. Ext. Detention: Show dimension and sizing of ED components in the details (i.e. orifice). A 24-hr target drawdown time recommended; provide design storm stage storage elevations for ED, and drawdown times talcs. [Note: A minimum 10 acres DA is recommended for ED to function properly. There are higher maintenance requirements for ED with DA < 10 acres.] Provide landscaping plan (VADEQ SW Design Spec. 15). 7. There appears to be pollutant load remaining (VRRM worksheet), before considering purchasing credits, consider implementing further upstream PR practices. Describe how the chosen practice fits into the overall SWM strategy. Were other practices considered and found insufficient? 8. Please contact Ana Kilmer for information about nutrient credit purchasing documentation and requirements. D. Erosion and Sediment Control Plan (ESCP) Virginia Code §62.1-44.15:55 requires the VESCP authority to approve or disapprove an ESCP. This plan is disapproved, and the reasons are provided in the comments below. The erosion control plan content requirements can be found in County Code section 17-402. 1. Bondstone Owner signature needed on VSMP application. 2. Need Signature on plans from PE. 3. Correct Baffle call out on Basin 1 Detail. 4. Add Inlet Protection for Phase II wash rack. Need Inlet Protection for Basin IA. 5. Remove 12' length of 6" pipe shown on basin detail leading to micropool. Show stub and cap at the low flow orifice. The VSMP permit application and all plans may be resubmitted for approval when all comments have been satisfactorily addressed. For re -submittals please provide 2 copies of the complete permit package with a completed application form. Engineering plan review staff are available from 2-4 PM on Thursdays, should you require a meeting to discuss this review. Process; After approval, plans will need to be bonded. The bonding process is begun by submitting a bond estimate request form and fee to the Department of Community Development. One of the plan reviewers will prepare estimates and check parcel and easement information based on the approved plans. The County's Management Analyst will prepare bond agreement forms, which will need to be completed by the owner and submitted along with cash, certificates or sureties for the amounts specified. The agreements will need to be approved and signed by the County Attorney and County Engineer. This may take 2-4 weeks to obtain all the correct signatures and forms. Stormwater Management Facilities Maintenance agreements will also need to be completed and recorded. The County's Management Analyst or other staff will prepare the forms and check for ownership and signature information. The completed forms will need to be submitted along with court recording fees. After bonding and agreements are complete, county staff will need to enter project information in a DEQ database for state application processing. DEQ will review the application information based on local VSMP authority approval. At this time, the DEQ portion of the application fees will need to be paid directly to the state. For fastest processing, this is done electronically with the emails provided on the application. DEQ should notify applicants with instructions on how to pay fees. When DEQ approves the Engineering Review Comments Page 3 of 3 application, they will issue a permit coverage letter. This should be copied to the county. After DEQ coverage is issued, via the coverage letter, the County can hold a pre -construction conference. Applicants will need to complete the request for a pre -construction conference form, and pay the remainder of the application fee. The form identifies the contractor and responsible land disturber, and the fee remaining to be paid. This will be checked by county staff, and upon approval, a pre -construction conference will be scheduled with the County inspector. At the pre -construction conference, should everything proceed satisfactorily, a joint VSMP and grading permit will be issued by the County so that work may begin. County forms can be found on the county website forms center under engineering; htip://www.albemarle.org/deptforms.asp?department--cdeng"o File: WPO201600070 - Belvedere Phase IVa - VSMP Comments 2016-12-19.doc