HomeMy WebLinkAboutSUB201600212 Review Comments Plans Reviewed By 2016-12-209 �'ll?GINZP COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902-4596 Phone (434) 296-5832 Fax (434) 972-4126 Road and Drainage plan review Project title: Belvedere Phase IV A - Road Plans Project file number: SUB201600212 Plan preparer: Collins Engineering [scott@collins-engineering.com] Owner or rep.: Belvedere Station Land Trust Date Received: 7 November 2016 Date of comments: 20 December 2016 Engineering has reviewed your plans and has the following comments: 1. The professional seals need to be signed and dated (Ref. 18-32.6.1). 2. Existing easements (access, drainage, sight, sanitary, etc.) with deed book, locations and dimensions to be shown. 3. Show all steep slopes (some are not shown), and the correct type (hatching). 4. There are steep slopes in the disturbed area (lots 239 & 240) that are to be preserved (Ref. 18- 30.7.4). 5. Plans indicate "...steep slopes shall be field verified." Verification must be provided prior to road plan approval and shall be field verified and certified by a licensed land surveyor. Aerial survey as a measure of improved topographic accuracy is not deemed acceptable. 6. The side notes state that there is no retaining wall, but a proposed wall (along back lots) is shown in the plans. 7. The height of the retaining wall exceeds 6' in the steep slope area, and must be staggered (Ref. 18-30.7.5). 8. Provide wall details and design certified by professional engineer. 9. 15" stormwater pipe is shown going under, or though wall; Show details at penetration, and include in wall design. 10. Provide safety railing on back lots for walls greater than 4 feet (requirement). 11. Refer to the following design detail/calc to make sure the required widths are met (Design Manual, section 6) for storm line STR 6 to STR 1 (end wall): Engineering Review Comments Page 2 of 3 E k5E11E%T KroTH . DIANaTER � 1, + l q u-{' 1 = 10' 1 till .l 12. Streets signs needed for traffic control (shown and labeled): speed limit on all streets, stop signs at all intersections. Street sign needed, typ. placed opposite stop sign. 13. Street sign needed indicating "no parking" along turnaround, and sign indicating street is not a though street (Sect. 18-32.7.2). Comments are pending from the Albemarle County Service Authority, and VDOT, and will be forwarded along as they are received. Engineering plan review staff are available from 2-4 PM on Thursdays, should you require a meeting to discuss this review. Process; After approval, plans will need to be bonded. The bonding process is begun by submitting a bond estimate request form and fee to the Department of Community Development. One of the plan reviewers will prepare estimates and check parcel and easement information based on the approved plans. The County's Management Analyst will prepare bond agreement forms, which will need to be completed by the owner and submitted along with cash, certificates or sureties for the amounts specified. The agreements will need to be approved and signed by the County Attorney and County Engineer. This may take 2-4 weeks to obtain all the correct signatures and forms. Stormwater Management Facilities Maintenance agreements will also need to be completed and recorded. The County's Management Analyst or other staff will prepare the forms and check for ownership and signature information. The completed forms will need to be submitted along with court recording fees. After bonding and agreements are complete, county staff will need to enter project information in a DEQ database for state application processing. DEQ will review the application information based on local Engineering Review Comments Page 3 of 3 VSMP authority approval. At this time, the DEQ portion of the application fees will need to be paid directly to the state. For fastest processing, this is done electronically with the emails provided on the application. DEQ should notify applicants with instructions on how to pay fees. When DEQ approves the application, they will issue a permit coverage letter. This should be copied to the county. After DEQ coverage is issued, via the coverage letter, the County can hold a pre -construction conference. Applicants will need to complete the request for a pre -construction conference form, and pay the remainder of the application fee. The form identifies the contractor and responsible land disturber, and the fee remaining to be paid. This will be checked by county staff, and upon approval, a pre -construction conference will be scheduled with the County inspector. At the pre -construction conference, should everything proceed satisfactorily, a joint VSMP and grading permit will be issued by the County so that work may begin. County forms can be found on the county website forms center under engineering; hlt2://www.albemarle.org/deptforms.asp?department=cdengao If you have any questions or concerns, please contact me either by email (diameskalbemarle.org) or by phone at 434-296-5832. Sincerely, David James Civil Engineer I File: SUB201600212 Belvedere Phase IVA - Road Plans comments 12-20.doc