Loading...
HomeMy WebLinkAboutSDP201600056 Review Comments 2016-11-10 (2)Short Review Comments Report for: SDP201600056 SubApplication Type: 5th Street Commercial Development - Initial Initial Site Plan Date Completed:11/08/2016 Reviewer:Rachel Falkenstein CDD Planning Review Status:Requested Changes Reviews Comments: Division: Date Completed:11/22/2016 Reviewer:Rachel Falkenstein CDD Planning Review Status:Approved Reviews Comments: Division: Date Completed:11/15/2016 Reviewer:Alexander Morrison ACSA Review Status:Requested Changes Reviews Comments:I have reviewed the above referenced initial site plan and have the following comments: • A water and sewer construction plan review by the ACSA is required at the final site plan stage. Submit 3 copies of the final site plan along with water and sewer data sheets to the ACSA, Attn: Michael Vieira, PE, to start the review. • Show ACSA easements on the proposed water infrastructure. • Include water and sewer profiles. • Call out all fittings, valves, etc. Division: Date Completed:11/22/2016 Reviewer:Frank Pohl CDD Engineering Review Status:Requested Changes Reviews Comments: Division: Date Completed:10/04/2016 Reviewer:Jay Schlothauer CDD Inspections Review Status:No Objection Reviews Comments:Based on plans dated September 26, 2016. No comments or conditions. Division: Date Completed:10/12/2016 Reviewer:Derek Bedarf CDD E911 Review Status:Requested Changes Reviews Comments:1. Per Sec. 7-200-B of the County's Road Naming and Property Numbering Ordinance (Page 2 of PDF). "It is intended by this article that all roads within the county which serve or are designed to serve three (3) or more dwelling units or business structures shall be named." With the existing hotel and the 3 proposed buildings, there are 4 structures that have or will have addresses, therefore a new road name will need to be created. Please review the procedures in the Road Naming and Property Numbering Manual and work with the neighboring property owner to decide upon a new road name for the road connecting 5th Street to the parking areas (just past the second Holiday Inn access). Please contact the GIS office with questions related to road naming. The adjacent Holiday Inn property (07600-00-00-055C0) is owned by: MORRIS CREEK YACHT CLUB INC C/O THE OLYMPIA COMPANIES P O BOX 508 PORTLAND ME, 04112 2. Additionally, rename "5TH STREET EXTENDED" to the official name of "5TH STREET" A PDF version of the Ordinance and Manual can be found here: https://www.albemarle. org/upload/images/Forms_Center/Departments/Geographic_Data_Services/Forms/Road_Naming_a nd_Property_Numbering_Ordinance_and_Manual.pdf Please consult the County's Road Name Index to check your road names prior to submittal. The Index can be found here: http://www.albemarle.org/albemarle/upload/images/webapps/roads/ Parcel and mapping information can be found here: http://gisweb.albemarle.org/ Division: Page:1 of 3 County of Albemarle Printed On:December 27, 2016 C/O THE OLYMPIA COMPANIES P O BOX 508 PORTLAND ME, 04112 2. Additionally, rename "5TH STREET EXTENDED" to the official name of "5TH STREET" A PDF version of the Ordinance and Manual can be found here: https://www.albemarle. org/upload/images/Forms_Center/Departments/Geographic_Data_Services/Forms/Road_Naming_a nd_Property_Numbering_Ordinance_and_Manual.pdf Please consult the County's Road Name Index to check your road names prior to submittal. The Index can be found here: http://www.albemarle.org/albemarle/upload/images/webapps/roads/ Parcel and mapping information can be found here: http://gisweb.albemarle.org/ Date Completed:10/18/2016 Reviewer:Adam Moore VDOT Review Status:Requested Changes Reviews Comments: Division: Date Completed:11/07/2016 Reviewer:Ron Higgins CDD ARB Review Status:Requested Changes Reviews Comments:Regarding requirements to satisfy the design guidelines as per § 18-30.6.4c (2), (3) and (5): • Clearly show all existing and proposed utilities and easements on the landscape plan. Increase planting area to avoid planting and utility conflicts without reducing the amount of landscaping proposed. • Regarding recommendations on the plan as it relates to the guidelines: None. Regarding recommended conditions of initial plan approval: Prior to Initial Plan Approval: • Clearly show all existing and proposed utilities and easements on the landscape plan. Increase planting area to avoid planting and utility conflicts without reducing the amount of landscaping proposed. Prior to Final Site Plan Approval: A Certificate of Appropriateness is required. The following items shall be addressed in final plan submittal: 1. Provide material and color samples for review. 2. Revise the raised parapets to be four-sided with roofs to improve building cohesiveness and provide depth to these features. 3. Provide specs on the proposed window glass for Building A confirming that visible light transmittance shall not drop below 40% and visible light reflectance shall not exceed 30%. 4. Provide a dumpster screen detail in the plan with the fence height, sufficient to screen the dumpster, indicated. 5. Show equipment locations and heights on the elevation drawings. All equipment (rooftop and ground-mounted) must be positioned to not be visible from the EC. This should not result in a parapet that looks over-scaled. Provide site sections and/or perspective views to clarify visibility of rooftop equipment from I64. 6. Provide complete lighting information for review. 7. Clearly show all existing and proposed utilities and easements on the landscape plan. Increase planting area to avoid planting and utility conflicts without reducing the amount of landscaping proposed. 8. Provide more variety to the shrub species proposed so that the number of proposed shrubs for any one species is limited to 25% of the total number of shrubs proposed. 9. Add medium trees along internal pedestrian ways at 25’ spacing and 2 ½ caliper. 10. Coordinate the plant schedule and the plan regarding the number of Inkberry Holly shown. 11. Clarify on the plans the wooded area to remain and show tree protection fencing. 12. Submit a comprehensive sign plan and design criteria with the next ARB submittal. Comprehensive sign criteria will need to be approved before final ARB approval is given for the building and site. 13. Provide a rear elevation of Building C. Regarding conditions to be satisfied prior to issuance of a grading permit: • Clarify on the plans the wooded area to remain and show tree protection fencing. Division: Page:2 of 3 County of Albemarle Printed On:December 27, 2016 11. Clarify on the plans the wooded area to remain and show tree protection fencing. 12. Submit a comprehensive sign plan and design criteria with the next ARB submittal. Comprehensive sign criteria will need to be approved before final ARB approval is given for the building and site. 13. Provide a rear elevation of Building C. Regarding conditions to be satisfied prior to issuance of a grading permit: • Clarify on the plans the wooded area to remain and show tree protection fencing. Date Completed:11/10/2016 Reviewer:Robbie Gilmer Fire Rescue Admin Review Status:Requested Changes Reviews Comments:Based on plans dated 09/26/2016 Comment #1- Island at the entrance shall have mountable curbs. Comment #2- Knox Boxes will be required on all three buildings. Please contact the Fire Marshal's office for locations. Comment #3- Building C needs to show FDC on site plan. FDC shall be on the Address side of the building within 150 feet of a fire hydrant. Comment #4- Fire flow test required before final approval. Division: Page:3 of 3 County of Albemarle Printed On:December 27, 2016 The Department of Community Development shall not accept submittal of the final site plan for signature until tentative approvals for the attached conditions from the following agencies/reviewers have been obtained: SRC Members: Albemarle County Planning Services (Planner) - 2 copies [Rachel Falkenstein, rfalkenstein@albemarle.org] Albemarle County Engineering Services - 1 copy [Frank Pohl, fphol@albemarle.org] Albemarle County Information Services (E911)- 1 copy [Derek Bedarf, dbedarf@albemarle.org] Albemarle County Planning Services (ARB)- 1 copy [Margaret Maliszewski, mmaliszewski@albemarle.org] Albemarle County Building Inspections —1 copy [Jay Schlothauer, jschlothauer@albemarle.org] Albemarle County Department of Fire Rescue- 1 copy [Robbie Gilmer, rgilmer@albemarle.org] Albemarle County Service Authority — 3 copies submitted directly to ACSA [Alex Morrison, amorrison@serviceauthority.org] Virginia Department of Transportation- 1 copy [Adam Moore Adam.Moore@VDOT.virginia.gov] If you have any questions about these conditions or the submittal requirements please feel free to contact me at (434) 296-5832 x3272, rfalkenstein@albemarle.org. Sincerely, Rachel Falkenstein Senior Planner 'AL County of Albemarle Department of Community Development 401 McIntire Road, Charlottesville, VA, 22902 Phone 434-296-5832 Memorandum To: Scott Collins (scott@collins-engineering.com) From: Rachel Falkenstein, Senior Planner Division: Planning Date: November 8, 2016 Subject: SDP 2016-56 Fifth Street Commercial — Initial Site Development Plan Fax 434-972-4126 The County of Albemarle Planning Division will recommend approval of the plan referenced above once the following comments have been satisfactorily addressed (The following comments are those that have been identified at this time. Additional comments or conditions may be added or eliminated based on further review.): [Each comment is preceded by the applicable reference, which is to the Subdivision/Zoning Ordinances unless otherwise specified.] 1. [32.5.2(a)] Some sheet numbers are out of order/incorrect. Please revise. 2. [32.5.2(a)] Some boundary dimensions are illegible on sheet 2. Please correct. 3. [32.5.2(a)] Include overlay districts within zoning note (Entrance Corridor, Flood Hazard Overlay, Steep Slopes). 4. [32.5.2(a)] List all proffers and SP conditions on the plan. 5. [32.5.2(a)] Building setback line shown is incorrect; 30' is the maximum setback for this site. Please revise. 6. [32.5.2(b)] Stepbacks listed on sheet 1 are incorrect. See section 4.20 for stepback requirements. 7. [32.5.2(b)] Minimum parking amounts should be provided with each phase of development. It does not appear that phase 1 will include the minimum required parking. 8. [32.5.2(c)] It is unclear with phasing lines when certain improvements are proposed such as pedestrian path and retaining wall. Please clarify. 9. [32.5.2(c)] Show phasing lines on all sheets. 10. [32.5.2(d)] Slopes are mislabeled as managed critical slopes. These slopes are preserved slopes. Please revise label and correct note on sheet 1. Slopes are permitted for disturbance through previously approved SP and ZMA plans. 11. [32.5.2(h)] List the base flood elevation. 12. [32.5.2(i)] Show the full length of the 5t" street improvements on the plan. 13. [32.5.2(i) & proffer 7] Bike lanes are required on 5" St along the frontage of the site. Show bike lanes on plan. 14. [32.5.2(1)] Label state route number for 5" Street (Rt 631) 15. [32.5.2(i)] Show existing greenway easement on plan. 16. [32.5.2(j)] Show and label existing water and sewer easements and indicate deed book and page number for all existing utility easements. 17. [32.5.2(n)] Provide proposed building heights. 18. [32.5.2(n)] List surface material for proposed 10' graded access road providing access to Moore's Creek. 19. [32.5.2(n)] Provide fencing type and height for proposed playground fence. 20. [32.5.2(n)] Provide more details on retaining wall elevation and height. Walls over 6' require approval by the County Engineer. 21. [32.5.2(o)] Are pathways and access road outside of the greenway intended to be dedicated to public use? If so, note such on plans. Dedication will be required prior to final site plan approval. 22. [32.5.2(q)] List traffic generation figures and ADT on the plan. 23. [32.7.9.4] Show trees to be preserved on the landscape plan, limits of clearing and location and type of protective fencing. Provide conservation checklist on the plan. 24. [32.7.9.6] Include calculations to show that minimum parking lot landscaping is provided. 25. [32.7.9.7 & proffer 5A] The screening provided along the greenway does not appear to comply with the screening proffer/screening requirements of this section. A minimum 20' planting depth should be provided and a double staggered row of evergreen trees or shrubs. 26. [Comment] There appear to be a number of potential conflicts between utilities and landscaping. Show full width of existing and proposed utility easements and confirm that landscaping can be provided in locations shown. 27. [5.1.60(f)] In locations where the pedestrian travelway crosses the drive-through lane, provide either a five (5) foot wide raised pedestrian travelway or a five (5) foot wide pedestrian travelway containing a change in texture and visual markings. 28. [Comment] Consider providing a pedestrian access point from the sidewalk along 5th Street into the northeast portion of the site. This will provide for access to the store fronts for pedestrians coming from the east along 5th Street. Please contact Rachel Falkenstein in the Planning Division by using rfalkenstein@albemarle.org or 434-296- 5832 ext. 3272 for further information. COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902-4596 Phone (434) 296-5832 Fax (434) 972-4126 Project: 5' Street Commercial Development — Initial Site Plan (SDP201600056) Plan preparer: Scott Collins, Collins Engineering [200 Garrett St., Suite K, Charlottesville, VA 22902, scott(&collins-en ing eering com] Owner or rep: FTV Investments LLC, 943 Glenwood Station Lane, Suite 101, Charlottesville, VA 22901 Plan received date: 29 Sept 2016 Date of comments: 22 Nov 2016 Reviewer: Frank V. Pohl, PE, CFM — Engineering Plan Coordinator: Rachel Falkenstein Please contact reviewer to schedule a meeting to discuss comments, if that would be helpful. 1. Final Site Plan approval requires an approved VSMP. 2. Final Site Plan approval is contingent on receiving an approved CLORM-F from FEMA. 3. General Notes: Floodplain Information: Proposed 100 -yr floodplain has not been "approved". Revise all notes to state that the new floodplain limits are "proposed". Show existing and proposed floodplain limits and BFE (383.0) per current FEMA mapping (plans show floodplain BFE to be 384 — correct this). Typical for all sheets. Also, add to the floodplain note that there will be no basements or crawl spaces and that all buildings will be constructed on slabs -on -grade. 4. The general note for SWM management states UG storage will provide detention and treatment. UG storage is not one of the 15 approved non-proprietary BMPs for treatment. Please confirm and state method for achieving pollutant removal/reduction requirements. 5. Show access easements for all offsite improvements on Holiday Inn property. 6. Adjust phasing so full -width drive lanes are provided around buildings. A phasing plan and narrative will be required with the Final Site Plan application. 7. Show proposed tree line along edge of fill. 8. Provide VDOT standard vehicular guardrail on top of retaining walls. 9. Parking spaces (3) near dumpster should be 10 -ft wide for a travel lane of 20 -ft. 10. Revise all curb radii to 3'R, min. 11. Provide dimensions for turn lanes along 5' Street (length, width, taper length, etc.). 12. Label fire lane. 13. Label loading zones for each building. 14. Provide CG -12 ramps for all accessible pedestrian routes. 15. Geotechnical retaining wall design required for Final Site Plan approval (computations, plan/profile; design/inspection/construction notes; safety rail details; drainage; backfill; etc.). Engineering Review Comments Page 2 of 2 16. Handicap parking spaces must have a smooth surface. Pervious pavers do not meet this requirement. 17. Provide stop signs from each Holiday Inn connection. 18. Note maximum slope of 3:1 for fill along floodplain. 19. Provide pipe sizes for all storm piping. 20. Resolve sanitary sewer and storm structure conflict at front of site. 21. Sheet 3 — There are some notes that don't appear to apply to anything — lower right of sheet. "Proposed dry swale", "Proposed Curb Cuts...". Also, 100 -yr floodplain note isn't pointing to floodplain line. Remove "approved 100 -yr floodplain" line from drawing, this line was not approved. 22. Provide certification (geotechnical investigation) that underground storage tanks will be above the groundwater elev. or that that they will be anchored to prevent floatation. 23. Show locations for power/gas/telephone/cable utilities pads and routing. 24. Revise site cross-sections to match those provided in the CLOMR-F application. Indicate limits of existing and proposed floodplain limits, BFE, max slopes, fill depth, etc. Sincerely, Frank V. Pohl, PE, CFM 296-5832 (ext. 7914) Rachel Falkenstein From: Margaret Maliszewski Sent: Tuesday, November 08, 2016 9:38 AM To: Rachel Falkenstein Cc: Ron Higgins Subject: ARB action on 5th Street Commercial Rachel, Here is the ARB's action on the 5t" Street Commercial application. An action letter will be ready in a few days. a. ARB -2016-127: Fifth Street Commercial - Initial Site Development Plan and second review of a building design (TM/Parcels 076000000055A0, 76M1000000100) Proposal: To construct three commercial/retail buildings with associated site improvements, including a drive- thru window on Building A. Location: On the south/east side of 5t" Street, south of Moores Creek, northwest of the Holiday Inn and north of 164 Motion: Mr. Lebo moved that the ARB forward the recommendations for ARB -2016-127 Fifth Street Commercial — Initial Site Development Plan outlined in the staff report to the Agent for the Site Review Committee, as follows: • Regarding requirements to satisfy the design guidelines as per § 18-30.6.4c (2), (3) and (5): • Clearly show all existing and proposed utilities and easements on the landscape plan. Increase planting area to avoid planting and utility conflicts without reducing the amount of landscaping proposed. • Regarding recommendations on the plan as it relates to the guidelines: None. Regarding recommended conditions of initial plan approval: Prior to Initial Plan Approval: • Clearly show all existing and proposed utilities and easements on the landscape plan. Increase planting area to avoid planting and utility conflicts without reducing the amount of landscaping proposed. Prior to Final Site Plan Approval: A Certificate of Appropriateness is required. The following items shall be addressed in final plan submittal: 1. Provide material and color samples for review. 2. Revise the raised parapets to be four-sided with roofs to improve building cohesiveness and provide depth to these features. 3. Provide specs on the proposed window glass for Building A confirming that visible light transmittance shall not drop below 40% and visible light reflectance shall not exceed 30%. 4. Provide a dumpster screen detail in the plan with the fence height, sufficient to screen the dumpster, indicated. 5. Show equipment locations and heights on the elevation drawings. All equipment (rooftop and ground -mounted) must be positioned to not be visible from the EC. This should not result in a parapet that looks over -scaled. Provide site sections and/or perspective views to clarify visibility of rooftop equipment from 164. 6. Provide complete lighting information for review. 7. Clearly show all existing and proposed utilities and easements on the landscape plan. Increase planting area to avoid planting and utility conflicts without reducing the amount of landscaping proposed. 8. Provide more variety to the shrub species proposed so that the number of proposed shrubs for any one species is limited to 25% of the total number of shrubs proposed. 9. Add medium trees along internal pedestrian ways at 25' spacing and 2'/2 caliper. 10. Coordinate the plant schedule and the plan regarding the number of Inkberry Holly shown. 11. Clarify on the plans the wooded area to remain and show tree protection fencing. 12. Submit a comprehensive sign plan and design criteria with the next ARB submittal. Comprehensive sign criteria will need to be approved before final ARB approval is given for the building and site. 13. Provide a rear elevation of Building C. • Regarding conditions to be satisfied prior to issuance of a grading permit: • Clarify on the plans the wooded area to remain and show tree protection fencing. Mr. Van Der Werf seconded the motion. The motion carried by a vote of 3:0. (Wardell absent, Binsted abstain) Margaret Maliszewski, Principal Planner Albemarle County Department of Community Development 401 McIntire Road Charlottesville, VA 22902 434-296-5832 x3276 mmaliszewski@albemarle.org Charles A. Kilpatrick, P.E. Commissioner COMMONWEALTH of VIRGINIA DEPARTMENT OF TRANSPORTATION 1601 Orange Road Culpeper, Virginia 22701 October 18, 2016 County of Albemarle Department of Community Development 401 McIntire Road Charlottesville, VA 22902 Attn: Rachel Falkenstein Re: 51h Street Commercial — Initial Site Plan SDP -2016-00056 Review #1 Dear Ms. Falkenstein: The Department of Transportation, Charlottesville Residency Transportation and Land Use Section, has reviewed the above referenced plan as submitted by Collins Engineering, dated 26 September 20I6, and offers the following comments: 1. The entrance requires an Access Management exception for spacing. The minimum spacing distance for the proposed configuration is 990', See Appendix F page F-27. 2. Provide intersection sight distance lines and profiles. 3. Provide the VDOT WP -2 detail and note on plans the required area of mill and overlay in accordance with the WP -2 standard. 4. The proposed relocation of the sanitary sewer line will need to be directionally bored, please show this, as trenching will not be permitted on 51h Street. 5. Provide an Autoturn exhibit confirming the adequacy of the 12' wide egress lane for the site's design vehicle. 6. Show route number, street name, ADT, design speed, and right-of-way for all streets appearing on the plan. 7. Show existing conditions on Route 631, particularly the existing turn lanes, and warrant analysis showing whether or not additional storage and/or right-of-way is necessary. 8. Please provide all curb radii within the right-of-way. Per previous comment, the 8' radius, which is no longer labeled, should be increased to ease the turning movement of the left -turn from Route 631. 9. Note that final site plan must show conformance with the VDOT Road Design ManuaI Appendices B(I) and F, as well as any other applicable standards, regulations or other requirements. Please provide two copies of the revised plan along with a comment response letter. If further information is desired, please contact Justin Deel at 434-422-9894. VirginiaDOT.org WE KEEP VIRGINIA MOVING October 18, 2016 Rachel Falkenstein Page 2 A VDOT Land Use Permit will be required prior to any work within the right-of-way. The owner/developer must contact the Charlottesville Residency Transportation and Land Use Section at (434) 422-9399 for information pertaining to this process. Sincerely, Adam J. Moore, P.E. Area Land Use Engineer Charlottesville Residency VirginiaDOT.org WE KEEP VIRGINIA MOVING