HomeMy WebLinkAboutSDP201500046 Application 2016-08-25 .1i:immunity'City elopment Oepartmerit
54.Sri I tee Albemarle Count) ,.-,1 r Charlottesville V422908-4595
4-40 Vtii -i r
i,..." 'ie.!» i Now Vole/10,434i 29E-5832 Fax 42A9'24T26
47.7iri,tia- Planning Application
...
!PARCEL/ OWNER INFORMATION
-- _
06100-00-00-123F0 Owner(s): 29 RIO XROAD LEC
Applicationn SDP201500046
....
;PROPERTY INFORMATION
,-- -
Lega!Des:.:, tn 1 ACREACE PARCEL 8 BANK AND OFFICES
Mag,steria;Cr Rio i L .•,1 Land Use Primary Commercial
....,
;----
Current AFD Not in A/F District ;.;; Current Zormng Primars Highway Commercial
[APPLICATION INFORMATION
i
Street Address 1700 SEMINOLE TL CHARLOTTESVILLE 22901 Entered 8si
' r-- aniecille Roth w'
Application Typo Site Development Plans !.;1
I Sii25;2015
,„....
Project CVS STORE NUMBER 10746 (29N & RIO RD) - FINAL
Received Date [08/24/15 Re:s isO IEste FInal L J Stibmmal Date 08/24/15 tal Fees 1500
Closing Frie Date [ Subrnitral Date Final Total Paid 1500
..„......,...___„,..„..„,
Revision Number _I
_
Legal Ad
..,
,...
!SUB APPLICATION(s)
Type ]Siiitb,4iyIticatio' i-onmhent
,_...
Ftriddl Site Development Plan • 08/24/15
APPLICANT / CONTACT INFORMATION
I:t:Slate 4911-: Phone_ PhoneCeil j
ROO LLC
,455 SECOND STREET SE 5TH CH4RL0TTESVILI 229C: -- ----
.,
-ii- ---iif 7—E "` 15871 crr VIEW DRTiE MIDLOTHIAN\,A 231:1E, 804419840
Signature of Contractor or Authorized A;e— Date
Application for
4,priti‘Initial Site Plan or Final Site Plan or Site Plan Exception � .
Project Name: CVS/pharmacy-Route 29 and Rio Road
Tax map and parcel(s): 06100 00 00123F0, 123G0 Zoning; HO
Contact(who should we contact about this project) Paul Sprouse,The Rebkee Company
Street Address 15871 City View Drive,Suite 300
City Midlothian State VA Zip Code 23113
Phone Number (804)419-0740 Email psprouse@rebkee.com
Owner of Record 29 Rio XRoad, LLC
street Address 455 Second Street SE 5th Floor
City Charlottesville State VA Zip Code 22902
Phone Number 434-245-4941 Email alan@riverbenddev.com
Applicant Ryan Perkins, P.E., Kimley-Horn
Street Address 1700 Willow Lawn Drive,Suite 200
City Richmond state VA Zip Code 23230
Phone Number (804)673-3882 Email ryan.perkins@kimley-horn.com
Type of Development
❑ Residential 8 Non-residential
Type of unit(s): ® Commercial
#of building(s): ❑ Industrial
❑ Quasi-Public
Sq.ft.of building(s): Sq.ft.of building(s); 11,945
#of units per building: Acreage of site: 1.535
Total#of units: Acreage in open space: 0.42
Resulting density:
Acreage in roads: 0.60
Acreage of site:
Average gallons of water used per day: 12
Acreage in open space:
Acreage in roads:
Average gallons of water used per day:
FOR OFFICE USE ONLY SDP# t r h
Fee Amount$ 145°0.`7`' `Date Paid d-"i'9�j�y who? �ice-z- �t 4- k eipt# l o l 1 t \ Ck# i it t' By: ,A)
County of Albemarle
Department of Community Development
401 McIntire Road Charlottesville,VA 22902 Voice: (434)296-5832 Fax: (434)972-4126
REVISED 6/10/2015 Page 1 of 2
Intended use or:iustiflcatiou for request:
Comments/Attachments:
FEES
SITE DEVELOPMENT PLAN SITE PLAN EXCEPTION
Initial Site Plan Final Site Plan Exception to drawing of site
plan under section 3235(a)
Approved No
Preapplication plan Preapplication plan
❑ $700 plus$15/dwelling ❑ $1,200 plus$1S/dwelling @ $1,,,500 ❑ $1,500
unit and/or$0.615 per unit and/or$0.01S per
square foot of square foot of
nonresidential structure nonresidential structure
$ $
16 folded copies of the plan #of copies required for submittal will be noted with 8 folded copies of the plan
plus an additional 6 copies f within an Entrance Corridor your initial approval letter. Copies of the plan should
be folded and in blue or black ink.Also provide 1
reduced copy of the plan no larger than 11 by 17 in.
U The initial site plan has a parking structure. U The final site plan has a parking
❑ Included are atrkitectural elevations,drawings, structure.
photographs or other visual materials showing any Included are revised architectural elevations,
parking structure proposed on the site and surrounding drawings,photographs or other visual
structures and band uses. materials submitted with the initial site plan.
Tice elevations shall be part of the approved
final site plea.
GROUNDWATER ASSESSMENT
(Required for all non-residential site plans not serviced by public water)
If the plans show a use using less than 2,000 gallons/day(average) Tier 3 Groundwater Review=$510
If the plans show a use rasing greater than 2,000 gallons/day(average) Tier 4 Groundwater Review=$1,100
It Relief from conditions of approval;modification or waiver of requirements=$425
Notices required by Section 324.2.1(f)
Preparing and mailing or delivering up to fifty(SO)notices=$200A0 pins the actual cost of first class postage.
Preparing and mailing or delivering,per notice more than fifty(50)=$1.00 plus the actual cost of first class postage.
Owner/Applicant Must Read and Sign
This site plan as submitted contains all of the information required by Section 32.5(Initial Site Plan)or Section 32.6(Final Site Plan)of
Chapter 18 of the Code of the County of Albemarle. I understand that plans which lack information required by said sections shall be
deemed incomplete and shall be denied by the agent within ten(10)days of submittal as provided in Section 32.42.1 or Section 32.4.3.1
of Chapter 18 of the Code as the case may be.By signing this application I am consenting to written comments,letters and or notifications
regarding this application being provided to me or my designated contact via fax and or email. This consent does not preclude such
written communication from also being sent via first class mail.
F lot P [only:To the best of my knowledge.I have comnied with Section 32.4.31(a)of Chanter 18 of the Code.
Signature of Ow ,Contract Purchaser,Agent Date
Alan Taylor 434-245-4941
Print Name Daytime phone number of Signatory
REVISED 6/10/2015 Page 2 of 2
Final Sit Development Plan
Checklist
Project Name: CVS/pharmacy-Route 29 and Rio Road
Firm: Kimley-Horn
This checklist must be completed,signed and submitted with the application. The information contained in this
checklist reflects the contents of the Section 32 of Chapter 18 of the Code of the County of Albemarle also known as
the Site Plan Ordinance as of January 1,2013. The applicant is responsible for insuring that no revisions to the
Ordinance have occurred since preparation of this document.
This final site plan has:
O an initial site plan that was approved for the development and it remains valid; SDP-20_ - .
® satisfied all of the requirements of section 32.6 below;and
O satisfied all of the conditions delineated in the letter provided under section 32.4.2.5(c)required to be satisfied prior to
submitting the final site plan.
0 Authorized preparer.
id The plan,and any amendments to a plan,is prepared and sealed,signed and dated by one of the following
❑ An architect licensed to practice in the Commonwealth of Virginia.
A professional engineer licensed to practice in the Commonwealth of Virginia.
❑ A land surveyor licensed to practice in the Commonwealth of Virginia.
LI A certified landscape architect licensed to practice in the Commonwealth of Virginia.
O Number of copies when first submitted.
0 Provide the number of copies as directed in the Initial Site Plan approval letter
0 One(1)reduced copy of the plan no larger than eleven(11)by seventeen(17)inches in size.
0 Scale and size.
id The plan is prepared to the scale of one(1)inch equals twenty(20)feet or larger,or to another scale approved by
the agent in a particular case.
❑ Other scale approved -one(1)inch equals ( )feet,by
0 No sheet exceeds forty-two(42)inches by thirty-six(36)inches in size.
® The plan IS prepared on one(1)sheet.OR
The plan IS prepared on more than one(I)sheet and match lines clearly indicate where the several sheets join.
The top of each sheet is approximately
❑ North or
❑ East
0 Dimensions.
The plan is dimensioned to at least the following standards for accuracy:
O Boundary,setback and zoning lines:Within one one-hundredth(0.01)of a foot.
▪ Existing contours:Within one-half(1/2)of the contour interval required in section 32.6.2(c).
O Proposed contours:Within one(1)foot horizontally and vertically.
O Spot elevations:Within one-tenth(0.10)of a foot.
O Existing critical structures including utilities and other topographic features:Within two(2) feet,
provided that for critical structures,which include,but are not limited to,gas lines,other utilities,pipes,
conduits,walls and buildings to be preserved,within one-tenth(0.10)of a foot.
O Proposed structures,roads,parking lots and other improvements:Within one one-hundredth(0.01)of a
foot.
REVISED 06/10/2015 Page 1 of 4
Alber County-Final Site Plan Checklist
Site Plan Ordinance Section 32.6-Contents of fintd site plan
In addition to containing all of the information required to be on an initial site plan,as provided in section 32.5,a final
site plan shall contain the following:
id Demonstrate compliance with chapter.Specific written schedules or notes as necessary to demonstrate that the
requirements of this chapter are satisfied.
id Proposed grading.
El Proposed grading(up to twenty[20]percent slope,maximum two[2]foot contours;over twenty[20]
percent slope,maximum five[5]foot contours).
® Water and sewer facilities.
El Detailed plans for proposed water and sewer facilities,including all pipe sizes,types and grades;
® proposed connections to existing or proposed central water supplies and central sewage systems;
location and dimensions of proposed easements and whether they are to be publicly or privately
maintained;
id profiles and cross sections of all water and sewer lines including clearance where lines cross;
id all water main locations and sizes;valves and fire hydrant locations;
id all sewer appurtenances by type and number;
RI the station on the plan to conform to the station shown on the profile and indicate the top and invert
elevation of each structure.
El Drainage and grading plans.
® Detailed onstruction drainage and grading plans:
Profiles of all ditches and channels whether proposed or existing,showing existing and
posed grades,and invert of ditches,cross pipes or utilities;typical channel cross
sections for new construction;and actual cross sections for existing channels intended
to remain;
id Profiles of all storm sewer systems showing existing and proposed grades;
® Plan view of all drainage systems with all structures,pipes and channels numbered or
lettered on the plan and profile views.Show sufficient dimensions and bench marks to
allow field stake out of all proposed work from the boundary lines;
8 A drainage summary table for culverts,storm sewer and channels as described in the
following example:
Structure Description Length Invert Invert Slope Remarks
Number In Out
1 42"RCP 50' 24.50 424.00 100.00% Provide
Class III 2,EW
2 DI-3B L=8 26.00 432.00 - IS-1
Top
3 PG-2A 400' 420.00 400.00 5.00% D=12"
4 Grade 200' 420.00 415.00 2.50% D=18"
Swale
la A legend showing all symbols and abbreviations used on the plan;
General notes,typical sections,and details of all items not covered by Virginia
Department of Transportation standard drawings;and
Flood plain limits for the one hundred(100)year storm for all watercourses with an
upstream drainage area of fifty(50)acres or more provided that the county engineer
may waive this requirement for drainage areas of less than one hundred(100)acres
upon determining that the information is unnecessary for review of the proposed
development.
REVISED 06/10/2015 Page 2 of 4
Alberk.,04 County-Final Site Plan Checklist
`Street sections.
❑ Typical street sections together with specific street sections where street cut or fill is five(5)feet or
greater;
U centerline curve data;
U radius of curb returns or edge of pavement;
U location,type and size of proposed ingress to and egress from the site together with culvert size;
❑ symmetrical transition of pavement at intersection with existing street;
❑ the edge of street surface or face of curb for full length of proposed street;
O when proposed streets intersect with or adjoin existing streets or travelways,both edges of existing
pavement or travelway together with curb and gutter indicated for a minimum of one hundred(100)
feet or the length of connection,whichever is the greater distance.
Public facilities and utilities.
❑ All public facilities,utility and drainage easements outside the right-of-way of public streets,provided
that new easements may be generally shown and accurately dedicated by separate plat.
❑ All water and sewer facilities to be dedicated to public use and the easements for those facilities and
shall be identified by a statement that the facilities are to be dedicated to the Albemarle County Service
Authority.
® Signature panel.
® Signature panel for signature by each member of the site review committee.
• Parking and loading areas.
8 For all parking and loading areas,indicate the
size,
angle of stalls,
® width of aisles and specific number of spaces required and provided,and
method of computation.Indicate type of surfacing for all paved or gravel areas.
• Landscape plan.
id A landscape plan that complies with section 32.7.9
® Outdoor lighting.
® Outdoor lighting information including
a photometric plan with
location,description,and photograph or diagram of each type of outdoor luminaire.
Recreational facilities.
U Specifications for recreational facilities.
In addition to the items required by the ordinance,Albemarle County Engineer,the Virginia
Department of Transportation,the Albemarle County Service Authority,and the Thomas Jefferson
Health District require these items on plans submitted for final site plan approval. Plans will not be
rejected if these items are not present,but they are required for approval. These items are provided in
an effort to communicate all final site plan comments.
1.Reference the benchmarks used for surveys. (Albemarle County Engineering Policy)
® 2.Indicate the available sight distance for entrances and left turn lanes. (Albemarle County Engineering Policy)
0 3.Label the maximum height of all retaining walls. (Albemarle County Engineering Policy)
Id 4.Provide copies of off-site easements,or letters of intent to grant them from off-site property owners.
(Albemarle County Engineering Policy)
REVISED 06/10/2015 Page 3 of 4
Albeh.soe County-Final Site Plan Checklist
-‘614 5.Show and label stream buffer limits. (Water Protection Ordinance,WPO)
Gd 6.Indicate the deed book and page reference for all existing utility easements located on the property.
(Albemarle County Service Authority)
7.Tier 3-Draft or Final Groundwater Management Plan(WPO Section 17-403)
8.Tier 4—Aquifer testing work plan(WPO Section 17-403)
Read and Sign
In representing the above referenced firm submitting this plan for final approval,I hereby sate that,to the best of my knowledge,the attached plan
co 'ns all i ormton required by this checklist.
Signature of Ow r,Contract Puithaser,Agent Date
Alan Taylor 434-245-4941
Print Name Daytime phone number of Signatory
REVISED 06/10/2015 Page 4 of 4