HomeMy WebLinkAboutWPO201500079 Plan - E&S Stormwater Management Plan 2015-10-15r SITE DATA OWNER / DEVELOPER: GREER, MICHAEL L. JR OR GENA L. 308 FARM LANE CHARLOTTESVILLE, VA 22902 PLAN PREPARER: ROUDABUSH, GALE, & ASSOCIATES 914 MONTICELLO ROAD CHARLOTTESVILLE, VA. 22902 (434) -977-0205 TAX MAP PARCEL No: 08600-00-00-10200 ZONING: RURAL AREAS DISTRICT (RA) USE: 1 DETACHED SINGLE FAMILY RESIDENTIAL DWELLING BUILDING HEIGHT:: MAXIMUM STRUCTURE HEIGHT IS 35 FEET SETBACKS: FRONT SIDE REAR 25' 25' 35' TOTAL PARCEL AREA 21.16 ACRES TOTAL PROPOSED LAND 4.8 ACRES DISTURBING AREA PROPOSED 0.50 AC. IMPERVIOUS AREA: ROSION CONTRO AND STORMWAT R MANAG M NT PLAN PROPOSED 4.3 A C . TURF AREA: FOREST/OPEN 16.36 AC. SPACE AREA: MAGISTERIAL DISTRICT. SAMUEL MILLER DISTRICT DRAINAGE DISTRICT: NORTHFORK HARDWARE RIVER WATERSHED: NORTHFORK HARDWARE RIVER TOPOGRAPHY: A FIELD TOPOGRAPHY SURVEY WAS PERFORMED ON NOV. 21, 2014. 0 �0 �ti THE AREA OF THE FIELD -RUN TOPOGRAPHY SURVEY IS APPROX. 2.8 ACRES, WITH THE PROPOSED HOUSE SITE LOCATED NEAR THE CENTER OF THIS AREA. *' THE REMAINING SITE TOPOGRAPHY WAS TAKEN FROM 2013 ALBEMARLE COUNTY GIS DATA. CRITICAL SLOPES: CRITICAL SLOPES EXIST ON THIS SITE & ARE LOCATED AS SHOWN. FLOODPLAIN: THERE ARE NO FLOODPLAINS LOCATED ON THIS PROPERTY. r LIMITS AS SHOWN ON FLOOD INSURANCE RATE MAP rrW COMMMUNITY PANEL NUMBER 51003CO400D. W EFFECTIVE DATE. FEBRUARY 4, 2005. THE STREAM BUFFER(S) SHOWN HEREON SHALL BE MANAGED IN ACCORDANCE WITH THE ALBEMARLE COUNTY WATER PROTECTION ORDINANCE. THIS SITE IS NOT LOCATED WITHIN AN AGRICUL TUBAL -FORESTAL DISTRICT. THIS SITE IS NOT LOCATED WITHIN THE WATERSHED OF A PUBLIC WATER SUIPPLY RESERVDIR. GENERAL CONSTRUCTION NOTES FOR EROSION AND SEDIMENT CONTROL PLANS 1. THE PLAN APPROVING AUTHORITY MUST BE NOTIFIED ONE WEEK PRIOR TO THiE PRE -CONSTRUCTION CONFERENCE, ONE WEEK PRIOR TO THE COMMENCEMENT OF LAND DISTURBING ACTIVITY, AND ONE WEEK PRIOR TO THE FINAL INSPECTION. 2. ALL EROSION AND SEDIMENT CONTROL MEASURES WILL BE CONSTRUCTED AND MAINTAINED ACCORDING TO MINIMUM STANDARDS AND SPECIFICATIONS OF THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK AND VIRGINIA REGULATIONS yr 625-02-00 EROSION AND SEDIMENT CONTROL REGULATIONS. 3. ALL EROSION AND SEDIMENT CONTROL MEASURES ARE TO BE PLACED PRIOR 170 OR AS THE FIRST STEP IN CLEARING. 4. A COPY OF THE APPROVED EROSION AND SEDIMENT CONTROL PLAN SHALL BE'MAINTAINED ON THE SITE AT ALL TIMES. 5. PRIOR TO COMMENCING LAND DISTURBING ACTIVITIES IN AREAS OTHER THAN INDICATED ON THESE PLANS (INCLUDING, BUT NOT LIMITED TO, OFF-SITE BORROW OR WAS3TE AREAS), THE CONTRACTOR SHALL SUBMIT A SUPPLEMENTARY EROSION CONTROL PLAN TO THE OWNER FOR REVIEW AND APPROVAL BY THE PLAN APPROVING AUTHORITY. 6. THE CONTRACTOR IS RESPONSIBLE FOR INSTALLATION OF ANY ADDITIONAL EROSION CONTROL MEASURES NECESSARY TO PREVENT EROSION AND SEDIMENTATION AS DETERMINED BY THE PLAN APPROVING AUTHORITY. 7. ALL DISTURBED AREAS ARE TO DRAIN TO APPROVED SEDIMENT CONTROL MEA53URES AT ALL TIMES DURING LAND DISTURBING ACTIVITIES AND DURING SITE DEVELOPMENT UNTIL FINAL STABILIZATION IS ACHIEVED. B. DURING DEWATERING OPERATIONS, WATER WILL BE PUMPED INTO AN APPROVED FILTERING DEVICE. 9. THE CONTRACTOR SHALL INSPECT ALL EROSION CONTROL MEASURES PERIODICALLY AND AFTER EACH RUNOFF PRODUCING RAINFALL EVENT. ANY NECESSARY REPAIRS OR CLEANUP TO MAINTAIN THE EFFECTIVENESS OF THE EROSION CONTROL DEVICES SHALL BE MADE IMMEDIATELY. 10. ALL FILL MATERIAL TO BE TAKEN FROM AN APPROVED, DESIGNATED BORROW AREA. 11. ALL WASTE MATERIALS SHALL BE TAKEN TO AN APPROVED WASTE AREA. EARTIH FILL SHALL BE INERT MATERIALS ONLY, FREE OF ROOTS, STUMPS, WOOD, RUBBISH, AND OTHER DEBRIS. 12. BORROW OR WASTE AREAS ARE TO BE RECLAIMED WITHIN 7 DAYS OF COMPLETION PER ZONING ORDINANCE SECTION 5.1.28. 13. ALL INERT MATERIALS SHALL BE TRANSPORTED IN COMPLIANCE WITH SECTID)N 13-301 OF THE CODE OF ALBEMARLE. 14. BORROW, FILL OR WASTE ACTIVITY INVOLVING INDUSTRIAL -TYPE POWER EQUIPMENT SHALL BE LIMITED TO THE HOURS OF 7:00 AM TO 9:00 PM. 15. BORROW, FILL OR WASTE ACTIVITY SHALL BE CONDUCTED IN A SAFE MANNERS THAT MAINTAINS LATERAL SUPPORT, OR ORDER TO MINIMIZE ANY HAZARD TO PERSONS, PHYSICAL DAMAGE TO ADJACENT LAND AND IMPROVEMENTS, AND DAMAGE TO ANY PUBLIC STREET BECAUSE OF SLIDES, SINKING, OR COLLAPSE. 16. THE DEVELOPER SHALL RESERVE THE RIGHT TO INSTALL, MAINTAIN, REMOVE OR CONVERT TO PERMANENT STORMWATER MANAGEMENT FACILITIES, WHERE APPLICABLE, ALL EROSION CONTROL MEASURES REQUIRED BY THIS PLAN REGARDLESS OF THE SALE OF ANNY LOT, UNIT, BUILDING OR OTHER PORTION OF THE PROPERTY. 17. TEMPORARY STABILIZATION SHALL BE TEMPORARY SEEDING AND MULCHING. SEEDING IS TO BE AT 75 LBS/ACRE, AND IN THE MONTHS OF SEPTEMBER TO FEBRUARY TO CONSIST A 50/50 MIX OF ANNUAL RYEGRASS AND CEREAL WINTER RYE, OR IN MARCH AMD APRIL TO CONSIST OF ANNUAL RYE, OR MAY THROUGH AUGUST TO CONSIST OF GERMAN MILLET, STRAW MULCH IS TO BE APPLIED AT 80 LBS/100SF. ALTERNATIVES ARE SUB3JECT TO BE APPROVED BY THE COUNTY EROSION CONTROL INSPECTOR. 18. PERMANENT STABILIZATION SHALL BE LIME AND FERTILIZER, PERMANENT SEEDING, AND MULCH. AGRICULTURAL GRADE LIMESTONE SHALL BE APPLIED AT 90 LBS/100)OSF. INCORPORATED INTO THE TOP 4-6 INCHES OF SOIL. FERTILIZER SHALL BE APPLIED AT 1000 LBS/ACRE AND CONSIST OF A 10-20-10 NUTRIENT MIX. PERMANENT SEEDING SHALL BE APPLIED AT 180 LBS/ACRE AND CONSIST OF 95% KENTUCKY 31 OR TALL FESCUE AND 0-5% PERENNIAL RYEGRASS OR KENTUCKY BLUEGRASS. STRAW MULCH IS TO S E APPLIED AT 80 LBS/100SF. ALTERNATIVES ARE SUBJECT TO BE APPROVED BY THE COUNTY EROSION CONTROL INSPECTOR. 19. MAINTENANCE: ALL MEASURES ARE TO BE INSPECTED WEEKLY AND AFTER EACH RAINFALL. ANY DAMAGE OR CLOGGING TO STRUCTURAL MEASURES IS TO BE REPAIRED IMMEDIATELY. SILT TRAPS ARE TO BE CLEANED WHEN 50% OF THE WET STORAGE VOLUME IS FILLED WITH SEDIMENT. ALL SEEDED AREAS ARE TO BE RESEEDED WHEN NECESSARY TO ACHIEVE A GOOD STAND OF GRASS. SILT FENCE AND DIVERSION DYKES WHICH ARE COLLECTING SEDIMENT TO HALF THEIR HEIGHT MUST BE CLEANED AND REPAIRED IMMEDIATELY. 20. ALL TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES ARE TO BE REMO)VED WITHIN 30 DAYS OF FINAL SITE STABILIZATION, WHEN MEASURES ARE NO LONGER HEEDED, SUBJECT TO APPROVAL BY THE COUNTY EROSION CONTROL INSPECTOR. 21. THIS PLAN SHALL BE VOID IF THE OWNER DOES NOT OBTAIN A PERMIT WITHIIN 1 YEAR OF THE DATE OF APPROVAL. (WATER PROTECTION ORDINANCE SECTION 17-204G) . 22. PERMANENT VEGETATION SHALL BE INSTALLED ON ALL DENUDED AREAS WITHIIN NINE (9) MONTHS AFTER THE DATE THE LAND DISTURBING ACTIVITY COMMENCED. (WAT-ER PROTECTION ORDINANCE SECTION 17-207B). 2 a WP0201500079 VICINITY MAP SCALE: 1"=2000 FEET EROSION & SEDIMENT CONTROL MEASURES FOR SINGLE FAMILY RESIDENCE CONSTRUCTION 1. SILT FENCE, SEDIMENT TRAPS AND OTHER PROTECTIVE MEASURES SHALL BE PROVIDED IN AREAS WHERE SEDIMENT FROM DISTURBED AREAS MAY LEAVE THE SITE, AND MUST BE PROPERLY INSTALLED BEFORE LAND DISTURBANCE. THESE MEASURES MUST REMAIN INSTALLED AND MAINTAINED UNTIL ADEQUATE STABILIZATION IS ACHIEVED AS DETERMINED BY THE PROGRAM AUTHORITY. 2. ALL EROSION MEASURES ARE SUBJECT TO INSPECTION PERIODICALLY AND AFTER EACH RUNOFF -PRODUCING RAINFALL EVENT.. ANY NECESSARY REPAIRS TO MAINTAIN THE EFFECTIVENESS OF THE EROSION CONTROL DEVICES AND CLEANUP OF SEDIMENTATION MUST BE MADE IMMEDIATELY: IF EROSION CONTROL MEASURES ARE FOUND TO BE INADEQUATE, OR IN NEED OF REPAIR, BY A COUNTY INSPECTOR, YOU WILL BE NOTIFIED. 3. A TEMPORARY STONE CONSTRUCTION ENTRANCE SHALL BE PROVIDED WHEREVER TRAFFIC WILL BE LEAVING A CONSTRUCTION SITE AND WHERE THERE EXISTS THE POSSIBILITY OF TRANSPORTING MUD DIRECTLY ONTO A ROAD OR OTHER PAVED AREA. 4. ALL DENUDED AREAS ON THE SITE SHALL BE STABILIZED WITHIN SEVEN (7) DAYS OF FINAL GRADING WITH PERMANENT VEGETATION OR A PROTECTIVE GROUND COVER SUITABLE FOR THE TIWE OF YEAR. TEMPORARY SOIL STABILIZATION SHALL BE APPLIED WITHIN SEVEN (7) DAY'S TO DENUDED AREAS THAT MAY NOT BE AT FINAL GRADE BUT WILL REMAIN DORMANT (UNDISTURBED) FOR LONGER THAN THIRTY (30) DAYS. 5. A PERMANENT STAIBILIZATION/VEGETATIVE COVER SHALL BE ESTABLISHED ON ALL DENUDED AREAS WITHIN NINE (9) MONTHS OF THE START OF CLEARING OR GRADING. UNLESS DOCUMENTED IIN WRITING TO THE PROGRAM AUTHORITY AT THE START OF LAND DISTURBANCE, THE NINE (9) MONTHS SHALL BE MEASURED FROM THE PERMIT ISSUANCE DATE. 6. DURING CONSTRUCTION OF THE PROJECT, SOIL STOCK PILES AND BORROW AREAS SHALL BE STABILIZED, COVERED, OR PROTECTED WITH SEDIMENT TRAPPING MEASURES. 7. ALL STORM SEWERZ INLETS THAT ARE OPERABLE DURING CONSTRUCTION SHALL BE PROTECTED SO THAT SEDIMENT -LADEN WATER CANNOT ENTER THE STORM WATER CONVEYANCE SYSTEM iWITHOUT FIRST BEING FILTERED OR OTHERWISE TREATED TO REMOVE SEDIMENT. 8. ALL TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES SHALL NOT BE REMOVED UNTIL DISTURBED AREAS ARE STABILIZED. AFTER STABILIZATION IS COMPLETE, ALL MEASURES SHALL BE REMOVED WITHIN 30 DAYS, UNLESS OTHERWISE AUTHORIZED BY THE PROGRAM AUITHORITY. TRAPPED SEDIMENT AND THE DISTURBED SOIL AREAS RESULTING FROM THE (DISPOSITION OF TEMPORARY MEASURES SHALL BE PERMANENTLY STABILIZED TO PREVENJT FURTHER EROSION AND SEDIMENTATION. GENERAL EROSION AND SEDIMENT CONTROL NOTES ES -1: UNLESS OTHERWISE INDICATED, ALL VEGETATIVE AND STRUCTURAL EROSION AND SEDIMENT CONTROL PRACTICES WILL BE CONSTRUCTED AND MAINTAINED ACCORDING TO MINIMUM STANDARDS AND SPECIFICATIONS OF THE "VIRGINIA EROSION AND SEDIEMNT CONTROL HANDBOOK" AND VIRGINIA REGULATIONS VR 625-02-00 EROSION AND SEDIMENT CONTROL REGULATIONS. ES -2: THE PLAN APPROVING AUTHORITY MUST BE NOTIFIED ONE WEEK PRIOR TO THE PRE -CONSTRUCTION CONFERENCE, ONE WEEK PRIOR TO THE COMMENCEMENT OF LAND DISTURBING ACTIVITY, AND ONE WEEK PRIOR TO THE FINAL INSPECTION. ES -3: ALL EROSION AND SEDIMENT CONTROL MEASURES ARE TO BE PLACED PRIOR TO OR AS THE FIRST STEP IN CLEARING. ES -4: A COPY OF THE APPROVED EROSION AND SEDIMENT CONTROL PLAN SHALL BE MAINTAINED ON THE SITE AT ALL TIMES. ES -5: PRIOR TO COMMENCING LAND DISTURBING ACTIVITIES IN AREAS OTHER THAN INDICATED ON THESE PLANS (INCLUDING, BUT NOT LIMITED TO, OFF-SITE BORROW OR WASTE AREAS), THE CONTRACTOR SHALL SUBMIT A SUPPLEMENTARY EROSION CONTROL PLAN TO THE OWNER FOR REVIEW AND APPROVAL BY THE PLAN REVIEWING AUTHORITY. ES -6: THE CONTRACTOR IS RESPONSIBLE FOR INSTALLATION OF ANY ADDITIONAL EROSION CONTROL MEASURES NECESSARY TO PREVENT EROSION AND SEDIMENTATION AS DETERMINED BY THE PLAN REVIEWING AUTHORITY. ES -7: ALL DISTURBED AREAS ARE TO DRAIN TO APPROVED SEDIMENT CONTROL MEASURES AT ALL TIMES DURING L^,ND DISTURBING ACTIVITIES AND DURING SITE DEVELOPMENT UNTIL FINAL STABILIZATION HAS BEEN ACHIEVED. ES -8: DURING DEWATERING OPERATIONS, WATER WILL BE PUMPED INTO AN APPROVED FILTERING DEVICE. ES -9: THE CONTRACTOR SHALL INSPECT ALL EROSION CONTROL MEASURES PERIODICALLY AND AFTER EACH FUNOFF-PRODUCING RAINFALL EVENT. ANY NECESSARY REPAIRS OR CLEANUP TO MAINTAIN THE EFFECTIVENESS OF THE EROSION CONTROL DEVICES SHALL BE MADE IMMEDIATELY. SHEET INDEX SHEET 1 ---------- COVER SHEET SHEET 2 ---------- EXISTING CONDITIONS SHEET 3 ---------- EROSION & SEDIMENT CONTROL PHASE 1 SHEET 4 ---------- EROSION & SEDIMENT CONTROL PHASE 2 SHEET 5 ---------- EROSION CONTROL NOTES & DETAILS SHEET 6 ---------- EROSION CONTROL NARRATIVE � �Z T H O.F If Christopher C. Mul(gan Lic. No. 031672 ►.�SS�0NAL ENG\ APPROVED by the fidbemade- UWAY )spigunity Development Department Date File}.,_ 0 REVISIONS Oct. 13, 2015 DATE Sept. 30, 2015 • QZ J ILI w � 1 EZ F- ..Lu c N2 0 �0 �ti N m CU Q q Q. *' Qm go OZ .j Q r Q rrW E W Z OV wo W > �Z Jz < ILL Q UQ W �w s W (� Z -J N 0 0 O Q� Z� cum)) U� Q !� cm N a4 ,z U (00 0 co Wz 'w 0 o r W W aW ��- z 1'� Q 14t M o) W O O a REVISIONS Oct. 13, 2015 DATE Sept. 30, 2015 FILE NUMBER 8236 SHEET 1/6 QZ J 1 EZ F- c _ 2 r Lu 0 OZ .j Q r _Q Z W W W > ILLD < ILL 0 o W W J It 2 .z +Q ioC 06 J 0 0 W m o Q !� Z 0 ,z U Z O 0) li W FILE NUMBER 8236 SHEET 1/6 REVISIONS Oct. 13, 2015 DATE Sept. 30, 2015 SCALE 1°=60' CONTOURS 2 FEET • Z a w � O I� �Z Fa- wW N2 rn_ W 2 q 0(o 4 W O 0 rc Lu O Z ®v wo ZrN %J J co w Q UQ ow V} J Z ¢ N ZO Z o � Urn N t) z v LL a: F w CC 0� Z t� oZS LuWLoo 0 LL 0 J 0 llF- m 0� �o Z 00) x 4 lu 24 c) W aW �z �o Z O Lu m a. W REVISIONS Oct. 13, 2015 DATE Sept. 30, 2015 SCALE 1°=60' CONTOURS 2 FEET FILE NUMBER 8236 SHEET 2/6 Z I� �Z Fa- ict) W W Oz O Q w W > Q Z ZO �C t) z v LL a: F w CC Z t� oZS Z W 0 J 0 llF- m �O z x Z c) W �z �o m W FILE NUMBER 8236 SHEET 2/6 REVISIONS Oct. 13, 2015 DATE Sept. 30, 2015 SCALE 1"=60" CONTOURS 2 FEET t) a O W W N = O cl) Z q ®� Nm NQ �- 0 ZO a r cc Q _I� Cc Lu cr-@ Z U� oV LZL W a: LZ L z Q rc C) W � 0 U Q Uq ocm04W <C U) W m m O t(� Z _ u) U0) W O� N Q (� 0 , O �z � O cc Lo �w `` �' W WI Uj r� "rx a. WA 0 Z ti 2 0) W 2 0 REVISIONS Oct. 13, 2015 DATE Sept. 30, 2015 SCALE 1"=60" CONTOURS 2 FEET FILE NUMBER 8236 SHEET 3/6 z g W _ 2 �- 0 0z Q _I� r Z U� oC F W a: z Q cr (L 0 U LLw z� <C U) W m m O 04 ®0 Z z() �z � O cc w FILE NUMBER 8236 SHEET 3/6 TEMPORARY SEEDING MIXTURES FOR THE PIEDMONT AREA 8 TABLE 26 TEMPORARY SEEDINGS BY RATES, DEPTHS, AND DATES Use Soil Test Recommendation or Rates Shown Below Seeding Mixture Planting Seeding zones 37/ and Seeding Date 38/ Lbs. per Seeding Rate depth 36/ 2 LBS. Species3/ Per Lbs/1000 TOTAL 150 LBS. 7a and 7b. 6b - Sa -and 5b 211- 5/1- 8/15- 3/1- 5/1- 18/15- 3/15-1 13 6/1-T8/1- TOTAL 150 LBS. if occasional mowing acre Sq. ft (Inches) 9.2 fall is desired. . . . . . . . . . .ANNUAL RYE 4/30 8/14 11/30 4/30 8/14 11/15 5/31 17/31 - VDOT J3, #357, #5, #56 OR #57 COARSE AGGREGATE IN VARIABLE (MIN. 7') 110/31 Choose one: WEEPING LOVEGRASS MAY BE ADDED Service lespedezc 0-20-0 400 9.2 BY crownvetch Birdsfoot trefoil BY f/ BY Barley 2.5 lou, 2.80 1-2 X - 10/15 X - 10/15 X - 10/1 Oats 3 lou. 2.21 1-2 X - - X - - X - - Rye 9/ 2.5 bu, 322 1-2 X - X X - X X - X Barley or Not required. not weeping Lovegras Spring the year closer than 4' if & serice tespecleack Rye Pius 150 tbs. 3A5 1 X X 10/15 X X 10/15 X X 10/1 Foxtail. after sericea has X X X X X X X X X mil.Let40/ 20-10-10 250 5.8 21 for red fescue Red & chewings 30 clays Later and Ky bluegrass; fescue, Kentucky bluegrass, hard December, and closer than 3' fescue mixture: Weeping 4 tbs. 0.09 May 20 -June -30, for fescue, X X If needed. t X tovegrassAl/ Annuat ryegrasS 50 tbs. 1.15 t1/4-1/2 1/4-1/2 X 11/1 X X 8/15 M!tLetAa/- 0 tbs. 1 1.15 1 /2 X X X 36/ Applicable on slopes of 3:1 or flatter 37/ Refer to figure A - Adopted from USDA, AIRS Miscellaneous Publication #1475, January 1990 38/ Between fall and spring seeding dates, use mulch only if ground is frozen and reseed when thawed 39/ May be used as a nurse crop for tate fall/early winter permanent seedings, add 56 Lbs/ac. to the permanent seeding mixture 40/ Maryland State Highway Administration Temporary Seed Mix May be used as a nurse crop for mid -summer permanent seedings. Add 2 lbs/ac 41/ to permanent seed mix. May be used as a nurse crop for mid -summer permanent seedlings. Add 10 lbs/ac. 42/ to the permanent seeding mix. PERMANENT SEEDING 8 F=F=RTII 17ATION & MAINTENANCE TABLE 24 Maintenance Fertilization for Permanent Seedings Use Soil Test Recommendation or Rates Shown Below Seeding Mixture Formulation Lbs. pe t Lbs. per Time Mowing 2 LBS. - SEASONAL NURSE CROP* Acre 1000 sf TOTAL 150 LBS. LOW -MAINTENANCE SLOPE (STEEPER THAN 3:1) Tait fescue make S 10-10-10 500 11.5 Yearly, or as needed xNot closer than 3' up 70% or more or 20 LBS. 74 TOTAL 150 LBS. if occasional mowing of cover. 30-10-10 400 9.2 fall is desired. . . . . . . . . . .ANNUAL RYE NOVEMBER 1ST THROUGH FEBRUARY 15TH . . . . . . . . . . ANNUAL RYE SUBSTITUTE SERICEA LESPEDEZA FOR CROWNVETCH Spring the year Do not mow Crownvetch SERICEA.) VDOT J3, #357, #5, #56 OR #57 COARSE AGGREGATE IN VARIABLE (MIN. 7') IF FLATPEA IS USED IN LIEU OF CROWNVETCH, INCREASE RATE TO 30 LBS./ACRE. ALL following establish - WEEPING LOVEGRASS MAY BE ADDED Service lespedezc 0-20-0 400 9.2 ment and every 4-5 crownvetch Birdsfoot trefoil DESCRIPTION --------- TH WIRE STAPLES #5 REBAR TO ---- - - - W - years thereafter. SECURE TIMBER AC_ WETVOLUME 184-25 CY DRY VOLUME Not required. not Fairty uniform REQUIRED VOLUME 111 .-2:1 OR SOIL FLATTER CY Fall the year closer than 4' if stand of tall (L) LEVEL SPREADER WITH RIGID LIP FT following establish- occasional, mowing is fescue & service 5-10-10 500 11.5 ment and every 4-5 desired, and then in Lespedeza, or BOTTOM TRAP EL 890-00 years thereafter, fall after seed has loirclsfoot trefoll. DRY VOL. EL 891(10 ITOP OF BANK matured, Source: Adapted from 1983 Maryland Standards for Soil Plate 3.02-1 Erosion and Sediment Control, and Va. DSWC L Not required. not weeping Lovegras Spring the year closer than 4' if & serice tespecleack following establish- occasional mowing is fairly uniform 5-10-10 500 11.5 ment and every 3-4 desired, and fall plant distributior years thereafter. after sericea has matured. September, Mow no closer than 20-10-10 250 5.8 21 for red fescue Red & chewings 30 clays Later and Ky bluegrass; fescue, Kentucky bluegrass, hard December, and closer than 3' fescue mixture: 20-10-10 100 2.3 May 20 -June -30, for fescue, If needed. t PERMANENT SEEDING MIXTURES Ps FOR THE PIEDMONT AREA TABLE 25 TOTAL LBS. PER ACRE MINIMUM CARE LAWN - COMMERCIAL OR RESIDENTIAL 175-200 LBS. - KENTUCKY 31 OR TURF -TYPE TALL FESCUE %95-100% - IMPROVED PERENNIAL RYE GRASS 0-5% - KENTUCKY BLUEGRASS 0-5% HIGH MAINTENANCE LAWN 200-250 LBS. - KENTUCKY 31 OR TURF -TYPE TALL FESCUE 100% GENERAL SLOPE (3:1 OR LESS) - KENTUCKY 31 FESCUE 128 LBS. - RED TOP GRASS 2 LBS. - SEASONAL NURSE CROP* 20 LBS. 197.65 TOTAL 150 LBS. LOW -MAINTENANCE SLOPE (STEEPER THAN 3:1) Ditch flow line - KENTUCKY 31 FESCUE 108 LBS. - RED TOP GRASS 2 LBS. - SEASONAL NURSE CROP* 20 LBS. - CROWN VETCH** 20 LBS. 74 TOTAL 150 LBS. *USE SEASONAL NURSE CROP IN ACCORDANCE WITH SEEDING DATES AS STATED BELOW: FEBRUARY 16TH THROUGH APRIL 30TH. . . . . . . . . . . . ANNUAL RYE MAY 1ST THROUGH AUGUST 15TH . . . . . . . . . . . . . . FOXTAIL MILLET AUGUST 16TH THROUGH OCTOBER 31ST. . . . . . . . . . . .ANNUAL RYE NOVEMBER 1ST THROUGH FEBRUARY 15TH . . . . . . . . . . ANNUAL RYE SUBSTITUTE SERICEA LESPEDEZA FOR CROWNVETCH EAST OF FARIVIVILLE, VA (MAY THROUGH SEPTEMBER USE HULLED SERICEA, ALL OTHER PERIODS, USE UNHULLED SERICEA.) VDOT J3, #357, #5, #56 OR #57 COARSE AGGREGATE IN VARIABLE (MIN. 7') IF FLATPEA IS USED IN LIEU OF CROWNVETCH, INCREASE RATE TO 30 LBS./ACRE. ALL LEGUME SEED MUST BE PROPERLY INNOCULATED. WEEPING LOVEGRASS MAY BE ADDED TO ANY SLOPE OR LOW MAINTENANCE MIX DURING WARMER SEEDING PERIODS; ADD 10- 20 LBS./ACRE IN MIXES. FERTILIZER (10-20-10 OR EQ) SHALL BE APPLIED AT THE RATE OF 1000 LBS/ACRE. AGRICULTURAL LIME SHALL BE APPLIED TO SEEDBEDS AT THE RATE OF 90 LBS/ 1000 SQ. FT. SUGGESTED TEMPORARY SEEDING MIXTURE FERTILIZER: 10-20-10 1,000 LBS/ACRE SEPTEMBER -FEBRUARY 15: 50% ANNUAL RYE & 50% WINTER RYE 100 LBS/ACRE FEBRUARY 16 -APRIL 30: ANNUAL RYE 100 LBS/ACRE MAY -AUGUST: GERMAN MILLET 50 LBS/ACRE OTHER OPTIONS EXIST. SEE VA EROSION AND SEDIMENT CONTROL HANDBOOK. SUGGESTED PERMANENT SEEDING MIXTURE LIME: 2 TONS/ACRE FERTILIZER: 10-20-10 1,000 LBS/ACRE MARCH -MAY 15: KENTUCKY 31 FESCUE 200 LBS/ACRE, ANNUAL RYE 20 LBS/ACRE MAY 16 -AUGUST 15: KENTUCKY 31 FESCUE 200 LBS/ACRE, FOXTAIL MILLET 20 LBS/ACRE AUGUST 16 -OCTOBER: KENTUCKY 31 FESCUE 200 LBS/ACRE, ANNUAL RYE 20 LBS/ACRE NOVEMBER- FEBRUARY: KENTUCKY 31 FESCUE 200 LBS/ACRE, WINTER RYE 20 LBS/ACRE Notes: See VDOT Road and Bridge Standards, Std, PE -1 for cut/fill details. All entrance grades shall start back of the shoulder line. If drainage is necessary, the ditch line may be moved back to provide 9 inches (renin.) cover over pipe. Entrances shall be 12 ft wide and transition smoothly into the roadway surface. Driveway entrance pavement shall extend to the right of line. When an existing street is re -developed and modification of an existing driveway entrance is required, the entrance pavement shall be extended to the right of way line or the extent of disturbance to the existing driveway. E = U) Q) (D C XE r- Desirable Radius Note: 2 M q) I For entrances to roadways having ADT of 2000 or more, E :2 C: U) W cu use radius of 20 feet. For ADT under 2000 radius may a) 01 be 12 feet, C 0 (D Pipe culvert LE VEL SPR FADER I if necessary 12 FT co STI CROSS SECTION 2.95 /SURFACE'-' 0 (1) 0) 197.65 16 FT/ See 0)-0 Ditch flow line /GRADE Z/ r- 14 - > Radius Note c) 0 a; 395,3 CY a) '0).0 37 FT T 74 X/ LEVEL UP OF OR 4.0 FT "0 C 0 Shoulder ---(, /1011" FT (D Q) W .= Edge of roadway pavement ROADWAY PAVEMENT FIGURE 9 - PRIVATE ENTRANCE DETAIL 1992 & SILT FENCE CONSTRUCTION OF A SILT FENCE (WITHOUT WIRE SUPPORT) 1. SET THE STAKES. 2. EXCA VA TE A 4'X 4 " TRENCH UPSLOPE ALONG THE LINE OF S TA KES, 6'MAX. C_ Ow J. STAPLE FIL TER MA TERIA L TO S TA KES AND EXTEND IT INTO THE TRENCH. a6w' .. . ....... 4. BACKFILL AND COMPACT THE EXCAVATED SOIL. SHEET FLOW INSTALLATION (PERSPECTIVE VIEW) POINTS A SHOULD BE HIGHER THAN POINT B. DRAINA GEIVA Y INSTALLATION (FR ON T EL E VA T1 ON) PLATE. 3.05-2 SOURCE.• Adapted from Installation of Straw and Fabric Filter Barriers for Sediment Con VA. DSWC Sherwood and Wyant 3.12 Source: Va. DSWC Plate 3.12-1 � ALTH OF 17 4 0 Christopher C. Mulligan Uc. No. 031672 I ON A L ssF SUPER SILT FENCE CONSTRUCTION OF A SILT FENCE (WITH WIRE SUPPORT) 1. SET POSTS AND EXCAVATE A 4"X4" 2. STAPLE WIRE FENCING TO THE POSTS. TRENCH UPSLOPE ALONG THE LINE OF POSTS. ii " 3. ATTACH THE FILTER FABRIC TO THE WIRE FENCE AND EXTEND IT INTO THE TRENCH. FLOW 4. BACKFILL AND COMPACT THE EXCAVATED SOIL. �31)1 EXTENSION OF FABRIC AND WIRE INTO THE TRENCH. SOURCE: Adapted from Installation of Straw and Fabric Filter Barriers for Sediment Control, RATE. 3.05-1 Wrwood & Wym 1992 3.21 LE VEL SPR FADER I LS STI CROSS SECTION 2.95 AC JUTE. OR EXCELSIOR OR EQUIVALENT 197.65 CY STAPLED IN PLACE VARIABLE (MIN. 7') 197,65 CY BURIED 6" MIN, 6' MIN, 395,3 CY - - - - - - - - - - - - - - BURIED 6" MIN. - 37 FT A - 74 FT LEVEL UP OF OR 4.0 FT SPREADER FLATTER 17.7 FT PROVIDED VOLUME 406 CY LEVEL SPREADER WITH VEGETATED LIP 897-00 CROSS SECTION 898-95 VDOT J3, #357, #5, #56 OR #57 COARSE AGGREGATE IN VARIABLE (MIN. 7') 900,90 GALVANIZED WIRE MESH BASKET SECURE WIRE MESH TO TIMBER 901-90 4 Fit -TER CLOTH 6X6 TREATED TIMBER Note: Berm Width= 3' SECURE WIRE TO GROUND6' MIN DESCRIPTION --------- TH WIRE STAPLES #5 REBAR TO ---- - - - W - DA SECURE TIMBER AC_ WETVOLUME 184-25 CY DRY VOLUME 7' MIN, UNDISTURBED CY REQUIRED VOLUME 111 .-2:1 OR SOIL FLATTER CY SIZE (W) 41 FT (L) LEVEL SPREADER WITH RIGID LIP FT (D) MIN. PHYSICAL REQUIREMENTS OF FILTER CLOTH NOTED IN STD, & SPEC, 3.119, RIPRV1 FT Source: Va. DSWC and N.C. Erosion and Sediment Control Planning and Design Manual Plate 3.21-2 SEDIMENT TRAP SIZING Note: Berm Width= 4.5' DESCRIPTION STI DA 2.95 AC WET VOLUME 197.65 CY DRY VOLUME 197,65 CY REQUIRED VOLUME 395,3 CY SIZE (W) 37 FT (L) 74 FT (D) 4.0 FT OUTLET LENGTH 17.7 FT PROVIDED VOLUME 406 CY BOTTOM TRAP EL 897-00 WET VOL. EL 898-95 DRY VOL. EL 900,90 TOP OF BANK 901-90 SEDIMENT TRAP SIZING Note: Berm Width= 3' COURSE AGGREGATE B TO SEDIMENT DESCRIPTION ST DA 2.75 AC_ WETVOLUME 184-25 CY DRY VOLUME 184.25 CY REQUIRED VOLUME 368.5 CY SIZE (W) 41 FT (L) 82 FT (D) 3.0 FT OUTLET LENGTH 16.5 FT PROVIDED VOLUME 374 CY BOTTOM TRAP EL 890-00 WET VOL. EL 891.50 DRY VOL. EL 891(10 ITOP OF BANK 894,00 1992 3.02 STONE CONSTRUCTION ENTRAN(`_E7 CE 70' MIN, EXISTING PAVEMENT A 3' K 111CI: I FILTER CLOTH -" MIN. A MOUNTABLE BERM (OPTIONAL) 7 SIDE ELEVATION EXISTING GROUND 70' MIR WASHRACK 10' MIR <OPTIONAL) 1N, 12' N� MI EXISTING PAVEMENT ZVDOT *1 POSITIVE DRAINAGE 10' MIN. COURSE AGGREGATE B TO SEDIMENT TRAPPING DEVICE C MUST EXTEND FULL WIDTH OF INGRESS AND EGRESS PLAN VIEW OPERATION 12' MIN. 3 MIN. : . 3 3 N FILTER CLOTH SECTION A -A IL REINFORCED CONCRETE DRAIN SPACE SECTION B -B Source: Adapted from 1983 Maryland Standards for Soil Plate 3.02-1 Erosion and Sediment Control, and Va. DSWC L .j REVISIONS Oct. 13, 2015 DATE Sept. 30, 2015 FILE NUMBER 8236 11� SHEET 5/6 Z 410 Q. Z W 12 W LU O LdL _QZ Z C/) L.0 06 Z < U) 0 ir. W LL 0 L.0 J F - Z W 0 06 a� Z coLU 0 0 Cr Z 0 Z u W Z 0 W 0 cc W FILE NUMBER 8236 11� SHEET 5/6 REVISIONS Oct. 13, 2015 DATE Sept. 30, 2015 SEQUENCE OF CONSTRUCTION i U 4 EROSION AND SEDIMENT CONTROL MINIMUM STANDARDS EROSION AND SEDIMENT CONTROL NARRATIVE 5. TEMPORARY SEDIMENT TRAPS (3.13) - TEMPORARY SEDIMENT TRAPS 7 a 12 0 ARE TO BE CONSTRUCTED TO PROTECT THE ADJACENT AREAS FROM BEGIN CONSTRUCTION (L 0 1. PERMANENT OR TEMPORARY SOIL STABILIZATION SHALL BE APPLIED TO DENUDED AREAS WITHIN SEVEN PRIOR TO CONSTRUCTION RECEIVING SEDIMENT LADEN RUNOFF. AREAS THAT ARE NOT W Z � DAYS AFTER FINAL GRADE IS REACHED ON ANY PORTION OF THE SITE. TEMPORARY SOIL STABILIZATION DENUDED SHALL BE DIVERTED FROM DRAINING INTO THE SEDIMENT 1.) CONTRACTOR SHALL INSTALL CONSTRUCTION ENTRANCE AND SILT FENCE AS FIRST STEP IN �t SHALL BE APPLIED WITHIN SEVEN DAYS TO DENUDED AREAS THAT MAY NOT BE AT FINAL GRADE BUT 1.) CONTRACTOR SHALL OBTAIN PERMITS TO WORK WITHIN STATE RIGHT-OF-WAY TRAPS, UNTIL SUCH TIME THAT THE DISTURBED AREAS ARE CONSTRUCTION. BE APPLIED TO op N Q gj WILL REMAIN DORMANT FOR LONGER THAN 30 DAYS. PERMANENT STABILIZATION SHALL (VDOT LAND -USE PERMIT). DEVELOPED AND STABILIZED. ACTUAL LOCATIONS AND DIMENSIONS 2.) SEDIMENT TRAPS AND DIVERSION DITCHES MUST BE INSTALLED AND MADE OPERATIONAL BEFORE �N ,TH k 0 AREAS THAT ARE TO BE LEFT DORMANT FOR MORE THAN ONE YEAR. 2.) CONTRACTOR SHALL OBTAIN LAND DISTURBANCE PERMIT FROM THE COUNTY OF OF THE EMBANKMENTS AND SPILLWAYS ARE SHOWN ON THE SITE ANY LAND DISTURBING ACTIVITY TAKES PLACE. 4rP Q. �r o�� 61 CONTRACTOR SHALL ESTABLISH A STABILIZED SITE AS REQUIRED. ALBEMARLE PRIOR TO BEGINNING CONSTRUCTION. A PRECONSTRUCTION MEETING PLAN. CALCULATIONS FOR THE SEDIMENT TRAPS ARE SHOWN WITH 3.) CONTRACTOR SHALL COORDINATE INSPECTIONS, AS REQUIRED BY THE COUNTY OF ALBEMARLE. .' 9 Q 2. DURING CONSTRUCTION OF THE PROJECT, SOIL STOCKPILES AND BORROW AREAS SHALL BE STABILIZED WITH THE ENGINEER, THE CERTIFIED LAND DISTURBER, AND THE ENVIRONMENTAL THE DETAIL. 4.) AFTER RECEIVING ENGINEERING APPROVAL, BEGIN CLEARING GRUBBING AND FINE GRADING OPERATIONS 0 4 � OR PROTECTED WITH SEDIMENT TRAPPING MEASURES. THE APPLICANT IS RESPONSIBLE FOR THE INSPECTOR MAY ALSO BE REQUIRED. ALLOW 72 HOURS FOR COORDINATION AND AS NECESSARY TO ACHIEVE FINAL GRADES. � - � " !E Z TEMPORARY PROTECTION AND PERMANENT STABILIZATION OF ALL SOIL STOCKPILES ON SITE AS WELL AS SCHEDULING OF PRE -CONSTRUCTION MEETING. 6. THE STORMWATER MANAGEMENT AND EROSION CONTROL FACILITIES 5.) AFTER SITE HAS REACHED SUBGRADE CONDITIONS, BEGIN STABILIZATION. OU Wo ROAD Christopher C. Mulligan BORROW AREAS AND SOIL INTENTIONALLY TRANSPORTED FROM THE PROJECT SITE. 3.) WRITTEN NOTIFICATION OF THE DATE ON WHICH CLEARING AND GRADING WORK SHOULD BE CHECKED REGULARLY BY THE OWNER AND/OR P 9 JJ Q. IF SOIL STOCKPILES ARE ANTICIPATED ON-SITE, CONTRACTOR SHALL STABILIZE THE SOIL STOCKPILES BEGINS MUST BE PROVIDED TO THE PROGRAM AUTHORITY WITHIN ONE WEEK OF CONTRACTOR TO ENSURE THAT IT IS STRUCTURALLY SOUND AND HAS 6.) PERMANENT SOIL STABILIZATION SHALL BE APPLIED TO ALL DENUDED AREAS Lic. No. Z THE COMMENCEMENT OF WORK. WITHIN SEVEN DAYS AFTER FINAL GRADE IS REACHED ON ANY PORTION OF THE SITE. p 031672 ��2 AND BORROW AREAS. NOT BEEN DAMAGED BY EROSION. ��F J o U 3. A PERMANENT VEGETATIVE COVER SHALL BE ESTABLISHED ON DENUDED AREAS NOT OTHERWISE TEMPORARY SOIL STABILIZATION SHALL BE APPLIED WITHIN SEVEN DAYS TO DENUDED AREAS THAT �`� SS�DNAL E� VQ W 2 OW PERMANENTLY STABILIZED. PERMANENT VEGETATION SHALL NOT BE CONSIDERED ESTABLISHED UNTIL A PROJECT DESCRIPTION VEGETATIVE PRACTICES MAY NOT BE AT FINAL GRADE BUT WILL REMAIN DORMANT FOR LONGER THAN 30 DAYS. (0 J Z GROUND COVER IS ACHIEVED THAT, IS UNIFORM, MATURE ENOUGH TO SURVIVE AND WILL INHIBIT EROSION. PERMANENT STABILIZATION SHALL BE APPLIED TO AREAS THAT ARE TO BE LEFT DORMANT FOR THE PURPOSE OF THIS PROJECT IS TO CONSTRUCT A SINGLE FAMILY RESIDENTIAL W J J IOcr CONTRACTOR SHALL ESTABLISH A VEGETATIVE COVER ON ALL DENUDED AREAS. MORE THAN ONE YEAR. 4. SEDIMENT BASINS AND TRAPS, PERIMETER DIKES, SEDIMENT BARRIERS AND OTHER MEASURES DWELLING WITH A DRIVEWAY THAT CONNECTS PERPENDICULAR TO EXISTING 1. SURFACE ROUGHENING (3.29) - ALL AREAS WITH A GRADE STEEPER 7.) AFTER SITE IS STABILIZED AND PERMISSION IS OBTAINED FROM THE EROSION CONTROL 20 v(6 a INTENDED TO TRAP SEDIMENT SHALL BE CONSTRUCTED AS A FIRST STEP IN ANY LAND- DISTU RBIING HIGHTOP DRIVE. A CONSTRUCTION ENTRANCE AND SILT FENCE SHALL BE THAN 3:1 SHALL BE STAIR -STEP GRADED OR GROOVED (PLATE INSPECTOR, REMOVE SILT FENCING AND OTHER EC MEASURES. IMPLEMENTED, PRIOR TO ANY CONSTRUCTION OR LAND DISTURBING ACTIVITY, TO ® � d Ih ACTIVITY AND SHALL BE MADE FUNCTIONAL BEFORE UPSLOPE LAND DISTURBANCE TAKES PLACE. 3,29-4) TO AID IN GRASS ESTABLISHMENT, INCREASE INFILTRATION, DIVERSION DITCHES WILL BE CONSTRUCTED AND MADE OPERATIONAL DIRECT SEDIMENT LATENT WATER FROM ENTERING ANY EXISTING ADJACENT AND TO SLOW RUNOFF VELOCITIES. cc 0)j THE SILT FENCE, SEDIMENT TRAPS, AND BEFORE ANY UPSLOPE LAND DISTURBING ACTIVITY TAKES PLACE. WATERCOURSES. THE LIMITS OF DISTURBANCE INCLUDES APPROXIMATELY 4.8 :)to 5. STABILIZATION MEASURES SHALL BE APPLIED TO EARTHEN STRUCTURES SUCH AS DAMS, DIKES AND ACRES OF LAND DISTURBING ACTIVITIES. 2. TOPSOILING &STOCKPILING (3.30) -TOPSOIL WILL BE STRIPPED Virginia Runoff Reduction Method New Development Worksheet - v2.$ -June 2014 -----........ __ .. ....... .. O U. DIVERSIONS IMMEDIATELY AFTER INSTALLATION. FROM AREAS TO BE GRADED AND STOCKPILED FOR LATER USE. To be used w/2011 BMP Standards and Specifications I EVENT. EXISTING SITE CONDITIONS W Z -1 CONTRACTOR SHALL INSPECT EROSION CONTROL MEASURES AFTER EACH RAINFALL STOCKPILES ARE TO BE STABILIZED WITH TEMPORARY VEGETATION Site Data I LL _. 6. SEDIMENT TRAPS AND SEDIMENT BASINS SHALL BE DESIGNED AND CONSTRUCTED BASED UPON THE CURRENTLY THE DISTURBED AREA IS A MIXTURE OF OPEN GRASS COVERED LAND OR TO HAVE SILT FENCE INSTALLED ALONG THE LOWER PERIMETER Name: Bundoran Fauns hof H3 -R L-O�e (t U TOTAL DRAINAGE AREA TO BE SERVED BY THE TRAP OR BASIN. AND FOREST. HIGHTOP DRIVE IS THE EXISTING PRIVATE ROAD THAT PROVIDES TO PROTECT DOWNSTREAM AREAS. Date: 1 I Date 10-12-15 Z I- Orn SEDIMENT TRAPS ARE DESIGNED AND WILL BE CONSTRUCTED BASED UPON THE TOTAL DRAINAGE AREA ACCESS TO THIS PROPERTY. THERE IS AN EXISTING POND LOCATED ON AN i 4.rt LU 20) TO BE SERVED BY THE TRAPS. ADJACENT PROPERTY TO THE EAST, WHICH EVENTUALLY DRAINS INTO THE NORTH 3. TEMPORARY SEEDING 3.31) -AREAS NOT BROUGHT TO FINAL r data input cells (� r >x M - - - Z Q� CAPACITY OF A SEDIMENT TRAP SHALL BE 134 CUBIC YARDS PER FORK HARDWARE RIVER. THE INSTALLATION AND MAINTENANCE OF THE SILT FENCE ALL BE = calculation cells A. THE MINIMUM STORAGE GRADE FOR A PERIOD OF MORE THAN 30 DAYS SH -- 1.. 2 Z ACRE OF DRAINAGE AREA AND THE TRAP SHALL ONLY CONTROL DRAINAGE AREAS LESS THAN THROUGHOUT CONSTRUCTION IS CRITICAL TO PREVENTING SEDIMENT LATENT ___. STABILIZED WITH A TEMPORARY SEED MIXTURE ACCEPTABLE FOR constant values O ow DIMENSIONS. OF DISTURBANCE. _ ____ ..._. THREE(3.0) ACRES. SEE SIZING TABLE FOR DIME RUNOFF FROM EXITING THE SITE LIMITS THAT TIME OF (YEAR. CRIMPING, PUNCH ROLLER -TYPE ROLLERS, OR TRACK WALKING; MAY BE USED TO INCORPORATE STRAW MULCH 1. Post Development Rroject &Land Cover Information B. SURFACE RUNOFF FROM DISTURBED AREAS THAT IS COMPRISED OF FLOW FROM DRAINAGE _ _ _ I I CL _ _ AREAS GREATER THAN OR EQUAL TO THREE ACRES SHALL BE CONTROLLED BY A SEDIMENT ADJACENT AREAS INTO THE SOIL ON SLOPES IF STRAW IS TO BE USED. - - - CPnSt8nt5 BASIN. THE MINIMUM STORAGE CAPACITY OF A SEDIMENT BASIN SHALL BE 134 CUBIC HIGHTOP DRIVE FORMS THE SOUTHERN BORDER, AND ADJACENT PROPERTIES ARE I YARDS PER ACRE OF DRAINAGE AREA. THE OUTFALL SYSTEM SHALL, AT A MINIMUM, ALSO IN THE BUNDORAN FARMS SUBDIVISION. HIGHTOP DRIVE CONNECTS TO PLANK 4. PERMANENT SEEDING (3.32) - ALL AREAS DISTURBED BY - ,. .... ..__ ROAD. Annual Rainfall (inches) _ MAINTAIN THE STRUCTURAL INTEGRITY OF THE BASIN DURING ATWENTY-FIVE YEAR STORIM OF 24-HOUR DURATION. RUNOFF COEFFICIENTS USED IN RUNOFF CALCULATIONS SHALL CONSTRUCTION SHALL BE STABILIZED WITHIN SEVEN (7) DAYS AFTER - _ i Target Rainfall Event {inches} 1.00 CORRESPOND TO A BARE EARTH CONDITION OR THOSE CONDITIONS EXPECTED TO EXIST FINAL GRAD IS REACHED. PERMANENT STABILIZATION SHALL BE Phosphorus EMC {mc�,!L} 0.26 Nitrogen EMC {mg/L} 1.86 OFF-SITE AREAS APPLIED TO AREAS THAT ARE TO BE LEFT DORMANT FOR MORE THAN WHILE THE SEDIMENT BASIN IS UTILIZED. - -- THE DRAINAGE AREAS FOR BOTH OF THE SEDIMENT TRAPS ARE LESS THAN THREE (3.0) ACRES. NO CONSTRUCTION OUTSIDE THE LIMITS OF CLEARING AND GRADING SHOWN IS ONE YEAR. Target Phosphorus Target Load Ib/acrelyr} fl.41 Pi 0 90 _ __ 7. CUT AND FILL SLOPES SHALL BE DESIGNED AND CONSTRUCTED IN A MANNER THAT WILL MINIMIZE REQUIRED. ANY SURPLUS OR SHORTAGE SHALL BE BROUGHT TO OR OBTAINED RE FOUND TO BE ERODING EXCESSIVELY WITHIN ONE YEAR OF PERMANENT EROSION. SLOPES THAT A FROM A SITE WITH APPROVED E&S MEASURES IN PLACE. ALL EXCESS MATERIAL 5. MULCH (335) - PLANT RESIDUES OR OTHER SUITABLE MATERIALS t_and Cover (acres! SHALL BE PROVIDED WITH ADDITIONAL SLOPE STABILIZING MEASURES UNTIL THE T sous IC Soils Sods Totals STABILIZATION SHALL BE HAULED TO AN APPROVED SITE WITH ADEQUATE EROSION CONTROL SHALL BE APPLIED TO DISTURBED SURFACES TO PREVENT EROSION ___ ___ _ . A soils IB ID PROBLEM IS CORRECTED. , r PROTECTION. VELOCITIES. THIS PRACTICE SHOULD Forest/Qpen Space (acres) -- undisturbed, ,;v 1. _ y www : y y ", v A r ;. PES ARE FOUND TO BE ERODING EXCESSIVELY WITHIN ONE YEAR OF PERMANENT STABILIZATION, AND REDUCE OVERLAND FLOW OC TI IF CUT AND FILL SLOPES protected forest/open space or reforested land y � � 0 I _ $ � 0 0 40 Ii 10 I 3 0 UNTIL THE PROBLEM IS CORRECTED. BE APPLIED TO ALL SEEDING OPERATIONS, OTHER PLANTER --------- - A ILIZING MEASURES WILL BE PROVIDED Managed Turf {acres} -- disturbed, graded for ,'�� � �� � ���� � �� ��- � � p��� � �� ; � � �" ' ADDITIONAL SLOPE STB MATERIALS WHICH DO NOT PROVIDE ADEQUATE SOIL PROTECTION SOILS �__ s ' 9( �0 4O 8. CONCENTRATED RUNOFF SHALL NOT FLOW DOWN CUT OR FILL SLOPES UNLESS CONTAINED WITHIN AN arils or other turf to be mowedlmana ed_�t10�z_1. v ... . ADEQUATE TEMPORARY OR PERMANENT CHANNEL, FLUME OR SLOPE DRAIN STRUCTURE. BY THEMSELVES, AND BARE AREAS WHICH CANNOT BE SEEDED DUE Impervious Cover {acres) f . 0 ya1 (( s (:00 0 �Q ......... - ALL CONCENTRATED RUNOFF WILL BE CONTAINED WITHIN AN ADEQUATE TEMPORARY OR PERMANENT CHANNEL TO THE SEASON BUT WHICH STILL NEED PROTECTION TO PREVENT -- 14E -CHESTER LOAM - 25% TO 45% SLOPES '—.- ... __._ __ [Total SOIL LOSS. CRIMPING, PUNCH ROLLER -TYPE ROLLERS, OR TRACK OR STRUCTURE. -- _...... . -._._ - ----�- ... ...____._ ... WATER SEEPS FROM A SLOPE FACE, ADEQUATE DRAINAGE OR OTHER PROTECTION SHALL SOIL IS DEEP, VERY HIGHLY SLOPING AND WELL DRAINED. MODERATE PERMEABILITY WITH WALKING MAY BE USED TO INCORPORATE STRAW MULCH INTO THE Rv Coefficients i 9. WHENEVER A MODERATELY HIGH TO HIGH WATER CAPACITY. BE PROVIDED. SOIL ON SLOPES IF STRAW IS TO BE USED. A soils I D soils C soils D soils CONTRACTOR SHALL PROVIDE ADEQUATE DRAINAGE OR OTHER PROTECTION IF THIS OCCURS. SURFACE RUNOFF POTENTIAL AND EROSION HAZARD IS HIGH. SOIL IS IN HYDROLOGIC Forest/openface 0.02 0.03 0.04 0.05 10. ALL STORM SEWER INLETS THAT ARE INSTALLED DURING CONSTRUCTION SHALL BE PROTECTED SO GROUP B. 6. EROSION CONTROL BLANKETS (3.36) -EROSION CONTROL Managed Turf 0.15 0.20 0.22 0.2a THAT SEDIMENT -LADEN WATER CANNOT ENTER THE CONVEYANCE SYSTEM WITHOUT FIRST BEING BLANKETS WILL, BE INSTALLED ON FILL SLOPES WITH A SLOPE Impervious cover 0,95 0.95 0.95 0.95 FILTERED OR OTHERWISE TREATED TO REMOVE SEDIMENT. 15E - CHESTER VERY STONY LOAM - 25% TO 45% SLOPES GREATER THAN 2:1 FOLLOWING FINAL GRADING AND SEEDING. ___.... ___ _ - _... ---...... ... ---- ; ...... . _--._. STORM SEWER INLETS ARE NOT PROPOSED ON THIS SITE. SOIL IS DEEP, VERY HIGHLY SLOPING AND WELL DRAINED. MODERATE PERMEABILITY WITH EROSION CONTROL BLANKETS WILL ALSO BE INSTALLED IN DITCHES I 11. BEFORE NEWLY CONSTRUCTED STORM WATER CONVEYANCE CHANNELS OR PIPES ARE MADE MODERATELY HIGH TO HIGH WATER CAPACITY. SURFACE RUNOFF POTENTIAL AND WHERE POTENTRAL EROSIVE VELOCITIES MAY EXIST AS DETERMINED - - - -- --- ... - A Land CoverSummar�/ I OPERATIONAL, ADEQUATE OUTLET PROTECTION AND ANY REQUIRED TEMPORARY OR PERMANENT EROSION HAZARD IS HIGH. SOIL IS IN HYDROLOGIC GROUP B. BY ENGINEERING CALCULATIONS. THIS WILL PROTECT FROM RILL -_ I CHANNEL LINING SHALL BE INSTALLED IN BOTH THE CONVEYANCE CHANNEL AND RECEIVING CHANNEL. AND GULLY EROSION. t orestl0 en Space Cover acres 3 50 --- - 1...._. ADEQUATE OUTLET PROTECTION AND ANY REQUIRED TEMPORARY OR PERMANENT CHANNEL LINING WILL BE 19C - CULLEN LOAM - 7% TO 15% SLOPES Weighted Rv forest (} 03 i PROVIDED AND/OR INSTALLED BEFORE NEWLY CONSTRUCTED STORM WATER CONVEYANCE CHANNELS OR PIPES _ _ -I_. SOIL IS DEEP, MODERATELY SLOPING AND WELL DRAINED. MODERATE PERMEABILITY WITH 7. DUST CONTROL (3.39) - DUST CONTROL MEASURES SHALL BE °I° Forest 42°/Q Managed Turf Cover 4 3D: ARE MADE OPERATIONAL. acres .. ___ _ A VERY LOW TO MODERATELY HIGH WATER CAPACITY. SURFACE RUNOFF POTENTIAL AND APPLIED TO ALL DISTURBED SURFACES TO PREVENT SURFACE AND 12. WHEN WORK IN A LIVE WATERCOURSE IS PERFORMED, PRECAUTIONS SHALL BE TAKEN TO MINIMIZE: _- EROSION HAZARD IS MEDIUM. SOIL IS IN HYDROLOGIC GROUP B. Weighted Rv to 0 2 AIR MOVEMENT OF DUST FROM EXPOSED SOIL SURFACES AND REDUCE ENCROACHMENT, CONTROL SEDIMENT TRANSPORT AND STABILIZE THE WORK AREA TO THE GREATEST THE PRESENCE; OF AIRBOURNE SUBSTANCES WHICH MAY PRESENT %Mana ed Turf 52% __----. EXTENT POSSIBLE DURING CONSTRUCTION. NONERODIBLE MATERIAL SHALL BE USED FOR THE ImperviousCover acres? _ 0 _ _ -- - . _ .. CONSTRUCTION OF CAUSEWAYS AND COFFERDAMS. EARTHEN FILL MAY BE USED FOR THESE STRUCTURES 36C - HAYESVILLE LOAM - 7% TO 15% SLOPES HEALTH HAZARDS, TRAFFIC SAFETY PROBLEMS, OR HARM ANIMAL OR Rv im envious = 0 95 IF ARMORED BY NONERODIBLE COVER MATERIALS. SOIL IS DEEP MODERATELY SLOPING AND WELL DRAINED. HIGH PERMEABILITY WITH A PLANT LIFE. _ - -- % Impervious fi Total Site Area acre;M - 5 THERE WILL BE NO CONSTRUCTION WORK IN A LIVE WATERCOURSE ON THIS SITE. MODERATELY HIGH TO HIGH WATER CAPACITY. SURFACE RUNOFF POTENTIAL AND T 63t1 ... - MANAGEMENT' STRATEGIES 13. WHEN A LIVE WATERCOURSE MUST BE CROSSED BY CONSTRUCT10N VEHICLES MORE THAN TWICE IN EROSION HAZARD IS MEDIUM. SOIL IS IN HYDROLOGIC GROUP B. Si#e Rv ii 17 ANY SIX-MONTH PERIOD, A TEMPORARY VEHICULAR STREAM CROSSING CONSTRUCTED OF NONERODIBLE MATERIAL SHALL BE PROVIDED. 36D - HAYESVILLE LOAM - 15% TO 25% SLOPES 1. CONSTRUCTION WILL BE SEQUENCED SO THAT GRADING OPERATIONS Post -Development Treatment Volume acre ft O 1 THERE WILL BE NO CONSTRUCTION WORK THAT IS PROPOSED TO CROSS A LIVE WATERCOURSE CAN BEGIN AND END AS QUICKLY AS POSSIBLE. Past Oeveiopment Tr,atment Volume (cubic i SOIL IS DEEP, HIGHLY SLOPING AND WELL -DRAINED. HIGH PERMEABILITY WITH A 14. ALL APPLICABLE FEDERAL, STATE AND LOCAL REGULATIONS PER TO WORKING IN OR CROSSING MODERATELY HIGH TO HIGH WATER CAPACITY. SURFACE RUNOFF POTENTIAL AND feet} f LIVE WATERCOURSES SHALL BE MET. EROSION HAZARD IS HIGH. SOIL IS IN HYDROLOGIC GROUP B. 2. SEDIMENT TRAPPING MEASURES WILL BE INSTALLED AS THE FIRST STEP IN GRA4ING AND WILL BE SEEDED AND MULCHED IMMEDIATELY { Post Development Load Tit Ib! r 23 4 _ _ NO CONSTRUCTION WORK OR CROSSING IN A LIVE WATERCOURSE ON THIS SITE. Post Develo menf Load TP Ib! r , Total Load (TP} Reduction Required (lb/yr) MEN94AA21 THERE WILL BE 15. THE BED AND BANKS OF A WATERCOURSE SHALL BE STABILIZED IMMEDIATELY AFTER WORK IN THE 37E3 - HAYESVILLE CLAY LOAM - 25% TO 45% SLOPES FOLLOWNG INSTALLATION. WATERCOURSE IS COMPLETED. SOIL IS DEEP VERY HIGHLY SLOPING AND WELL -DRAINED. HIGH PERMEABILITY WITH A THERE WILL BE NO CONSTRUCTION WORK IN A LIVE WATERCOURSE ON THIS SITE. 3. TEMPORARY/PERMANENT SEEDING OR OTHER STABILIZATION WILL 16. UNDERGROUND UTILITY LINES SHALL BE INSTALLED IN ACCORDANCE WITH THE FOLLOWING STANDARDS IN MODERATELY HIGH TO HIGH WATER CAPACITY. SURFACE RUNOFF POTENTIAL AND FOLLOW IMMEDIATELY AFTER GRADING. STORMWATER MANAGEMENT CALCULATIONS ADDITION TO OTHER APPLICABLE CRITERIA: EROSION HAZARD IS HIGH. SOIL IS IN HYDROLOGIC GROUP B. A. NO MORE THAN 500 LINEAR FEET OF TRENCH MAY BE OPENED AT ONE TIME. 4. THE JOB SUPERINTENDENT SHALL BE RESPONSIBLE FOR THE B. EXCAVATED MATERIAL SHALL BE PLACED ON THE UPHILL SIDE OF TRENCHES. 56C - MEADOWVILLE LOAM - 7% TO 15% SLOPES INSTALLATION AND MAINTENANCE OF ALL EROSION AND SEDIMENT SOIL IS DEEP, MODERATELY SLOPING AND WELL -DRAINED. HIGH PERMEABILITY WITH A CONTROL PRACTICES. WATER QUALITY CONTROL: (See Above Spreadsheet) C. EFFLUENT FROM DEWATERING OPERATIONS SHALL BE FILTERED OR PASSED THROUGH AN MODERATELY HIGH TO HIGH WATER CAPACITY. SURFACE RUNOFF POTENTIAL AND The Stormwater Management Plan and calculations for Bundoran Farms, Lot H3 -R, demonstrate VSMP compliance by utilizing DISCHARGED IN A MANNER THAT APPROVED SEDIMENT TRAPPING DEVICE, OR BOTH, AND EROSION HAZARD IS LOW. SOIL IS IN HYDROLOGIC GROUP A. 5. WITHIN 30 DAYS AFTER BEING NOTIFIED BY THE EROSION AND SEDIMENT recorded Greenbelt Farmbelt easements, Sustainable Design Development Guidelines, and Community DOES NOT ADVERSELY AFFECT FLOWING STREAMS OR OFF-SITE PROPERTY. CONTROL ADMINISTRATOR, THE TEMPORARY EROSION AND SEDIMENT P Y Charter which limit the D. MATERIAL USED FOR BACK FILLING TRENCHES SHALL BE PROPERLY COMPACTED IN ORDER TO 81D - THURMONT LOAM - 15% TO 25% SLOPES CONTROLS CAN BE CLEANED UP OR REMOVED, AND ANY SEDIMENT building site acreages, the maximum amount of impervious areas associated with development, and the activities permitted in MINIMIZE EROSION AND PROMOTE STABILIZATION. TRAPS OR SEDIMENT BASINS CANL BE CLEANED OUT OR CONVERTED TO forested and open spaces on those lots. See below for applicable excerpts from these documents. E. RESTABILIZA11ON SHALL BE ACCOMPLISHED IN ACCORDANCE WITH THESE REGULATIONS. SOIL IS DEEP, HIGHLY SLOPING AND WELL -DRAINED. MODERATE PERMEABILITY WITH A PERMANENT STORMWATER MANAGEMENT BASINS. MODERATELY HIGH TO HIGH WATER CAPACITY. SURFACE RUNOFF POTENTIAL AND F. APPLICABLE SAFETY REGULATIONS SHALL BE COMPLIED WITH. EROSION HAZARD IS HIGH. SOIL IS IN HYDROLOGIC GROUP B. PERMANENT STABILIIZATION D.B. 3486, PG. 153: THIS APPLIES TO ALL UTILITY INSTALLATION OPERATIIONS INCLUDING WATER AND SEWER. Overview of Green Belt and Farm Belt Easement, Operational Areas and Potential Homesites, Plat Notes for Bundoran Farm. 17. WHERE CONSTRUCTION VEHICLE ACCESS ROUTES INTERSECT PAVED OR PUBLIC ROADS, PROVISIONS ALL AREAS DISTUREBED BY CONSTRUCTION SHALL BE STABILIZED WITH STRAW Note 4. reads in part: "Farm Belt and Green Belt Easements: All portions of lots outside of the homesites shown on this BE MADE TO MINIMIZE THE TRANSPORT OF SEDIMENT BY VEHICULAR TRACKING ONTO THE: CRITICAL EROSION AREAS SHALL & SEEDING IMMEDIAkTEKENTUC',KY 3 FOLLOWING FINISHED GRADING. SEEDING SHALL BE plat, as it may be revised, amended or supplemented, are subject to farm belt and green belt easements, as defined in the PAVED SURFACE. WHERE SEDIMENT IS TRANSPORTED ONTO A PAVED OR PUBLIC ROAD SURFACE, THE QBE DONE WITH KEN TAE FESCUE IN ACCORDANCE TO STANDARD AND ROAD SURFACE SHALL BE CLEANED THOROUGHLY AT THE END OF EACH DAY. SEDIMENT SHALL- CRITICAL SLOPE AREAS EXIST ON THIS SITE. PARTICULAR CARE SHALL BE TAKEN SPECIFICATION 3.32?, PERMANENT SEEDING, OF THE VIRGINIA EROSION AND Community Charter referenced. in Note 1, above. ... Use of any portion of the lot outside of the homesite is restricted by R FROM THE ROADS BY SHOVELING OR SWEEPING AND TRANSPORTED TO A SEDIMENT ON THE FILL SLOPES AND DITCHES TO ENSURE ADEQUATE VEGETATION IS .321, REMOVEDSEDIMENT CONTROL. HANDBOOK. ANY FERTILIZER AND LIME APPLICATIONS such easements and otherwise as provided in the Community Charter. Such easements are for the purpose of engagingin STREET WASHING SHALL BE ALLOWED ONLY AFTER SEDIMENT IS REMiOVED IN ESTABLISHED AND ALL DENUDED AREAS ARE PREVENTED FROM RUNNING OFF-SITE P CONTROL DISPOSAL AREA. THIS MANNER. THIS PROVISION SHALL APPLY TO INDIVIDUAL DEVELOPMENT LOTS AS WELL AS TTO OR INTO A LIVE WATERCOURSE. SHALL BE IN ACCONRDANCE WITH SOIL TEST RESULTS. ALL SEEDED AREAS agricultural operations and activities and such farm, forest, land, water, and wildlife management and environmental activities p Y pursuant to the Community Charter." LARGER LAND -DISTURBING ACTIVITIES. WILL BE STRAW MUILCHED TO PROTECT AGAINST RILL EROSION AND TO and practices as may be authorized CONTRACTOR SHALL MAKE PROVISIONS TO KEEP ADJACENT ROADS CLEAN FROM SOIL BUILD-UP. EROSION AND SEDIMENT CONTROL MEASURES PRESERVE SOIL MOUISTURE THAT WILL ENHANCE SEED GERMINATION. CRIMPING, 18. ALL TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES SHALL BE REMOVED WITHIN 30 DkYS PUNCH ROLLER-TYFPE ROLLERS, OR TRACK WALKING MAY BE USED TO INCORPORATE STRAW MULCH INTO THE SOIL ON SLOPES IF STRAW IS TO BE D.B. 3500, PG 1-112: AFTER FINAL SITE STABILIZATION OR AFTER THE TEMPORARY MEASURES ARE NO LONGER NEEDED, UNLESS UNLESS OTHERWISE INDICATED, ALL VEGETATIVE AND STRUCTURAL EROSION AND USED. OTHERWISE AUTHORIZED BY THE LOCAL PROGRAM AUTHORITY. TRAPPED SEDIMENT AND THE SEDIMENT CONTROL PRACTICES SHALL BE CONSTRUCTED AND MAINTAINED Community Charter for Bundoran Farm (Charter) DISTURBED SOIL AREAS RESULTING FROM THE DISPOSITION OF TEMPORARY MEASURES SHALL BEACCORDING TO MINIMUM STANDARDS AND SPECIFICATIONS OF THE VIRGINIA PERMANENTLY STABILIZED TO PREVENT FURTHER EROSION AND SEDIMENTATION. EROSION AND SEDIMENT CONTROL HANDBOOK, LATEST EDITION. THE MINIMUM MAINTENANCE OBTAIN INSPECTOR APPROVAL PRIOR TO REMOVING ANY EC; MEASURES. Charter, Ch. 3.1 , pg. 12 (2nd paragraph) CONTRACTOR SHALL STABILIZE SITE, AND STANDARDS OF THE VIRGINIA EROSION AND SEDIMENT CONTROL REGULATIONS "ATI 19. PROPERTIES AND WATERWAYS DOWNSTREAM FROM DEVELOPMENT SITES SHALL BE PROTECTED FROM SHAE BE ADHERED TO UNLESS OTHERWISE WAIVED OR APPROVED BY A VARIANCE. IN GENERAL, ALL EROSION AND SEDIMENT CONTROL MEASURES WILL BE portions of a Lot outside of the Homesite(s) on such Lot shall be subject to the Farmbelt and Greenbelt Easement SEDIMENT DEPOSITION, EROSION AND DAMAGE DUE TO INCREASES IN VOLUME, VELOCITY AND PEAK CHECKED DAILY ANID AFTER EACH SIGNIFICANT RAINFALL. THE FOLLOWING described in Chapter 13." FLOW RATE OF STORM WATER RUNOFF FOR THE STATED FREQUENCY STORM OF 24-HOUR DURATION IN STRUCTURAL PRACTICES ITEMS WILL BE CHECKED IN PARTICULAR: ACCORDANCE WITH THE FOLLOWING STANDARDS AND CRITERIA: ALL PROPERTIES AND WATERWAYS DOWNSTREAM FROM DEVELOPMENT SITES WILL BE PROTECTED FROM 1. THE CONSTRUCTION ENTRANCE SHALL BE CHECKED DAILY FOR SOIL Charter, Ch. 1 3.9, pg. 49 A TEMPORARY CONSTRUCTION SEDIMENT DEPOSITION, EROSION AND DAMAGE DUE TO INCREASES IN CONCENTRATED RUNOFF. 1. TEMPORARY CONSTRUCTION ENTRANCE (3.02) - BUILDUP. IF TFHE ENTRANCE BECOMES CLOGGED WITH SOIL AND FAILS TO "The Founder hereby rants to the Association, its successors, and assigns a perpetual, exclusive easement (subject to an ENTRANCE SHALL BE INSTALLED WHERE THE ACCESS ROAD INTERSECTS WITH Y 9 9 P P � ( 1 Y A. CONCENTRATED STORM WATER RUNOFF LEAVING A DEVELOPMENT SITE SHALL BE DISCHARZGED PREVENT TRAMISPORTATION OF SOIL ONTO THE ROADWAY, ADDITIONAL DIRECTLY INTO AN ADEQUATE NATURAL OR MAN-MADE RECEIVING CHANNEL, PIPE OR STFORM HIGHTOP DRIVE. pre-existing rights and easements) over all portions of the Community lying outside the boundaries of the Homesites STONE, REPLACEMENT OF STONE, OR A WASH -RACK MAY BE REQUIRED. „Farmbelt SEWER SYSTEM. FOR THOSE SITES WHERE RUNOFF IS DISCHARGED INTO A PIPE OR PIPE and Greenbelt Easement')„ () for the purposes of: (a) engaging in agricultural operations and activities within those SYSTEM, DOWNSTREAM STABILITY ANALYSES AT THE OUTFALL OF THE PIPE OR PIPE SYSTEM 2. CONSTRUCTION ROAD STABILIZATION (3.03) -ACCESS ROADS, PARKING 2• SILT FENCE SHALL BE INSPECTED IMMEDIATELY AFTER EACH RAINFALL portions of the easement area consisting primarily of pastures and fields suitable for such activities... (b) engaging SHALL BE PERFORMED. AREAS, AND OTHER ON-SITE VEHICLE TRANSPORTATION ROUTES SHALL BE AND AT LEAAI DAILY DURING PROLONGED RAINFALL. CLOSE ATTENTION in...timberin , logging, and silviculture activities as the Farm Management Committee deems appropriate for maintenance of NO CONCENTRATED STORM WATER RUNOFF IS ANTICIPATED TO LEAVE THE DEVELOPMENT SITE. STABILIZED WITH STONE IMMEDIATELY AFTER GRADING. SHALL BE PAID TO THE REPAIR OF DAMAGED SILT FENCE RESULTING the Greenbelt Zone in its natural condition as forest or open space, wildlife management activities, and recreational pursuits B. ADEQUACY OF ALL CHANNELS AND PIPES SHALL BE VERIFIED IN THE FOLLOWING MANNER;: FROM END RUINS AND UNDERCUTTING. SHOULD THE FABRIC ON A SILT (1) THE APPLICANT SHALL DEMONSTRATE THAT THE TOTAL DRAINAGE AREA TO THE POINT 3. SILT FENCE BARRIER (3.05) - SILT FENCE BARRIERS WILL. BE FENCE DECOMFPOSE OR BECOME INEFFECTIVE PRIOR TO THE END OF THE such as hiking, horseback riding, and other recreational activities... (c) engaging in such other forest, land, water, and wildlife OF ANALYSIS WITHIN THE CHANNEL IS ONE HUNDRED 11MES GREATER THAN THE INSTALLED DOWNSLOPE OF AREAS WITH MINIMAL GRADES TO FILTER EXPECTED USA4BLE LIFE AND THE BARRIER STILL BE NECESSARY, THE management and environmental activities aind practices as the Board, upon recommendation of the Farm Management CONTRIBUTING DRAINAGE AREA OF THE PROJECT IN QUESTION; OR RUNOFF FROM SHEET FLOW AS INDICATED ON THE ATTACHED SITE FABRIC SHALL. BE REPLACED PROMPTLY. SEDIMENT DEPOSITS SHOULD BE Committee deems appropriate." PLAN. REMOVED AFTER EACH STORM EVENT. THEY MUST BE REMOVED WHEN 2 a NATURAL CHANNELS SHALL BE ANALYZED BY THE USE OF A TWO-YEAR O O DEPOSITS REACH APPROXIMATELY ONE-HALF THE HEIGHT OF THE STORM TO VERIFY THAT STORM WATER WILL NOT OVERTOP THE CHANNEL BAkNKS 4. TEMPORARY DIVERSION DITCHES (3.12) - A SYSTEM OF DIVERSION BARRIER. ANY' SEDIMENT DEPOSITS REMAINING IN PLACE AFTER THE SILT Bundoran Farm, A Property Owner"s Guide to Sustainable Design & Development (Guide) pg. 37: NOR CAUSE EROSION OF CHANNEL BED OR BANKS DITCHES WILL DIVERT SEDIMENT -LADEN RUNOFF FROM THE DISTURBED AREAS FENCE IS NO !LONGER REQUIRED SHALL BE DRESSED TO CONFORM WITH "Impervious Cover Threshold: To preserve the function of existing natural systems to the greatest possible extent, Bundoran THE STORMWATER CONVEYANCE CHANNELS AND PIPES PROPOSED ARE ABLE TO CARRY THE EXPECTED TO THE PROPOSED SEDIMENT TRAPS. ALL TEMPORARY DIVERSION DITCHES THE EXISTING ,GRADE, PREPARED, AND SEEDED. Farm has defined a threshold of impervious area within the Develo SHALL BE STABILIZED IMMEDIATELY FOLLOWING INSTALLA11ON WITH TEMPORARY p pment Zone of a homesite. The threshold is intended to POST -DEVELOPMENT STORMWATER RUNOFF. OR PERMANENT VEGETATION TO PREVENT EROSION OF THE DITCH ITSELF. THE 3. ALL SEEDED AREAS WILL BE CHECKED REGULARLY TO ENSURE THAT A help maintain groundwater recharge rates ancd reduce localized and downstream stormwater problems. The impervious cover DIVERSION DITCHES SHALL BE INSPECTED AFTER EVERY STORM EVENT, GOOD STAND IIS MAINTAINED. AREAS SHOULD BE FERTILIZED AND threshold for a Development Zone is consistenit with the Virginia Chesapeake Bay Preservation Act, which requires stormwater AND/OR ONCE EVERY TWO WEEKS, WHETHER A STORM EVENT HAS OCCURRED RE -SEEDED ASS NEEDED. management on developmentt projects that create more than 16 percent impervious area. OR NOT, AND REPAIRS MADE TO THE DITCH, FLOW CHANNEL, OUTLET OR SEDIMENT TRAPPING FACILITY, AS NECESSARY. The average size of a Development Zone at Bundoran Farm is 1 acre, or 43,560 square feet, and the 16 percent impervious area threshold is roughly 7,000 square feet. Development Zones with more than 7,000 square feet of total impervious cover . must employ LID techniques to mitigate for the impervious area that exceeds 7,000 square feet. Impervious surfaces can include the roof area of the house, garage, outbuildings, and outdoor areas made with impermeable materials, such as the patio, parking and driveway section located within the Development Zone." REVISIONS Oct. 13, 2015 DATE Sept. 30, 2015 i U 4 Z J a 12 0 a: (L 0 w W Z � N co2 co rnco �t C� tq N Q gj .i�0) 0 Q. �r a° 9 Q cc LILI !E Z Z Q OU Wo 1 JJ Q. JZ Z % J o U Z Q VQ W 2 OW dd (0 J Z CC' N W J J IOcr Q0 2 20 v(6 a � W ® � d Ih 0 cc 0)j 0 :)to (D O U. W Z -1 n LL w0 - o L-O�e (t U � Z I- Orn W 4.rt LU 20) Z Q� 1-4 2 Z O ow CL REVISIONS Oct. 13, 2015 DATE Sept. 30, 2015 FILE NUMBER 8236 SHEET 6/6 Z J cr 1 (L MW � _2 0 OZ W Q -, < > Z II S� V J � � Z> FW- Q cr Z 2 d' < o U Z O to W J Cc Q Q cr O W J J IOcr W a O Z Z ID W 0) cc LU FILE NUMBER 8236 SHEET 6/6 DA POTENTIAL POLLUTANT SOURCES THE POTENTIAL POLLUTANT SOURCES ASSOCIATED WITH THE LAND DISTURBANCE OF THE SITE, AS ILLUSTRATED BY THE DISTURBANCE AREA, CONSISTS OF MINOR MAINTENANCE AND EQUIPMENT FUELING OPERATIONS. THESE ACTIVITIES SHALL BE LIMITED TO THE SPECIFIC AREA SHOWN ON THIS PLAN. IN ADDITION, THERE WILL BE FERTILIZER, SEED AND STRAW TEMPORARILY STORED AND UTILIZED FOR BOTH TEMPORARY AND PERMANENT SEEDING OPERATIONS. THERE WILL BE A PORTA-POTTY AND SOLID WASTE DISPOSAL, GENERALLY LOCATED AS SHOWN. IN ADDITION, THE CONCRETE WASH-OUT AREA SHALL BE PLACED IMMEDIATELY ADJACENT TO THE DRIVEWAY, AS SHOWN. MATERIAL DELIVERY WILL TAKE PLACE THROUGH THE USE OF THE PROPOSED DRIVEWAY AND MATERIAL STORAGE WILL BE LOCATED IN A GENERAL AREA BELOW THE HOUSE SITE, AS SHOWN. VEHICLE AND E�UTPMENT WASHING AS WELL AS DEWATERING OPERATIONS SHOULD TAKE PLACE ON OR ADJACENT TO THE DRIVEWAY. THE CONTRACTOR MUST ENSURE THAT THE DRAINAGE FROM THESE ACTIVITIES FLOWS INTO EITHER OF THE TWO SEDIMENT TRAPS. RECIEVING WATERS THERE ARE NO LIVE WATERCOURSES LOCATED ON THIS SITE. THE RUNOFF FROM THIS SITE EVENTUALLY DRAINS INTO THE NORTHFORK HARDWARE RIVER. THE TWO PROPOSED SEDIMENT TRAPS WILL ACCOMMODATE THE ENTIRE DENUDED AREA DIMENT TRAP S ARE LOCA TED IN THR OUGHOUT CONS TRUCTION. SINCE THE SE THE EXISTING LOW AREA OF THE LIMITS OF DISTURBANCE, EXISTING AND PROPOSED RUNOFF WILL CONTINUALLY DRAIN INTO THE TRAPS THROUGHOUT CONSTRUCTION. STO RMWATER MANAGEMENT THIS SITE HAS BEEN DESIGNED IN ACCORDANCE WITH AVAC50-60-1190. SEE THE WPO PLAN FOR SPECIFICS RELATING TO WATER DUALITY AND WATER QUANTITY COMPLIANCE. INSTALLATION & MAINTENANCE ALL EROSION CONTROL MEASURES ARE TO BE CONSTRUCTED IN ACCORDANCE WITH THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK, THIRD EDITION 1992. ALL LAND DISTURBING ACTIVITIES SHALL BE IN ACCORDANCE WITH VIRGINIA EROSION AND SEQIMENT CONTROL LAW AND REGULATIONS 4VAC50-30. EXISTING VEGETATION SHALL BE PRESERVED TO THE MAXIMUM EXTENT PRACTICAL AND QISTURBED PORTIONS OF THE SITE SHALL BE STABILIZED AS t�UICKLY AS POSSIBLE. IF PERIODIC INSPECTIONS QR OTHER INFORMATION INDICATE THE NEED FOR MODIFYING OR PROVIDING ADDITIONAL EC MEASURES, -THE OPERATOR MUST N S PRACTIC ABLE AS WE LL AS AS S00 A REPLACE OR MODIFY TH E MEASURES UPDATE THE SWPPP IN ACCORDANCE WITH THE LAND DISTURBANCE PERMIT. ALL CONSTRUCTION DEBRIS SHALL BE STORED -AND/OR SALVAGED WITHIN THE PROPOSED AREAS OF LAND DISTURBANCE. ANY LITTER EXPOSED TO STORMWATER SHALL BE PREVENTED FROM BECOMING A POLLUTANT SOURCE IN STORMWATER DISCHARGES. THE CONSTRUCTION SITE SHALL BE MONITORE❑ DAILY TO CONTROL LITTER. TEMPORARY PORTA-POTTIES SHALL BE UTILIZED THROUGHOUT CONSTRUCTION AND SHALL BE LOCATED WITHIN THE DISTURBED AREA. ALL CONTROL MEASURES SHALL BE PROPERLY MAINTAINED IN AN EFFECTIVE WORKING OPERATING CONDITION IN ACCORQANCE WITH GOOD ENGINEERING PRACTICE AND, WHERE APPLICABLE, MANUFACTURER RECOMMENDATIONS. IF SITE INSPECTIONS IDENTIFY CONTROL MEASURES ARE NOT OPERATING EFFECTIVELY, MAINTENANCE SHALL BE PERFORMED AS SOON AS PRACTICABLE TO MAINTAIN THE CONTINUED EFFECTIVENESS OF THE STORMWATER CONTROLS. IN THE EVENT THAT ADDITIONAL AREAS WERE BEING UTILIZED FOR CONTAMINATE DISPOSAL, NOT SPECIFICALLY CONTROLLED BY AN APP ROVED EROSION CONTROL MEASURE, THE PLAN SHALL BE IMMEDIATELY REVISED TO REFLECT ALL CURRENT, POTENTIAL POLLUTANT LOCATIONS, AS WELL AS SPECIFY ANY ADDITIONAL MEASURES NECESSARY FOR ASSURANCE OF THE PROPER MAINTENANCE AND APPLICABLE SPILL PREVENTION CONTROL MEASURES ARE IN PLACE AND FUNCTIONAL. SPILL PREVENTION INFORMATION MEANS OF S ECONDA RY CON TAINME NT IN LING ARE AS MU5 T PROVIDE A ALL FUE CASE OF FUEL LEAKS OR SPILLS. THIS COULD INCLUDE THE USE OF SPILL BUCKETS AND OR FUEL S PILL MATTIN G OR ANY TYP EOFD EVICE THAT TRAPS AND CONTAINS THE FUEL AND WHICH CAN BE REMOVED FROM THE SITE AND TAKEN TO AN APPROVED DISPOSAL LOCATION. THE CONCRETE WASHOUT AREA MUST BE LOCATED UPSTREAM OF A SEDIMENT TRAP 0 BASIN. R 0 BERM MUST BE INS TALLED AROUND THE EAC H PORTA -POTTY A ST LT FENCE R AND THE SOLID WASTE DUMPSTER TO PREVENT AND/OR LIMIT ENVIRONMENTAL IMPACTS. - \I plat 1p' , \.. 1 t! l,f I j 11,, , J'. : t 1'J f'! /-., \ .. , !1 /tJ ''rf r . ! JI( f ff 7[' 0 I / / •_. � �`-" l_ �"!1'► / , , l,, / ..��' , -, � __ "___—, -.1--l' -, ( I—_ "_ '__ -'111- __ , 11", ___ " ___,_ I-- "",_ " _' _" ___ 11—i I-, t ", '11- '__ _""' _" _­ . ..... '-111 �'_ " ' ' '_ _'_ �'_ I-- - _ _i,"l__ "',__ ill""__ "I"","" '_'.­_'_ _--i-, '111'_" __ - I—, __" ____"' " "" "ll- ___"""' _""" _____ _""'1-111 "I "� �� '11'_ _ . � - _ " ", _ " ", '_ ", ", " I-_ __ _1""'_ ' _'_ __ ' - �" -__1 1--__ , � 1, � 11- , _", � - ", - '_" '� - �'� ___1 ""­__ __-, - .. 1 ,l 11 ' 0 FFER , , + - ,.. ", WP ..�"'"", " ­'­_ "'_ ... � ' _," 11 , "11 I i ,...r, /'' y ..�' 1 _11 I''r I /' %__" \i _, I 1 1, , I •_a 9 � _ t '1 .�-- ./' __ -1, ) , '( . � t _0 \ \ .1�% /// `t / - '­ , """' __ -, __ '__ "__ __ " ""'. - '� � �' "', "", \ -, "l-, '_ 'I" I" ___ '_-'l'_" __ __ \' �_ `` _� 1'' _--" `\ D �� \ v _ _ yTH 0 � I ,I x r I a �` __,_ t . „ 'i „ \ '� q ,~, ,'''/ % �11 "I, e , .,,.;i�l�l Christopher C. Mail igan ',r , \ Lic. No. `-10 / /: / �__ - _,_ ___ "\\ ~�'__,, ,, 031672 w� / - -11 1-1 j' „ _ _ ;a F G ._ ._ _ „ „ E` ¢EE�Z _- , _. : _..._ .._ „ "`� \„ s 11 t s E _ '' 11- _ t � -4., \— � 0 N A' E ~~ __ _, /' --'- _. \, _ _ - __ F. , _.... - i / ""_ , Ill- / _ - , ) - I _ — _ �/' „t_.. I --- - i % 1\ \ _ �T'/11 ,\ , „ _ \ - \ / '"`y if/ \1` °\./ " �`, l /. 11 r / _ /- s�, _ / / / /, - _ / — _. _ - \ r l._ ,", / / _ _._ /-` < ` ;` �4 _ ,, -11- / t r ,- _ . , \ , l .. r ', ' \\. t - , �- _. x i i' _.. _ , '`\ i; r. t , 1 r __ .. r ._ %f `- I i , , / __, ..,/ `'rte. ",I l i '`0 i -r � t_'�. .' \ \ \\ I \ (` r r' _ / \1\\r _ _� t i -„ - _. __... _. % 11 / /, - _ .>. / , \ ,; �, 860 _ t \ ~,_. _ _ T \ - \ `, t _ he ._._ .- _... 1 �,. , r..., i -r. % \ '-- ._ ..... _...._._... _.. ti.,._. / __ — '-_ f - i _ - - / -- _ _ - . _ 1 _ i11 4 ;- / j i J _ __. YLI N K _.._ . _, _% r,, 20 CE 7U , �, N R _./ / \ -'._ - �-- . , - _ "r'., - - EASEMEN T _._, , _ r - y tX�e - ,~ 1 __'.- \::: - ' /�/ _...866.._- .. . f/,% - - / , \,' ••/'� /;% _ \ \ D.B. 4291 P.137 O.,o ,o { __ ... 1 r RWD R r r A__4 0 q 8 - _ _. \`. \ ; I - F F .�_.; -i ,-.-ter ', .:� ., ... .�::'_. �, 1- " DISI'URBA , '�E ,. r __ ' - \ d' - _ . /� / -/ - - ,..__ _ 4 _ _ _ �\ S� -.� � � w „ � � , ,. �. � ''+ LIMITS- OF- -8� I 11!/ / \ * t , r :' _ / y , 1 - K r / r _. _. _- , „ , , -- - _.._ _ _.. .;..._ _ 8 9 4' r \ / - _._ /X/�/ , \. \ . _ _, e 1 t i i. - : � , _ , r ___ STURBANCE / _._ \ ~ _ - - _ _..._. _ \ /- 8'- ,~ir , �. \ , r __ t / ` 87 8 0 \ ,. , / \ ,/ r :� .._.._. _ .......... - .. k ,t - 8 .9 ' .. j _____ '�,. f , .__, t r t /. . i,.. 11 \ =' ^ 0 �/ \: \ : t /.. - _ 00 �, t ,. , y. TREELYNE 9 '' \ ... '� � � ----- ... 1, ,i ,... �, ', , , 1 \ / R -- >. 9 ,, - ~ / 141 _ - _ ,. ,... ,,. .. �. , •�`. / ''` � ' `PROP .- 6 . ,, / . J „ \ \ , ,.. f SF ,. 9 0 DV 2 / / _ _ '9 -/, . \ �''fiR L NE _ Q , :� r', / , ' -.__ - ►:. 2 \ i F_11. E :r >= ..~ N I Y l ,, r ` 1. % ! .! �.�--' ...\ .. � t _ �� � ' � i 1 / L 6 n / V < r' J' I < D \ CRS s , -.i: \ l r .. 6 � I: <- Q iPSx Y \.^ x T '` ., , 1 0 1 / I r 9 _,. _ , ,r . s \, . \ , \ \ r \ \ / _, a „ \ _ ,r , , _.. \ - X \ \ 8 1 r , / r / i' :\ 9 9 r i` \, r % W f, 91 - ,8 _ f. 4 \. 2 �. , \ / 1 J X /•. \ r. .i _ r \ \ r , i, / / / \ D \ \ ✓ . .... _ ...._ __ __ r' 11", f V Q //. / .,, / i. ., r t t J t '., 2 ` r ` �' : ti \. „ I Q \ 4- \ / _ / \. / . �.< /, 9 ,. „ \ \ (.. /. \ l� , r \ ..:. \ \ r. � ', i /' f ti _ /. / - \ � LrM" o: / / \ \ O U 1 ! 0 __ y 0 _ t - -- 2 S _ `i - /'• \ DISTUR A G i` \ 1 r N E \. ;' \ 1 , �_ 1 \ �' t , �. l./ t , i`. 1 __ _. ,' _ ,r , / /f , , , \ .: 1 _ j. / . l a / i ;_ , ., , t ,I <. „ 6� e � t, P. i, ,; R 5 t 1.��l I /� , '11, "c", :\ f i i _t. r: 9 \ \ t tlJ C V/ - / - 1 \ r ' , x I S' ! \ \. \19 ?� r \ \ / , .-. c ., a, ,., , t ,.,, „ \ I I A - 1, \ n, .l, / ... \ ,, \ \.1)1� \. \ 1 O v. \ \. \ , \ �- \ _ \ - I f, DC . \ , . N\' \ \ D` w , , \ \11V !:.', ' ,.s":r 1/ 't. \ ., .... ,. ,. .\..,-i <., ,,.i :. : ,',. `'t \ S' :_..,:... \ ... I '. i,,,' ( ,�, n.. '.i! f.: r„ .5€', ,,. r r �`i .. , f 1 f.. L. - .,, , / .. : , \- �. \, , *<\ , ..: \ v. \\ ..: _ .,. , �. ._ `I .. ,. ,,, ,. 1 .<, r /, l.•., .. �.. / , „ \ /., s% �`i�%(� .. \, \ 1 \-C l •7/ ' „ .\, t t \ _-.,. , r.. . \ �,!=\ i. ,. _-- — f'a % \ \ . . --- Z_'�- ��' �' .' " \""' \ � , , .1 - ' '11, '�_ '�'� "� I " �'- " - � I't " " /'� " I . ..... / , "�'. I ' "' ' ' " \ "�� .... �' " il, T, ' " ', !, "I �.,-' 1, __ \ , '�' " _"�' �'�"' ��lx_ \�_,_ \� X \. � , , , � � , � , '­ , ,,,,, ..... , !, �' ' I\,, lk" /" ., " �' �\ " ", "-:'�:­\ " � '� , , �'\ '__[:3_ " , .. ,,,, " , "., I , \�\ , , , �. , 1� "� ) \ \. \ \, ", , lk"N' !f,.. `'• �' � -'\ .�\: \ .', \ \�\ \ \ \. .\,,�ee��"�'�`' \: \', .`:l'/ %._ ., ✓,-F ,;/Tel , J. /, SCALE I " = 60' 60 30 0 60 120 SCALE IN FEET / ,/ t , t / /:.,'j /, i" ,.�- +.�.'-#WrG'ww�)s �4r/',� rIXR ;' l / , ., t7,J r lei t, l t , / , ,r ,r I., _ ((J <.z /' :He i -e., dt ✓ ' 1 ,' , , , r ko r ,t ,t 1, ,i':. , '/' /" /:._/ / .b x: , / / / T ' / r r ! ( t i f f ! W \ i \ \ \ .. / rr I'lli �x .� rj / /' / (r ( ' it O I '-i. /// /,.'' / % / f :, }=933.00 / /' �� / I 1'+ , /. / ;,/ %,<,? :/ /'" \ 6' t i P . ., f �'* _ •% , , / '� " '�4 , / �` / /. i i ( r r i � \ ' 1 ! - co 0l0 / /' /'/i"""_';I-- -r U t ,'f. 4 ,� -, + / / /'p�'\ !/ Q> 'pro `f r f I 11 l , /' , , . 7 / 11 " / /,/ :/ ./'. / 1 k I I' F .I. i ) 1 ,-v r / /' f i I I , r 1 /' " " / I'll I I , -1 I ) I I � / __ I -"- 11 '/ z , ,-,O-",- "' '/ / t i ' ; I i i � i / i I , I / e/ // '/ ) / / I . / // // x/ f (�•� _ :\ , i f t r t i r I / r , 1 r r / � .f i ' Y5i(./i / /, ,, ..ff- R�P. f f 1 r l S r \I 1 f/ ,! i r 1 1 �, i / i %` .,f 1 Q I, „�'/ f I L E1�• b11 /' / REELrNE asp PROP. 1 %`,' f` i i i j �` ,g TfEElE 1 J, I / / _� • \# REEL rL+ / ' / / / , -01 , / LI ` IT QF l _ , , /: // /^ I 1 f ' f t N c— r ...t �:... I, 1 1 / / / / i ' 1 d ,. y l - - ,., I ;TUR�AN� MI U AN '. , i i , t /` ' i . ,. /'" ', ^? i 'jam ` 1 ' „" .I ..'^ '� I t'r ' °7 .f" T-. , ,, / / / ! / , ; ' r` i / ; �% • 1 Q Y(v,r _' /"',.;,, `\ I ! i i , / ,, 7 f t I i , 1 1 t 1 t i 1, n,. i '�'�?��� � ,r.:�J —�� / r�— ,!r' / �1 — f•( _,t. 0 N V ///11 . F ;.,:_' \� � 1 � CO <D / , � � I , ? t t t C f/:a'f .''.,- f .,1 f '.,.,, :r / / �/ ! t i / r / \. lJ'7 fi , // / , ,.r.' / _ "------, f 1 �..__ ' . ^ CSS 'v ' / / r I , I N i x f' i ,f f ?r t i� , / r" i r I 11 / t / r , ) f` i I 1, b �b i'" \ \ 00 i , r -) / . i rr ( O> r N ( m f i, f I/ _ . , / / / / i ` t I 1, / /r .. i :,, ! 1. W � y 1 \ ; _ , % t 0 \. 1 r ? r ,1 , /% / ,a, '' ,' % i/ / /'.1 : I i i i f Y I f f f l / / / / /i ' // % / / � , / % / ` , / /` / / /- It DRAINAGE ESMT. - NA BUNDORAN FARM, LLC f D.B. 34' P.87 L • i • u 4 a 2 w 0 - U w %u N � Z o co N m to NB � R �% ¢_ �' 'r. z O Q U' w 9 0 rr Lu ir Z 0U Wo kz JZ (t -.. !0 00 w Q UQ�w Cid (0 Oo cc JZ QN 1 �, Z 0 v CD I N W 0 cc o � 0 <t 0 ' (0' Cr x Q �0 ou- rr^^ W J 1 Q) J LL W 0 0> Vo cc I W �� pti a w z ° 0) 14t qt 0) W 8 Z 0 aw DATE Oct. 16, 2015 SCALE 111 = 601 CONTOURS 2 FEET FILE NUMBER 8236 SHEET 112 z I P1 1.{.. T i 00M 6.L.� 0g � Q J .- _z I z cc (/j° 0 > W z � 2 w cr W Z :) 0 \rr W LL J z 0 z C W Im ..J 0 0 W Q/// IL cr CL Z co J (L W FILE NUMBER 8236 SHEET 112 r STAPLES (2 PER BALE) WOOD OR METAL STAKES (2 PER BALE) A L_ VARIES 10 MIL, PLASTIC LININGSTRAW BALE (TYR) NATIVE MATERIAL (OPT.) BINDING WIRE SECTION A -A' NOT TO SCALE 10' MIN. ,-STAKE (TYR) 10 MIL. PLASTIC LINING - STRAW BALE (TYR) PLAN NOT TO SCALE CONCRETE WASHOUT AREA ABOVE -GRADE CONTAINMENT AREA W/ STRAW BALES SILT FENCE LOCATE ON DOWNHILL SIDE OF SOLID WASTE COLLECTION AREA 10 MIL, PLASTIC LI 1 3' MIN. LATH AND FLAGGING ON 3 SIDES 10 MIL, PLASTIC LINING VEHICLE TRACKING CONTROL (GRAVEL, PAVEMENT OR OTHER STABLE SURFACE) 1. NO CONSTRUCTI❑N WASTE MATERIALS WILL BE BURIED ONSITE, 2. DESIGNATE A S❑LID WASTE COLLECTION AREA. 3. THE S❑LID WASTE COLLECTION AREA SHOULD BE LOCATED A MINIMUM OF 50 FEET AWAY FROM CONCENTRATED FLOWS OF STIORMWATER, DRAINAGE COURSES, AND ST❑RMWATER DRAINS, WATER BODIES, AND SHOULD NOT BE LOCATED IN AREAS PRONE TO FLOODING OR PONDING, 4. ALL WASTE MATERIALS WILL BE COLLECTED AND STORED IN A PROPER RECEPTACLE IN ACCORDANCE WITH ALL FEDERAL, STATE, AND LOCAL WASTE MANAGEMENT REGULATI❑NS. S❑LID WASTE GENERATED FROM CONSTRUCTION ACTIVITIES ON THE PROJECT SITE AND TRASH WILL BE DEP❑SITED IN DUMPSTERS AND/OR OTHER SOLID WASTE CONTAINERS. ONLY TRASH AND CONSTRUCTI❑N DEBRIS FROM THE SITE WILL BE DEPOSITED IN THE DUMPSTER. 5. NOTE, ONLY APPROPRIATE SOLID WASTES SHOULD IBE PLACED IN DUMPSTERS AND/OR SOLID WASTE CONTAINERS, CEIRTAIN WASTES SUCH AS HAZARDOUS WASTES, APPLIANCES, FLUORESCENT LAAMPS, PESTICIDES, ETC., MAY NOT BE DISPOSED OF IN SOLID WASTE CONTAINERS, FOR ANY ITEM THAT IS CONSIDERED HAZARDOUS WASTE, FOLLOW THE PROCEDURES SPECIFIED IN THE STORMWATER POLLUTION PREVENTION PLAN (SWPPP) `MATERIAL MANAGEMENT PRACTICES - HAZARDOUS PRODUCTS", 6. LIQUID WASTE WILL NOT BE DISP❑SED OF IN DUMPSTERS AND/OR SOLID WASTE CONTAINERS. FOLLOW MANUFACTURES', FEDERAL, STATE, AND LOCAL GUIDELINES TO DISP❑SE OF LIQUID WASTES PROPERLY, 7. SILT FENCE SHOULD BE INSTALLED ON THE D❑WNHIILL SIDE OF THE SOLID WASTE C❑LLECTI❑N AREA ON A MINIMUM OF ONE SIDE. 8. SOLID WASTE, CONSTRUCTION DEBRIS, AND TRASH IC❑LLECTED IN THE DUMPSTER AND/OR SOLID WASTE CONTAINERS WILL BE HAULED TO AN APPROPRIATE WASTE DISPOSAL SITE. 9. SCHEDULE REGULAR SOLID WASTE COLLECTION PICIKUPS TO PREVENT THE CONTAINERS FROM OVERFILLING. 10. DURING THE DEMOLITION PHASE OF CONSTRUCTION, PROVIDE EXTRA CONTAINERS AND SCHEDULE PICKUPS ON A MORE FREQUENT BASIS. 11, SMALLER SOLID WASTE CONTAINERS WILL BE RAISIED OFF THE GROUND WITH A PALLET OR AN EQUIVALENT STRUCTURE. 12. THE PROJECT C❑NSTRUCTI❑N MANAGER SHALL ENSURE THAT SILT FENCE IS INSTALLED ON THE DOWNHILL SLOPE BELOW THE SOLID WASTE COLLECTION AREA TO CONTAIN LEAKAGE AND/OR SIPILLAGE, 13, THE PROJECT CONSTRUCTION MANAGER MUST ENSURE THAT DUMPSTERS AND/OR SOLID WASTE CONTAINERS HAVE SECURE, WATERTIGHT LIDS S❑ THEY CAN BE COVERED BEF❑RE/DURING PERIODS [OF RAIN. 14, IF DUMPSTERS AND/OR SOLID WASTE CONTAINERS :DO NOT HAVE SECURE, WATERTIGHT LIDS, THEY MUST BE KEPT IN A COVERED AREA. 15. INSPECT SOLID WASTE COLLECTION AREA AND CHEICK DUMPSTERS AND/DR SOLID WASTE CONTAINERS FOR LEAKS, SPILLS AND EXTERNAL CORROSION AND STRUCTURAL FAILURE WEEKLY AND IMMEDIATELY AFTER STORM EVENTS, 16, CLEAN UP LEAKS AND SPILLS IMMEDIATELY. SOLID WASTE COLLECTION C❑NTAINNdENT AREA NOT TO SCALE SECTI❑N A -A' NOT TO SCALE VARIES PLAN NOT TO SCALE CONCRETE WASHOUT AREA BELOW -GRADE CONTAINMENT AREA ATH AND FLAGGING N 3 SIDES 1. CONCRETE TRUCKS WILL ONLY WASH OUT, DISCHARGE SURPLUS CONCRETE, OR DRUM WASH WATER AT APPROVED LOCATIONS IN ACCORDANCE WITH FEDERAL, STATE, AND LOCAL REGULATIONS. ALL CONCRETE AND CONCRETE WASHOUT SLURRIES FROM THE CONCRETE MIXER TRUCKS AND CHUTES WILL BE DISCHARGED INT❑ THE WASHOUT AREA OR HAULED ❑FF -SITE FOR DISPOSAL. SMALLER EQUIPMENT SUCH AS WHEELBARROWS AND HAND TOOLS ALSO WILL BE WASHED DOWN AT THE TEMPORARY CONCRETE WASHOUT, 2. THE TEMPORARY CONCRETE WASHOUT AREA WILL BE CONSTRUCTED BEFORE ANY CONCRETE POURS OCCUR AT THE SITE, 3. CONCRETE POURS WILL NOT BE CONDUCTED DURING OR BEFORE AN ANTICIPATED STORM EVENT, 4. WHEN THE TEMPORARY WASHOUT AREA IS NO LONGER NEEDED FOR THE CONSTRUCTION PROJECT 5. TEMPORARY CONCRETE WASHOUT WILL BE CONSTRUCTED WITH A MINIMUM FLAT AREA OF 8'X8' AT THE BOTTOM OF THE PIT WITH 31l OR FLATTER SIDE SLOPES) HOWEVER, THE PIT SHOULD BE SIZED FOR SUFFICIENT VOLUME AND QUANTITY TO CONTAIN ALL LIQUID AND CONCRETE WASTE GENERATED BY THE WASHOUT ❑PERATI❑NS. 6. THE TEMPORARY UNLINED CONCRETE WASHOUT SHOULD BE A MINIMUM OF 400' FROM ANY NATURAL DRAINAGE PATHWAY OR WATERB❑DY, D❑ NOT SANDBAG (TYP,) LOCATE UNLINED CONCRETE WASHOUT WITHIN 1000' OF ANY WELLS, DRINKING WATER SOURCE. IF SITE CONSTRAINTS MAKE THIS INFEASIBLE, OR IF HIGHLY PERMEABLE S❑ILS EXIST ON SITE, THE CONCRETE WASHOUT AREA MUST BE INSTALLED WITH AN IMPERMEABLE LINER (10 MIL. PLASTIC LINER) ❑R SURFACE STORAGE ALTERNATIVES USING PREFABRICATED TOP OF BERM CONCRETE WASHOUT DEVICES OR A LINED ABOVE GROUND STORAGE AREA SHOULD BE USED, 7. THE WASHOUT AREA WILL BE INSPECTED DAILY AND AFTER HEAVY RAINS TO ENSURE THAT ALL CONCRETE WASHING IS BEING DISCHARGED INTO THE WASHOUT AREA, THAT THERE ARE NO LEAKS OR TEARS ARE PRESENT, AND TO IDENTIFY IF THE WASHOUT HAS REACHED 75% OF ITS HOLDING CAPACITY, 8, DAMAGES TO THE CONTAINER SHOULD BE REPAIRED PROMPTLY. 9. TEMPORARY CONCRETE WASHOUT SHALL BE REPAIRED, CLEANED, OR BOTTOM OF BERM ENLARGED AS NECESSARY TO MAINTAIN FOR CONCRETE WASTE. 10. PLASTIC LINING MUST BE FREE OF HOLES, TEARS, OR OTHER DEFECTS THAT C❑MPR❑MISE THE IMPERMEABILITY OF THE MATERIAL. 11, WHEN THE TEMPORARY CONCRETE WASHOUT IS FILLED TO 75% OF ITS CAPACITY, THE WASHING WATER SHOULD BE VACUUMED OFF OR ALLOWED TO EVAPORATE TO AVOID OVERFLOWS, 12. WHEN THE REMAINING CEMENTITIOUS SOLIDS HAVE HARDENED, THEY SHOULD BE REMOVED AND DISPOSED OF OR RECYCLED, THE CONCRETE WILL BE BROKEN UP, REMOVED, AND TAKEN TO A LANDFILL FOR DISPOSAL OR RECYCLING CENTER RECYCLING. 13, BEFORE HEAVY RAINS, THE WASHOUT CONTAINER'S LIQUID LEVEL SHOULD BE LOWERED OR THE CONTAINER SHOULD BE COVERED TO AV❑ID AN OVERFLOW DURING THE RAINST❑RM. 14. SIGNS WILL BE POSTED MARKING THE L❑CATI❑N OF THE WASHOUT AREA TO ENSURE THAT CONCRETE EQUIPMENT OPERATORS USE THE PROPER FACILITY, SILT FENCE LOCATE ON DOWNHILL SIDE OF PORTABLE TOILET T 10' STD. PORTABLE TOILET 1. ALL SANITARY WASTE WILL BE COLLECTED FROM THE PORTABLE TOILETS AS REQUIRED BY FEDERAL, STATE, AND LOCAL REGULATI❑NS, 2. THE PROJECT CONSTRUCTION MANAGER SHALL PROVIDE A SUFFICIENT NUMBER OF PORTABLE T❑ILEITS TO SERVE THE MAXIMUM NUMBER OF EMPLOYEES EXPECTED ON SITE DAILY. 3. POSITION PORTABLE TOILETS SO THAT THEY ARE SECURE AND WILL NOT BE TIPPED OR KNOCKED OVER. 4. THE PORTABLE TOILETS WILL BE MAINTAINED AND INSPECTED WEEKLY FOR EVIDENCE OF LEAKING HOLDING TANKS, 5. TOILETS WITH LEAKING H❑LIDING TANKS WILL BE REMOVED FROM THE SITE AND REPLACED WITH NEW PORTABLE TOILETS. 6. CLEAN UP LEAKS AND SPILLS IMMEDIATELY 7. CONTAINMENT TRAYS CAN BE USED AS SECONDARY CONTAINMENT IF PORTABLE TOILET IS SET ON A LEVEL GRAVEL OR PAVED PAD. 8, SILT FENCE SHOULD BE INSTALLED ON THE DOWNHILL SIDE OF THE PORTABLE TOILET ON A MINIIMUM OF ONE SIDE, 9. IF PORTABLE TOILET IS LOCATED ON SINGLE FAMILY HOME SITE, AND SILT FENCE IS INSTALLED AIROUND THE PERIMETER OF THE PROJECT SITE, THE ADDITIONAL SILT FENCE DIRECTLY ADJACENT TO THE TOILET IS NOT NECESSARY. PORTABLE TOILET CONTAINMENT AREA N❑]T TO SCALE GOOD HOUSEKEEPING, THE FOLLOWING GOOD HOUSEKEEPING FPRACTICES WILL BE FOLLOWED ONSITE DURING THE CONSTRUCTION PR❑JEC:Ti 1, IDENTIFY ALL HAZARDOUS AND N❑NJHAZARDOUS SUBSTANCES PRESENT AT THE PROJECT SITE. 2. THE PROJECT C❑NSTRUCTI❑N MANACGER MUST COMPILE A LIST OF ALL CHEMICALS PRESENT AT THE PROJECT SITE AND OBTAIN A MATERIAL SAFETY DATA SHEET (MSDS) FOR E=ACH ONE, 3. WHEN POSSIBLE, ALL PRODUCTS WIILL BE KEPT IN THEIR ORIGINAL CONTAINERS WITH THE ORIGINAL MilANUFACTURE'S LABEL, 4, IF IT IS NOT POSSIBLE TO KEEP TTHE PRODUCTS IN THEIR ORIGINAL CONTAINERS WITH THE MANUFACTURE'S LABEL, THE NEW CONTAINER MUST BE LABELED WITH THE NAME OF TEHE PRODUCT/CHEMICAL, THE UNIT NUMBER (WHEN APPLICABLE), EXPIRATION DATE (WHEN APPLICABLE), HANDLING INSTRUCTIONS, AND HEALTH OR ENVIRONMENTAL HAZARDS (WHEN APPLICABLE), IF THIS INFORMATION) IS NOT AVAILABLE ON THE MANUFACTURE'S ORIGINAL LABEL, CONSULT THE MSDS'S FOR THE RELEVANT INFORMATI❑N. 5. THE PROJECT CONSTRUCTION MANACGER WILL MAKE SPECIAL NOTE ON THE INVENTORY OF THE HAZARDOUS CHBEMICALS ON THE PROJECT SITE THAT REQUIRE SPECIAL HANDLING, STORtAGE, OR DISP❑SAL, 6. MANUFACTURER'S RECOMMENDATIONS FOR PROPER STORAGE, USE, AND DISPOSAL MUST BE FOLLOWED FOR' ALL CHEMICALS AND MATERIALS PRESENT ON THE PROJECT SITE, 7. ALL MATERIALS STORED ON THE PROJECT SITE WILL BE STORED IN A NEAT, ORDERLY MANNER IN THEIR 0PPROPRIATE CONTAINERS, 8. MATERIALS THAT HAVE THE POTENTIAL FOR CONTAMINATING RUNOFF DURING STORM EVENTS WILL BE S'T❑RED IN THEIR APPROPRIATE WATERTIGHT CONTAINERS, STORED ION A SPILL PALLET UNDER A CANOPY, TARPAULIN, SHRINK WRAPPED OR OITHERWISE PRECLUDED FROM DIRECT EXPOSURE OF PRECIPITATION. 9. ACCESS TO STORAGE AREAS MUST ]BE RESTRICTED TO PREVENT VANDALISM, 10, WHENEVER POSSIBLE, ALL OF A PRODUCT WILL BE USED UP BEFORE DISP❑SING OF THE CONTAINER. 11. EMPTY CONTAINERS THAT MAY C❑NTfAIN CHEMICAL RESIDUES SHALL BE DISP❑SED OF IN ACCORDANCE WITH] FEDERAL, STATE AND LOCAL REGULATIONS, 12. CHEMICAL OR PETROLEUM PRODUCTS WILL NOT BE MIXED WITH ONE ANOTHER UNLESS RECOMMENDED BY THE MANUFACTURER, 13. THE PROJECT CONSTRUCTION MANAGER WILL INSPECT THE INVENTORY DAILY TO ENSURE PROPER USE AND DISP❑SAL OF MATERIALS ON THE PROJECT SITE. 14. THE PROJECT CONSTRUCTION MANAGER WILL ENSURE ADEQUATE SUPPLIES ARE AVAILABLE AT ALL TIMES TO HANDLE SPILLS, LEAKS, AND DISPOSAL OF USED LIQUIDS. 15, ALL PROJECT PERSONNEL WILL BE INSTRUCTED ON GOOD HOUSEKEEPING PRACTICES, FUELING AREA BELOW -GRADE CONTAINMENT AREA SANDBAG 10 MIL. PLASTIC LINING-\ 2% SLOPE - 3' MIN, BERM PAVED FUELING AREA _ SECTION A -A' 12' HIGH DIVERSION BERM NOT TO SCALE ON 3 DOWNHILL SIDES VARIES SANDBAG (TYR) Q 10 MIL, PLASTIC LINING BOTTOM OF BERM TOP OF BERM PLAN NOT TOSCALE 1. ALL PETROLEUM-BASED PRODUCTS USED ON THE PROJECT SITE WILL BE USED'STORED, AND DISP❑SED OF ACCORDING TO FEDERAL, STATE, AND LOCAL REGULATIONS, THE F❑LL❑WING PRACTICES ARE USED TO REDUCE THE RISK ASSOCIATED WITH PETROLEUM PR❑DUCTSi 2. ALL REFUELING, REPAIR AND CHANGING OF EQUIPMENT AND VEHICLE FLUIDS SHALL BE CONDUCTED IN A DESIGNATED AREA, 3, FUELING AREA CONTAINMENT SHOULD BE SIZED FOR 110% OF THE LARGEST STORAGE TANK CAPACITY WITH SUFFICIENT FREEBOARD TO CONTAIN THE 25 -YEAR, 24 HOUR STORM EVENT, 4. THE FUELING AREA AND CONTAINMENT AREA SHOULD BE A MINIMUM OF 50' FROM STORM DRAIN INLETS, OPEN DITCHES, WATERWAYS OR BODIES OF WATER. 5. MATERIAL FOR CONSTRUCTING THE DIVERSI❑N BERM SHOULD BE SUFFICIENTLY IMPERVIOUS TO CONTAIN OIL, 6. PLASTIC LINING MUST BE FREE OF HOLES, TEARS, OR OTHER DEFECTS THAT C❑MPR❑MISE THE IMPERMEABILITY OF THE MATERIAL, 7. FUELING AREA CONTAINMENT SHALL BE REPAIRED, CLEANED, OR ENLARGED AS NECESSARY TO MAINTAIN CONTAINMENT FOR 110% OF LARGEST STORAGE TANK CAPACITY AND SUFFICIENT FREEBOARD TO CONTAIN THE 25 -YEAR, 24 HOUR STORM EVENT, 8, DISPOSE OF ALL USED ❑IL, ANTIFREEZE, SOLVENTS AND OTHER AUT❑MOTIVE-RELATED CHEMICALS ACCORDING TO MANUFACTURER INSTRUCTIONS. 9. USED OIL, ANTIFREEZE, AND SOME SOLVENTS CAN BE RECYCLED AT DESIGNATED FACILITIES, BUT OTHER CHEMICALS MUST BE DISP❑SED OF AT A HAZARDOUS WASTE DISPOSAL SITE. 110, THE PROJECT CONSTRUCTION MANAGER SHALL DISPOSE OF OR RECYCLE THESE MATERIALS ACCORDING TO FEDERAL, STATE, AND LOCAL REGULATIONS, 111, ALL VEHICLES ON THE PROJECT SITE WILL BE MONITORED FOR LEAKS AND RECEIVE REGULAR PREVENTIVE MAINTENANCE TO REDUCE THE CHANCE OF LEAKAGE, R2, VEHICLES AND EQUIPMENT WILL BE INSPECTED DAILY, t3, IF A LEAK IS DISCOVERED, USE DRIP PANS AND ABSORBENTS UNDER OR AROUND LEAKY VEHICLES UNTIL THE LEAK IS REPAIRED, 14, LEAKS WILL BE REPAIRED IMMEDIATELY, OR THE PROBLEM VEHICLE(S) OR EQUIPMENT WILL BE REMOVED FROM THE PROJECT SITE, 15. THE EQUIPMENT/VEHICLE STORAGE AREA AND FUEL TANKS WILL BE INSPECTED WEEKLY AND AFTER STORM EVENTS, 116. THE PROJECT CONSTRUCTION MANAGER WILL ENSURE THAT ALL PETROLEUM PRODUCT CONTAINERS PROVIDE SECONDARY CONTAINMENT. 117, DOUBLE -WALLED CONTAINERS CAN BE USED AS A MEANS OF SECONDARY CONTAINMENT 118. NOTE, DOUBLE -WALLED CONTAINERS/TANKS WITH FITTINGS OR OPENINGS LOCATED BELOW THE LIQUID LEVEL OF THE CONTAINER MAY REQUIRE ADDITIONAL SECONDARY CONTAINMENT TO CONFORM TO FEDERAL, STATE, AND/OR LOCAL REGULATIONS, 119. NOTE, DOUBLE -WALLED CONTAINERS DO NOT PRECLUDE THE REQUIREMENT OF SECONDARY CONTAINMENT FOR REFUELING OR TRANSFER OPERATIONS. 20. THE PROJECT CONSTRUCTION MANAGER SHALL DESIGNATED AN AREA FOR THE COLLECTION AND STORAGE OF ALL PETROLEUM BASED PRODUCTS, 21. THE CONTAINERS SHALL BE PROTECTED FROM RAIN EVENTS, 22. STORE CONTAINERS ON SPILL PALLETS OR EQUIVALENT STRUCTURES, 23. CONTAINERS MUST BE STORED AND STACKED IN ACCORDANCE WITH THE MANUFACTURERS' DIRECTIONS, 24, ANY ASPHALT SUBSTANCES USED ONSITE WILL BE APPLIED ACCORDING TO THE MANUFACTURER'S RECOMMENDATIONS, 25, THE PROJECT CONSTRUCTION MANAGER WILL ENSURE THAT ALL SPILLS OR CONTAMINATED SURFACES ARE CLEANED UP IMMEDIATELY, USING DRY CLEAN UP MEASURES WHERE POSSIBLE, AND ELIMINATE THE SOURCE OF THE SPILL TO PREVENT A DISCHARGE OR A FURTHERANCE OF AN ONGOING DISCHARGES THAT THE SURFACES ARE NOT CLEANED BY HOSING THE AREA DOWN, 26. IF AGGREGATE ABOVEGROUND STORAGE CAPACITY OF PETROLEUM CONTAINERS/TANKS/DRUMS STORED ON THE PROJECT SITE IS GREATER THAN 1,320 GALLONS, THE PROJECT CONSTRUCTION MANAGER MUST PREPARE A SPILL PREVENTION, CONTROL, AND COUNTERMEASURE (SPCC) PLAN. 2?7. TO CALCULATE THE TOTAL ABOVEGROUND STORAGE CAPACITY, THE PROJECT CONSTRUCTION MANAGER CAN ADD TOGETHER THE STORAGE CAPACITY OF ALL OF STORAGE CONTAINERS/TANKS/DRUMS AS WELL AS THE FUEL AND FLUID TANKS ON THE MOBILE AND OPERATIONAL EQUIPMENT, IN THIS CALCULATION, INCLUDE ONLY THOSE TANKS THAT HAVE MORE THAN 55 GALLONS OF STORAGE CAPACITY. THIS REQUIREMENT DOES NOT INCLUDE MOBILE REFUELERS, 28. IF THE AGGREGATE ABOVEGROUND STORAGE CAPACITY OF PETROLEUM PRODUCTS ON THE PROJECT SITE IS GREATER THAN 1,320, THE PROJECT CONSTRUCTION MANAGER MUST FOLLOW ALL APPLICABLE FEDERAL REGULATIONS GOVERNING SECONDARY CONTAINMENT. ALT H op I'ei �o , �j � Christopher C. Mulligan Lic. No. 031672 �v� 1%S% / O N A L ENG I REVISIONS DATE a w � 0 w LU r ® 4 aUQ U) J llJ 0 W N2 t!1 0 N N C4 ,` go 0 cc ccW E@ OU rL wLL 0 LU M �w J Z -j N Z0' v0) O Cc� MN 22 co az Uj W Mi p n (L 0.1d' W Q 101 - ■ MM1 CO 10 MIL. PLASTIC LINING - STRAW BALE (TYR) PLAN NOT TO SCALE CONCRETE WASHOUT AREA ABOVE -GRADE CONTAINMENT AREA W/ STRAW BALES SILT FENCE LOCATE ON DOWNHILL SIDE OF SOLID WASTE COLLECTION AREA 10 MIL, PLASTIC LI 1 3' MIN. LATH AND FLAGGING ON 3 SIDES 10 MIL, PLASTIC LINING VEHICLE TRACKING CONTROL (GRAVEL, PAVEMENT OR OTHER STABLE SURFACE) 1. NO CONSTRUCTI❑N WASTE MATERIALS WILL BE BURIED ONSITE, 2. DESIGNATE A S❑LID WASTE COLLECTION AREA. 3. THE S❑LID WASTE COLLECTION AREA SHOULD BE LOCATED A MINIMUM OF 50 FEET AWAY FROM CONCENTRATED FLOWS OF STIORMWATER, DRAINAGE COURSES, AND ST❑RMWATER DRAINS, WATER BODIES, AND SHOULD NOT BE LOCATED IN AREAS PRONE TO FLOODING OR PONDING, 4. ALL WASTE MATERIALS WILL BE COLLECTED AND STORED IN A PROPER RECEPTACLE IN ACCORDANCE WITH ALL FEDERAL, STATE, AND LOCAL WASTE MANAGEMENT REGULATI❑NS. S❑LID WASTE GENERATED FROM CONSTRUCTION ACTIVITIES ON THE PROJECT SITE AND TRASH WILL BE DEP❑SITED IN DUMPSTERS AND/OR OTHER SOLID WASTE CONTAINERS. ONLY TRASH AND CONSTRUCTI❑N DEBRIS FROM THE SITE WILL BE DEPOSITED IN THE DUMPSTER. 5. NOTE, ONLY APPROPRIATE SOLID WASTES SHOULD IBE PLACED IN DUMPSTERS AND/OR SOLID WASTE CONTAINERS, CEIRTAIN WASTES SUCH AS HAZARDOUS WASTES, APPLIANCES, FLUORESCENT LAAMPS, PESTICIDES, ETC., MAY NOT BE DISPOSED OF IN SOLID WASTE CONTAINERS, FOR ANY ITEM THAT IS CONSIDERED HAZARDOUS WASTE, FOLLOW THE PROCEDURES SPECIFIED IN THE STORMWATER POLLUTION PREVENTION PLAN (SWPPP) `MATERIAL MANAGEMENT PRACTICES - HAZARDOUS PRODUCTS", 6. LIQUID WASTE WILL NOT BE DISP❑SED OF IN DUMPSTERS AND/OR SOLID WASTE CONTAINERS. FOLLOW MANUFACTURES', FEDERAL, STATE, AND LOCAL GUIDELINES TO DISP❑SE OF LIQUID WASTES PROPERLY, 7. SILT FENCE SHOULD BE INSTALLED ON THE D❑WNHIILL SIDE OF THE SOLID WASTE C❑LLECTI❑N AREA ON A MINIMUM OF ONE SIDE. 8. SOLID WASTE, CONSTRUCTION DEBRIS, AND TRASH IC❑LLECTED IN THE DUMPSTER AND/OR SOLID WASTE CONTAINERS WILL BE HAULED TO AN APPROPRIATE WASTE DISPOSAL SITE. 9. SCHEDULE REGULAR SOLID WASTE COLLECTION PICIKUPS TO PREVENT THE CONTAINERS FROM OVERFILLING. 10. DURING THE DEMOLITION PHASE OF CONSTRUCTION, PROVIDE EXTRA CONTAINERS AND SCHEDULE PICKUPS ON A MORE FREQUENT BASIS. 11, SMALLER SOLID WASTE CONTAINERS WILL BE RAISIED OFF THE GROUND WITH A PALLET OR AN EQUIVALENT STRUCTURE. 12. THE PROJECT C❑NSTRUCTI❑N MANAGER SHALL ENSURE THAT SILT FENCE IS INSTALLED ON THE DOWNHILL SLOPE BELOW THE SOLID WASTE COLLECTION AREA TO CONTAIN LEAKAGE AND/OR SIPILLAGE, 13, THE PROJECT CONSTRUCTION MANAGER MUST ENSURE THAT DUMPSTERS AND/OR SOLID WASTE CONTAINERS HAVE SECURE, WATERTIGHT LIDS S❑ THEY CAN BE COVERED BEF❑RE/DURING PERIODS [OF RAIN. 14, IF DUMPSTERS AND/OR SOLID WASTE CONTAINERS :DO NOT HAVE SECURE, WATERTIGHT LIDS, THEY MUST BE KEPT IN A COVERED AREA. 15. INSPECT SOLID WASTE COLLECTION AREA AND CHEICK DUMPSTERS AND/DR SOLID WASTE CONTAINERS FOR LEAKS, SPILLS AND EXTERNAL CORROSION AND STRUCTURAL FAILURE WEEKLY AND IMMEDIATELY AFTER STORM EVENTS, 16, CLEAN UP LEAKS AND SPILLS IMMEDIATELY. SOLID WASTE COLLECTION C❑NTAINNdENT AREA NOT TO SCALE SECTI❑N A -A' NOT TO SCALE VARIES PLAN NOT TO SCALE CONCRETE WASHOUT AREA BELOW -GRADE CONTAINMENT AREA ATH AND FLAGGING N 3 SIDES 1. CONCRETE TRUCKS WILL ONLY WASH OUT, DISCHARGE SURPLUS CONCRETE, OR DRUM WASH WATER AT APPROVED LOCATIONS IN ACCORDANCE WITH FEDERAL, STATE, AND LOCAL REGULATIONS. ALL CONCRETE AND CONCRETE WASHOUT SLURRIES FROM THE CONCRETE MIXER TRUCKS AND CHUTES WILL BE DISCHARGED INT❑ THE WASHOUT AREA OR HAULED ❑FF -SITE FOR DISPOSAL. SMALLER EQUIPMENT SUCH AS WHEELBARROWS AND HAND TOOLS ALSO WILL BE WASHED DOWN AT THE TEMPORARY CONCRETE WASHOUT, 2. THE TEMPORARY CONCRETE WASHOUT AREA WILL BE CONSTRUCTED BEFORE ANY CONCRETE POURS OCCUR AT THE SITE, 3. CONCRETE POURS WILL NOT BE CONDUCTED DURING OR BEFORE AN ANTICIPATED STORM EVENT, 4. WHEN THE TEMPORARY WASHOUT AREA IS NO LONGER NEEDED FOR THE CONSTRUCTION PROJECT 5. TEMPORARY CONCRETE WASHOUT WILL BE CONSTRUCTED WITH A MINIMUM FLAT AREA OF 8'X8' AT THE BOTTOM OF THE PIT WITH 31l OR FLATTER SIDE SLOPES) HOWEVER, THE PIT SHOULD BE SIZED FOR SUFFICIENT VOLUME AND QUANTITY TO CONTAIN ALL LIQUID AND CONCRETE WASTE GENERATED BY THE WASHOUT ❑PERATI❑NS. 6. THE TEMPORARY UNLINED CONCRETE WASHOUT SHOULD BE A MINIMUM OF 400' FROM ANY NATURAL DRAINAGE PATHWAY OR WATERB❑DY, D❑ NOT SANDBAG (TYP,) LOCATE UNLINED CONCRETE WASHOUT WITHIN 1000' OF ANY WELLS, DRINKING WATER SOURCE. IF SITE CONSTRAINTS MAKE THIS INFEASIBLE, OR IF HIGHLY PERMEABLE S❑ILS EXIST ON SITE, THE CONCRETE WASHOUT AREA MUST BE INSTALLED WITH AN IMPERMEABLE LINER (10 MIL. PLASTIC LINER) ❑R SURFACE STORAGE ALTERNATIVES USING PREFABRICATED TOP OF BERM CONCRETE WASHOUT DEVICES OR A LINED ABOVE GROUND STORAGE AREA SHOULD BE USED, 7. THE WASHOUT AREA WILL BE INSPECTED DAILY AND AFTER HEAVY RAINS TO ENSURE THAT ALL CONCRETE WASHING IS BEING DISCHARGED INTO THE WASHOUT AREA, THAT THERE ARE NO LEAKS OR TEARS ARE PRESENT, AND TO IDENTIFY IF THE WASHOUT HAS REACHED 75% OF ITS HOLDING CAPACITY, 8, DAMAGES TO THE CONTAINER SHOULD BE REPAIRED PROMPTLY. 9. TEMPORARY CONCRETE WASHOUT SHALL BE REPAIRED, CLEANED, OR BOTTOM OF BERM ENLARGED AS NECESSARY TO MAINTAIN FOR CONCRETE WASTE. 10. PLASTIC LINING MUST BE FREE OF HOLES, TEARS, OR OTHER DEFECTS THAT C❑MPR❑MISE THE IMPERMEABILITY OF THE MATERIAL. 11, WHEN THE TEMPORARY CONCRETE WASHOUT IS FILLED TO 75% OF ITS CAPACITY, THE WASHING WATER SHOULD BE VACUUMED OFF OR ALLOWED TO EVAPORATE TO AVOID OVERFLOWS, 12. WHEN THE REMAINING CEMENTITIOUS SOLIDS HAVE HARDENED, THEY SHOULD BE REMOVED AND DISPOSED OF OR RECYCLED, THE CONCRETE WILL BE BROKEN UP, REMOVED, AND TAKEN TO A LANDFILL FOR DISPOSAL OR RECYCLING CENTER RECYCLING. 13, BEFORE HEAVY RAINS, THE WASHOUT CONTAINER'S LIQUID LEVEL SHOULD BE LOWERED OR THE CONTAINER SHOULD BE COVERED TO AV❑ID AN OVERFLOW DURING THE RAINST❑RM. 14. SIGNS WILL BE POSTED MARKING THE L❑CATI❑N OF THE WASHOUT AREA TO ENSURE THAT CONCRETE EQUIPMENT OPERATORS USE THE PROPER FACILITY, SILT FENCE LOCATE ON DOWNHILL SIDE OF PORTABLE TOILET T 10' STD. PORTABLE TOILET 1. ALL SANITARY WASTE WILL BE COLLECTED FROM THE PORTABLE TOILETS AS REQUIRED BY FEDERAL, STATE, AND LOCAL REGULATI❑NS, 2. THE PROJECT CONSTRUCTION MANAGER SHALL PROVIDE A SUFFICIENT NUMBER OF PORTABLE T❑ILEITS TO SERVE THE MAXIMUM NUMBER OF EMPLOYEES EXPECTED ON SITE DAILY. 3. POSITION PORTABLE TOILETS SO THAT THEY ARE SECURE AND WILL NOT BE TIPPED OR KNOCKED OVER. 4. THE PORTABLE TOILETS WILL BE MAINTAINED AND INSPECTED WEEKLY FOR EVIDENCE OF LEAKING HOLDING TANKS, 5. TOILETS WITH LEAKING H❑LIDING TANKS WILL BE REMOVED FROM THE SITE AND REPLACED WITH NEW PORTABLE TOILETS. 6. CLEAN UP LEAKS AND SPILLS IMMEDIATELY 7. CONTAINMENT TRAYS CAN BE USED AS SECONDARY CONTAINMENT IF PORTABLE TOILET IS SET ON A LEVEL GRAVEL OR PAVED PAD. 8, SILT FENCE SHOULD BE INSTALLED ON THE DOWNHILL SIDE OF THE PORTABLE TOILET ON A MINIIMUM OF ONE SIDE, 9. IF PORTABLE TOILET IS LOCATED ON SINGLE FAMILY HOME SITE, AND SILT FENCE IS INSTALLED AIROUND THE PERIMETER OF THE PROJECT SITE, THE ADDITIONAL SILT FENCE DIRECTLY ADJACENT TO THE TOILET IS NOT NECESSARY. PORTABLE TOILET CONTAINMENT AREA N❑]T TO SCALE GOOD HOUSEKEEPING, THE FOLLOWING GOOD HOUSEKEEPING FPRACTICES WILL BE FOLLOWED ONSITE DURING THE CONSTRUCTION PR❑JEC:Ti 1, IDENTIFY ALL HAZARDOUS AND N❑NJHAZARDOUS SUBSTANCES PRESENT AT THE PROJECT SITE. 2. THE PROJECT C❑NSTRUCTI❑N MANACGER MUST COMPILE A LIST OF ALL CHEMICALS PRESENT AT THE PROJECT SITE AND OBTAIN A MATERIAL SAFETY DATA SHEET (MSDS) FOR E=ACH ONE, 3. WHEN POSSIBLE, ALL PRODUCTS WIILL BE KEPT IN THEIR ORIGINAL CONTAINERS WITH THE ORIGINAL MilANUFACTURE'S LABEL, 4, IF IT IS NOT POSSIBLE TO KEEP TTHE PRODUCTS IN THEIR ORIGINAL CONTAINERS WITH THE MANUFACTURE'S LABEL, THE NEW CONTAINER MUST BE LABELED WITH THE NAME OF TEHE PRODUCT/CHEMICAL, THE UNIT NUMBER (WHEN APPLICABLE), EXPIRATION DATE (WHEN APPLICABLE), HANDLING INSTRUCTIONS, AND HEALTH OR ENVIRONMENTAL HAZARDS (WHEN APPLICABLE), IF THIS INFORMATION) IS NOT AVAILABLE ON THE MANUFACTURE'S ORIGINAL LABEL, CONSULT THE MSDS'S FOR THE RELEVANT INFORMATI❑N. 5. THE PROJECT CONSTRUCTION MANACGER WILL MAKE SPECIAL NOTE ON THE INVENTORY OF THE HAZARDOUS CHBEMICALS ON THE PROJECT SITE THAT REQUIRE SPECIAL HANDLING, STORtAGE, OR DISP❑SAL, 6. MANUFACTURER'S RECOMMENDATIONS FOR PROPER STORAGE, USE, AND DISPOSAL MUST BE FOLLOWED FOR' ALL CHEMICALS AND MATERIALS PRESENT ON THE PROJECT SITE, 7. ALL MATERIALS STORED ON THE PROJECT SITE WILL BE STORED IN A NEAT, ORDERLY MANNER IN THEIR 0PPROPRIATE CONTAINERS, 8. MATERIALS THAT HAVE THE POTENTIAL FOR CONTAMINATING RUNOFF DURING STORM EVENTS WILL BE S'T❑RED IN THEIR APPROPRIATE WATERTIGHT CONTAINERS, STORED ION A SPILL PALLET UNDER A CANOPY, TARPAULIN, SHRINK WRAPPED OR OITHERWISE PRECLUDED FROM DIRECT EXPOSURE OF PRECIPITATION. 9. ACCESS TO STORAGE AREAS MUST ]BE RESTRICTED TO PREVENT VANDALISM, 10, WHENEVER POSSIBLE, ALL OF A PRODUCT WILL BE USED UP BEFORE DISP❑SING OF THE CONTAINER. 11. EMPTY CONTAINERS THAT MAY C❑NTfAIN CHEMICAL RESIDUES SHALL BE DISP❑SED OF IN ACCORDANCE WITH] FEDERAL, STATE AND LOCAL REGULATIONS, 12. CHEMICAL OR PETROLEUM PRODUCTS WILL NOT BE MIXED WITH ONE ANOTHER UNLESS RECOMMENDED BY THE MANUFACTURER, 13. THE PROJECT CONSTRUCTION MANAGER WILL INSPECT THE INVENTORY DAILY TO ENSURE PROPER USE AND DISP❑SAL OF MATERIALS ON THE PROJECT SITE. 14. THE PROJECT CONSTRUCTION MANAGER WILL ENSURE ADEQUATE SUPPLIES ARE AVAILABLE AT ALL TIMES TO HANDLE SPILLS, LEAKS, AND DISPOSAL OF USED LIQUIDS. 15, ALL PROJECT PERSONNEL WILL BE INSTRUCTED ON GOOD HOUSEKEEPING PRACTICES, FUELING AREA BELOW -GRADE CONTAINMENT AREA SANDBAG 10 MIL. PLASTIC LINING-\ 2% SLOPE - 3' MIN, BERM PAVED FUELING AREA _ SECTION A -A' 12' HIGH DIVERSION BERM NOT TO SCALE ON 3 DOWNHILL SIDES VARIES SANDBAG (TYR) Q 10 MIL, PLASTIC LINING BOTTOM OF BERM TOP OF BERM PLAN NOT TOSCALE 1. ALL PETROLEUM-BASED PRODUCTS USED ON THE PROJECT SITE WILL BE USED'STORED, AND DISP❑SED OF ACCORDING TO FEDERAL, STATE, AND LOCAL REGULATIONS, THE F❑LL❑WING PRACTICES ARE USED TO REDUCE THE RISK ASSOCIATED WITH PETROLEUM PR❑DUCTSi 2. ALL REFUELING, REPAIR AND CHANGING OF EQUIPMENT AND VEHICLE FLUIDS SHALL BE CONDUCTED IN A DESIGNATED AREA, 3, FUELING AREA CONTAINMENT SHOULD BE SIZED FOR 110% OF THE LARGEST STORAGE TANK CAPACITY WITH SUFFICIENT FREEBOARD TO CONTAIN THE 25 -YEAR, 24 HOUR STORM EVENT, 4. THE FUELING AREA AND CONTAINMENT AREA SHOULD BE A MINIMUM OF 50' FROM STORM DRAIN INLETS, OPEN DITCHES, WATERWAYS OR BODIES OF WATER. 5. MATERIAL FOR CONSTRUCTING THE DIVERSI❑N BERM SHOULD BE SUFFICIENTLY IMPERVIOUS TO CONTAIN OIL, 6. PLASTIC LINING MUST BE FREE OF HOLES, TEARS, OR OTHER DEFECTS THAT C❑MPR❑MISE THE IMPERMEABILITY OF THE MATERIAL, 7. FUELING AREA CONTAINMENT SHALL BE REPAIRED, CLEANED, OR ENLARGED AS NECESSARY TO MAINTAIN CONTAINMENT FOR 110% OF LARGEST STORAGE TANK CAPACITY AND SUFFICIENT FREEBOARD TO CONTAIN THE 25 -YEAR, 24 HOUR STORM EVENT, 8, DISPOSE OF ALL USED ❑IL, ANTIFREEZE, SOLVENTS AND OTHER AUT❑MOTIVE-RELATED CHEMICALS ACCORDING TO MANUFACTURER INSTRUCTIONS. 9. USED OIL, ANTIFREEZE, AND SOME SOLVENTS CAN BE RECYCLED AT DESIGNATED FACILITIES, BUT OTHER CHEMICALS MUST BE DISP❑SED OF AT A HAZARDOUS WASTE DISPOSAL SITE. 110, THE PROJECT CONSTRUCTION MANAGER SHALL DISPOSE OF OR RECYCLE THESE MATERIALS ACCORDING TO FEDERAL, STATE, AND LOCAL REGULATIONS, 111, ALL VEHICLES ON THE PROJECT SITE WILL BE MONITORED FOR LEAKS AND RECEIVE REGULAR PREVENTIVE MAINTENANCE TO REDUCE THE CHANCE OF LEAKAGE, R2, VEHICLES AND EQUIPMENT WILL BE INSPECTED DAILY, t3, IF A LEAK IS DISCOVERED, USE DRIP PANS AND ABSORBENTS UNDER OR AROUND LEAKY VEHICLES UNTIL THE LEAK IS REPAIRED, 14, LEAKS WILL BE REPAIRED IMMEDIATELY, OR THE PROBLEM VEHICLE(S) OR EQUIPMENT WILL BE REMOVED FROM THE PROJECT SITE, 15. THE EQUIPMENT/VEHICLE STORAGE AREA AND FUEL TANKS WILL BE INSPECTED WEEKLY AND AFTER STORM EVENTS, 116. THE PROJECT CONSTRUCTION MANAGER WILL ENSURE THAT ALL PETROLEUM PRODUCT CONTAINERS PROVIDE SECONDARY CONTAINMENT. 117, DOUBLE -WALLED CONTAINERS CAN BE USED AS A MEANS OF SECONDARY CONTAINMENT 118. NOTE, DOUBLE -WALLED CONTAINERS/TANKS WITH FITTINGS OR OPENINGS LOCATED BELOW THE LIQUID LEVEL OF THE CONTAINER MAY REQUIRE ADDITIONAL SECONDARY CONTAINMENT TO CONFORM TO FEDERAL, STATE, AND/OR LOCAL REGULATIONS, 119. NOTE, DOUBLE -WALLED CONTAINERS DO NOT PRECLUDE THE REQUIREMENT OF SECONDARY CONTAINMENT FOR REFUELING OR TRANSFER OPERATIONS. 20. THE PROJECT CONSTRUCTION MANAGER SHALL DESIGNATED AN AREA FOR THE COLLECTION AND STORAGE OF ALL PETROLEUM BASED PRODUCTS, 21. THE CONTAINERS SHALL BE PROTECTED FROM RAIN EVENTS, 22. STORE CONTAINERS ON SPILL PALLETS OR EQUIVALENT STRUCTURES, 23. CONTAINERS MUST BE STORED AND STACKED IN ACCORDANCE WITH THE MANUFACTURERS' DIRECTIONS, 24, ANY ASPHALT SUBSTANCES USED ONSITE WILL BE APPLIED ACCORDING TO THE MANUFACTURER'S RECOMMENDATIONS, 25, THE PROJECT CONSTRUCTION MANAGER WILL ENSURE THAT ALL SPILLS OR CONTAMINATED SURFACES ARE CLEANED UP IMMEDIATELY, USING DRY CLEAN UP MEASURES WHERE POSSIBLE, AND ELIMINATE THE SOURCE OF THE SPILL TO PREVENT A DISCHARGE OR A FURTHERANCE OF AN ONGOING DISCHARGES THAT THE SURFACES ARE NOT CLEANED BY HOSING THE AREA DOWN, 26. IF AGGREGATE ABOVEGROUND STORAGE CAPACITY OF PETROLEUM CONTAINERS/TANKS/DRUMS STORED ON THE PROJECT SITE IS GREATER THAN 1,320 GALLONS, THE PROJECT CONSTRUCTION MANAGER MUST PREPARE A SPILL PREVENTION, CONTROL, AND COUNTERMEASURE (SPCC) PLAN. 2?7. TO CALCULATE THE TOTAL ABOVEGROUND STORAGE CAPACITY, THE PROJECT CONSTRUCTION MANAGER CAN ADD TOGETHER THE STORAGE CAPACITY OF ALL OF STORAGE CONTAINERS/TANKS/DRUMS AS WELL AS THE FUEL AND FLUID TANKS ON THE MOBILE AND OPERATIONAL EQUIPMENT, IN THIS CALCULATION, INCLUDE ONLY THOSE TANKS THAT HAVE MORE THAN 55 GALLONS OF STORAGE CAPACITY. THIS REQUIREMENT DOES NOT INCLUDE MOBILE REFUELERS, 28. IF THE AGGREGATE ABOVEGROUND STORAGE CAPACITY OF PETROLEUM PRODUCTS ON THE PROJECT SITE IS GREATER THAN 1,320, THE PROJECT CONSTRUCTION MANAGER MUST FOLLOW ALL APPLICABLE FEDERAL REGULATIONS GOVERNING SECONDARY CONTAINMENT. ALT H op I'ei �o , �j � Christopher C. Mulligan Lic. No. 031672 �v� 1%S% / O N A L ENG I FILE NUMBER 8236 SHEET 2/2 REVISIONS DATE a w � 0 w LU r ® 4 aUQ U) J llJ 0 W N2 t!1 0 N N C4 ,` go 0 cc ccW E@ OU rL wLL 0 LU M �w J Z -j N Z0' v0) O Cc� MN 22 co az Uj W Mi p n (L 0.1d' W Q 101 - FILE NUMBER 8236 SHEET 2/2 REVISIONS DATE Oct. 16, 2015 MM1 CO = W IN- z J 0� �t Q J }- Z 0 W cr rr1 VJ P ® > �W 0 Z W Vl 0 Qa W� LL L W 1_ Oz O Q J Z m �_j a 0 CL z M0 W FILE NUMBER 8236 SHEET 2/2